welcome to today’s event looking crescent and …...welcome to today’s event looking further at...
TRANSCRIPT
www.onehousing.co.uk
Hello and welcome
• Reviewing feedback from previous events• Updated masterplan• Phasing strategy• Updated typical home layouts• Updated commitments for the Landlord Offer• The ballot process
Welcome to today’s event looking further at the designs of Juniper Crescent and Gilbeys Yard
Today’s event we will be:
CONTACT US
Briony Rogers 0207 428 [email protected]
If you want to find out more or would like to book a one to one visit please call:
Sasha Grant 0208 821 [email protected]
Between February 2017 and May 2018 we worked with residents to carry out an options appraisal on the future of Gilbeys Yard & Juniper Crescent. Full redevelopment was selected as the preferred option for further consideration and consultation.
In July 2019, Countryside were selected as the preferred 50:50 joint venture partner to work on the project. Countryside are providing their experience in construction and have been working on the indicative phasing and optimisation of the proposals.
We welcome your input and feedback during these workshops so we can understand how you use your home, how we can design new homes for existing residents, sizes of homes, storage, amenity spaces and discussing the uses and types of open spaces. We will be looking at the masterplan in more detail and the access routes, heights and open spaces.
Join the conversation
We have been working with you to develop the Landlord Offer document. The Landlord Offer will cover the details of our offer to you (should the estates be redeveloped) and will be what you vote on in the ballot. What you tell us is important and will influence the proposed regeneration of your homes, your neighbourhood and the Landlord Offer. The final proposals we develop will be put to a ballot due to take place in Spring 2020 and we want to provide you with as much information as possible so you can make an informed decision.
During all the events, we want to hear your feedback to help us to shape the proposals. If you have something you would like to comment about or make suggestions please leave feedback on the comment cards provided or on the boards using a sticky note or speak to one of the project team.
41 notesDRAFTWe have a representative from Civica Election Services (CES) who have been employed to run the ballot process as an impartial and independent organisation. If you have any questions about the ballot process they will be on hand to answer your queries.
www.onehousing.co.uk
Join the conversation
WHAT YOU TOLD US IN THE PREVIOUS EVENT
Parking is really
important to us, as my
dad is disabled
Create inclusive
spaces that intergenerational
activities
You said... Response...
Soundproofing
is important Full height windows in living/dining spaces
Flexible indoor spaces
in the community
centre that can
accommodate different
type of activities and
classes
Spill out spaces
outside the community centre
- table tennis,
seating and trees
Open plan but clear zoning
Outdoor gym space
PLEASE ADD YOUR COMMENTS
41 notes61 notes
1 note
115
General findings and summary from sticky notes:
Summary of comments from the last event:
Key notes:
Residents used the sticky notes at the workshop tables to express what they wanted to see with regeneration and how their homes could be improved. A majority of the comments mentioned topics related to the internal layouts such as having separate kitchen and living spaces and more storage space. Residents were very interested in creating open community spaces with seating and activities to bring the residents together. Residents also showed concerns in ensuring the spaces are safe and easily maintained, ensuring lighting and CCTV to be considered.
Considered ways of improving safety and security in open spaces
Provide green and open spaces where possible and introduce new planting
Provide play areas and outdoor activity spaces
Provide a community space that can accommodate a variety of activities
Provide access to the roof to be used by the community
Provide spill out spaces that can encourage activity within the estate
Tell us what else is important to you? Total post it notes and written comments
Most commentswere about the interior
layout of the homesand how to improvethe homes through
regeneration
...mentioned the typesof communal spaces
and open spaces theywould like to see in the
regeneration
...specificallyhighlighted the
importance of having athe landlord offer even
in early January
You said:Direct connectionbetween kitchenand living room
You said:
If we don’t make it safe it’s a complete
waste of time
Design multi-functional spaces
that can easily adapt
Indoor andoutdoor
spaces foryouth
You said:
You said:
You said:I would like to see a place
that brings the people together
Play structures
and spaces that
outdoor activity
- climbing structures and
chess tables
Ensure safety
and security - ensure that spaces are not
misused
Spaces for sport
activities - such
as football fields
and basketball
courts
Green communal
gardens to encourage gardening activities
Vegetation
and green
space - avoid
water features
and movable
furniture
Kids play spaces
need to be overlooked
The idea of community centre will bring the community together
Limit large commercial uses especially large commercial uses
Flexible working spaces could alleviate vandalism – good design principle
Storage is important - more
storage divided
into different smaller ones
Separated kitchen
and living room, with
a dining table in the
kitchen if possible -
the separated kitchen
needs to be in a
sensible location
Open Spaces
Community Spaces
Most liked:
Outdoor gym and play spaces
Mix of hardscape and softscape landscape
Communal gardens for gardening activities
Biodiverse roof Spill out spaces with play activities
Flexible indoor community spaces
Separate kitchen
12
3
6
Open plan kitchenOpen plan kitchen
Flexible
Green lawn areas
Internal LayoutsDRAFTDRAFT
www.onehousing.co.uk
ADDITIONAL AGREED ITEMS FOR THE LANDLORD OFFER
Service charges will be based on the cost of providing services that are delivered within the new development. We are committed to making sure service charges are kept as low as possible. If there are increases in service charges, One Housing will make a phased introduction of the increase over a three year period for existing tenants who return as follows:
All new homes for returning residents will include the following white goods. These items will be given to returning residents, who are then responsible for any maintenance: (i) a fridge freezer, (ii) a washer / dryer, and (iii) a fitted hob and oven.
As a minimum, new homes will have a minimum storage provision of (following Building Regulations and London Housing SPG):
1 Bedroom Homes: 1.5sqm2 Bedroom Homes: 2sqm3 Bedroom Homes: 2.5sqm4 Bedroom Homes: 3sqm
The proposed home sizes will meet or exceed London Space Standards. For those currently in homes that are larger than London Space Standards, the proposals will ensure there will be no loss of usable space compared to existing properties. This will mean that around 80% of tenants will get larger homes and around 20% will maintain at least their current provision of useable space.
Minimum home sizes are set-out below and where applicable, these will increase to meet the current space provision of oversized properties.
50 m2 = 1 bed / 2 person70 m2 = 2 bed / 4 person95 m2 = 3 bed / 6 person apartment 102 m2 = 3 bed / 6 person duplex124 m2 = 4 bed / 8 person duplex
There will be no single bedrooms, unless agreed with the tenant.
All homes will be designed to be as energy-efficient as possible and to maximise thermal comfort throughout the year.
All new homes will use high quality materials for the kitchens, bathrooms and all doors and windows.
Tenants with pets will be allowed to continue to have them in any property they move into. There will be an amnesty for tenants who did not get permission for their current pets if they sign One Housing ’s Good Pets agreement. If a nuisance is caused by any pet, this will need to be reviewed.
One Housing will make only the one direct offer of a one-bedroom property to verified adult children who are living with parents on the estates, and only if the regeneration goes ahead. This will be away from the estates within the borough of Camden in a One Housing property. If a property is accepted by an adult child, the household will need to reduce their social rent home bedroom size requirements as a result of the vacating adult, unless that household was already overcrowded. The disturbance package is not applicable.
Tenants from Juniper Crescent and Gilbeys Yard or verified adult children living with them will be given priority by One Housing for intermediate rent properties on the new development if they meet the criteria for and are registered on Camden Council’s Intermediate Housing Register of Interest. If an intermediate rent property is accepted by an adult child, the household will need to reduce their social rent home bedroom size by the vacating adult, unless you are overcrowded.
Existing tenants in intermediate rented homes who already live on the estates during regeneration will be given priority by One Housing to relocate to a new intermediate rent home on the new development providing they continue to meet the criteria for Camden Council’s Intermediate Housing Register of Interest.
The scheme will replace any lost houses with new houses or duplexes for existing tenants who choose this option. If a property is accepted by an adult child, the household will need to reduce their bedroom size which may become smaller than the duplexes being replaced and therefore will not be provided. As a minimum, downsizing households will be offered one bedroom above housing need, as recommended in the Mayor’s Regeneration Guidance unless a property is accepted by an adult child, the household will need to reduce their social rent home bedroom size by the vacating adult, unless you are overcrowded.
If a tenant’s Council Tax increases because their new home on the estates Council Tax “banding”, One Housing will pay some of the extra costs during the first three years as follows:
• During the first year One Housing will pay all (100%) of any extra Council Tax due to the higher banding.
• In the second year One Housing will pay two-thirds (66%) of any extra Council Tax due to higher banding
• In the third year One Housing will pay one third (33%) of any extra Council Tax due to a higher banding.
• The contingency payment is a discretionary payment to tenants to cover the costs of moving homes (“disturbance”) at the rate of £500 per required move. Every tenant will be consulted with about the details of their move, any other considerations will be made on a case by case basis.
Year 1 Year 2 Year 3 Year 4Any extra service charges paid by One Housing
33% of any extra charges paid by tenant
66% of any extra charges paid by tenant
The full amount of extra service charges paid by tenant
Design of Housing
Rehousing
Disturbance Package
Service Charges
DRAFTDRAFT
www.onehousing.co.uk
RESIDENT REQUESTS & THE LANDLORD OFFER
STEERING GROUP ONE HOUSING
DRAFTYour resident steering group have been working with One Housing to put forward their requests for you and your neighbours for the landlord offer. This table shows you what was requested by the steering group and what is offered by One housing. All of the commitments will be presented in your landlord offer prior to the ballot.
ADULT CHILDREN
Adult children living with tenants to get offer of own home.
Residents protected in full from any increases for 3 years.
Every house with a garden to have a garden replaced in the new homes.
Replacement of the existing houses with new ones.
All existing parking spaces to be retained for current tenants.
Tenants to be able to keep their existing pets in their new homes.
No increase in rent levels for replacement homes.
Residents protected in full from any increases for 3 years.
Home sizes to match largest social homes built in last few years.
Tenants to be allowed to keep their existing tenancy and rights.
Agreed, as a one off direct offer into a One Housing property.
Protected in full in first year, partial protection for the next 2 years.
All new homes to have a garden, balcony or private amenity space.
Replacing the existing houses with duplexes (maisonettes).
Agreed, subject to Camden Council’s planning consent.
Agreed, provided the tenant signs a good pet agreement.
Agreed.
Protected in full in first year, partial protection for the next 2 years.
80% of the new homes will be larger than the existing ones and brought up to current space standards.
All existing rights to be included in a new tenancy agreement.
COUNCIL TAX
GARDENS
HOUSES
PARKING
PETS
RENTS
SERVICE CHARGES
SIZE OF HOMES
TENANCY RIGHTS
£ DRAFT
www.onehousing.co.uk
The focus will be on streets, routes and high quality open spaces which will
generate a network of pedestrian friendly streets and views to
heritage assets
UPDATED MASTERPLAN
Chalk Farm Road
Stables Market
New street linking to location of underground
winding vaults
New duplexes with private gardens and roof terraces
along the canal
Improved paving and landscaping
Secure communal gardens
Roof terraces- residents amenity
Central space that enhances the setting to
Roundhouse
Secure communal gardens and play areas, parking for
residents below
New traditional streets
Gloucester Avenue
Regents Canal
Interchange
A fully inclusive and diverse community will be at the heart of the development, with high quality family
homes and community uses generating a truly sustainable neighbourhood that will last
for generations to come
DRAFTPLEASE
ADD YOUR COMMENTS
DRAFT
www.onehousing.co.uk
Chalk Farm Road
The Roundhouse
Fitzro
y Roa
d
Oval Road
The Interchange
Below 4 storeys
KEY
4-6 storeys6-7 storeys
8-10 storeys10-12 storeysAbove 12 storeys
Chalk Farm Road
The Roundhouse
Fitzro
y Roa
d
Oval Road
The Interchange
Chalk Farm Road
The Roundhouse
Fitzro
y Roa
d
Oval Road
The Interchange
Secondary vehicular routes
KEY
Service routes
Chalk Farm Road
The Roundhouse
Fitzro
y Roa
d
Oval Road
The Interchange
Primary vehicular routes
Potential on street parking
Pedestrian access
Vehicle access
Podium parking
KEY
Chalk Farm Road
The Roundhouse
Fitzro
y Roa
d
Oval Road
The Interchange
Pedestrian connections to Highline, Regents Canal & Primrose Hill
Primary pedestrian routes
Secondary pedestrian routes
Potential Highline route
outside boundaryTow path
Lift access to market
KEY
Potential connection to Highline
New connection to towpath
Future connection to Primrose Hill
Chalk Farm Road
The Roundhouse
Fitzro
y Roa
d
Oval Road
The Interchange
Cyclist route to Chalk Farm
Road, Oval Road and
Primrose Hill
KEY
MASTERPLAN STRATEGIES
Building heights Land uses
Cycle movementPedestrian movement
Vehicular movement Parking
Non residential uses
KEY
DRAFT
www.onehousing.co.uk
DRAFTDRAFT
Balcony
Bedroom 1 Bedroom 3Bedroom 2
Bathroom
Hall St.1
St.2 WC
Utility
Living/Dining
Kicthen
Balcony: 9.5m2
Bedroom 1: 14.2m2
Bedroom 2: 11.6m2
Bedroom 3: 11.6m2
Bathroom: 4.4m2
WC: 2.1m2
Hall: 9.9m2
Living/Kitchen/Dining: 32.2m2
Storage1: 1.3m2
Storage1: 2.1m2
Utility: 1.5m2
Entrance
Total Area = 95m2
Minimum space standards = 95 m2
3B6P Flat
Plan view
Plan view
1B2P Flat3D View
3D View
Entrance
KitchenBedroom
Balcony
BathroomHall
St.1
Utility
Living/Dining
Balcony: 5 m2
Bedroom 1: 12m2
Bathroom: 4.4m2
Hall: 6.1m2
Living/Kitchen/Dining: 22.1m2
Storage1: 2.5m2
Utility: 1.5m2
Total Area = 50.5m2
Minimum space standards = 50 m2
INDICATIVE MASTERPLANTYPOLOGIES
www.onehousing.co.uk
TYPOLOGIES IN PROGRESS & TO UPDATEDRAFT
DRAFTRev Date Description Dwn Ckd
CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record. All intellectual property rights reserved.
Drawn
Date
Scale @ A3
Checked
Designed with reference to the surveys, information and reports listed: Xxxxxxxxxxxxxx Xxxxxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx. 1 : 100
Author
Checker
02/06/20
AAXXXXC-k
Unnamed
Enter Project Name here
2B4P WCH Flat
Total Area: 86m2
National Space Standards: N/A
2B4P WCH1 : 1002B4P WCH
DRAFT
2B4P Flat
2B4P Flat - Wheelchair (draft)
Plan view
Plan view
3D View
3D View
Balcony: 7.0m2
Bedroom 1: 13.4 m2
Bedroom 2: 11.8m2
Bathroom: 4.4m2
Hall: 8.5m2
Living/Kitchen/Dining: 26.3m2
Storage1: 1.2m2
Storage2: 0.5m2
Utility: 1.7m2
Balcony: 7.0m2
Bedroom 1: 13.4 m2
Bedroom 2: 11.8m2
Bathroom: 4.4m2
Hall: 8.5m2
Living/Kitchen/Dining: 26.3m2
Storage1: 1.2m2
Storage2: 0.5m2
Utility: 1.7m2
Entrance
Balcony
Bedroom 1
Bedroom 2
BathroomHall
St.1
St.2
Utility
Kitchen
Living/Dining
INDICATIVE MASTERPLANTYPOLOGIES
Total Area = 70.5m2
Total Area = 70.5m2
Minimum space standards = 70 m2
Minimum space standards = 70 m2
www.onehousing.co.uk
DRAFTDRAFTDRAFT
3B6P Duplex - Ground Floor
4B8P Duplex - Ground Floor
Bedroom 1: 13m2
Bedroom 2: 11.5m2
Bedroom 3: 11.7m2
Bathroom: 4.4m2
Shower Room: 3.0m2
Hall: 11.6m2
Living/Dining: 19.2m2
Bedroom 1: 11.8m2
Bedroom 2: 16.8m2
Bedroom 3: 15.2m2
Bedroom 4: 11.8m2
Bathroom: 4.4m2
Shower Room: 3.0m2
Hall: 13.5m2
Rear Garden
Front Garden
Hall
Hall
St.1 St.2
St.3
Shower Room
Utility
Living/Dining
Kitchen
Bedroom 1
Bedroom 2
Bathroom
Bathroom
Bedroom 3
Entrance
Total Area = 102.9m2
Minimum space standards = 102 m2
Front Garden
Rear Garden
Bedroom 1
Bedroom 2
Bedroom 3
Bedroom 4
Hall
St.1
St.2St.2
St.3Shower Room
Util
ity
Living/Dining
Kitchen
Entrance
Total Area = 124.5m2
Minimum space standards = 124 m2
Kitchen: 14.1m2
Storage 1: 0.8m2 *Storage 2: 0.8m2
Storage 3: 1.4m2
Utility: 1.5m2
Living/Dining: 15.3m2
Kitchen: 16.1m2
Storage 1: 0.8m2 *Storage 2: 1.9m2
Storage 3: 0.8m2
Utility: 1.5m2
www.onehousing.co.uk
DRAFTDRAFTDRAFT
Rev Date Description Dwn Ckd
CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record. All intellectual property rights reserved.
Drawn
Date
Scale @ A3
Checked
Designed with reference to the surveys, information and reports listed: Xxxxxxxxxxxxxx Xxxxxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx. 1 : 100
Author
Checker
11/13/19
AAXXXXC-f
3B6P D T2
Enter Project Name hereDRAFT
3B6P Flat
Total Area: 102m2
1 : 1003B6P 01 Duplex T2
1 : 1003B6P Duplex T2
3B6P Maisonette - Level 00
3B6P Maisonette - Level 01
Rev Date Description Dwn Ckd
CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record. All intellectual property rights reserved.
Drawn
Date
Scale @ A3
Checked
Designed with reference to the surveys, information and reports listed: Xxxxxxxxxxxxxx Xxxxxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx. 1 : 100
Author
Checker
11/13/19
AAXXXXC-f
3B6P D T2
Enter Project Name hereDRAFT
3B6P Flat
Total Area: 102m2
1 : 1003B6P 01 Duplex T2
1 : 1003B6P Duplex T2
3B6P Maisonette - Level 00
3B6P Maisonette - Level 01
Rev Date Description Dwn Ckd
CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record. All intellectual property rights reserved.
Drawn
Date
Scale @ A3
Checked
Designed with reference to the surveys, information and reports listed: Xxxxxxxxxxxxxx Xxxxxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx. 1 : 100
Author
Checker
11/13/19
AAXXXXC-f
3B6P D T2
Enter Project Name hereDRAFT
3B6P Flat
Total Area: 102m2
1 : 1003B6P 01 Duplex T2
1 : 1003B6P Duplex T2
3B6P Maisonette - Level 00
3B6P Maisonette - Level 01
3B6P Duplex - Podium (draft)
4B8P Duplex - Podium
Bedroom 1: 11.8m2
WC: 2.6m2
Hall: 7.4m2
Kitchen/Dining: 18.8m2
Storage 1: 0.9m2 *Utility: 1.6m2
Front garden
Rear Garden
Bedroom 1
Hall
St.1
WC
Utility
Dining/ Kitchen
Total Area = 124.5m2
Minimum space standards = 124 m2
Bedroom 2: 12.9m2
Bedroom 3: 12.6m2
Bedroom 4: 13.7m2
Storage 2: 1.3m2
Storage 3: 1.4m2
Bathroom: 4.4m2
Living: 16.6m2
Bedroom 2
Bedroom 3Bedroom 4
Living
St.2
St.3
Bathroom
Ground floor First floor First floor
First floor
Ground floor
Ground floor
Entrance
DRAFTTYPOLOGIES IN PROGRESS & TO UPDATE
www.onehousing.co.uk
DRAFT Rev Date Description Dwn Ckd
CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record. All intellectual property rights reserved.
Drawn
Date
Scale @ A3
Checked
Designed with reference to the surveys, information and reports listed: Xxxxxxxxxxxxxx Xxxxxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx. 1 : 100
Author
Checker
11/13/19
AAXXXXC-g
3B6P D T3
Enter Project Name here
1 : 1003B6P Duplex
1 : 1003B6P 01 Duplex
3B6P Maisonette - Level 00 3B6P Maisonette - Level 01
DRAFT
Total Area: 102m2
3B6P Maisonette
1 : 100Level 2
3B6P Maisonette - Level 02
Rev Date Description Dwn Ckd
CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record. All intellectual property rights reserved.
Drawn
Date
Scale @ A3
Checked
Designed with reference to the surveys, information and reports listed: Xxxxxxxxxxxxxx Xxxxxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx. 1 : 100
Author
Checker
11/13/19
AAXXXXC-g
3B6P D T3
Enter Project Name here
1 : 1003B6P Duplex
1 : 1003B6P 01 Duplex
3B6P Maisonette - Level 00 3B6P Maisonette - Level 01
DRAFT
Total Area: 102m2
3B6P Maisonette
1 : 100Level 2
3B6P Maisonette - Level 02
Rev Date Description Dwn Ckd
CDM REGULATIONS 2015. All current drawings and specifications for the project must be read in conjunction with the Designer's Hazard and Environment Assessment Record. All intellectual property rights reserved.
Drawn
Date
Scale @ A3
Checked
Designed with reference to the surveys, information and reports listed: Xxxxxxxxxxxxxx Xxxxxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx, Xxxxxxxxxxxx Xxxxxxxxxxx. 1 : 100
Author
Checker
11/13/19
AAXXXXC-g
3B6P D T3
Enter Project Name here
1 : 1003B6P Duplex
1 : 1003B6P 01 Duplex
3B6P Maisonette - Level 00 3B6P Maisonette - Level 01
DRAFT
Total Area: 102m2
3B6P Maisonette
1 : 100Level 2
3B6P Maisonette - Level 02
3B6P Duplex - Upper Level (draft)
4B8P Duplex - Upper LevelWC: 2.6m2
Hall: 8.9m2
Kitchen/Dining: 17.5m2
Storage 1: 0.8m2
Utility: 1.6m2
Bedroom 1: 13.6m2
Bedroom 2: 13.5m2
Bedroom 3: 14.5m2
Bedroom 4: 13.6m2
Storage 2: 2.5m2
Storage 3: 1m2
Bathroom: 4.4m2
Living: 16.5m2
Bedroom 1
Total Area = 124.5m2
Minimum space standards = 124 m2
Bedroom 2
Bathroom
Front garden
Roof terrace
Bedroom 3
Bedroom 4
Living
Hall
Kitchen /diningWC
St.2St.3
St.1
First floorRoof level
First floor
First floor
Ground floor
Ground floor
Ground floor
DRAFTTYPOLOGIES IN PROGRESS & TO UPDATE
www.onehousing.co.uk
GREEN STREETS
1
23
45
89
6
7
1 2 3 4
5
6
789
There will be specially designated and increased public play and amenity
space built into the design, to accommodate the increased density in the redevelopment on
both estatesDRAFTDRAFT
www.onehousing.co.uk
RESIDENTIAL SQUARE
The design of the new estates will
prioritise walking and cycling
DRAFTDRAFT
DRAFT
www.onehousing.co.uk
KeyPotential biodiverse roofs
Potential amenity roofs
PODIUM GARDENS & ROOFS
DRAFTDRAFT
www.onehousing.co.uk
PHASING STRATEGY
Gloucester Avenue
Regents Canal
Interchange
PHASE 1PHASE 3
PHASE 2
PHASE 4
PHASE 3
Roundhouse
• This phasing option would provide enough new floorspace to provide new homes for the residents temporarily moved off-site as well as residents from other parts of the estate
• This phasing would allow us to design enough duplexes and family sized homes to meet the needs of residents. This is because they are courtyard blocks with both front and rear private amenity spaces
• This phasing option provide enough floorspace to allow for some private sale homes, to help fund the project and create a tenure-blind and 50:50 mixed-tenure community
• This phasing option provide the flexibility to allow the design team to deal with new constraints as we go through the detailed design process
BENEFITS OF THIS PHASING SCENARIO:
PLEASE ADD YOUR COMMENTS
DRAFT
www.onehousing.co.uk
ILLUSTRATIVE PHASE 1
DRAFTCreate good quality housing, places that encourage healthy
lifestyles and facilitate happy and inclusive
community life
PLEASE ADD YOUR COMMENTS
Residents Communal courtyard
Rooftop amenity space
Allotment space
Private gardens
Defensible spaces create a buffer between the entrance to the private
homes and the public street
Green street
Play area
www.onehousing.co.uk
PHASE 1 STRATEGIES
DRAFTGround Floor Uses First Floor Uses Open Spaces
Residential accommodation (apartments)
Residential accommodation (duplexes)
Potential for non-residential activities
Residential circulation cores
Residential services
Residential accommodation (apartments) Potential biodiverse roofs
Residential accommodation (duplexes) Potential amenity roofs
Residential circulation cores
Phase 1 - Podium Garden
MaisonetteDeck access
Deck access
Deck access
Deck accessMaisonette
Maisonette
Parking
Apartment
Apartment
Maisonette
Access to private roof terraces for
individual maisonettes
Private amenity space
Private amenity space
Access to private roof terraces for
individual maisonettes
Defensible spaceDefensible space
Green RouteCamden Highline
Communal Courtyard
www.onehousing.co.uk
We are following guidance from the Greater London Authority and holding a ballot so that you can vote anonymously either:
There is no minimum turnout needed and the result will be based on a simple majority – in other words whichever vote (yes or no) receives the highest number of votes will decide if the scheme goes ahead or not.
BALLOT PROCESS
02/03 30/0309/03 06/0316/03 13/0323/03 20/03 POST BALLOT PERIOD
APR 20 JUN 20 AUG 20JUL 20DRAFT
We have employed Civica Election Services (CES) formerly Electoral Reform Services (ERS), an impartial and independent organisation, to manage the registration and ballot process in line with Greater London Authority guidance. CES has been managing ballots for organisations (including the NHS, Trade Unions and Local Authorities) since 1988.
They will be responsible for: • Processing registrations • Securely posting the ballot papers to eligible residents• Receiving and counting the votes • Verifying that all votes have been cast legitimately• Issuing the result.
Information on how to vote will be clearly listed on your ballot paper, which you will receive by post from CES. You will be able to vote using one of the following methods:
• Post the completed ballot paper back to CES in the pre-paid envelope provided. Please ensure you post your ballot paper with enough time to be received by CES before the deadline.
• Vote online at www.CESvotes.com/JCGY Using the security codes listed on your ballot paper.
In favour of our proposals to regenerate Juniper Crescent and Gilbeys Yard (with a ‘yes’ vote); or
Against our proposals (with a ‘no’ vote).
Who will run the ballot? How do I cast a vote?
MAY 20MAR 20
LANDLORD OFFERDISTRIBUTION
RESIDENTS REVIEW OF THE
LANDLORD OFFER DOCUMENT
VOTING PERIOD ONGOING RESIDENT
ENGAGEMENT
PLANNING APPLICATION SUBMISSION
DESIGN• Refinement of design• Finalise plans• Prepare supporting information
www.onehousing.co.uk
ENGAGEMENT PROGRAMME & EVENTS TIMELINE
Initial Masterplan layout & proposals and Outline Parameters and Strategies
MAY 19 JUN 19 AUG 19 SEP 19JUL 19 NOV 19 DEC 19OCT 19 JAN 20
What has been achieved up to date & the way forward/ Vision for the CGY
• Previous consultation• Meet the Team• Ballot Process• The Hybrid application
process• The engagement
strategy and programme ahead
MASTERPLANNeighbourhood
Introductory Event
MASTERPLANNeighbourhood Event 1 &
Workshop 1
MASTERPLANEXHIBITION
Final Outline Application proposals
SITE VISIT 1Acton Gardens
SITE VISIT 2New Avenue
WE ARE HERE5th edition newsletter 6th edition newsletter 8th Newsletter
7th newsletter and Resident one to
onesResident one to ones Resident one to ones Resident one to ones
Detail Phase 1EXHIBITIONFinal Detail Application proposals
FEB 20 MAR 20
Detail Phase 1Wide
Neighbourhood Event 2
EVENT 1: Building Upon the Vision - Draft Masterplan strategies
• Feedback from Previous events
• Updated key design principles /strategies and what are the key design outline parameters
• Agree the vision for CGY regeneration / residents priorities final list
WORKSHOP1 : Open Spaces, Land Uses, Streets and Buildings
• Feedback from Previous events
• Workshop about masterplan land uses
• Workshop about masterplan open spaces
• Workshop about masterplan streets
• Workshop about masterplan buildings and heights
The Phase 1 location, size, and initial design parameters
Final Draft proposals for the new homes layouts and amenity spaces
MASTERPLANNeighbourhood
Event 1
APR 20 MAY 20 JUN 20 JUL 20
SUBM
ISSI
ON
OF
HYB
RID
PL
AN
NIN
G A
PPLI
CATI
ON
BALL
OT
PERI
OD
BA
LLO
T PE
RIO
D
MASTERPLANNeighbourhood
Event 2
Final Draft Outline Application proposals
Detail Phase 1Workshop 1
Initial Ideas for how the new homes in phase 1 will look like - architecture, 3d sketches
CHRI
STM
AS
HO
LID
AYS
CHRI
STM
AS
HO
LID
AYS
Draft landlord offer presented to residents through a drop in event - prior to March 20 Ballot
Landlord Offer
DRAFT Event
JULY/AUG 2020
Resident one to ones
Ballot/Landlord Offer timeline
Resident Engagement events and workshops
PLEASE ADD YOUR COMMENTS
Detail Phase 1Wide
Neighbourhood Event 1
DRAFTDRAFT
www.onehousing.co.uk
SOCIAL VALUE
Improve Health and Wellbeing• Events and activities held at The Pirate Castle or the new community centre• Subsidised boating and activity programmes• Summer holiday camps for young people • Opportunities to contribute to public art.
Add your suggestions here...
Sports Inspired• Work with local schools or nurseries to provide sports and activities to local children• Opportunities for dance, yoga, fencing, judo etc.
Add your suggestions here...
Pirate Castle
• Support the Pirate Castle’s existing activities, such as summer holiday camps, volunteering opportunities and accredited training
• Promote the “1,000 Doors” programme to identify local residents that would benefit from it
Add your suggestions here...
Improve Permeability• New and improved pedestrian walkways and cycling routes • Opening the canal to ensure that it can be enjoyed by all
Add your suggestions here...
Tell us what else is important to you?
Facilities with the Roundhouse
Add your suggestions here...
• A community hub - coffee shop with education classes • Live performance space • Visual arts and design studios• Rehearsal studio • A co-working hub for young creatives aged 18-30 years
Training Opportunities
Add your suggestions here...
• Apprentices for both sites and the local area• Mentoring programme at The Roundhouse • Volunteering opportunities through The Pirate Castle and The Roundhouse
Add your suggestions here...
E-Car Club• Provision of electric car club to Juniper Crescent and Gilbeys Yard residents with up to four electric cars
across the development• Potential for a free one-year membership for residents with subsidised booking and rental of the vehicles
PLEASE ADD YOUR COMMENTS
Here are some initial ideas of what social value opportunities
the development could bring to you. Please
add your suggestions and tell us what would
benefit you and the community the most
DRAFT