Page 1: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 2: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Introductions

District Team

Stakeholders

Project Purpose

Develop a Comprehensive Flood Control Program

Develop Drainage Alternatives

Provide a Balanced Multi-Objective Approach

Welcome

Page 3: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 4: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 5: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 6: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 7: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 8: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 9: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 10: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 11: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 12: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 13: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 14: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 15: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Agenda

Introductions and Opening Comments

Meeting Purpose

Project Overview

Stakeholder Involvement and Input

Summary and Next Steps

Adjourn

Page 16: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Stakeholder involvement approach

Public Meeting May 2015

Public Meeting April 2016

July 2014-October 2014

July 2014- April 2016

April 2016

Page 17: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Project Overview Project Limits

Page 18: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 19: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

SCOPE OF WORK

Existing Conditions Analysis

Hydrologic Analysis and Floodplain Delineation

Preparation of FEMA Map Revision

Alternatives Analysis and Remediation Recommendations

Public and Stakeholder Involvement

Project Overview continued

Page 20: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Existing Conditions

Drainage Complaints

Project Overview continued

Page 21: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Drainage Complaints

Page 22: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Existing Conditions

Review Available Studies & Reports

Project Overview continued

Page 23: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

March 23, 1981, Preliminary Drainage Study Report, Ruthrauff Road I-10 to La Cholla Blvd., Cella Barr Associates.

June 3, 1981, Hydrologic Investigation for Gardner Lane Area, Cella Barr Associates July 16, 1981, Alternative Design Schemes for the Gardner Lane Area, Cella Barr Associates. November 10, 1981, Report on Existing 100-year Flooding Conditions within The Gardner Lane Area,

Cella Barr Associates. August 15, 1983, Critical Watershed Management Plan, Ruthrauff Road Area, Cella Barr Associates. August 15, 1983, Main Report, Critical Watershed Management Plan, Ruthrauff Road Area, Cella

Barr Associates. December 17, 1993 (Revised November, 1995), Existing–Conditions Hydrologic Modeling for the

Tucson Stormwater Management Study, Phase II, Stormwater Master Plan, Simons, Li & Associates, Inc.

December 15, 1995, Final Report, Tucson Stormwater Management Study, Phase II, Stormwater Master Plan, Simon, Li & Associates, Inc.

April 2011, I-10 Mainline Reconstruction, Casa Grande-Tucson Highway (I-10) Ruthrauff Road to Prince Road, Final Drainage Report, AECOM.

June 16, 2011, Flood Insurance Study, Pima County, Arizona and Incorporated Areas, Federal Emergency Management Agency.

Available Studies and Reports

Page 24: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Existing Conditions

Interstate 10 Drainage Structures

Project Overview continued

Page 25: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Interstate 10 Drainage Structures

Page 26: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 27: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis
Page 28: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Hydrologic Analysis and Floodplain Delineation

Project Overview continued

Page 29: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Preliminary Flo-2D

Page 30: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

FLO-2D Preliminary Map with Topography (50’ grid)

Page 31: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

FLO-2D Preliminary Map with Aerial Imagery (15’ grid)

Page 32: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Project Overview continued FEMA Map Revision

Page 33: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Existing FEMA Floodplains

Page 34: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Project Overview continued Alternatives Analysis and Remediation Recommendation

Page 35: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Prioritizing the List

A: Mitigating Sheet Flooding

Public Safety

B: Removing properties from

floodplain

Economic

C: Creating value for residents

Economic Intangibles

D: Creating value for

taxpayers

Economic Enhancements

E: Sustainable solutions

Economic Social Equity

Environmental

F: Stakeholder buy-in

Viability

Page 36: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

1 • Agree on performance criteria

2 • Develop weighting values for performance criteria

3 • Develop alternatives without consideration of cost

4 • Score the alternatives using performance criteria

5 • Add costs to determine scoring with costs

6 • Complete a fatal flaw analysis

7 • Determine recommended alternative based on final score

Alternatives analysis process

Page 37: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Project Overview continued

Schedule

Page 38: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Schedule

0 3 6 9 12 15 18 21 24

Task 6: Project Administration

Task 5: Public Involvement

Task 4: Alternatives Analysis and RemediationRecommendations

Task 3: Preparation of FEMA Map Revision

Task 2: Hydrologic Analysis and Floodplain Delineation

Task 1: Existing Conditions Analysis

10/9/2015: Flowing Wells Wash LOMR

5/4/2015 4/8/2016

4/4/2016: Alternatives Report

4/4/2015

10/6/2014: Existing Conditions Report

months

Page 39: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Deliverables

LOMR for Flowing Wells Wash

Existing Condition Report

Final Report Consisting Of…

Alternative Selection Report

Implementation Plan

Public Outreach Summary Report

Project Overview continued

Page 40: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Individual Questions/Comments?

Data that we are missing and you can share?

Are there other Stakeholders we should contact?

Other Comments or Ideas?

Stakeholder Involvement and Input

Page 41: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Regular Monthly Progress Meetings at RFCD

Fall Workgroup Meeting

Continued Stakeholder Coordination

Deliverable Production

Summary/Next Steps

Page 42: Welcome [webcms.pima.gov]...2014/07/24  · October 2014 July 2014- April 2016 April 2016 Project Overview Project Limits SCOPE OF WORK Existing Conditions Analysis Hydrologic Analysis

Adjourn

Thank You!