COST 723 WG1 Meeting 1 Stefan Buehler 3
Overall Activities
• Delay due to COST move to ESF
• Web site and mailing lists at http://www.cost723.org
• COST 723 splinter meeting at EGS/Nice– Opening Workshop planned at ESTEC– Date (to be reconfirmed at this meeting):
March 11-13, 2004– Collection of COST 723 related EGS
presentations on cost723.org
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 4
WG1 Activities
– Radiosonde• Humidity• Ozone
– Aircraft• MOZAIC• MARSCHALS
– Satellite• AMSU• Odin• Envisat• Champ
• Established contacts to data sources:
• We will learn about ongoing activities in these areas in the next two days (hopefully).
AMSU-B Humidity Data
Stefan Buehler
University of Bremen
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 6
Platform Instrument Launch DMSP F-13 SSM-T2 March 95
DMSP F-14 SSM-T2 April 97
NOAA-15 (NOAA-K) AMSU-B May 1998
NOAA-16 (NOAA-L) AMSU-B September 2000
NOAA-17 (NOAA-M) AMSU-B June 2002
Aqua HSB May 2002
Operational Microwave Humidity Data
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 7
Figure by M. Kuvatov
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 8
AMSUB
Channels
Figure by V. Oommen-John
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 9
Wettest day in 2002 (July 17)
Driest day in 2002 (January 5)
Peak altitude of Jacobians gives sounding altitude
Figure by V. Oommen-John
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 10
Wettest day in 2002 (July 17)
Driest day in 2002 (January 5)
Lindenberg Radiosonde DataSolid: RH, dashed T, dotted RH_icesat
Figure by M. Kuvatov
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 11
Match-up Procedure
• Problems:– Sonde drifts during ascent– Time difference between sonde launch and
overpass
Pixel level comparison not possible
Figure by V. Oommen-John
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 12
Solution: Look at a target area, we take a 50km circle.
Striking: Atmospheric inhomogeneity can be a problem.
Figure by M. Kuvatov
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 13
Num
ber
of O
ccur
renc
esStandard deviation of brightness temperatures inside the target area.
Vertical lines are from operational calibration.
Figure by V. Oommen-John
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 14
Error Model• The 50km inhomogeneity is the
dominant error source. Error model:
i = C0 + 50km
• C0 is small, we take 0.5K.
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 15
Comparison Lindenberg radiosonde humidity vs. AMSU-B on NOAA15, time period 2002.
Discrepancies in the UT for very dry conditions.
Figure by M. Kuvatov
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 16
Radiosonde Stations in COST 723 Countries (from Met Office Archive)
Figure by V. Oommen-John
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 17
Satellite Data as a Tool to Compare Different Stations
Lindenberg / Germany (Vaisala RS80)
Kem / Russia (Goldbeater skin)
Figure by V. Oommen-John
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 18
Conclusions• It is worthwhile to compare operational satellite
humidity data and radiosondes.• Comparison in radiance space avoids inverse
problem.• A good match-up methodology is crucial.• Tests consistency of:
RT Model
Satellite Data
Radiosonde Data
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 19
Draft Workshop Program, Day 1Thu. March 11, 2004 14:00 Welcome, agenda, etc.
14:30 Session 1: UTLS Data sources
14:30 Presentation
15:00 Presentation
15:30 Coffee break
16:00 Presentation
16:30 Presentation
17:00 Presentation
17:30 Close
19:00 Joint dinner
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 20
Draft Workshop Program, Day 2Fri. March 12, 2004 09:00 Session 2: Data assimilation
09:00 Presentation
09:30 Presentation
10:00 Coffee break
10:30 Presentation
11:00 Presentation
11:30 Presentation
12:00 Lunch
14:00 Session 3: Data interpretation and scientific studies
14:00 Presentation
14:30 Presentation
15:00 Presentation
15:30 Coffee break
16:00 Presentation
16:30 Presentation
17:00 Close
Bern, 6.-7. 10. 2003
COST 723 WG1 Meeting 1 Stefan Buehler 21
Draft Workshop Program, Day 3Sat. March 13, 2004 09:00 WG work in 3 parallel sessions
WG 1
WG 2
WG 3
12:00 Lunch
13:30 Joint session, WG reports and discussion
WG 1
WG 2
WG 3
16:00 Close
Do we also have to put in a short MC Meeting? When?