Technical Submission for Pipework. Issued by: London Office Tech- submission No. Job Reference Number: Project: For the attention of: Copy to: From Completed By: Stephen Keen Manufacturer Model Ref. Number Quantit y Mechanical & Pipework Fabrications n/a n/a n/a Pipework Engineering Services n/a n/a n/a Note: All equipment sourced only from LPC listed/approved contractors, where appropriate. Equipment Particulars Information provided: From Suppliers Data Sheets Document Ref: EN 10255 Tube Weights / Certificates Attached Not Applicable Description of application Areas to be used All Fire Protection Pipework All sprinkler ranges & mains Clients specification used:

Upload: others

Post on 12-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: stephenkeen.comstephenkeen.com/.../03/Technical-Submission-Pipework.docx · Web viewAll pipework will be fabricated off site and installed on site to a construction issued pre-fabrication

Technical Submission for Pipework.

Issued by: London Office Tech-submission No.

Job Reference Number:Project:

For the attention of:Copy to:

From Completed By: Stephen Keen

Manufacturer Model Ref. Number QuantityMechanical & Pipework Fabrications n/a n/a n/aPipework Engineering Services n/a n/a n/a

Note: All equipment sourced only from LPC listed/approved contractors, where appropriate.

Equipment Particulars

Information provided: From Suppliers Data Sheets

Document Ref: EN 10255 Tube Weights / Certificates Attached Not Applicable

Description of application Areas to be usedAll Fire Protection Pipework All sprinkler ranges & mains

Clients specification used:

Statement of compliance to specification – Compliant not applicable

If non-compliant give details:

STATUS

Approved Approved with comments Rejected – Re-submit

Comments:

Date Issued Approval required by Date approval received00/00/2018 00/00/2018

Page 2: stephenkeen.comstephenkeen.com/.../03/Technical-Submission-Pipework.docx · Web viewAll pipework will be fabricated off site and installed on site to a construction issued pre-fabrication

We will be using the following pipework:Assembly & Installation:

All pipework will be fabricated off site and installed on site to a construction issued pre-fabrication drawing. All pipework is fabricated with identification numbers for ease of identification when installing and to reduce installation time.

Pipe weights are as follows:

Maintenance:

Quarterly Checks - Pipework should be checked for corrosion in accessible areas and to gauge the overall integrity of the pipework.

Testing

All pipework will be pressure tested to the following pressures as per BS EN 12845

15 Bar or 1.5 times the working pressure (whichever is higher) for 2 hours.

Page 3: stephenkeen.comstephenkeen.com/.../03/Technical-Submission-Pipework.docx · Web viewAll pipework will be fabricated off site and installed on site to a construction issued pre-fabrication
Page 4: stephenkeen.comstephenkeen.com/.../03/Technical-Submission-Pipework.docx · Web viewAll pipework will be fabricated off site and installed on site to a construction issued pre-fabrication

Certificates of Conformity