Page 1: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

Building Information Modelling What’s in it for the Client?

BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum

Page 2: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

Why Draw in 3D ? (Thanks to John McCarthy AO)

Reduce Clashes

Reduce Cannibalisation

Reduce Materials

Reduce Labour

Improve Productivity

Reduce Construction Cost

Reduce Time

Reduce Interest

Construction Innovation 2014 Forum

Page 3: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum

Page 4: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

Architecture

Construction Innovation 2014 Forum

Page 5: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

1 Bligh was

Designed and Documented

Entirely in BIM!

Design Development

Sustainability Analysis

BIM in Construction

Facilities Management With BIM

BIM Throughout!

Construction Innovation 2014 Forum

Page 6: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

1 Bligh was

Designed and Documented

Entirely in BIM!

Strong commitment by DEXUS to BIM

Entire consultant team used BIM

All subcontractors in BIM

Head Contractor in BIM

32 parties in combined model

BIM by Everyone!

Construction Innovation 2014 Forum

Page 7: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

Construction Stage

Appoint BIM Manager

Head Contractor implements BIM

All subcontractors expected to use BIM

BIM Execution Plan developed

Training and secondment programs

to BIM thus enabling project team

Information requirements, standards,

protocols and publication cycle defined

Construction Innovation 2014 Forum

Page 8: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

A Strategic Approach to

Implementation and

Management

Not a project team of geniuses

No specialist software or hardware: Revit and Navisworks as the main platforms

Standard PC workstations

Single BIM Manager

Identify the desired outcomes

Identify required tasks and information

Find ways to deal with the issues

Construction Innovation 2014 Forum

Page 9: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

Elevation/Section

3D study

Plan

Detail

Central Building Information Model

Schedule

Construction Innovation 2014 Forum

Page 10: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum

Page 11: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

Image by Arup

Construction Innovation 2014 Forum

Page 12: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum

Page 13: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum

Page 14: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum

Page 15: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum

Page 16: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum

Page 17: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum

Page 18: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum

Page 19: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014 Construction Innovation 2014 Forum

Page 20: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

The BIM Process

“On-site clashes have been

dramatically reduced, leading to higher quality work, improved coordination

between tradesmen and time savings.”

“Over 10,000 clashes have been detected prior to site works through the delivery of the project.

The Bligh Street BIM model now accommodates

over 30 individual discipline models” Bruce Jones, Grocon

“We reduced waste, we saved time,

we increased quality” Tony Gulliver, Development Manager, Dexus Property Group

Construction Innovation 2014 Forum

Page 21: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

The BIM Process

“sections of this complex geometry have been set out by surveyors in 3D

with information generated directly from the BIM model – in doing so,

the correctness and precision of

construction has been improved.”

“We saw accelerated coordination

of disciplines and trades.”

“Many of the most complex areas of

Bligh Street such as basements, plant rooms and the

roof structure, simply could not have been

designed or constructed without

the use of BIM.” Bruce Jones, Grocon

Construction Innovation 2014 Forum

Page 22: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

So what did DEXUS get?

Reduced clashes

Reduced cannibalisation

Reduced materials

Reduced labour

Improved productivity

Reduced tolerances

Higher quality finishes

1st CBD High rise 6 Star Green Star

Integrated building and tenant model

Integrated building management system

Lower ongoing operating costs

1 BLIGH

Construction Innovation 2014 Forum

Page 23: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

40% recycled concrete 90% steel with 50% recycled content FSC certified timber Recycled timber Solar cooling

Tri-generation

Black water treatment

Rainwater harvesting

Sewer mining

Naturally ventilated atrium

Double skin facade

1 BLIGH ESD

Page 24: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

So what of the future?

Build on past achievements

Embrace Technological Change

Benchmark and specify BIM-MEPAUS

Integrate BIM Systems for Portfolios

Educate Owners and Facility Managers

Construction Innovation 2014 Forum

Page 25: Welcome to BIM-MEPAUS - Building Information Modelling · 2016-06-07 · Construction Innovation 2014 ForumBIM AUS– MEP Innovation Form 2014 The BIM Process “On-site clashes have

BIM – MEP AUS Innovation Form 2014

Victor P. Hoog Antink

with thanks to

Construction Innovation 2014 Forum