Dec 2014 –Team Delivery DeadlinesSl.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
2. HE Product Release ( T&A Integration)
21st Nov 2014 Shwetha Delayed yet to complete
3. K12 – Teacher lesson based workflow release with New UI
30th Dec 2014 Srilakshmi
4.5. CCP Sprint 7A - BA 15th Dec 2014 Vitthal / Lakshmi Delivered6. CCP Sprint 7B - TH Vitthal /
HemavathiNeed planned date
7. CCP Sprint 8 - SS 26th Dec 2014 Vitthal / Malathi8. CLP Sprint - 19 26th Dec 2014 Vitthal /
Hemavathi9. KAN Ban - Stories Every Week Vitthal / Malathi In progress10. K12 - Repro Release 30th Nov 2014 Srilakshmi Delayed yet to get
sign-off11. HE - Product release 7th Nov 2014 Yuvaraj Delayed yet to
receive the re-scheduled date
Nov 2014 –Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
2. HE Product Release ( T&A Integration)
21st Nov 2014 Shwetha Delayed yet to complete
3. EduKate Sprint 1 Release
5th Nov 2014 Srilakshmi Completed
4. Treasure House 30th Nov 2014 Vitthal / Hemavathi
Postponed
5. Secondary and Primary Production issues and Change Request (First Line Development)
Every Week Vitthal / Malathi Completed
1. K12 - Repro Release 30th Nov 2014 Srilakshmi Delayed yet to get sign-off
2. HE - Product release 7th Nov 2014 Yuvaraj Delayed
OCT 2014 –Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
3. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
4. HE Product Release 14th August 2014 for MDIS26th August 2014
Yuvaraj 14th release delivered on 18th.
26th August release has been delayed to 4th Sep and later to 9th SepStill Delayed as of 6th
October
Completed5. K12 Product
Release(2.0.9.11)30th Oct 2014 Shwetha Completed
6. CLP- Sprint 18 9th Oct 2014 Vitthal Completed7. HE Product Quarterly
(Sep release)30th Sep 2014 Yuvaraj Completed
Sep 2014 –Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
8. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
9. CLP- Sprint 17 Patch 8th Sep 2014 Vitthal Completed10. EPS Report Migration 20th August 2014 Shwetha Delayed to 28th
August later to 4th Sep to 10th Sep.Completed
11. HE Product Release 14th August 2014 for MDIS26th August 2014
Yuvaraj 14th release delivered on 18th.
26th August release has been delayed to 4th Sep and later to 9th SepStill Delayed as of 6th
October12. K12 Product Release 26th August 2014 Shwetha Delayed to 28th
August later to 4th August to 10th August.Sep 10th
Completed13. CLP Live release 10th Sep 2014 Shwetha Delayed to 28th
August later to 4th Sep to 10th Sep.Completed
14. CLP- Sprint 18 9th Oct 2014 Vitthal / Lakshmi15. CCP- Sprint 6 9th Oct 2014 Malathi16. ELT –Sprint 3 9th Sep 2014 Hemavathi17. K12 Product Quarterly
release30th Sep 2014 Shwetha Completed
18. HE Product Quarterly release
30th Sep 2014 Yuvaraj Still Delayed as of 6th
October
August 2014 –Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
2. CCP- Sprint 5 + Additional stories
26th August 201428th August 2014
Vitthal Completed
3. CLP- Sprint 17 26th August 2014 Vitthal Completed4. EPS Report Migration. 20th August 2014 Shwetha Delayed to 28th
August later to 4th Sep to 10th Sep.
5. HE Product Release 14th August 2014 for MDIS26th August 2014
Yuvaraj 14th release delivered on 18th.
26th August release has been delayed to 4th Sep and later to 9th Sep
6. K12 Product Release 26th August 2014 Shwetha Delayed to 28th August later to 4th Sep to 10th Sep.
7. EduKate – Demo version Release
8th August 2014 Sridhar Completed
8. EduKate – Question Extraction
8th August 2014 Shwetha and Prakash
Completed
9. CRPH – Demo Preparation
8th August 2014 Sridhar and Padma
Completed
10. Repro – Server deployment for clean version
20th August 2014 Gnaneswar 25th August 2014
11. Support for SIMS integration
Srilakshmi Completed
12. SIMS service re-configuration for UAT and Live environment for Auto Run
18th August 2014 Vitthal Completed
July 2014 –Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
2. CCP- Sprint 5 26th August Vitthal Completed3. CLP- Sprint 16 2nd July and 8th July Vitthal Completed4. EPS Server Migration. 2nd July 2014 Shwetha and
GiridharCompleted
5. HE Product Release 30th July 2014 Yuvaraj and Padma
Postponed to august 14th as the previous release dates extended due to delay
6. K12 Product Release 30th July 2014 Gnanesh and Shwetha
Not done postponed to august as the previous release dates extended due to delay.
7. Update of New version release to Demo and trail servers along with Demo data (HE and K12)
8th July 2014 Gnanesh, Padma and Giridhar
Completed
June 2014 –Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
8. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
9. CLP- Secondary Performance tuning
30th June 2014 Prakash and Vitthal
Completed
10. CCP- Sprint 5 Vitthal11. CLP- Sprint 15 patch 2nd and 4th June Vitthal Completed12. CLP- Sprint 16 2nd July and 8th July Vitthal13. Support assisting tool
development10th June 2014 Malathi Completed
14. EPS application Migration.
30th May 2014 Shwetha and Prakash
Completed
15. HE Product Release 30th June 2014 Prakash and Srilakshmi
Delayed
16. K12 Product Release 30th June 2014 Gnanesh and Srilakshmi
Delayed
May 2014 –Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
17. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
18. CLP- Secondary Performance tuning
Prakash and Vitthal
Delayed because of server un availability.
19. CCP- Sprint 4 30th April 2014 Vitthal Completed20. CLP- Sprint 15 28th June 2014 Vitthal Completed21. Support assisting tool
developmentVitthal Completed
22. EPS application Migration.
Prakash and Srilakshmi
Completed
1. HE Product Release Yuvaraj Delayed2. ELT Sprint -2 Release 30th June 2014 Vitthal and
Hemavathi Completed
April 2014 –Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
2. HE Solution Development – Version 1.1 Release(includes Existing and WGU requirement)
28TH March 2014 Yuvaraj Delayed1st April 2014
Further delayed23rd April 2014Completed on 28th
April 20143. K12 2.9.0.9
Deployment4th April 2014 Srilakshmi /
Gnanseswar / Prakash
Delayed
4. K12 2.9.0.9 Deployment
20th March 2014 Srilakshmi / Gnanseswar / Prakash
Delayed27th March 2014
Further delayed because of DB Related issues.
5. K12 2.9.0.10 30th April 2014 Srilakshmi6. CLP – ELT SPRINT 2 6th May 2014 Hemavathi 30th April 20147. CLP –Secondary
SPRINT 1423rd April 2014 Vitthal Completed
8. Repro RIS Migration from 2.8 to 2.9
3rd April 2014 Prakash and Gnaneswar
Completed
9. CLP- Secondary Performance tuning
4th April 2014 Prakash and Vitthal
Delayed
10. Switzer Land Proposal 1st April 2014 Gnaneswar 8th April 201411. HE Feature Document 28th March 2014 Padma Delayed
7th April 2014Completed
12. HE Presentation for LBF
11th April 2014 Padma Completed
13. HE New Feature and Report Use Case document
28th March 2014 Padma Completed
14. HE White Paper 28th March 2014 Padma Completed
document15. QTI Import and
Authoring capabilities in SARAS and Compliance of the same with CLP
26th March 2014 Antony Delayed1st April 20143rd April 2014Completed
16. Mobile App Service Delivery
4th April 2014 Prakash Delayed9th April 201423rd April 2014Completed
17. K12 Cloud server update
28th April 2014 Prakash/ Srilakshmi/ Giridhar
18. CLP Hot Fix Release 28th April 2014 and 30th April 2014
Vitthal Completed
19. CLP Monitoring report 29th April 2014 Vitthal Completed
March 2014 –Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
2. HE Solution Development – Version 1.1 Release(includes Existing and WGU requirement)
28TH March 2014 Yuvaraj
3. K12 2.9.0.9 20th Mar 2014 Srilakshmi 27th March 2014
4. Secondary Site CLP- SPRINT 13
14th March 2014 Vitthal Completed
5. CLP – ELT SPRINT 1 20th March 2014 Hemavathi Completed6. Primary Site CCP-
SPRINT 326th March 2014 Vitthal Completed
7. Repro DIS Migration from 2.8 to 2.9
27th March 2014 Prakash and Gnaneswar
Completed
8. Switzer Land Proposal 1st April 2014 Gnaneswar9. HE Feature Document 28th March 2014 Padma Completed10. HE New Feature and
Report Use Case document
28th March 2014 Padma Completed
11. QTI Import and Authoring capabilities in SARAS and Compliance of the same with CLP
26th March 2014 Antony
12. Mobile App Service Delivery
4th April 2014 Prakash
Feb 2014 –Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
2. Migration to EPS Shwetha On hold – Due to BYU Work.
3. HE Solution Development – Version 1.0 Release
30th Dec 2013 Yuvaraj Jan 15th 2014 - Valid30th Jan 2014 - Delayed15th Feb 2014 – Delayed28th Feb 2014Completed
4. K12 2.9.0.8 15th Feb 2014 Srilakshmi5. Test player Integration 17th Dec 2013 Vitthal 7th Feb 2014 –
DelayedCompleted
6. Repro – DBF Preparation Support
14th Feb 2014 Gnaneswar Completed
7. Primary Main Site CCP- SPRINT 2
7th Feb 2014 Vitthal Completed
8. Primary Main Site CCP- SPRINT 3
14th Feb 2014 Vitthal Completed
9. CLP – Performance Testing Support for ‘Ravichandra.P’
14th Feb 2014 Giridhar and Vitthal
Completed
10. SIT Demo Preparation 8th Feb 2014 Sridhar, Yuvaraj, Padma and Giridhar.
Completed
11. K12 Solution Micro site 14th Feb 2014 Gnaneswar and Naveen
Completed
12. CLP – Sprint 12 28th Feb 2014 Vitthal Completed
January 2014 –Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
2. Migration to EPS Shwetha On hold – Due to BYU Work.
3. HE Solution Development
30th Dec 2013 Yuvaraj Jan 15th 2014 -ValidJan 30th 2014 - Delayed
4. Repro - Release Jan 31st 2014 Srilakshmi Completed5. Test player Integration 17th Dec 2013 Vitthal 7th Feb 20141. CLP Primary Free
Chapter Site - Updates15-Jan-2014 Vitthal Completed
2. CLP SPRINT 11 5-Jan-2014 Vitthal Completed6. Repro – DBF
Preparation Support14th Feb 2014 Srilakshmi Completed
7. Primary Main Site 7th Feb 2014 Vitthal
December 2013 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
8. CLP – Integration (MSMQ and Bug Fixing)
4th Dec 2013 Vitthal PoC done.
9. Support for Customer ProjectsEPS , GTN , Repro, CLP
Team
10. Migration to EPS Shwetha On hold – Due to BYU Work.
11. HE Solution Development
30th Dec 2013 Yuvaraj and Shwetha
12. HE Solution Documentation
14th Dec 2013 Padma
13. Repro - Release Completed14. CLP Secondary Pending
Tasks5. Cross domain - Sub domain6. Eductation ID issue11 Moving Files to Production S3 bucket12. Home Icon Clickable
VitthalCompleted
15. Test player Integration 17th Dec 2013 Vitthal16. K12 2.9 Issue fixing +
Blank DB26-Nov-2013 Shwetha 11-12-2013
17. CLP Secondary Free Chapter Site
16-Dec-2013 Vitthal Testing
18. Synch tool Improvements
4-Dec-2013 Prakash Completed
19. CLP Primary Free Chapter Site
30-Dec-2013 Vitthal Completed
November 2013 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
20. CLP – Integration (MSMQ and Bug Fixing)
4th Dec 2013 Vithhal PoC done.
21. Support for Customer ProjectsEPS , GTN , Repro,
Team
22. Migration to EPS Shwetha On hold – Due to BYU Work.
23. HE Solution Development
Yuvaraj and Shwetha
Plan will be v delivered on TFS
25th Nov 20132nd Dec 2013
24. Repro - Release 15-oct -2013 Srilakshmi/ Gnan
Plan NeededMoved to 30th October 201315th Nov 201329th Nov 20132nd Dec 2013
25. CLP Secondary Pending Tasks
1. Https - delivery date2. Tuning List - Delivery Date3. Security implementation4. Issues - Delivery date5. Cross domain - Sub domain6. Eductation ID issue7.Storing two new fields9. Service Schedule10. Email configuration11 Moving Files to Production S3 buket12. Home Icon Clickable
22-Nov-2013 Vitthal Plan Needed
Completed
26. Test player Integration 26-Nov-2013 Vitthal Completed27. EPS Access control
implementation20-Nov-2013 Shwetha Completed
28. K12 2.9 Issue fixing + Blank DB
26-Nov-2013 Shwetha Plan needed
29. IIMR Validation and User experience
2-Dec-2013 Shwetha 5-Dec-2013
improvements on Planning and Scheduling
30. CLP – Primary Screen designs and detailed requirement document
22-Nov-2013 Antony and Srinivas
CompletedScreens to be completed by 25th Nov 2013
31. CLP Secondary Free Chapter Site
15-Dec-2013 Vitthal
32. Synch tool Improvements
4-Dec-2013 Prakash
1. CLP Primary Free Chapter Site
30-Dec-2013 Vitthal
October 2013 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. CLP – Integration (MSMQ and Bug Fixing)
Vithhal Plan Needed
2. Tablet App Rollout at EPS
3rd Aug 2013 Giridhar Completed
3. Preparing Complete K12 solution experience
14th August 2013 Antony and Gnehwar
23rd August 201328th August 201328th September 2013
11th Oct 2013Completed
4. Support for Customer ProjectsEPS , GTN , Repro,
Team
5. CLP Database tuning+ Blank Database
10th Oct 2013 Satya / Vitthal Blank Database ReadyCompleted
6. Migration to EPS Shwetha On hold – Due to BYU Work.
7. CLP Tuning Phase 18-Oct-2013 Vitthal Completed8. KT from Malathi 30- Oct-2013 Vitthal Completed9. BYU – Presales Demo
Application13-Oct -2013 Shwetha and
PadmaCompleted
10. Repro - Release 15-oct -2013 Srilakshmi/ Gnan
Plan NeededMoved to 30th October 2013
11. Responsive - CLP 15-oct -2013 Srinivas / Giridhar
Completed
12. Repro – Synch Framework Release
10-oct -2013 Srilakshmi Completed
13. CLP – Automation Testing
18-oct -2013 Giridhar Completed
September 2013 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. CLP – Integration (MSMQ and Bug Fixing)
Malathi Moved to October
2. Repro Improvements 15th Sep 2013 Shwetha Completed
3. EPS Support- Report and Co-
scholastic Import
3rd Sep 2013 Shwetha 13th Sep 201326th Sep 2013Completed
4. Tablet App Rollout at EPS
Giridhar Date awaited for Teacher TrainingCompleted
5. Preparing Complete K12 solution experience
14th August 2013 Antony and Gnehwar
23rd August 201328th August 2013
Moved to October6. Support for Customer
ProjectsEPS , GTN , Repro,
Team
7. CLP Database tuning+ Blank Database
Satya / Vitthal Blank Database will be ready by 25th
8. Migration to EPS Shwetha On hold – Due to BYU Work.
9. K12 Mobile Service development and Support
18th Sep 2013 Suhas 25th Sep 2013Completed
10. IIMR – SPRINT 5 deployment Testing and migration
16th Sep 2013 Shwetha Completed – Issues
11. T&A , K12 and Project maker integration
13th Sep 2013 Shwetha Completed
12. GTN CR 18th Sep 2013 Malathi Completed
13. CLP SPRINT -9 and User testing Readiness
Vitthal Completed
1. Repro Improvements 30th Sep 2013 Srilakshmi / Gnaneshwar
Completed
August 2013 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. CLP – Integration (MSMQ and Bug Fixing)
26th Aug 2013 Malathi On hold
2. Synch Framework implementation – Lesson, Test, Question Organization Ready for deployment
9th August 2013 Shwetha / Srilakshmi
Given for testing13th August 2013.
(due to un planned leaves of QA team members)
(Due to system Crash)21st Aug 2013Completed
3. Repro Improvements 29th August 2013 Shwetha Date will be give today (12th August)
Date will be give today (19th August)
Sep 2nd 2013 release
4. K12 New version (2.9)Release – With New UI
21st August 2013 Shwetha 22nd August 2013(Additional issues)
26th August 2013Delay form Shwetha in communication.
Completed5. EPS Support
- Marks entry and Reports Rollout
6th August 2013 Shwetha 8th August 20139th August 2013(due to un planned leaves of QA team members)20th Aug 2013(QA team Slippages)(DB team capability
in completing the task)27th August 20132nd Sep 2013
6. EPS Web site changes 2nd August 2013 Shwetha Completed7. Tablet App Rollout at
EPS8th August 2013 Giridhar 7th August 2013
Installation Completed
Completed
8. Synch Framework implementation – Assignment Resource
22nd August 2013 Shwetha / Srilakshmi (Due to system
Crash)29th August 20132nd Sep 2013
9. Preparing Complete K12 solution experience
14th August 2013 Antony and Gnehwar
23rd August 2013
28th August 2013
10. Responsive layout - CLP
10th July 2013 Srinivas Murthy 10th July 201331st July 20136th August 2013UI – 12th August 2013
Functionality – 13th August 2013.
16th August 2013.Completed
11. CLP Improvements- S3 Integration
Vitthal Dates for the improvements Vitthal (12th August)20th August 2013( Not planned)27th August 2013Completed
12. CLP SPRINT -7 16th August 2013 Vitthal Completed13. K12 Performance
Testing14th August 2013 Shwetha Completed
14. Video Catalog Rollout 16th August 2013 Shwetha Version 1 completed
Version -2 on 2nd August 201321st August 2013Completed
15. CLP – Performance testing and tuning
14th August 2013 Vitthal 20th August 2013(Server Issues)
16. K12 Mobile Service developments
14th August 2013 Shwetha / Suhas 19th August 2013(Delay from DB Team)Completed
17. Support for Customer ProjectsEPS , GTN , Repro, JSSIS and JSSPS
Team
17. Project Maker Issue Fixing
9th August 2013 Giridhar 12th August 2013
Due to other priority tasks which got extended and Testing without test case.19th August 2013Completed
18. CLP Database tuning Satya / Vitthal Plan needed from Vitthal
Plan will be given on 4th Sep 2013
19. Co-scholastic excel sheet import format
30th August 2013 Harsha/ Shwetha
2nd Sep 2013
20. Website Further Changes
13th August 2013 Harsha/ Shwetha
14th August 2013(Completed)
CLP SPRINT -7 Patch 23rd August 2013 Vitthal CompletedMigration to EPS ShwethaPOC - Google Calendar 26th August 2013 Prashant CompletedPOC - HTML 5 Concept Map
Suhas
CLP – SPRINT -8 2nd September 2013
Vitthal Completed
Website Further Changes
28th August 2013 Harsha/ Shwetha
Completed
July 2013 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. CLP – SPRINT -5 – Pending Story Release
1st July 2013 Vitthal 2nd July 2013Completed
2. CLP – SPRINT -6 15th July 2013 Vitthal Plan will be sent on 2nd July 2013Completed
3. CLP – Integration Malathi Analysis and plan will be sent on 2nd July 2013Completed(MSMQ Not implemented)
1. Synch Framework implementation - Lesson
10th July 2013 Shwetha / Srilakshmi
In Complete
2. Repro Improvements 5th July 2013 Shwetha In complete3. K12 New version
(2.9)Release – With New UI
5th July 2013 Shwetha In complete
4. EPS Support- Web site updates- Data Imports- Marks entry
testing- Tuning
Except marks entry - 3rd July 2013
Shwetha Completed except Marks entry and tuning
5. Tablet App Rollout at EPS
10th July 2013 Shwetha / Antony
In Progress
6. GTN - Release 3rd July 2013 Malathi Completed7. Preparing Complete
K12 solution experience
10th July 2013 Antony and Giridhar
8. Responsive layout - CLP
In Progress
9. CLP Improvements- S3 Integration- JavaScript and CSS
reference from S3- SP Changes and
migration to update course name to Aggregation
- S3 Content player
Vitthal
- Code Review- Multiple VD for Test
Player to hide logo in the course player
- User name Taken from DB
- Migration of SP and results to summary table
- Journey path Clickable
- Url Rewriting for organization Level
- Login Screen changes when session time out
10. CLP SPRINT -7 31st July 2013 Vitthal / Antony11. K12 Performance
Testing12th July 2013 Completed
12. Project Maker Deployment – EPS Rollout
5th July 2013 Completed
13. Project Maker New Feature –
5th July 2013 Completed
May 2013 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
14. CLP – SPRINT -3 17th May 2013 Vitthal15. Synch Framework
implementation8th May 2013 Shwetha /
MithunTest and Question Synch Completed
16. Repro Theme Changes 8th May 2013 Shwetha17. Demo Application
(latest) on Cloud including App
19th April 2013 Antony FTP Creation is pending for Apps
18. Repro Latest apps both android and i-OS with Multi question support.
8th May 2013 Giridhar
19. K12 2.9- Open page
integration issues
- Adaptive learning
- Subtheme tag to question in Edit
- Deferred Issues
Shwetha
20. JSSIS and JSSPS Promotion Issues
Shwetha
21. JSSIS and JSSPS Content and Lesson Import
Shwetha
22. EPS Support for Promotion
Vitthal
23. Preparing Complete K12 solution experience
10th May 2013 Antony and Giridhar
24. Project Maker Changes Shwetha25. K12 Publishing sector
Changes.Shwetha
April 2013 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. CLP – SPRINT -1 30th April 2013 Vitthal2. Synch Framework
implementationShwetha / Mithun
Test and Question Synch Completed
3. EPS Support for- Marks Entry.- Report Changes- Book upload
5th April 2013 Vitthal Completed
4. Repro Theme Changes 8th May 2013 Shwetha5. Demo Application
(latest) on Cloud including App
19th April 2013 Antony FTP Creation is pending for Apps
6. Product Management tasks
- Mind Map- Business
models w/f and screen shots
-
16th April 2013 Antony Mind map is Completed
Business workflow screens to be reviewed
7. K12 2.9- Open page
integration issues
- Adaptive learning
- Subtheme tag to question in Edit
18th April 2013 Shwetha
8. Deployment Automation
Shwetha
9. Project Maker Changes Shwetha
March 2013 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
10. CLP – SPRINT -1 30th March 2013 Vitthal Only Business logic
11. IIM Ranchi 5th Sprint 15th Feb 2013 Shwetha 22nd Feb 20131st March 20136th March 201313th March 201318th March 2013(Testing Server)
8th March 201318th March 201320th March 2013(Extranet / Customer Server)Completed
12. K12 2.8 Testing and Bug fixing
Shwetha / Giridhar
Testing will be completed by 12th Feb 201322nd Feb 201326th Feb 20134th March 20136th March 2012Completed(5.151)28th Feb 20131st March 20134th March 20137th March 201313th March 201319th March 2013(demo server)Completed
13. CLP – Course Import Vitthal 28th Feb 20134th March 20136th March 2013Completed
14. CLEP – URL Rewriting Vitthal /Harsha 25th Feb 2013Completed
15. EPS New Changes 19th Feb 2013 Suhas / Vitthal 27th Feb 201328th Feb 2013
1st March 20134th March 20137th March 2013Completed
16. K12 – My bag (4 Types) - Testing
Giridhar 27th Feb 20131st March 2013Completed
17. Test Reports – Changes 26th Feb 2013 Avinash 27th Feb 201328th Feb 20131st March 20138th March 2013Dev - completed12th March 2013Completed
18. K12 – My bag (iOS) (testing)s
1st March 2013 Giridhar Completed
19. Internationalization 27th Feb 2013 Manjunath / Shwetha
28th Feb 20131st March 20135th March 20137th march 2013Completed
20. K12 Japanese Version on Extranet
26th Feb 2013 Shwetha / Kiran 28th Feb 20131st March 20134th March 2013Completed
21. Repro and Pilot2 environment synchronization
20th March 2013 Antony Completed
22. K12 Cloud Hosting Shwetha/ Antony
23. Synch Framework implementation
Shwetha / Mithun
24. CLP First Sprint Plan 28th Feb 2013 Vitthal 4th March 2013Completed
25. Support for Marks Entry.
31st March 2013
26. GTN Issue – Resource
Feb 2013 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. IIM Ranchi 5th Sprint 15th Feb 2013 Shwetha 22nd Feb 20131st March 20136th March 2013(Testing Server)
8th March 2013(Extranet / Customer Server)
2. GTN Taxonomy Version Release
21st Feb 2013 Vitthal Deployment package ready by 11th Feb 2013 –18th Feb 201325th Feb 2013Completed
3. EPS Report Changes (Final Report)
6th Feb 2013 Vitthal Completed.
4. K12 Lite Performance Tuning
7th Feb 2013 Shwetha / Chandru
18th Feb 2013Completed
5. K12 2.8 Testing and Bug fixing
Shwetha / Giridhar
Testing will be completed by 12th Feb 201322nd Feb 201326th Feb 20134th March 2013(5.151)28th Feb 20131st March 20134th March 20137th March 2013 (demo server)
6. Installation and testing of K12 solution and My bag on to Repro server -1 .
8th Feb 2013 Antony/Shwetha/Giridhar
Completed
7. Performance Assessor Data Seeding and Demo.
12th Feb 2013 Antony Completed
8. Installation and testing of K12 solution and My bag on to Repro server
13th Feb 2013 Antony/Shwetha/Giridhar
Completed
-2 .9. CLP – Course Import Vitthal 28th Feb 2013
4th March 201310. CLP – Offline Test Vitthal /Malathi 27th Feb 201311. CLEP – URL Rewriting Vitthal /Harsha 25th Feb 2013
Completed12. EPS New Changes 19th Feb 2013 Suhas / Vitthal 27th Feb 2013
28th Feb 20131st March 2013
13. Repro Local (Ryath) Installation.
25th Feb 2013 Antony Completed
14. K12 – My bag (4 Types) - Testing
Giridhar 27th Feb 20131st March 2013
15. Automation of Data Feed
4th March 2013 Vitthal Completed
16. Test Reports – Changes 26th Feb 2013 Avinash 27th Feb 201328th Feb 20131st March 2013
17. K12 – My bag (iOS) 1st March 2013 Giridhar18. Internationalization 27th Feb 2013 Manjunath /
Shwetha28th Feb 20131st March 2013
19. K12 Japanese Version on Extranet
26th Feb 2013 Shwetha / Kiran 28th Feb 20131st March 2013
20. CLP First Sprint Plan 28th Feb 2013 Vitthal 4th March 201321. CLP POC of UI and
Theme + User Control28th Feb 2012 Malathi Completed
January 2013 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. IIM Ranchi 5th Sprint 15th Feb 2013 Shwetha2. GTN Taxonomy issues
and CR31st Jan 2013 Malathi/ Girdhar Completed
3. GTN Search SP Optimization and Testing
3rd Jan 2013 Vitthal/ Chandru Completed
4. EPS Report Changes (Final Report)
6th Feb 2013 Vitthal
5. K12 E-Pad (Plan B Changes) – HTML5
25th Jan 2013 Vitthal Completed
6. K12 Sales Kit - Content Listing and Deployment
4th Jan 2013 Antony/ Shwetha
Completed
7. K12 Lite Performance testing
7th Feb 2013 Vitthal / Kiran
8. Open page Integration 17th Jan 2013 Mithun/Shwetha Completed
December 2012 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
9. IIM Ranchi 4th Sprint 15th December 2012
Shwetha 18th Dec 2012Completed
10. GTN Taxonomy issues 10th Dec 2012 Malathi/ Girdhar Completed
11. EPS Website Changes 8th December 2012
Vitthal / Kiran Completed
12. Activity Import Vitthal13. K12 Solution Lite 21st Nov 2012 Vitthal 18th Dec 2012
21st Dec 2012Completed
14. K12 E-Pad Changes (Plan C)- Pointing to live EPS Data - Pointing to live EPS Projects - Lesson Plan HTML 5 - Start Mockup
- Testing the current version on demo server - Concept Map - Done
12th Dec 2012 Vitthal / Srinivas Completed27th Dec 2012 (issue fixes)
15. GTN – EU region Move 5th Dec 2012 Sridhar / Giridhar / Rajshekar
Completed
16. LEP SBA Pilot site Data import.
12th Dec 2012 Shwetha Completed
17. K12 E-Pad (Plan B Changes)
26th Dec 2012 REST Services Completed
18. K12 Solution issues and Changes- Concept Map Implementation- Lesson Edit issue- Flash Changes
20th Dec 2012 Shwetha/Mithun 27th Dec 2012
19. K12 Tablet User Stories
14th Dec 2012 Antony 18th Dec 2012Completed
20. K12 Sales kit –SQl express
27th Dec 2012 Shwetha Completed
November 2012 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. IIM Ranchi 3rd Sprint 31st October 2012
Shwetha/ Ravi Ranjan
5th November 2012
10th November 2012
12th Nov 2012Completed
2. GTN New stories 10th Nov 2012 Vitthal Completed
3. K12 Sales Kit 10th Nov 2012 Antony/Shwetha 13th Nov 2012Except Concept mapping and activity import other things are completed
4. K12 Solution Lite 21st Nov 2012 Vitthal / Hema5. HTML 5 POC -1 8th Nov 2012 Suhas and
SahanaCompleted
6. Lesson Player – Without Flash - POC
12th Nov 2012 Vinay Completed
7. K12 Report tuning 16th Nov 2012 Vitthal / Malathi Completed8. EPS New Server 13th Nov 2012 Vitthal Completed9. HTML 5 – Lesson plan 16th Nov 2012 Suhas Completed10. HTML 5 – Lesson
player19th Nov 2012 Sahana Completed
11. MIS – Attendance Vitthal / Kiran On holdEffort – 3 man days
12. Content Production server Issues
Vitthal Completed
13. K12 CRM 23rd Nov 2012 Vitthal/ Kiran Completed.
October 2012 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
14. IIM Ranchi 3rd Sprint 31st October 2012
Shwetha/ Ravi Ranjan
5th November 2012
15. GTN Support, Testing and CR’s
Vitthal 10th October 2012Completed
16. K12 2.7- Principle
dashboard- Multi
Curriculum- Improve C-
mapping
26th Sep 2012 Shwetha 13th October 2012
19th October 2012
29th October 2012
9th Nov 2012.
12th Nov 201217. EPS 1to 6th and 6 to 8th
Report Changes.26th Sep 2012 Vitthal 8th October 2012
Completed18. Learning Event Portal
Changes17th October 2012
22nd October 2012Completed.
19. EPS 9th std report Changes
17th October 2012
Vitthal/ Hema 29th October 2012
20. EPS Website Changes 16th October 2012
Vitthal/Kiran Completed
21. GTN Taxonomy mapping Import and Testing
16th October 2012
Vitthal Completed
22. GTN Data feed Automation
29th October 2012
Vitthal 6th Nov 2012
September 2012 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
23. IIM Ranch 2nd Sprint 30th August 2012 Shwetha/ Ravi Ranjan
7th September 201212th September 201214th September 2012Completed
24. GTN Support, issues and Performance Testing
Vitthal Completed
25. Activity Import (word based)
Vitthal TBP
26. Excel Teacher Network August 3rd 2012 Vitthal 16th August 201224th August 201231st August 20124th September 2012Completed
27. EPS Support (Report Changes Rollout)
I book Import
Vitthal Completed
28. SFA Change Request 25th Sep 2012 Vitthal Completed29. K12 2.7
- Principle dashboard
- Multi Curriculum
- Improve C-mapping
26th Sep 2012 Shwetha 13th October 2012
30. EPS Web site Changes 26th Sep 2012 Vitthal Completed31. EPS 1to 6th Report
Changes26th Sep 2012 Vitthal 8th October 2012
August 2012 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1. K12 2.6.0 15th July 2012 Shwetha/ Mithun
17th July 201220th July 20122nd August 201210th August 201216th August 201222nd August 2012Completed
2. Excel Teacher Network August 3rd 2012 Vitthal 16th August 201224th August 201231st August 2012
3. IIM Ranchi (2nd Sprint) 30th August 2012 Shwetha/ Ravi Ranjan
7th September 2012
4. EPS,JSSIS and JSSPS Support
1. Issues fixing and deployment (raised by sanju)
7th August 2012 Mithun 13th August 2012Completed
5. ACR Integration 22nd August 2012
Sridhar Joies Completed
6. GTN New deployment testing (European zone)
20th August 2012 Santosh MP Testing Completed.
7. Activity Import (word based)
24th August 2012
Vitthal
8. EPS Reporting module changes
16th August 2012 Vitthal 22nd August 2012Completed
July 2012 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
9. K12 2.6.0 15th July 2012 Shwetha 17th July 201220th July 20122nd August 2012
10. Excel Teacher Network August 3rd 2012 Vitthal 16th August 201211. GTN Performance
testing and Tuning on new features
20th June 2012 Vitthal 4th July 20129th July 201210th July 2012Completed
12. Automation test scripts (Pending Use cases)
15th July 2012 Srinivas, Vidya and Santosh
25th July 2012Completed
13. Lesson Import Changes – 2.0 and additional requirements
30th June 2012 Mithun / Shashi
3rd July 20126th July 2012Completed
14. IIM Ranchi (1st Sprint) 30th July 2012 Shwetha15. EPS,JSSIS and JSSPS
Support1. K12 student
import2. Timetable
update3. Promoting the
existing students
16th July 2012 Srinivas.H Completed
16. Knowledge Transfer 30th July 2012 Team 2hrs daily17. Project Import (7
Projects)20th July 2012 Santhosh MP Completed
18. K12 Unit plan and Assignment Changes
25th July 2012 Vitthal Completed
19. Report Changes - EPS 25th July 2012 Vitthal Completed
June 2012 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
20. EPS and JSS Support1. Library
Management enablement
2. Meeting with principal and prashanth sir
3. 1 week training and monitoring
On Going Sridhar Joies / Anotny bineesh
Completed
21. K12 2.6.0 15th July Shwetha22. Excel Teacher Network August 3rd 2012 Vitthal23. Weather station
application Changes8th June Vitthal Rescheduled
11th Junecompleted
24. GTN Performance testing and Tuning on new features
20th June Vitthal 4th July 2012
25. Automation test scripts (Admin and Pedagogist part except flash)
25th June Srinivas and Santosh
Completed
26. Lesson Import Changes 19th June Mithun / Shashi Completed27. Project Maker Issue
fixing23rd June Mithun / Santosh Completed
28. Sarla Birla – Deployment and Data Creation
26th June Mithun / Santosh Completed
29. Lesson Import Changes – 2.0 and additional requirements
30th June Mithun / Shashi 3rd July 2012
May 2012 – K12 Team Delivery DeadlinesSL.No and Priorities
Task Dead Line for completion
Who is Responsible?
Status Update
1.
P1
Guardian Staging Release
3rd May Vitthal Completed8th May Vitthal Completed10th May Vitthal Postponed to
12th may14th MayCompleted
15th May Vitthal Postponed to18th May28th May29th MayCompleted
5.P1
Guardian Taxonomy Release to Production
29th May Vitthal Rescheduled
6.P1
Learning Event Phase -1 10th May Shwetha Completed
7.
P1
Learning Event Performance Testing and Tuning
16th May Shwetha Postponed to26th May6th June11th June
8.P3
Facebook Use-case implementation
30th May Mithun Postponed to 1st June7th JuneCompleted
9.
P3
Movement of Curriculum Management to K12 2.5.0.0
10th May Vitthal Postponed to 15th May 201222nd May 201229th May 20125th June11th June
10.P2
Deferred Issues - K12 - 2.4.0.0
30th May Shwetha 1st June 201214th June 201220th June26th JuneCompleted
11.P2
Test and Question - Bulk Import and Export
30th May Shwetha Completed
12.P1
Review Changes LP 16th May Shwetha Postponed to21st May 2012Completed
APRIL 2012 – K12 Team Delivery DeadlinesSL.No Task Dead Line for
completionWho is Responsible?
Status Update
13. Curriculum mapping - release
Planned – 15th Anil, Srinivas & Prakash
Completed
14. Guardian staging release Planned – 10th Vitthal Completed15. Guardian production
releasePlanned – 03rd Vitthal Completed
16. Guardian staging release Planned – 13th Vitthal Completed17. Learning Event Portal –
Phase 1Planned – 30th Shwetha Postponed to
10th MayCompleted
18. EPS – 2012-13 Action items Cleaning and alternate
URL for referring to old resources
New iBook Promotion
Planned – 20th Vitthal Rescheduled 6 times
25th April30th April2nd May3rd May7th May8th May14th MayCompleted
19. MIS – SRS document Planned – 20th Balamurugan Rescheduled 2 times
25th April30th April2nd May7th May - Completed
20. Demo – Preparation (Sarla Birla)
Planned – 25th Balamurugan & Srinivas
Completed
MARCH 2012 – K12 Team Delivery DeadlinesSL.No Task Dead Line for
completionWho is Responsible?
Status Update
1. 2.4.0.0 – Release Planned - 2nd MarchActual - ?
Vitthal, Shwetha and Hemavathi
Completed
2. Question and Test export and
Planned - 2nd March
Shwetha Completed
3. EPS – CCE Report rollout Planned – 8th March
Vitthal Completed
4. Demo Server – readiness Planned – 9th March
Balamurugan All issues are fixed and testing is started.
5. 2.5.0.0 – Release Planned – 5th April Vitthal & Shwetha6. Guardian Sprint Release Planned – 7th
MarchVitthal Completed
7. Guardian Sprint Release Planned – 15th March
Vitthal Completed
8. Guardian Sprint Release Planned – 16th March
Vitthal Completed
9. Guardian Sprint Release Planned – 20th March
Vitthal Completed
10. Guardian Sprint Release Planned – 26th March
Vitthal Completed
11. Guardian Sprint Release Planned – 30th March
Vitthal Completed
12. Guardian Sprint Release Planned – 5th April Vitthal Completed13. Learning Event Portal –
Requirement and Analysis document + POC
Planned – 17th March
Shwetha & Balamurugan
Completed