Construction Pre-Construction Stage User Guide
Web-Based Contract Management Services
![Page 2: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/2.jpg)
i
Table of Contents
Diary Setup .............................................................................................................................................. 1
Roles Involved .................................................................................................................................. 1
Workflow Stages ............................................................................................................................... 2
Activities ............................................................................................................................................ 3
Getting started with Diary Setup record ......................................................................................... 3
Creating a Diary Setup record ....................................................................................................... 5
Editing a Diary Setup record .......................................................................................................... 8
Activating a Diary Setup record ................................................................................................... 10
Viewing a Diary Setup record ...................................................................................................... 13
Consent to Sublet / Road Report ............................................................................................................ 15
Consent to Sublet ............................................................................................................................... 15
Roles Involved ................................................................................................................................ 15
Workflow Stages ............................................................................................................................. 16
Other Records ................................................................................................................................. 16
Activities .......................................................................................................................................... 17
Getting started with Consent to Sublet ......................................................................................... 17
Creating a Consent to Sublet record ............................................................................................ 19
Editing a Consent to Sublet record .............................................................................................. 27
Submitting a Consent to Sublet record ........................................................................................ 30
Viewing a Consent of Sublet record ............................................................................................. 32
Incident Notification ................................................................................................................................ 35
Incident Notification ............................................................................................................................ 35
Roles Involved ................................................................................................................................ 35
Workflow Stages ............................................................................................................................. 36
Activities .......................................................................................................................................... 37
Getting started with Incident Notification ...................................................................................... 37
Creating an Incident Notification record ....................................................................................... 39
Editing an Incident Notification record .......................................................................................... 45
Submitting an Incident Notification record .................................................................................... 48
![Page 3: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/3.jpg)
ii
Requesting More Information ....................................................................................................... 50
Remediation of an Incident Notification record ............................................................................. 53
Viewing an Incident Notification record ........................................................................................ 56
Material Delivery Schedule ..................................................................................................................... 58
Material Delivery Schedule ................................................................................................................. 58
Roles Involved ................................................................................................................................ 58
Workflow Stages ............................................................................................................................. 59
Activities .......................................................................................................................................... 60
Getting started with Material Delivery Schedule record ................................................................ 60
Creating a Material Delivery Schedule record .............................................................................. 62
Editing a Material Delivery Schedule record ................................................................................ 66
Submitting a Material Delivery Schedule record........................................................................... 68
Requesting More Information .......................................................... Error! Bookmark not defined.
Reviewing a Material Delivery Schedule record .............................. Error! Bookmark not defined.
Acknowledging a Material Delivery Schedule record.................................................................... 70
Approving the Material Delivery ...................................................... Error! Bookmark not defined.
Accepting a Material Delivery Schedule record ............................................................................ 73
Viewing a Material Delivery Schedule record ............................................................................... 76
![Page 4: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/4.jpg)
1
Diary Setup
This section describes the various activities performed on the records pertaining to Diary Setup. This record will follow a specific workflow process.
We are using the ‘Diary Setup’ record to demonstrate the activities involved with Navigating to the record, Creating the record, and Activating the record.
Roles Involved
User roles are stakeholders who have the privileges to Create and Activate the Diary Setup records based on the workflow stages. The table below lists the user roles involved in the Diary Setup record workflow:
For more details on the workflow actions performed by each user role, refer to Workflow Stages table.
User Roles
External SP (CA)- Record Creator
External SP (CA)- Record Review and Approver
External SP (Contractor) - Record Creator
External SP (Contractor) - Record Review and Approver
![Page 5: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/5.jpg)
2
Workflow Stages
This workflow table explains the various stages of the Diary Setup record. It also describes the User Roles involved at each stage of the workflow to complete the Diary Setup record lifecycle.
For example, in the "Draft" workflow stage, the user role External SP (CA)- Record Creator creates the record and activates the record.
Current Workflow Stage
User Role Role Permissions Workflow Action
Next Workflow Stage
Draft
External SP (CA)- Record Creator
Create, Read, Update, Delete
Activate Active
External SP (CA)- RRA
External SP (Contractor) - Record Creator
External SP (Contractor) - RRA
![Page 6: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/6.jpg)
3
Activities
Getting started with Diary Setup record
To navigate to the Diary Setup record:
1. In the module menu, click Contracts. The Contracts List page is displayed.
2. Double-click on the contract. The Contract Dashboard appears.
3. Enter Diary Setup in the search toolbar below the Menu tab.
Searching the Record
![Page 7: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/7.jpg)
4
4. Click Diary Setup in the contract navigation tree. The list of records are displayed.
List of Records
![Page 8: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/8.jpg)
5
Creating a Diary Setup record
Prerequisites
To create a Diary Setup record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The roles involved in this activity are:
External SP (CA)- Record Creator
External SP (CA)- Record Review and Approver
External SP (Contractor) - Record Creator
External SP (Contractor) - Record Review and Approver.
1. In the Diary Setup page, click New in the General group. The Diary Setup record is displayed.
Creating the record
In the new Diary Setup record, observe the generic contract header of the record which contains the fields that are auto-populated from the contract details. The Record ID is a unique identifier which is auto-generated and assigned to the record.
Generic Contract Header details
![Page 9: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/9.jpg)
6
2. From the Diary Category drop-down box, select the Diary Category.
3. To select the inspector, click . The Inspectors picker list is displayed.
Field Details - Dairy Category and Inspector
4. Select the Inspector from the list and click Select. The selected Inspector is added to the field.
Field Details - Inspectors
![Page 10: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/10.jpg)
7
5. To attach or link a document relevant to the Diary Setup record, refer to the Global Functions User Guide, Attachments.
6. To add comments to the record, refer to the Global Functions User Guide, Comments.
7. Click Save.
Save action
The Diary Setup record is created in the “Draft” workflow stage.
Record List
![Page 11: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/11.jpg)
8
Editing a Diary Setup record
Prerequisites
To edit a Diary Setup record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The roles involved in this activity are:
External SP (CA)- Record Creator
External SP (CA)- Record Review and Approver
External SP (Contractor) - Record Creator
External SP (Contractor) - Record Review and Approver.
1. In the Diary Setup page, click the checkbox corresponding to the record to be edited. The record must be in “Draft” status.
2. In the General group, click Edit. The Diary Setup record is displayed in edit mode.
Editing the record
![Page 12: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/12.jpg)
9
3. Make the changes in the editable fields as required and click Save.
Save the changes
The record will be displayed in the list of records.
Records list
![Page 13: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/13.jpg)
10
Activating a Diary Setup record
Prerequisites
To activate a Diary Setup record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The role involved in this activity are:
External SP (CA)- Record Creator
External SP (CA)- Record Review and Approver
External SP (Contractor) - Record Creator
External SP (Contractor) - Record Review and Approver.
1. In the Diary Setup page, click the checkbox corresponding to the record to be edited. The record must be in “Draft” status.
2. In the General group, click Edit. The Diary Setup record is displayed in edit mode.
3. Make sure that all the mandatory fields in the record are filled in.
Note: Fields marked with an Asterisk (*) indicate mandatory inputs.
4. In the Workflow group, click Activate.
![Page 14: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/14.jpg)
11
Submit action
The Notes window is displayed.
Notes Window
5. Enter the notes if any and click OK for completion of the current stage. The record will be displayed in the list of records with the “Active” status.
![Page 15: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/15.jpg)
12
Records list
![Page 16: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/16.jpg)
13
Viewing a Diary Setup record
Prerequisites
To view the Diary Setup records:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
1. In the Diary Setup page, click the checkbox corresponding to the record to be viewed.
2. In the General group, click View.
Viewing the record
![Page 17: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/17.jpg)
14
The Diary Setup record is displayed in view mode.
View action
Only users that are permissioned to view this record will have access depending on the status of the record.
![Page 18: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/18.jpg)
15
Consent to Sublet / Road Report
This section describes the various activities performed pertaining to the Consent to Sublet record. Each record will follow a specific workflow process.
We are using the Consent to Sublet record to demonstrate the activities involved with Navigating to the record, Creating the record, Editing the record, Submitting the record, Reviewing the record, and Viewing the record.
The other record listed below will follow similar activities, but the description, workflow status and the examples may differ slightly within each of the associated steps:
Road Report
Consent to Sublet
Roles Involved
User roles are stakeholders who have the privileges to Create, Update, and Delete the Consent to Sublet record. The table below lists the user roles involved in the Consent to Sublet.
For more details on the workflow actions performed by each user role, refer to the Workflow Stages table.
User Role
External SP (CA)- Record Review and Approver
External SP (Contractor) - Record Review and Approver
![Page 19: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/19.jpg)
16
Workflow Stages
This workflow table explains the various stages of the Consent to Sublet record. It also describes the User Roles involved at each stage of the workflow to complete the Consent to Sublet lifecycle.
For example, in the “Draft” workflow stage, the user role External SP (Contractor) - Record Review and Approver creates the Consent to Sublet record and submits it to External SP CA - Record Review and Approver for review.
Current Workflow Stage
User Role Role Permissions
Workflow Action
Next Workflow Stage
Draft External SP (Contractor) - RRA
Create, Read, Update, Delete
Submit Submitted To External SP (CA) - RRA
More Information External SP (Contractor) - RRA
Read, Update Submit Submitted To External SP (CA) - RRA
Submitted To External SP (CA) - RRA
External SP (CA)- RRA
Read, Update
Reviewed Completed
More Information More Information
All other user roles Read NA NA
Other Records
The records below will follow similar activities and actions associated as with the ‘Consent to Sublet’ record. Listed below are the records that will follow the general guide with creating, viewing, reading, submitting, and reviewing the records but may differ in the description, workflow and the examples for each of the associated steps:
Road Report
![Page 20: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/20.jpg)
17
Activities
Getting started with Consent to Sublet
To navigate to the Consent to Sublet record:
1. In the module menu, click Contracts. The Contracts List page is displayed.
2. Double-click on the contract. The Contract Dashboard appears.
3. Enter Consent to Sublet in the search toolbar below the Menu tab.
Searching the Record
![Page 21: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/21.jpg)
18
4. Click Consent to Sublet in the contract navigation tree. The list of records are displayed.
List of Records
![Page 22: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/22.jpg)
19
Creating a Consent to Sublet record
Prerequisites
To create a Consent to Sublet record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The role involved in this activity is External SP (Contractor) - Record Review and Approver.
1. In the Consent to Sublet record page, click New in the General group. The Consent to Sublet page is displayed.
Creating the record
In the new Consent to Sublet record page, observe the generic contract header of the record which contains the fields that are auto-populated from the contract details. The Record ID is a unique identifier which is auto-generated and assigned to the record.
Generic Contract Header details
![Page 23: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/23.jpg)
20
2. From the Date drop-down list, select the date of issue of the consent to sublet.
Field Details - Road Details
3. In the Subcontractor’s Name box:
a. Click to display the list of subcontractors.
b. Select the subcontractor who is selected by MTO to sublet and click Select.
Field Details - SubContractors List
![Page 24: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/24.jpg)
21
Observe that the Subcontractor’s Address and the Subcontractor’s Company Name are auto-populated from the subcontractor selected from the list.
Field Details - Subcontractor’s Details
4. To add a new Tender Items record:
a. Expand the Tender Items section and click Add.
Field Details - Tender Items
b. From the Tender Item List, select the tender item and click Select. This item will appear in the display pane of the Tender Items.
![Page 25: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/25.jpg)
22
Field Details - Tender Items List
c. Select the row and click Edit. The Tender Item List is displayed
Field Details - Tender Items Edit
Observe that the Item Description, Unit of Measure, Current Tender Quantity, and Unit Price fields are auto-populated from the tender item list.
d. In the Quantity Subcontracted field, enter the quantity of the item that is to be subcontracted out. The % of Item Work Subcontracted is auto-populated.
e. Click Save to save the record.
![Page 26: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/26.jpg)
23
Field Details - Edit Tender Items
5. Click Calculate, the below information is auto-populated:
(A) Total Cost of above Items - The total value of the work sublet to subcontractor for all the tender items selected in the current record.
(B) Total Previously Approved Sublet (All Subcontractors) - The total value of the work sublet to the subcontractors for all the approved/updated/completed records in the current construction contract.
(C) Total Draft Sublet (All Subcontractors) - The total value of the work sublet to the subcontractors for all the draft/submitted records in the current construction contract (not including the current record).
Total Tender - The total value of all the tender items in the current construction contract.
(A + B) as a percentage of Total Tender - The percentage of the work sublet to the subcontractors compared to the tender value of the current construction contract.
![Page 27: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/27.jpg)
24
Field Details - Calculate Tender Items
6. To attach or link a document relevant to the Consent Of Sublet record, refer to the Global Functions User Guide, Attachments.
7. To add comments to the record, refer to the Global Functions User Guide, Comments.
![Page 28: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/28.jpg)
25
8. Click Save.
Save action
![Page 29: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/29.jpg)
26
The Consent to Sublet record is created in the “Draft” workflow stage.
Record List
![Page 30: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/30.jpg)
27
Editing a Consent to Sublet record
Prerequisites
To edit a Consent to Sublet record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The role involved in this activity is External SP (Contractor) - Record Review and Approver.
1. In the Consent to Sublet page, click the checkbox corresponding to the record to be edited. The record must be in “Draft” status.
2. In the General group, click Edit. The Consent to Sublet page is displayed in edit mode.
Editing the record
3. Make the changes in the editable fields as required and click Save.
![Page 31: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/31.jpg)
28
Save the changes
![Page 32: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/32.jpg)
29
The record will be displayed in the list of records.
Records list
![Page 33: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/33.jpg)
30
Submitting a Consent to Sublet record
Prerequisites
To submit a Consent to Sublet record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The roles involved in this activity are External SP (Contractor) - Record Review and Approver.
1. In the Consent to Sublet page, click the checkbox corresponding to the record to be edited. The record must be in “Draft” or “More Information” status.
2. In the General group, click Edit. The Consent to Sublet page is displayed in edit mode.
3. Make sure that all the mandatory fields in the record are filled in.
Note: Fields marked with an Asterisk (*) indicate mandatory inputs.
4. In the Workflow group, click Submit.
Submit action
![Page 34: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/34.jpg)
31
The Notes window is displayed.
Notes Window
5. Enter the notes if any and click OK for completion of the current stage. The record will be displayed in the list of records with the updated status.
Records list
Note: This record has now been assigned to another user for them to respond to.
![Page 35: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/35.jpg)
32
Viewing a Consent of Sublet record
Prerequisites
To view the Consent of Sublet record:
The user must have a valid user ID with an associated role.
User role must be assigned to the active construction contract.
1. In the Consent of Sublet page, click the checkbox corresponding to the record to be viewed.
2. In the General group, click View.
Viewing the record
![Page 36: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/36.jpg)
33
The Consent to Sublet record page is displayed in view mode.
View action
Only users that are permissioned to view this record will have access depending on the status of the record.
![Page 37: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/37.jpg)
34
![Page 38: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/38.jpg)
35
Incident Notification
This section describes the various activities performed pertaining to the Incident Notification record. This record will follow a specific workflow process.
We are using the Incident Notification record to demonstrate the activities involved with Navigating to the record, Creating the record, Editing the record, Submitting the record, Accepting the record, Remediation of the record, Reviewing the record and Viewing the record.
Incident Notification
Roles Involved
User roles are stakeholders who have the privileges to Create, Update, and Delete the Incident Notification record. The table below lists the user roles involved in the Incident Notification.
For more details on the workflow actions performed by each user role, refer to the Workflow Stages table.
User Role
External SP (CA)- Record Review and Approver
External SP (Contractor) - Record Creator
External SP (Contractor) - Record Review and Approver
![Page 39: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/39.jpg)
36
Workflow Stages
This workflow table explains the various stages of the Incident Notification record. It also describes the User Roles involved at each stage of the workflow to complete the Incident Notification lifecycle.
For example, in the “Draft” workflow stage, the user role External SP CA - Record Review and Approver creates the Incident Notification record and submits it to External SP (Contractor) - Record Review and Approver for review.
Current Workflow Stage
User Role Role Permissions
Workflow Action
Next Workflow Stage
Draft
External SP (CA)- RRA
Create, Read, Update, Delete
Submit
Submitted To External SP (Contractor) - RRA
External SP (Contractor) -Record Creator
Submitted To External SP (Contractor) - RRA
External SP (Contractor) - RRA
Submitted To External SP (CA)- RRA
More Information
External SP (Contractor) - Record Creator
Read, Update Submit Submitted To External SP (CA)- RRA
Submitted To External SP (Contractor) - RRA
External SP (Contractor) - RRA
Read, Update Submit
Submitted to MTO - Environmental Officer
Submitted To External SP (CA)- RRA
External SP (CA)- RRA
Read, Update
Accept Remediation For External SP (Contractor) - RRA
More Information Submitted To External SP (Contractor) - RRA
Remediation For External SP (Contractor) - RRA
External SP (Contractor) - RRA
Read, Update Submit Finalize To External SP (CA)- RRA
Finalize To External SP (CA)- RRA
External SP (CA)- RRA
Read, Update
Reviewed Completed
More Information Remediation For External SP (Contractor) - RRA
![Page 40: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/40.jpg)
37
Activities
Getting started with Incident Notification
To navigate to the Incident Notification record:
1. In the module menu, click Contracts. The Contracts List page is displayed.
2. Double-click on the contract. The Contract Dashboard appears.
3. Enter Incident Notification in the search toolbar below the Menu tab.
Searching the Record
![Page 41: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/41.jpg)
38
4. Click Incident Notification in the contract navigation tree. The record list page is displayed.
Record list page
![Page 42: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/42.jpg)
39
Creating an Incident Notification record
Prerequisites
To create an Incident Notification record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The roles involved in this activity are:
o External SP (CA)- Record Review and Approver
o External SP (Contractor) - Record Creator
o External SP (Contractor) - Record Review and Approver.
1. In the Incident Notification page, click New in the General group. The Incident Notification page is displayed.
Creating the record
In the new Incident Notification page, observe the generic contract header of the record which contains the fields that are auto-populated from the contract details. The Record ID is a unique identifier which is auto-generated and assigned to the record.
Generic Contract Header details
![Page 43: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/43.jpg)
40
2. Fill the follwing information in the fields below:
a. Date of Incident - Select the date of occurrence of the incident from the calendar drop-down.
b. Time of Incident (24HR) - Enter the time when the incident occurred.
c. Description of Incident (What Happened) - Enter the description of the incident.
d. Location - Enter the location of the incident.
e. GPS Co-ordinates - Enter the location co-ordinates to track the location of the incident.
f. Incident Type - From the drop-down list, select whether the incident type is Environmental or Non-Environmental.
g. Immediate Actions Taken - Enter the actions taken immediately for the incident.
Field Details - Incident Details
3. To add the Authority(s):
a. Expand the Authority(s) Notified section and click Add. The Resource List form is displayed.
Field Details - Authority(s) Notified
![Page 44: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/44.jpg)
41
b. Click the checkbox of the authority notified for the incident from the list and click Select. The authority(s) selected is added in the Authority(s) Notified section.
Note: The Resource List displays the list of resources in the associated CA Contract.
Field Details - Resource List
c. Select the row and click Edit. The Edit Authority(s) Notified form is displayed.
Field Details - Edit Authority(s) Notified section
![Page 45: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/45.jpg)
42
d. Select the Date and enter the Time of when you notified the authority about the incident.
Field Details - Date and Time of Notification
e. Click Save. The details are saved in the grid.
Field Details - Authority(s) Notified section
4. To attach or link a document relevant to the Incident Notification record, refer to the Global Functions User Guide, Attachments.
5. To add comments to the record, refer to the Global Functions User Guide, Comments.
![Page 46: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/46.jpg)
43
6. Click Save.
Save action
![Page 47: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/47.jpg)
44
The Incident Notification record is created in the “Draft” workflow stage.
Record List
![Page 48: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/48.jpg)
45
Editing an Incident Notification record
Prerequisites
To edit an Incident Notification record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The roles involved in this activity are:
o External SP (CA)- Record Review and Approver
o External SP (Contractor) - Record Creator
o External SP (Contractor) - Record Review and Approver.
1. In the Incident Notification page, click the checkbox corresponding to the record to be edited. The record must be in “Draft” status.
2. In the General group, click Edit. The Incident Notification page is displayed in edit mode.
Editing the record
![Page 49: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/49.jpg)
46
3. Make the changes in the editable fields as required and click Save.
Save the changes
![Page 50: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/50.jpg)
47
The record will be displayed in the list of records.
Records list
![Page 51: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/51.jpg)
48
Submitting an Incident Notification record
Prerequisites
To submit an Incident Notification record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The roles involved in this activity are:
o External SP (CA)- Record Review and Approver
o External SP (Contractor) - Record Creator
o External SP (Contractor) - Record Review and Approver.
1. In the Incident Notification page, click the checkbox corresponding to the record to be edited. The record must be in “Draft” or “More Information” status.
2. In the General group, click Edit. The Incident Notification page is displayed in edit mode.
3. Make sure that all the mandatory fields in the record are filled in.
Note: Fields marked with an Asterisk (*) indicate mandatory inputs.
4. In the Workflow group, click Submit.
Submit action
![Page 52: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/52.jpg)
49
The Notes window is displayed.
Notes Window
5. Enter the notes if any and click OK for completion of the current stage. The record will be displayed in the list of records with the updated status.
Note: The updated workflow stage depends on the Incident Type selected while creating the record.
If the Incident Type is Environmental, workflow stage will be “Review by Environmental”. If the Incident Type is Non Environmental, workflow stage will be “Submitted”.
Records list
![Page 53: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/53.jpg)
50
Requesting More Information
Prerequisites
To request for “More Information” on the Incident Notification record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The roles involved in this activity are:
o External SP (CA) - Record Review and Approver
o MTO - Environmental Officer
o External SP (Contractor) - Record Review and Approver.
1. In the Incident Notification page, click the checkbox corresponding to the record to be edited. The record must be in “Submitted” or “Review” status.
2. In the General group, click Edit. The Incident Notification page is displayed in edit mode.
Editing the record
![Page 54: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/54.jpg)
51
3. In the Workflow group, click More Information.
Requesting More Information
The Notes window is displayed.
Notes Window
![Page 55: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/55.jpg)
52
4. Enter the notes if any and click OK for completion of the current stage. The record will be displayed in the list of records with the updated status.
Records list
Note: This record has now been assigned to another user for them to respond to.
![Page 56: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/56.jpg)
53
Remediation of an Incident Notification record
Prerequisites
To remediate an Incident Notification record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The role involved in this activity is External SP (Contractor) - Record Review and Approver.
1. In the Incident Notification page, click the checkbox corresponding to the record to be edited. The record must be in “Submitted” status.
2. In the General group, click Edit. The Incident Notification page is displayed in edit mode.
Editing the record
3. In the Remediation and Restoration section, fill in the following information:
Actions taken or to be taken to remediate and restore the environment - Enter the details of the action taken for remedying or restoring the environment.
Field Details - Remediation and Restoration
![Page 57: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/57.jpg)
54
4. In the Workflow group, click Submit.
Submit action
The Notes window is displayed.
Notes Window
![Page 58: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/58.jpg)
55
1. Enter the notes if any and click OK for completion of the current stage. The record will be displayed in the list of records with the updated status.
Records list
Note: This record has now been assigned to another user for them to respond to.
![Page 59: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/59.jpg)
56
Viewing an Incident Notification record
Prerequisites
To view an Incident Notification record:
The user must have a valid user ID with an associated role.
User role must be assigned to the active construction contract.
1. In the Incident Notification page, click the checkbox corresponding to the record to be viewed.
2. In the General group, click View.
Viewing the record
![Page 60: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/60.jpg)
57
The Incident Notification record page is displayed in view mode.
View action
Only users that are permissioned to view this record will have access depending on the status of the record.
![Page 61: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/61.jpg)
58
Material Delivery Schedule
This section describes the various activities performed on the records pertaining to Material Delivery Schedule. This record will follow a specific workflow process.
We are using the ‘Material Delivery Schedule’ record to demonstrate the activities involved with Navigating to the record, Creating the record, Editing the record, Submitting the record, Reviewing the record, Acknowledging the record, Approving the record, Accepting the record and Viewing the record.
Material Delivery Schedule
Roles Involved
User roles are stakeholders who have the privileges to Create, Update, and Delete the Material Delivery Schedule records based on the workflow stages. The table below lists the user roles involved in the Material Delivery Schedule record workflow:
For more details on the workflow actions performed by each user role, refer to Workflow Stages table.
User Roles
External SP (CA) - Record Review and Approver
External CA Inspector
External SP (Contractor) - Record Review and approver
![Page 62: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/62.jpg)
59
Workflow Stages
This workflow table explains the various stages of the Material Delivery Schedule record. It also describes the User Roles involved at each stage of the workflow to complete the Material Delivery Schedule record lifecycle.
For example, in the "Draft" workflow stage, the user role External SP (Contractor) - Record Review and approver creates the record and submits it to External SP (CA) - Record Review and Approver for review.
Current Workflow Stage
User Role Role Permissions
Workflow Action
Next Workflow Stage
Draft External SP (Contractor) - RRA
Create, Read, Update, Delete
Submit Submitted
More Information External SP (Contractor) - RRA
Create, Read Submit Submitted
Submitted
External SP (CA) - RRA
External CA Inspector
Read, Update
Submit Review
More Information
More Information
Review External SP (Contractor) - RRA
Read, Update
Acknowledge Acknowledged
More Information
Submitted
Acknowledged
External SP (CA) - RRA
Read, Update Materials Delivered
Review
External CA Inspector
Review External SP (Contractor) - RRA
Read, Update Accepted Completed
![Page 63: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/63.jpg)
60
Activities
Getting started with Material Delivery Schedule record
To navigate to the Material Delivery Schedule record:
1. In the module menu, click Contracts. The Contracts List page is displayed.
2. Double-click on the contract. The Contract Dashboard appears.
3. Enter Material Delivery Schedule in the search toolbar below the Menu tab.
Searching the Record
![Page 64: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/64.jpg)
61
4. Click Material Delivery Schedule in the contract navigation tree. The list of records are displayed.
List of Records
![Page 65: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/65.jpg)
62
Creating a Material Delivery Schedule record
Prerequisites
To create a Material Delivery Schedule record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The role involved in this activity is:
o External SP (Contractor) - Record Review and Approver.
1. In the Material Delivery Schedule page, click New in the General group. The Material Delivery Schedule page is displayed.
Creating the record
In the new Material Delivery Schedule page, observe the generic contract header of the record which contains the fields that are auto-populated from the contract details. The Record ID is a unique identifier which is auto-generated and assigned to the record.
Generic Contract Header details
![Page 66: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/66.jpg)
63
2. Expand Supplied Materials section and perform the following steps:
a. Click Add. The Tender Items form appears.
Field Details - Edit Material Details
b. Select the required tender item and click Select. The details are saved in the grid
Field Details - Tender Items List
![Page 67: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/67.jpg)
64
c. Select the details in the grid and click Edit. The Edit Supplied Materials form appears.
Field Details - Tender Items List
d. Enter the Requested Quantity of the supplied materials.
e. Select the Date Required for the delivery of supplied material from the calendar drop-down.
Field Details - Edit Supplied Materials
The details are saved in the grid
Field Details - Supplied Materials details
3. To attach or link a document relevant to the Material Delivery Schedule record, refer to the Global Functions User Guide, Attachments.
![Page 68: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/68.jpg)
65
4. To add comments to the record, refer to the Global Functions User Guide, Comments.
5. Click Save.
Save action
The Material Delivery Schedule record is created in the “Draft” workflow stage.
Record List
![Page 69: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/69.jpg)
66
Editing a Material Delivery Schedule record
Prerequisites
To edit a Material Delivery Schedule record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The role involved in this activity is:
o External SP (Contractor) - Record Review and Approver.
1. In the Material Delivery Schedule page, click the checkbox corresponding to the record to be edited. The record must be in “Draft” or “More Information” status.
2. In the General group, click Edit. The Material Delivery Schedule page is displayed in edit mode.
Editing the record
![Page 70: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/70.jpg)
67
3. Make the changes in the editable fields as required and click Save.
Save the changes
The record will be displayed in the list of records.
Records list
![Page 71: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/71.jpg)
68
Submitting a Material Delivery Schedule record
Prerequisites
To submit a Material Delivery Schedule record:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The role involved in this activity is:
o External SP (Contractor) - Record Review and Approver.
1. In the Material Delivery Schedule page, click the checkbox corresponding to the record to be edited. The record must be in “Draft” or “More Information status.
2. In the General group, click Edit. The Material Delivery Schedule page is displayed in edit mode.
3. Make sure that all the mandatory fields in the record are filled in.
Note: Fields marked with an Asterisk (*) indicate mandatory inputs.
4. In the Workflow group, click Submit.
Submit action
![Page 72: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/72.jpg)
69
The Notes window is displayed.
Notes Window
5. Enter the notes if any and click OK for completion of the current stage. The record will be displayed in the list of records in “Submitted” status
Records list
Note: This record has now been assigned to another user for them to respond to.
![Page 73: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/73.jpg)
70
Acknowledging a Material Delivery Schedule record
Prerequisites
To acknowledge the Material Delivery Schedule records:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The role involved in this activity is:
o External SP (Contractor) - Record Review and Approver.
1. In the Material Delivery Schedule page, click the checkbox corresponding to the record to be edited. The record must be in “Review” status.
2. In the General group, click Edit. The Material Delivery Schedule page is displayed in edit mode.
Editing the record
![Page 74: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/74.jpg)
71
3. In the Workflow group, click Acknowledge.
Acknowledge action
The Notes window is displayed.
Notes Window
![Page 75: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/75.jpg)
72
4. Enter the notes if any and click OK for completion of the current stage. The record will be displayed in the list of records in “Acknowledged” status.
Records list
Note: This record has now been assigned to another user for them to respond to.
![Page 76: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/76.jpg)
73
Accepting a Material Delivery Schedule record
Prerequisites
To accept the Material Delivery Schedule records:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
The role involved in this activity is:
o External SP (Contractor) - Record Review and Approver.
1. In the Material Delivery Schedule page, click the checkbox corresponding to the record to be edited. The record must be in “Review” status.
2. In the General group, click Edit. The Material Delivery Schedule page is displayed in edit mode.
Editing the record
![Page 77: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/77.jpg)
74
3. In the Workflow group, click Accepted.
Accepted action
The Notes window is displayed.
Notes Window
![Page 78: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/78.jpg)
75
4. Enter the notes if any and click OK for completion of the current stage. The record will be displayed in the list of records in “Completed” status.
Records list
![Page 79: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/79.jpg)
76
Viewing a Material Delivery Schedule record
Prerequisites
To view the Material Delivery Schedule records:
The user must have a valid user ID with an associated role.
User roles must be assigned to the active construction contract.
1. In the Material Delivery Schedule page, click the checkbox corresponding to the record to be viewed.
2. In the General group, click View.
Viewing the record
![Page 80: Web-Based Contract Management Services · User Guide Web-Based Contract Management Services. i Table of Contents Diary Setup ... The role involved in this activity is External SP](https://reader030.vdocuments.net/reader030/viewer/2022040600/5e8bd58f7390a168c44d298c/html5/thumbnails/80.jpg)
77
The Material Delivery Schedule record page is displayed in view mode.
View action
Only users that are permissioned to view this record will have access depending on the status of the record.