weekly report - alamo.eduweekly report st. phillip’s college — norris technical building...

2
WEEKLY REPORT St. Phillip’s College — Norris Technical Building March 16 — March 20 This week activities: Next week activities: Cont. Exterior Framing on South Elevation Start fur-downs Level 4 Elevator Shaft Protection Start Prime & 1st coat of Paint Level 4 Star Data Cable Install Double Sided Walls Level 1 Cont. Exterior Framing on South Elevation Cont. Final Paint on Level 4 Walls Cont. Data Cable Install Cont. Framing and Drywall at Ele- vator Shaft Cont. Prime & 1st coat of Paint Level 4

Upload: others

Post on 19-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WEEKLY REPORT - alamo.eduWEEKLY REPORT St. Phillip’s College — Norris Technical Building February 24— February 28 This week activities: Next week activities: Complete Level 2

WEEKLY REPORT St. Phillip’s College — Norris Technical Building

March 16 — March 20

This week activities: Next week activities:

Cont. Exterior Framing on South Elevation

Start fur-downs Level 4

Elevator Shaft Protection

Start Prime & 1st coat of Paint Level 4

Star Data Cable Install Double Sided Walls Level 1

Cont. Exterior Framing on South Elevation

Cont. Final Paint on Level 4 Walls

Cont. Data Cable Install Cont. Framing and Drywall at Ele-

vator Shaft

Cont. Prime & 1st coat of Paint Level 4

Page 2: WEEKLY REPORT - alamo.eduWEEKLY REPORT St. Phillip’s College — Norris Technical Building February 24— February 28 This week activities: Next week activities: Complete Level 2

Fur down at Level 4 Final Paint Level 4

Data Cable Elevator Shat Protection

Drywall Level 1 Spray Fireproofing