WelcomeWEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH
PLN’S BANGKA BELITUNG EXPERIENCES WITH -ISLAND ELECTRIFICATION PROGRAM25 November 2020, 10.30 – 11.50 CET (16.30 – 17.50 WIB)
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 4
ABOUT PLN CORPORATE
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 5
PT PLN (Persero) is a State-Owned Enterprise (BUMN)
engaged in the electricity sector which is integrated
throughout Indonesia. In 2018, PLN was the largest utility company in
Southeast Asia by assets and customers.
Core Business:
Power Generation Transmission dan distribution Customer service
in 2018, PLN has a total installed
generating capacity of 57,822 MW,
transmission network length of 46,685
kms, substation capacity of 124,345 MVA,
distribution network length of 959,038
kms, number of customers 71.92 million,
national electrification ratio of 98.3%,
assets of Rp. 1,492.49 trillion.
ABOUT PLN BANGKA BELITUNG
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 6
UGI MUNTOK 2X30 MVA (2017)
GI KELAPA 1X30 MVA
GI BUKIT SEMUT 1X30 MVA
ACSR 1x240 mm2
57,3 km
ACSR 2x240 mm2
70 km (2017)
ACSR 1x240 mm273,1 km
ACSR 2x240 mm260 km (2018)
GI KAMPAK 2X30 MVA
Koba
GI TOBOALI 1X30 MVA
(2018)
TanjungApi-api
Kenten
XLPE 2x300 mm239 km
ACSR 2x240 mm216 km
Landing Point
ACSR 2x330 mm220 km
GG
D
GI PANGKAL PINANG 3
2X30 MVA (2021)
G
G
GI BELINYU 1X30 MVA (2026)
ACSR 2x240 mm
2
45 km (2026)
G
G
Dukong
ManggarACSR 1x210 mm2
70 km (2018)
BELITUNG UTARA
SUGE
ACSR 1x240 mm220,24 km
ACSR 1x210 mm235 km (2019)
G
G
GU
G
GI PANGKAL PINANG 2
2X30 MVA (2026)
ESTABLISHED SINCE 1984 SERVICE AREA: BANGKA & BELITUNG
ISLANDS ELECTRIFICATION RATIO : 100% TOTAL DEMAND: 670.816 MVA TOTAL CUSTOMERS: 413.051 PLG
• Area: 11,623 km²• Population: 954,642• Economy: agriculture,
mining, quarrying & Tourism
Area: 4,800 km²Population: 271,868
Economy: agriculture,mining, quarrying &
Tourism
SUB UNIT:• Rayon Pangkalpinang• Rayon Sungailiat• Rayon Mentok• Rayon Toboali• RayonKoba
SUB UNIT:• Rayon Manggar• Rayon Tanjung
Pandan
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 7
ELECTRIFICATION RATIO IN PLN BANGKA BELITUNG
100% electrified
Issues and Challenges
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 8
HOW WE OVERCOME THE PROBLEMS?
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 9
Energy transition through a rapid and efficient increase in new renewable energy (EBT)
Optimizing Renewable Energy from local resource (Solar PV, agro-waste based biomass & biogas)
Improving solar power plant dispatchability &availability through solar-diesel hybrid system inisolated islands.
Encouraging electric vehicle and electric inductionstove usage for household in isolated island toenhance electricity load in isolated island andacceptance on green energy. (Converting 100%Bukulimau island’s household from oil and firewoodcooking stove usage to electric induction stove sinceOct 2018 as the model)
Accelerating the adoption and mastery of newtechnology, and the application of a smart grid system
Solar Energy Potential :
Annual average 2.004kWh/m2/year ; Irradiation 5,49 kWh/m2/day.
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 10
Kp. Jawa
PROV. SUMATERA SELATAN
LP
LP
LPLP
GI KELAPA
1x30 MVA GI SUNGAILIAT
1x30 MVA
GI AIR ANYIR
1x60 MVA
GI PANGKALPINANG
1x30, 1x60 MVA
GI KOBA
1x30 MVA
GI DUKONG
2x30 MVA
GI SUGE
1x20, 1x30, 1x 60 MVAGI TOBOALI
1x60 MVA
CURRENT ENERGY MIX IN BANGKA BELITUNG
PLTD MUNTOK
DM : 11,2 MW
BP : 7,5 MW
PLTD MERAWANG
DM : 31,7 MW
BP : 24,9 MW
PLTD Belinyu
DM : 3,7 MW
BP : 3,0 MW
PLTBg GPL (Excess Power)
DM : 1,2 MW
BP : 1,2 MW
PLTU AIR ANYIR
DM : 47,8 MW
BP : 44,7 MW
MPP AIR ANYIR
DM : 50 MW
BP : 44 MW
PLTD Sewa AIR ANYIR
DM : 18 MW
BP : 16,7 MW
PLTD KOBA
DM : 3,05 MW
BP : 2,6 MW
PLTD TOBOALI
DM : 5 MW
BP : 4,7 MWPLTD PENGAREM
DM : 3,6 MW
BP : 3,2 MW
PLTD CELAGEN
DM : 300 kW
BP : 74 kW
PLTD PONGOK
DM : 1 MW
BP : 190 kW
PLTS PONGOK
Kap : 80 kWp
PLTD S. NASIK
DM : 1,315 MW
BP : 254 kW
PLTD SUMEDANG
DM : 300 kW
BP : 25 kW
PLTD GERSIK
DM : 400 kW
BP : 42 kW
PLTD SELIU
DM : 415 kW
BP : 90 kW
PLTD BUKULIMAU
DM : 400 kW
BP : 30 kW
PLTS BUKULIMAU
Kap : 80 kWp
PLTD MANGGAR
DM : 6,4 MW
BP : 4,4 MW
PLTBm BE
(IPP)
DM : OFF
BP : OFF
PLTBg AUSTINDO
(IPP)
DM : 1,8 MW
BP : 1,5 MW
PLTD PILANG
DM : 7,8 MW
BP : 2,8 MW
PLTBm LISTRINDO
(IPP)
DM : OFF
BP : OFF
PLTBm EKP (IPP)
DM : 4,5 MW
BP : 3,5 MW
PLTBg BBS (IPP)
DM : 2 MW
BP : 1,8 MW
PLTU SUGE
DM : 33 MW
BP : 28 MW
MPP SUGE
DM : 25 MW
BP : 12,5 MW
PLTD NANGKA
DM : 200 kW
BP : 22 kW
BANGKA SYSTEM
Capacity Power : 180,4 MW
Peak Load : 159,03 MW
Reserve margin : 21,37 MW
BELITUNG SYSTEM
Capacity Power : 77,9 MW
Peak Load : 43,6 MW
Reserve margin : 34,3 MW
PLTD KELAPAN
DM : 25 kW
BP : 7 kW
PLTD PANJANG
DM : 30 kW
BP : 12 kW
PLTD TINGGI
DM : 35 kW
BP : 10 kW
PLTBn
Pegantungan
DM : 4 MW
BP : - MW
* Juli 2020PLTD KUIL
DM : 100 kW
BP : 27 kW
PLTD LONG
DM : 100 kW
BP : 23 kW
PLTD BUNTAR
DM : 40 kW
BP : 21 kW
28.4%
66.3%
5.2%
Batu Bara BBM EBT
ENERGY COMPOSITION
BANGKA
45%
47%
8%
Batu Bara BBM EBT
ENERGY COMPOSITION
BELITUNG
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 11
Kp. Jawa
PROV. SUMATERA SELATAN
LP
LP
LPLP
GI KELAPA
1x30 MVA GI SUNGAILIAT
1x30 MVA
GI AIR ANYIR
1x60 MVA
GI PANGKALPINANG
1x30, 1x60 MVA
GI KOBA
1x30 MVA
GI DUKONG
2x30 MVA
GI SUGE
1x20, 1x30, 1x 60 MVAGI TOBOALI
1x60 MVA
Existing Renewable Energy in Bangka BelitungPLTBg GPL (Excess Power)
DM : 1,2 MW
BP : 1,2 MW
PLTS Celagen
Kap : 80 kWp
PLTS BUKULIMAU
Kap : 80 kWp
PLTBm BE
(IPP)
DM : 3 MW (OFF)
BP : OFF
PLTBg AUSTINDO
(IPP)
DM : 1,8 MW
BP : 1,5 MW
PLTBm LISTRINDO
(IPP)
DM : 3 MW (OFF)
BP : OFF
PLTBm EKP (IPP)
DM : 4,5 MW
BP : 3,5 MW
PLTBg BBS (IPP)
DM : 2 MW
BP : 1,8 MW
PLTBn
Pegantungan
DM : 4 MW
BP : - MW
* July 2020
PLTSa P. TInggi
Kap : 20 kW
Biogas: 5 MWBiomass: 10,5 MWSolar PV : 0,365 MWpWaste to Energy (WtE) : 0,02 MW
PLTS Pongok
Kap : 125 kWp
PLTS BUKULIMAU
Kap : 80 kWp
15,8 MW (16,3%) of total 257 MW electricity production until July 2020 are coming from Renewable Energy sources
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 12
Bangka Island
PLTBMLISTRINDO
PLTDMENTOK
PLTDKOBA
PLTDTOBOALI
PLTDMERAWANG
GISUNGAILIAT
GIAIR ANYIR
GIPANGKALPINANG
PLTU AIR ANYIR
PLTS/PLTDP. PONGOK
PLTS/PLTDP. CELAGEN
GIKELAPA
PLTD SEWAAIR ANYIR
PLTGMPP AA
GI KOBA
PLTDNANGKA
PLTBG GPL
Pongok
PV Module :Canadian Solar Type CS6P-250M504 module (9 seri x 56 string)Total Capacity 126 kWp
MPPT Charge Controller :Leonics Type SCM240140RM, 6 unitTotal Capacity 165 kW
Inverter :Apollo Type MTP-616F, 1 unitTotal Capacity 125 kW
Battery Bank :NS Type OPzS2-2500 AH, 121 blockTotal Capacity 605 kWh
Diesel Generator Set :Deutz Type TCD2013L64V, 5 UnitTotal Capacity 5 x 200 kVA
Celagen
PV Module :Yingli Type YC250P-29b320 module (20 seri x 16 string)Total Capacity 80 kWp
MPPT Charge Controller :Zigor Solar integrated to InverterTotal Capacity 100 kW
Inverter :Zigor Solar Type HIT3C-100, 1 unitTotal Capacity 100 kW
Battery Bank :BSB Type OPzV2-1000 AH, 181 blockTotal Capacity 362 kWh
Diesel Generator Set :Deutz Type BF6M-1013EC, 3 UnitTotal Capacity 3 x 100 kVA
EXISTING SOLAR POWER PLANT IN BANGKA ISLAND
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 13
PLTS Pulau Belitung
PLTD PADANG
PLTU BELITUNG ENERGI
PLTD S. NASIK
PLTS P. GRESIK
PLTDPILANG
PLTS/PLTDP. BUKULIMAU
BIOGASAUSTINDO
PLTD P. SELIU
GIDUKONG
GISUGE
PLTUSUGE
PLTGMPP
PLTD SUMEDANG
Bukulimau
PV Module :Yingli Type YC250P-29b360 module (20 seri x 16 string)Total Capacity 80 kWp
MPPT Charge Controller :Zigor Solar integrated to InverterTotal Capacity 100 kW
Inverter :Zigor Solar Type HIT3C-100, 1 unitTotal Capacity 100 kW
Battery Bank :BSB Type OPzV2-1000 AH, 181blockTotal Capacity 362 kWh
Diesel Generator Set :Deutz Type BF6M-1013EC, 4 UnitTotal Capacity 4 x 100 kVA
Gresik
PV Module :Solarworld Type SW230 175 module Total Capacity 40 kWp
MPPT Charge Controller :Leonics 3 unit
Inverter :Apollo Type MTP-616F, 1 unitTotal Capacity 45 kW
Battery Bank :Type OPzS2-1200 AH, 120 bhTotal Capacity 240 kWh
Diesel Generator Set :Deutz Type BF6M-1013EC, 4 UnitTotal Capacity 4 x 100 kVA
EXISTING SOLAR POWER PLANT IN BELITUNG ISLAND
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 14
ROAD MAP GREEN ENERGY BABEL
2022
20212020
2025
2023
2024
5,1%BANGKA
6,2%
11,2 MW
BELITUNG
2,4%
1,8 MW 6,7%BANGKA
7,3%
13,2 MW
BELITUNG
5,1%
3,8 MW
9,0%BANGKA
8,4%
15,2 MW
BELITUNG
10,4%
7,8 MW
23,1%BANGKA
22,3%
40,2 MW
BELITUNG
25,1%
18,8 MW
23,1%BANGKA
22,3%
40,2 MW
BELITUNG
25,1%
18,8 MW
25,1%BANGKA
25,1%
45,2 MW
BELITUNG
25,1%
18,8 MW
UGI MUNTOK 2X30 MVA (2017)
GI KELAPA 1X30 MVA
GI BUKIT SEMUT 1X30 MVA
ACSR 1x240 mm2
57,3 km
ACSR 2x240 mm2
70 km (2017)
ACSR 1x240 mm273,1 km
ACSR 2x240 mm260 km (2018)
GI KAMPAK 2X30 MVA
Koba
GI TOBOALI 1X30 MVA
(2018)
TanjungApi-api
Kenten
XLPE 2x300 mm239 km
ACSR 2x240 mm216 km
Landing Point
ACSR 2x330 mm220 km
GG
D
GI PANGKAL PINANG 3
2X30 MVA (2021)
G
G
GI BELINYU 1X30 MVA (2026)
ACSR 2x240 mm
2
45 km (2026)
G
G
Dukong
ManggarACSR 1x210 mm2
70 km (2018)
BELITUNG UTARA
SUGE
ACSR 1x240 mm220,24 km
ACSR 1x210 mm235 km (2019)
G
G
GU
G
GI PANGKAL PINANG 2
2X30 MVA (2026)
Solar PV Development Plan In Bangka Belitung
PLTS TOBOALI A2.000 kWp
PLTS TOBOALI B700 kWp PLTS P. LEPAR
500 kWp
PLTS BELINYU2.000 kWp
PLTS P. CELAGEN30 kWp
PLTS P. PONGOK45 kWp
PLTS PAYUNG 21650 kWp
PLTS P. GERSIK10 kWp
PLTS P. SELIU40 kWp
PLTS P. MENDANAU170 kWp
PLTS P. SUMEDANG10 kWp
PLTS P. BUKULIMAU20 kWp
PLTS TJ. BATU ITAM
1.500 kWp
Isolated (with battery)
ENERGY PRICE COMPARISON
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 16
-
500
1,000
1,500
2,000
2,500
3,000
Coal Diesel Biomass Solar PV
1,378
2,626
1,545 1,328
Estimate Energy Price From PV System
Rp. 1.328/kwh *Depreciation expense is considered nominal average
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH 17
THANK YOU…BANGKA BELITUNG TOURISM
It is time for questions and answers
WEEK OF INDONESIA-NETHERLANDS EDUCATION AND RESEARCH
Thank you!