welcome to integral engineering july 2014 integral engineering staff induction

28
Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Upload: gerald-spencer

Post on 22-Dec-2015

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Welcome to

INTEGRAL Engineering

July 2014

INTEGRAL Engineering Staff Induction

Page 2: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

About INTEGRALIntegral Engineering Pty Ltd (Integral) is a new Mackay based engineering firm that aims to provide high quality and cost-effective engineering solutions to clients in the Central Queensland region.

Integral has been established through a restructure of ASPEC Engineering’s Mackay branch office.

Integral aims to:

•Provide more cost effective engineering services in response to challenging market conditions •Be an industry leader in the area of Structural Integrity and Structural Risk Management •Continue to provide responsive and reliable engineering support to local port, mining and industrial clients •Provide multi-disciplinary engineering design services for brownfield facilities through alliance partnerships with ASPEC and other local engineering firms •Build on and develop close long term relationships

INTEGRAL Engineering Staff Induction

Page 3: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Outline

1. Fire and safety

2. All about Integral

3. Organisational structure

4. Administration

5. Information management

6. Integral Quality System

7. Where to go for help

INTEGRAL Engineering Staff Induction

Page 4: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Fire and EvacuationHow to raise an alarm

In line with occupational health and safety principles our training session begins with information about what to do in an emergency. In case of a fire the smoke alarms will automatically sound an alert alarm. Please note that the alarm system is internal and you will still need to call 000 to notify emergency services, if possible make contact with the building Chief Warden.

Smoke alarms

There are smoke alarms installed in the office. The alarm indicates that people should check their immediate area for signs of danger and make ready to evacuate.

INTEGRAL Engineering Staff Induction

Page 5: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Fire and EvacuationHow to evacuate

The procedure for evacuation is as follows: Assemble at the floor evacuation point (INTEGRAL Reception), leaving bulky items in your office. Wardens will check all occupiable spaces on the floor. When exit stairs are clear people should descend in an orderly manner and move as a group to the emergency evacuation area which is situated on the grassed area across from Integral in front of Crane Logistics and await instructions from the Chief Warden. Do not re-enter the building! The floor evacuation point is the only staircase.

Precautions

It is the responsibility of all building occupants to take precautions to prevent the outbreak of fire in the building. These precautions include preventing the build up of rubbish which may increase the danger/severity of a fire, store flammable materials in a safe manner, checking to ensure fire fighting equipment is in safe working order and notifying building management if it is not, keeping passageways and fire exits clear from obstruction.

Firefighting

All building occupants should familiarise themselves with the different fire fighting equipment on premises including, fire extinguishers, hose reels, and fire blankets.

INTEGRAL Engineering Staff Induction

Page 6: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Evacuation RouteFire and Evacuation

INTEGRAL Engineering Staff Induction

Page 7: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

First AidFirst Aid Officer

Cecily Bella

First Aid Kit

There is a first aid kit located on top of the fridge in the kitchen. You must inform the First Aid Officer if you are injured or ill. If you use anything out of the First Aid kit, please advise the First Aid Officer, this allows us to replenish the kit as required and provides an opportunity for investigation and collection of required information.

INTEGRAL Engineering Staff Induction

Page 8: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

ApproachINTEGRAL in the industry •We provide engineering services to mining companies and ports•Respected in the industry •Participate in professional groups

INTEGRAL clients •Provides the best services to clients•Maintains client relations•Provides technical expertise•Manages jobs •Partnerships with companies in the industry

INTEGRAL employees•Take individual accountability and initiative •Are adaptable and mobile •Take responsibility for their professional development

INTEGRAL work•Standard systems are important to us•We minimise overheads and support costs

INTEGRAL Engineering Staff Induction

Page 9: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Organisational EthicsINTEGRAL is an equal opportunity employer and we take our obligations under the Queensland anti-discrimination act very seriously. Harassment of or discrimination against another person will not be tolerated and may lead to the termination of your employment contract. Under the act it is unlawful to discriminate against someone on the basis of their age, gender, marital status, sexual orientation, race, political or trade union activity, pregnancy, family responsibilities, religion, physical impairment or relationship status.

INTEGRAL is committed to using best practice HR systems, one component of this relates to the management of employee grievances. If there is a situation in your work which you feel needs addressing, please speak with the Business Services Manager. If you do not feel comfortable doing this you are welcome to contact the Director.

INTEGRAL is a non-smoking workplace and as such smoking is not permitted within the building. Smoking is permitted outside the front entrance of the building as long as you are further than 4 meters from the door. The use of illicit drugs is not permitted at any time you are representing INTEGRAL Engineering.

INTEGRAL Engineering Staff Induction

Page 10: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

PeopleCraig Meng

Company Director

INTEGRAL Engineering Staff Induction

Page 11: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Organisational StructureINTEGRAL Engineering’s company Principals are Dr Frank Gatto and Craig Meng. Frank is a non-executive Director based in the ASPEC Newcastle office. The Principals are responsible for managing and monitoring group performance, developing client relationships, business expansion, providing specialist advice, and managing strategic jobs.

Craig is responsible for arranging monthly group meetings and submitting project reports, group level resource scheduling, developing and maintaining group documentation, visiting clients and referrers, and building the profile of INTEGRAL by attending conferences and writing articles for industry publications.

Project leaders are selected on the basis of project specific knowledge and experience. Each employee may be project leader on a number of projects and a member of a number of other project teams. They are responsible for developing a comprehensive understanding of the project, preparing the proposal and job budget for the project, arranging resources, monitoring project progress and performance and checking deliverables.  Individual engineers/drafters/technicians etc are responsible for their own professional development and training, attendance at meetings, producing deliverables of a high quality, and working as a member of a collaborative team.

INTEGRAL Engineering Staff Induction

Page 12: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Organisational Structure

INTEGRAL Engineering Staff Induction

Page 13: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Roles & Responsibilities

Project Leaders•Manage jobs •Develop client relationships and business as part of team•Work on jobs

Engineers, technicians, drafters, support staff•Self development to higher level •Work on jobs•Manage small jobs/ tasks

INTEGRAL Engineering Staff Induction

Page 14: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Life Long LearningINTEGRAL actively supports staff to further develop their knowledge, skills and abilities. Staff are encouraged to gain membership of relevant professional associations and groups, for example Engineers Australia or the Australian Steel Institute. Staff with a specific interest area relevant to their work is encouraged to seek specialised training in this area. Staff are encouraged to gain membership of associations and professional groups

•Engineers Australia•National Professional Engineers Register (NPER) •Registered Professional Engineer Queensland (RPEQ)•Australian steel Institute

INTEGRAL professional development register

•INTEGRAL updates this with the training that you provide•Email any addition PD activities to Cecily Bella•Meet professional association requirements (150 hours over three years for the National Professional Engineers)•Attend development opportunities: Through IE Aus, ASI , private reading etc)

INTEGRAL Engineering Staff Induction

Page 15: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Administration

Extended HoursWorking of extended hours on a long-term basis is not encouraged. However all staff are expected to do what is necessary to meet short-term deadlines

Leave applicationsShould be submitted for approval by the Director well in advance of taking that leave.

Travel bookingsShould be made through the Business Services Manager.

Expenses Should be requisitioned through Business ServicesReimbursement Receipts need to be submitted through Xero as soon as practical. Login to Xero will be created by Business Services.

INTEGRAL Engineering Staff Induction

Page 16: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

TimesheetsTimesheets should be recorded daily and submitted for approval by the Director by 3 p.m. every Friday afternoon, or as requested from time to time.

INTEGRAL Engineering Staff Induction

Page 17: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Expenses paid by Integral Credit CardEach office has a rubber stamp for expenses. Please use this stamp whenever possible and fill out the relevant details on any expenses/receipts/invoices. This applies also to any overhead purchases.  Name:                  Your Name  Project:                  Project Number or if it is an overhead use           

Overhead codes :   Mackay -  IE OHFord    Territory Mackay – AE05Toyota Prado Mackay – AE03

                                                                                                                                                             Payment Method:            Account payable (not yet paid so Integral needs to pay it) Cash (if Integral need to reimburse you because you have paid with cash or your own personal c/card Billable and Non Billable:                               This obviously only applies to Project Expenses and not overheads. Please tick if the expense is a billable expense (we can invoice the Client) or tick Non Billable (if we can’t invoice Client). Any significant expenditure not billable on a project shall be approved by Business Services or Director.

INTEGRAL Engineering Staff Induction

Page 18: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Staff LocationsPlease advise your Supervisor if you are:

•On Site•At Client Meetings•On Training

If you are sick/unable to come into the office please call/email your Supervisor.

INTEGRAL Engineering Staff Induction

Page 19: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

On-Line

Website Accesshttp://www.integraleng.com.au

Timesheetshttps://my.workflowmax.com/login.aspx

Remote E-MailGoogle Apps

The INTEGRAL website is the remote contact point for staff to access online resources.

INTEGRAL Engineering Staff Induction

Page 20: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Home Page

INTEGRAL Engineering Staff Induction

Page 21: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Member Area

INTEGRAL Engineering Staff Induction

Page 22: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Software and Applications

Engineering•Space Gass 10•Strand 7

Drafting•Autocad•Navisworks•Prosteel 3D

INTEGRAL Engineering Staff Induction

General•Outlook•Microsoft Office•WorkflowMax•Xero•Google Apps

Page 23: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

I.T.

Drive Information

i:/ Integral ProjectsAdministrationKnowledgeRed DingoSoftwareTempArchived Projects

m:/ ASPEC Mackay server archive

INTEGRAL uses a number of different information storage systems. Employees can store data on the c:/ drive of their own computer, but generally should work off i:/ when in the office. Different types of information are stored in specific drives, as shown in table below. Remote access to these drives is available through a VPN.

INTEGRAL Engineering Staff Induction

Page 24: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Information ManagementProject Set upNew Project registered and numbered

INTEGRAL Engineering Staff Induction

Page 25: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Information ManagementProject Set upFolder Location - Project related emails are retained and stored on the server for future. INTEGRAL has a colour coding system for the folders in which project information is stored, which is as follows: Black means unsuccessful, green means current/active, red means closed/completed, yellow means prospective jobs.access.

INTEGRAL Engineering Staff Induction

Page 26: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Information ManagementProject Set upFolder Structure on server

INTEGRAL Engineering Staff Induction

Page 27: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Information ManagementProject Set upRelevant Staff advised of new project

INTEGRAL Engineering Staff Induction

Page 28: Welcome to INTEGRAL Engineering July 2014 INTEGRAL Engineering Staff Induction

Where to go for help?Document sourcing:Cecily Bella

Weekly timesheets:Cecily Bella

Payment and finance:Cecily Bella

Room bookings/Admin:Cecily Bella

Safety/Quality/Training:Cecily Bella

IT Support (Atlantic Digital):Derry Crittenden Brendan Moore

Immediate concerns about your work can be addressed to the project leader or Business Services. Please consult with these people before approaching either of the principals.

INTEGRAL Engineering Staff Induction