wei huang work sample 2015

15
WEI HUANG WORK SAMPLE

Upload: wei-huang

Post on 22-Jul-2016

224 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Wei huang work sample 2015

WEI HUANG WORK SAMPLE

Page 2: Wei huang work sample 2015

The Rødovre high rise is comprised of two towers , dancing at the gate of Rødovre city. Situated on the west axis of Copenhagen, the site marks the watershed seperating historic neighborhoods and the industrial suburb, traditional low rises to the east, and the modernist apartment high rises to the west. The design of the two towers emerges from juxpositioning the contrasting conditions between the traditional and the new, the metropolis and the suburb. The form of towers aim to merge an outward orientation focusing on the city of Rødovre, with the inward interest on a dynamic public landscape below.

Rødovre High Rise TowerINTERVENTION

STUDY OF DANCE

FLOOR PLAN 3rd FL

5 10

3rd Floor

5 10

3rd Floor

FLOOR PLAN 12th FL

5 10

12th Floor Plan

FLOOR PLAN 29th FL

Section

50 15 30

NORTHWEST SECTION

1Design 2008

Copenhagen Rødovre High-rise Competition Finalist Lead Designer

Page 3: Wei huang work sample 2015

PLAZA IN SUMMER

SOUTH STREET VIEW

PLAZA IN WINTER

TOWER NIGHT VIEW

STRUCTURAL ANALYSIS

Structural Models

Lateral Displacement Mode 1

Lateral Displacement Mode 2Torsional Displacement Mode 3

Static Analysis Column Loads

Axial Force, Fx: 41600. kN/pic.cm

694.5 kN

-613.2 kN

-1921. kN

-3229. kN

-4536. kN

-5844. kN

-7152. kN

-8459. kN

Translation, Ux: 1280. mm/pic.cm

Output axis: local

762.2 mm

653.0 mm

543.8 mm

434.6 mm

325.4 mm

216.2 mm

107.0 mm

-2.143 mm

Deformation magnification: 12.50

Translation, Ux: 1280. mm/pic.cm

Output axis: local

771.1 mm

609.0 mm

446.9 mm

284.8 mm

122.8 mm

-39.34 mm

-201.4 mm

-363.5 mm

Translation, Ux: 1280. mm/pic.cm

Output axis: local

781.6 mm

669.2 mm

556.8 mm

444.4 mm

332.0 mm

219.7 mm

107.3 mm

-5.107 mm

Page 4: Wei huang work sample 2015

Harbin grand theater is inspired by the landscape of the Songhua river. At the heart of the economic, cultural and spiritual identity of the city of Harbin, the river traces out a dynamic landscape, constantly changing its flow with the seasons and through the years. It leaves the history of its changing course in undulating patterns in the flat plains of the surroundings. The city sit back from the river, allowing its generous flood-planes to assume the role of a vast public space. New development leapfrog the river, expanding the city to the north. The theater is a major component of this new urban development.

The form of the opera house is inspired by the Songhua river; it is shaped as an extension of the river, flows of water and ice, a response to its force and spirit. This relationship between the architecture and the river evolves through the process of the design, moving from a gestural to an organizational relationship, from an organic expression to a refined iconicity. The building will be visible from both the old and new city, forging new identity for the Harbin skyline and new linkages between the north and south banks of the river. And yet, it remains a genuine and integral element of the landscape and a visible reminder of the power of the river as a shaping force. The result is a world-class performance venue and cultural institution, as well as a celebration of the spirit of the river and the city of Harbin.

Responsibilities: Conceptual, Design Development, Graphic presentation, Parametric Design, Local design

Institute and consultant Coordination, Material Research and development, Facade Rationalization

and Fabrication, Construction Documents

VALLEY

EROSION & DEPOSIT

ICE

retawamgamdniw

retawamgamdniw

Harbin Grand Theater

APRIL 2015

MULTIPURPOSE THEATERMULTIPURPOSE THEATER

2 Design 2010-2012 Construction 2010-present

Lead Designer in SD/CD/DD

SITE PLAN

SECTION SML THEATER

Page 5: Wei huang work sample 2015

APRIL 2015

CROSS SECTION

PYRAMID GLASS CANOPYGLAZING DETAIL

MAIN STRUCTURE PROCESS

PROCESS

Page 6: Wei huang work sample 2015

REHEARSAL ROOM OPT1

REHEARSAL ROOM PLAN REHEARSAL SECTION

REHEARSAL ROOM OPT2 REHEARSAL ROOM OPT3

REHEARSAL ROOM OPT4

MAIN THEATER SEATING POTS

REHEARSAL ROOM OPT3

DANCE FLOOR舞蹈地胶

sqm 面积

530㎡

GLASS 玻璃

sqm 面积

113㎡Description 描述

mirror高反射镜面

WOOD 木材

sqm 面积

500㎡

G.R.G.

sqm 面积

851㎡Description 描述

White 白色

REHEARSAL ROOM排练厅

8000

1

8900

2400 GL-4

12 3

GRG-1

WOOD-2

MAIN THEATER CHAMBER

Page 7: Wei huang work sample 2015

BUMP PANEL TYPE 1

BUMP PANEL TYPE 2

ORIGINAL FACADE SURFACE

CURVATURE ANALYSIS

PANEL BUMPS PATTERN

GH DEFINTION

2015 CONSTRUCTION IMAGE

2015 CONSTRUCTION IMAGE

Page 8: Wei huang work sample 2015

Harbin Wood Sculpture Museum3Design 2009-2010

Construction 2010-2012Lead Designer in SD/CD

Natural Processes

From the frosted local landscapes to the singular wood carving culture, this museum is a contrast between the elegance of nature and the speed of daily life. Its 200 meter long body is shaped as a frozen fluid that reflects and explores the relation between the building and the subject that inspired the art work .

The three vertical voids take cues from caves in glacier, day light flood in through skylights into the voids adjacent to the galleries, creating focal points, guiding for visitor into each museum. The two different exhibitions connected by a centralized entrance which both separates the two museums while simultaneously joining them.

Page 9: Wei huang work sample 2015

Harbin Wood Sculpture Museum

ATRIUM RENDER

CUT-AWAY MODELS

SECTIONS

ON SITE MAR 2012 ON SITE MAR 2012

FACADE COMPLETION

Page 10: Wei huang work sample 2015

COMPRESSIVE FITNESS CENTER4

CompressionWhen measured in different scales, wind and sound lose or gain resolutions based on its the respective spatial and urban conditions. Through the translation of variable wind and sound resolutions in Dumbo’s neighborhood, a new reading of her urban environment emerges. The same concept manifests itself through the organization of our fitness center. Inter-programmatic relationships are discovered through a resolution study of their appropriate functions. Volumetric studies help establish spatial hierarchies. Sound and wind guidelines are adopted in order to provide each program with an adequate comfort level. The result is an architectural statement which integrates the behavior of air properties from the literal to the figurative.

LOCAL STREET CORRIDOR LOCAL STREET PRESSURIZEDDUMB STREET PRESSURIZED

GROUND LEVEL PROGRAM GROUND LEVEL PRESSURIZED

THIRD LEVEL SOUND PROPAGATIONTHIRD LEVEL SOUND PROPAGATION

DUMBO STREET CORRIDOR

6

5

4

3

2

1

GFEDCBA

20’20’ 40’0’

6

5

4

8

7

3

2

1

9

10

GROUND LEVEL PROGRAM

1 CAFE2 RETAIL3 MEMBER’S LOUNGE4 ADMIN OFFICES5 CHILDCARE6 JUNGLE GYM7 PUBLIC CORRIDOR8 BOXING RING9 CROSSFIT TRAINING10 DANCE STUDIOS

N

6

5

4

3

2

1

GFEDCBA

N

20’20’ 40’0’

THIRD LEVEL PLAN

11 WOMEN’S LOCKER ROOM12 WOMEN’S BATHROOM 13 WOMEN’S SHOWER ROOM14 MEN’S LOCKER ROOM15 MEN’S BATHROOM 16 MEN’S SHOWER ROOM17 POOL18 BASKETBALL COURT19 TREATMENT AREA

17

16

20

19 13

1512

1411

6

5

4

8

7

3

2

1

9

10

GROUND LEVEL PLAN

1 CAFE2 RETAIL3 MEMBER’S LOUNGE4 ADMIN OFFICES5 CHILDCARE6 JUNGLE GYM7 PUBLIC CORRIDOR8 BOXING RING9 CROSSFIT TRAINING10 DANCE STUDIOS 10’0’

N

6

5

4

3

2

1

GFEDCBA

N

17

20’20’ 40’0’

THIRD LEVEL PLAN

11 WOMEN’S LOCKER ROOM12 WOMEN’S BATHROOM 13 WOMEN’S SHOWER ROOM14 MEN’S LOCKER ROOM15 MEN’S BATHROOM 16 MEN’S SHOWER ROOM17 POOL18 BASKETBALL COURT19 TREATMENT AREA

16

19

18 13

1512

1411

18

YOGA

SUNDECKTOP

FIFTH FLOOR

FITNESS STUDIOFOURTH FLOOR

POOLTHIRD FLOOR

CYCLE & STRENGTH TRAINING

SECOND FLOOR

DAY CARERETAIL

FIRST FLOOR

6 5 4 3 2 1

CROSS SECTION20’20’ 40’0’

YOGA

SUNDECKTOP

FIFTH FLOOR

FITNESS STUDIOFOURTH FLOOR

POOLTHIRD FLOOR

CYCLE & STRENGTH TRAINING

SECOND FLOOR

DAY CARERETAIL

FIRST FLOOR

6 5 4 3 2 1

20’20’ 40’0’MODIFIEDNATURAL CROSS SECTION: VENTILATION GRADIENT

WIND PRESSURIZED ZONING GRADIENT

AIR CONDITIONED ZONING GRADIENT

GSAPP Summer Studio 2013Critic Phu Hoang Assistant Emanuel Admassu

Team Mate: Joseph Brunner

Page 11: Wei huang work sample 2015

COMPRESSIVE FITNESS CENTER

YOGA

SUNDECKTOP

FIFTH FLOOR

FITNESS STUDIOFOURTH FLOOR

POOLTHIRD FLOOR

CYCLE & STRENGTH TRAINING

SECOND FLOOR

DAY CARERETAIL

FIRST FLOOR

6 5 4 3 2 1

CROSS SECTION20’20’ 40’0’

YOGA

SUNDECKTOP

FIFTH FLOOR

FITNESS STUDIOFOURTH FLOOR

POOLTHIRD FLOOR

CYCLE & STRENGTH TRAINING

SECOND FLOOR

DAY CARERETAIL

FIRST FLOOR

6 5 4 3 2 1

CROSS SECTION: PROGRAMMATIC VENTILATION SPECIFICITY MIXTURE SUSPENSIONACCELERATION 20’20’ 40’0’

YOGA

SUNDECKTOP

FIFTH FLOOR

FITNESS STUDIOFOURTH FLOOR

POOLTHIRD FLOOR

CYCLE & STRENGTH TRAINING

SECOND FLOOR

DAY CARERETAIL

FIRST FLOOR

6 5 4 3 2 1

20’20’ 40’0’MODIFIEDNATURAL CROSS SECTION: VENTILATION GRADIENT

YOGA

SUNDECKTOP

FIFTH FLOOR

FITNESS STUDIOFOURTH FLOOR

POOLTHIRD FLOOR

CYCLE & STRENGTH TRAINING

SECOND FLOOR

DAY CARERETAIL

FIRST FLOOR

6 5 4 3 2 1

20’20’ 40’0’MODIFIEDNATURAL CROSS SECTION: VENTILATION GRADIENT

WIND PRESSURIZED ZONING GRADIENT

AIR CONDITIONED ZONING PROGRAM

OPEN AIR POOL IN SUMMER

WIND PRESSURIZED ZONING GRADIENT

AIR CONDITIONED ZONING GRADIENT

AIR CONDITIONED ZONING GRADIENT

SOUTH FACADE WIND DIAGRAM RENDER

Page 12: Wei huang work sample 2015

PERMEABLE NATURE GSAPP Spring Studio 2014Critic Ada Tolla, Giuseppe Lignano,Thomas Demonchaux

Site: New York

5

ROOF VIEW LEVEL -10

SOUTH ELEVATION NORTH ELEVATION CROSS SECTION LONGITUDINAL SECTION

GROUND LEVEL LEVEL 5

INTERIOR SHOT EAST ELEVATION WEST ELEVATION

EROSION FORM SUCCESSION

Page 13: Wei huang work sample 2015

PERMEABLE NATURE

NATURAL CRYSTAL FORMATION

HEXANGON NATURAL FORMATION

CRYSTAL CELL GROWTH

CRYSTALLIZING FACADE

FRACTURED PLAN

SECTION THROUGH ATRIUM

HEX FOREST CEMETERY

FRACTURED EMERGENCE

Page 14: Wei huang work sample 2015

China Pavilion Milan EXPO6 Design 2013-2015

Construction 2014-2015Designer in CD/CA

purlin / rafter pin; 39mm bracing purlin / rafter joint ; 22mm bracingpurlin / rafter joint ; 33mm bracing

double bracing detail wood rafter / steel purlin w/ 22mm bracing

wood purlin / steel rafter w/ bracing

Purlin Joint Details Purlin Joint On Site

PURLIN UNROLLED ANALYSIS

As a main part of the timber/steel structure, 650 wood purlins supports the rafters throughout the roof. Due to the undulating shape of the roof, every piece of these purlins has a slightly different angle. The analysis here breaks down the angle variation, and group them into smaller number, 10 types, and provides a feasible fabrication option for timely manufacturing.

STEEL RAFTER (RED) PURLIN SYSTEM (GREEN) PURLIN SYSTEM ANALYSIS

Page 15: Wei huang work sample 2015

China Pavilion Milan EXPO

CONCEPT OF CONSTRUCTION

COLLISION CONTROL MODEL

MULTIMEDIA HALL (ON SITE 2015_04)

CONCEPT OF CONSTRUCTION

BACKBOARD

BACKBOARD

(800x1800MM)

(25x500MM)

OFFSET 30MM

MINIMUM 200MM

OFFSET 60MM

OVERLAP 60MM

STEP 1. INSTALL BACKBOARD

STEP 2. PRINT AND MOUNT FRAME

DWG 1:1 ON RAFTER

STEP 3. INSTALL PANEL FRAME

STEP 4. INSTALL PANELS

RAFTER

BACK BOARD(LIGHT SEALING)

PURLIN

CEILING SOUND PROOF GYPSUM BOARDS800mmX1800mm

CONCEPT OF CONSTRUCTION

CEILING BOARDSUPPORT FRAME

PANEL LOCATION DRAWING

R 09 R 10 R 11 R 12 R 13 R 14

R 15 R 16 R 17 R 18 R 19 R 20

ASSEMBLY DIAGRAM

PANELS RENDER