welcome to integral engineering july 2014 integral engineering staff induction
TRANSCRIPT
Welcome to
INTEGRAL Engineering
July 2014
INTEGRAL Engineering Staff Induction
About INTEGRALIntegral Engineering Pty Ltd (Integral) is a new Mackay based engineering firm that aims to provide high quality and cost-effective engineering solutions to clients in the Central Queensland region.
Integral has been established through a restructure of ASPEC Engineering’s Mackay branch office.
Integral aims to:
•Provide more cost effective engineering services in response to challenging market conditions •Be an industry leader in the area of Structural Integrity and Structural Risk Management •Continue to provide responsive and reliable engineering support to local port, mining and industrial clients •Provide multi-disciplinary engineering design services for brownfield facilities through alliance partnerships with ASPEC and other local engineering firms •Build on and develop close long term relationships
INTEGRAL Engineering Staff Induction
Outline
1. Fire and safety
2. All about Integral
3. Organisational structure
4. Administration
5. Information management
6. Integral Quality System
7. Where to go for help
INTEGRAL Engineering Staff Induction
Fire and EvacuationHow to raise an alarm
In line with occupational health and safety principles our training session begins with information about what to do in an emergency. In case of a fire the smoke alarms will automatically sound an alert alarm. Please note that the alarm system is internal and you will still need to call 000 to notify emergency services, if possible make contact with the building Chief Warden.
Smoke alarms
There are smoke alarms installed in the office. The alarm indicates that people should check their immediate area for signs of danger and make ready to evacuate.
INTEGRAL Engineering Staff Induction
Fire and EvacuationHow to evacuate
The procedure for evacuation is as follows: Assemble at the floor evacuation point (INTEGRAL Reception), leaving bulky items in your office. Wardens will check all occupiable spaces on the floor. When exit stairs are clear people should descend in an orderly manner and move as a group to the emergency evacuation area which is situated on the grassed area across from Integral in front of Crane Logistics and await instructions from the Chief Warden. Do not re-enter the building! The floor evacuation point is the only staircase.
Precautions
It is the responsibility of all building occupants to take precautions to prevent the outbreak of fire in the building. These precautions include preventing the build up of rubbish which may increase the danger/severity of a fire, store flammable materials in a safe manner, checking to ensure fire fighting equipment is in safe working order and notifying building management if it is not, keeping passageways and fire exits clear from obstruction.
Firefighting
All building occupants should familiarise themselves with the different fire fighting equipment on premises including, fire extinguishers, hose reels, and fire blankets.
INTEGRAL Engineering Staff Induction
Evacuation RouteFire and Evacuation
INTEGRAL Engineering Staff Induction
First AidFirst Aid Officer
Cecily Bella
First Aid Kit
There is a first aid kit located on top of the fridge in the kitchen. You must inform the First Aid Officer if you are injured or ill. If you use anything out of the First Aid kit, please advise the First Aid Officer, this allows us to replenish the kit as required and provides an opportunity for investigation and collection of required information.
INTEGRAL Engineering Staff Induction
ApproachINTEGRAL in the industry •We provide engineering services to mining companies and ports•Respected in the industry •Participate in professional groups
INTEGRAL clients •Provides the best services to clients•Maintains client relations•Provides technical expertise•Manages jobs •Partnerships with companies in the industry
INTEGRAL employees•Take individual accountability and initiative •Are adaptable and mobile •Take responsibility for their professional development
INTEGRAL work•Standard systems are important to us•We minimise overheads and support costs
INTEGRAL Engineering Staff Induction
Organisational EthicsINTEGRAL is an equal opportunity employer and we take our obligations under the Queensland anti-discrimination act very seriously. Harassment of or discrimination against another person will not be tolerated and may lead to the termination of your employment contract. Under the act it is unlawful to discriminate against someone on the basis of their age, gender, marital status, sexual orientation, race, political or trade union activity, pregnancy, family responsibilities, religion, physical impairment or relationship status.
INTEGRAL is committed to using best practice HR systems, one component of this relates to the management of employee grievances. If there is a situation in your work which you feel needs addressing, please speak with the Business Services Manager. If you do not feel comfortable doing this you are welcome to contact the Director.
INTEGRAL is a non-smoking workplace and as such smoking is not permitted within the building. Smoking is permitted outside the front entrance of the building as long as you are further than 4 meters from the door. The use of illicit drugs is not permitted at any time you are representing INTEGRAL Engineering.
INTEGRAL Engineering Staff Induction
PeopleCraig Meng
Company Director
INTEGRAL Engineering Staff Induction
Organisational StructureINTEGRAL Engineering’s company Principals are Dr Frank Gatto and Craig Meng. Frank is a non-executive Director based in the ASPEC Newcastle office. The Principals are responsible for managing and monitoring group performance, developing client relationships, business expansion, providing specialist advice, and managing strategic jobs.
Craig is responsible for arranging monthly group meetings and submitting project reports, group level resource scheduling, developing and maintaining group documentation, visiting clients and referrers, and building the profile of INTEGRAL by attending conferences and writing articles for industry publications.
Project leaders are selected on the basis of project specific knowledge and experience. Each employee may be project leader on a number of projects and a member of a number of other project teams. They are responsible for developing a comprehensive understanding of the project, preparing the proposal and job budget for the project, arranging resources, monitoring project progress and performance and checking deliverables. Individual engineers/drafters/technicians etc are responsible for their own professional development and training, attendance at meetings, producing deliverables of a high quality, and working as a member of a collaborative team.
INTEGRAL Engineering Staff Induction
Organisational Structure
INTEGRAL Engineering Staff Induction
Roles & Responsibilities
Project Leaders•Manage jobs •Develop client relationships and business as part of team•Work on jobs
Engineers, technicians, drafters, support staff•Self development to higher level •Work on jobs•Manage small jobs/ tasks
INTEGRAL Engineering Staff Induction
Life Long LearningINTEGRAL actively supports staff to further develop their knowledge, skills and abilities. Staff are encouraged to gain membership of relevant professional associations and groups, for example Engineers Australia or the Australian Steel Institute. Staff with a specific interest area relevant to their work is encouraged to seek specialised training in this area. Staff are encouraged to gain membership of associations and professional groups
•Engineers Australia•National Professional Engineers Register (NPER) •Registered Professional Engineer Queensland (RPEQ)•Australian steel Institute
INTEGRAL professional development register
•INTEGRAL updates this with the training that you provide•Email any addition PD activities to Cecily Bella•Meet professional association requirements (150 hours over three years for the National Professional Engineers)•Attend development opportunities: Through IE Aus, ASI , private reading etc)
INTEGRAL Engineering Staff Induction
Administration
Extended HoursWorking of extended hours on a long-term basis is not encouraged. However all staff are expected to do what is necessary to meet short-term deadlines
Leave applicationsShould be submitted for approval by the Director well in advance of taking that leave.
Travel bookingsShould be made through the Business Services Manager.
Expenses Should be requisitioned through Business ServicesReimbursement Receipts need to be submitted through Xero as soon as practical. Login to Xero will be created by Business Services.
INTEGRAL Engineering Staff Induction
TimesheetsTimesheets should be recorded daily and submitted for approval by the Director by 3 p.m. every Friday afternoon, or as requested from time to time.
INTEGRAL Engineering Staff Induction
Expenses paid by Integral Credit CardEach office has a rubber stamp for expenses. Please use this stamp whenever possible and fill out the relevant details on any expenses/receipts/invoices. This applies also to any overhead purchases. Name: Your Name Project: Project Number or if it is an overhead use
Overhead codes : Mackay - IE OHFord Territory Mackay – AE05Toyota Prado Mackay – AE03
Payment Method: Account payable (not yet paid so Integral needs to pay it) Cash (if Integral need to reimburse you because you have paid with cash or your own personal c/card Billable and Non Billable: This obviously only applies to Project Expenses and not overheads. Please tick if the expense is a billable expense (we can invoice the Client) or tick Non Billable (if we can’t invoice Client). Any significant expenditure not billable on a project shall be approved by Business Services or Director.
INTEGRAL Engineering Staff Induction
Staff LocationsPlease advise your Supervisor if you are:
•On Site•At Client Meetings•On Training
If you are sick/unable to come into the office please call/email your Supervisor.
INTEGRAL Engineering Staff Induction
On-Line
Website Accesshttp://www.integraleng.com.au
Timesheetshttps://my.workflowmax.com/login.aspx
Remote E-MailGoogle Apps
The INTEGRAL website is the remote contact point for staff to access online resources.
INTEGRAL Engineering Staff Induction
Home Page
INTEGRAL Engineering Staff Induction
Member Area
INTEGRAL Engineering Staff Induction
Software and Applications
Engineering•Space Gass 10•Strand 7
Drafting•Autocad•Navisworks•Prosteel 3D
INTEGRAL Engineering Staff Induction
General•Outlook•Microsoft Office•WorkflowMax•Xero•Google Apps
I.T.
Drive Information
i:/ Integral ProjectsAdministrationKnowledgeRed DingoSoftwareTempArchived Projects
m:/ ASPEC Mackay server archive
INTEGRAL uses a number of different information storage systems. Employees can store data on the c:/ drive of their own computer, but generally should work off i:/ when in the office. Different types of information are stored in specific drives, as shown in table below. Remote access to these drives is available through a VPN.
INTEGRAL Engineering Staff Induction
Information ManagementProject Set upNew Project registered and numbered
INTEGRAL Engineering Staff Induction
Information ManagementProject Set upFolder Location - Project related emails are retained and stored on the server for future. INTEGRAL has a colour coding system for the folders in which project information is stored, which is as follows: Black means unsuccessful, green means current/active, red means closed/completed, yellow means prospective jobs.access.
INTEGRAL Engineering Staff Induction
Information ManagementProject Set upFolder Structure on server
INTEGRAL Engineering Staff Induction
Information ManagementProject Set upRelevant Staff advised of new project
INTEGRAL Engineering Staff Induction
Where to go for help?Document sourcing:Cecily Bella
Weekly timesheets:Cecily Bella
Payment and finance:Cecily Bella
Room bookings/Admin:Cecily Bella
Safety/Quality/Training:Cecily Bella
IT Support (Atlantic Digital):Derry Crittenden Brendan Moore
Immediate concerns about your work can be addressed to the project leader or Business Services. Please consult with these people before approaching either of the principals.
INTEGRAL Engineering Staff Induction