welcome to unique delta technical service...
TRANSCRIPT
![Page 1: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/1.jpg)
Welcome to Unique Delta Technical Service
L.L.C
![Page 2: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/2.jpg)
1 Introduction
2 Licenses
3 Man Power Resources
4 Projects Served
5 Contact US
![Page 3: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/3.jpg)
1. Introduction
![Page 4: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/4.jpg)
Unique Delta Technical Service L L.C has been established in Dubai,
UAE. The firm is an successful technical service supplier which can
provide a full range of human resources for Oil & Gas project, Power
Station construction, Tank construction, Water Injection and Water
Treatment project, etc. Since the establishment, the firm has provided
human resources for different fields of projects, especially for :
MAJNOON Oil Export Pipeline Project
Iraq BADRA Well Gathering System Project
Iraq BADRA-GHARRAF Oil Export Pipeline Project
HALFAYA Oil Export Pipeline Project
EPC3 x 2500m³ Crude Oil Flow Tank Project, RUMALA Oilfield
Well Pads and Oil Gathering System at the West Qurna Oilfield
![Page 5: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/5.jpg)
Obtain Iraq Visa for 1-year multiple entry within 5 days;
Adequate Experienced Engineers of each discipline
Abundant Registered Skilled Worker China, India, Pakistan, Iraq, etc.
Full Set of experienced management and operation personnel
![Page 6: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/6.jpg)
2. Licenses
![Page 7: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/7.jpg)
![Page 8: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/8.jpg)
![Page 9: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/9.jpg)
3. Manpower Resources
![Page 10: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/10.jpg)
Management Organzation
General Manager
Deputy Manager
Project Control
Department
Marketing Department
Deputy Manager
Contract Department
Financial Department
Admin Department
![Page 11: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/11.jpg)
Manpower Category Number ManpowerCategory
Number
Foreman 26 Excavator Operator 52
Scaffolder 188 Crane Operator 48
Welder 216 Telecommunication Worker
53
Pipe Fitter 203 Concrete Worker 275
Electrician 78 Operator 68
Instrument Workers 62 Labor 568
Steel Fixer 132
Total 1969
Registered Field Manpower
![Page 12: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/12.jpg)
Man Power Certificate
![Page 13: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/13.jpg)
Welder Certificate
Electrician Certificate
Scafolder Certificate
Man Power Certificate
![Page 14: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/14.jpg)
Excavator Operator Certificate
Crane Operator Certificate
Man Power Certificate
![Page 15: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/15.jpg)
Process Engineer
Information about candidate
Name: Wang Tiejun
Nationality: China
Date of birth: 12/09/1972
Education &
Name of
educational
institution :
Bachelor & Jiangsu Institute of
Petrochemical Technology
Engineering
certifications
and experience:
Senior engineer
Work
experience:16 years
Rewards:
Professional
qualifications:Senior engineer
Experience:
2013- Present Project Manager for Baotou LNG Plant
2011 - 2012Engineering Manager for JiNing crude oil
pipeline project
2009- 2012
Engineering Manager for CNOOC
Deepwater Onshore terminal Gas Plant
(Gaolan)
Pipeline Engineer
Information about candidate
Name: Xu Wei
Nationality: China
Date of birth: 03/05/1980
Education & Name
of educational
institution :
Bachelor & China University Of Petroleum
Engineering
certifications and
experience:
Engineer
Work experience: 10 years
Rewards:
Professional
qualifications:Engineer
Experience:
2012 - presentLeading Engineer for EPC Well Gathering
System at Badra Oil Field, in Republic of Iraq
2010 - 2012Engineer for MAJNOON OIL EXPORT PIPELINE
PROJECT
2010 - 2011Leading engineer for HALFAYA PROJECT
SURFACE FACILITY EARLY FCP (GEXL)
2008 - 2009 Engineer for Sebei-Xining-Lanzhou Gas Pipeline
2007 - 2008Engineer for Lanzhou-Zhengzhou-changsha Oil
Pipeline
![Page 16: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/16.jpg)
Piping Enginer
Information about candidate
Name: Jiang Hong
Nationality: China
Date of birth: 08/05/1968
Education&
Name of
educational
institution :
College &JiLin Institute of Technology
Engineering
certifications and
experience:
Piping engineer
Work experience: 22 years
Rewards:
Professional
qualifications:Certified Safety Engineer, Certified Constructor
Experience:
2012 - presentPiping engineer ,Epc Well Gathering System At Badra
Oil Field, In Republic of Iraq Project
2011 - 2012 Piping engineer ,Majnoon Oil Export Pipeline Project
2010- 2011Piping engineer ,Halfaya Project Surface Facility Early
Fcp
Lead Mechanical Engineer
Information about candidate
Name: Cheng Peng
Nationality: China
Date of birth: 20/12/1978
Education &
Name of
educational
institution :
Master & Harbin Institute of Technology
Engineering
certifications and
experience:
Engineer
Work experience: 12 years
Rewards: Outstanding employee
Professional
qualifications:Mechanical engineer
Experience:
2012- presentMechanical Engineer for EPC Well Gathering
System at Badra Oil Field.
2011 - 2012Mechanical Engineer for HALFAYA
project surface facility
2009 - 2011Mechanical Engineer for North Pars
LNG Project
2006 - 2009Mechanical Engineer for LISHA oil
storage project
![Page 17: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/17.jpg)
Lead Instrumentation Engineer
Information about candidate
Name: Bao Limei
Nationality: China
Date of birth: 07/8/1968
Education &
Name of
educational
institution :
Bachelor & Tianjin University
Engineering
certifications and
experience:
Senior engineer
Work experience: 23 years
Rewards:
Professional
qualifications:Senior engineer
Experience:
2009 - presentLiShui36-1 Gas Field Development Project
NiYu Island Onshore Terminal Gas Plant
2008 - 2009NanPu Oilfield NP4-2 Island Development
Project
2007 - 2009JiDong NanPu Oilfield NP1-3 Island Development Project
2005 - 2007 Shanghai Baihe pressure station project
Lead Electrical Engineer
Information about candidate
Name: Cheng Xin
Nationality: China
Date of birth: 05/06/1970
Education & Name
of educational
institution :
Bachelor Degree
Engineering
certifications and
experience:
Senior engineer
Work experience: 20 years
Rewards:
Professional
qualifications:Senior engineer
Experience:
2010.5-2012.9CNOOC Deepwater Onshore Terminal Gas Plant
(Gaolan)
2006.5-2007.9Jidong Oilfield 110 kV Power Supply System
Engineering
2006.11-2008.5LEDONG Gas Field Engineering Onshore Terminal
and Pipeline (CNOOC)
2004.2-2005.8PANYU/HUIZHOU Gas Field Development
Engineering ZHUHAI onshore terminal (CNOOC)
2001.8-2003.9DONGFANG 1-1 Gas Field Development
Engineering onshore terminal (CNOOC)
1997.9-1998.10 QiuDong gas process plant (CNPC)
![Page 18: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/18.jpg)
Civil and Structural Engineer
Information about candidate
Name: Qiu Ruidi
Nationality: China
Date of birth:
Education & Name
of educational
institution :
Bachelor & Xi’an highway Institute
Engineering
certifications and
experience:
Senior engineer
Work experience: 23 years
Rewards:
Professional
qualifications:Certification of supervisor
Experience:
2011 - 2012lead civil engineer for Hafaya project surface
facility early FC
2010 - 2011lead civil engineer for West-East Gas Pipeline
Project(Phase Ⅱ ) Cangwu-Hezhou branch
project
2008 - 2009lead civil engineer for West-East Gas Pipeline
Project (PhaseⅡ)
Telecommunication engineer
Information about candidate
Name: Zhang Zhaomeng
Nationality:
Date of birth: 11/06/1982
Education & Name
of educational
institution :
Engineering
certifications and
experience:
Engineer
Work experience: 10 years
Rewards:
Professional
qualifications:
Experience:
10/2012 -
present
Leading Communication engineer for Gazprom/ EPC Well
Gathering System at Badra Oil Field, in
08/2011 –
04/2012
Communication engineer for Halfaya project Surface
Facility Early FCP,
11/2010-
11/2011
Communication engineer for Myanmar-China Gas Pipeline
Project (submarine optic fiber calbe) Submarine Optic
Fiber Cable Project.
06/2010-
02/2012
Communication engineer for CNOOC Deep Water Nature
Gas ZhuHaiGaoLan Terminal Project.
04/2010-
05/2010
Communication engineer for Dagang Oilfield Residential
Area f System.
07/2009/08/
2009
Communication engineer for Discharge Pipelines and
Cavern Leaching of TuzGölü Underground Gas Storage
Project.(in )
06/2009-
03/2010
Communication engineer for Dagang Oilfield Digital
television network transformation project.
05/2009-
12/2009
Communication engineer for ChengHai Oilfield ZoneⅡSurface Construction Project.
01/2009-
05/2009
Communication engineer for CNOOC SuiZhong 36-1 Dock
Terminal Project.
![Page 19: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/19.jpg)
4. Projects Served
![Page 20: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/20.jpg)
Project Manpower Category Quantity
BADRA Well Gathering System Project
Welder 10
Instrument Workers 12
Camp Maintenance Personnel 8
Electrician 7
Pipe Fitter 3
Operator 6
Total 46
![Page 21: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/21.jpg)
Project Manpower Category Quantity
MAJNOON Oil Export Pipeline Project
Welder 5
E&I Workers 6
Electrician 4
Operator 8
Labor 8
Total 31
![Page 22: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/22.jpg)
Project Manpower Category Quantity
BADRA-GHARRAF Oil Export Pipeline Project
Welder 3
Electrician 5
Steel Fixer 3
Labor 10
Total 21
![Page 23: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/23.jpg)
Project Manpower Category Quantity
HALFAYA Oil Export Pipeline Project
Field Supervisor 2
Instrument Workers 4
Camp Maintenance Personnel 4
Electrician 7
Pipe Fitter 3
Total 20
![Page 24: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/24.jpg)
Project Manpower Category Quantity
EPC3 x 2500m³ Crude Oil Flow Tank Project, RUMALA Oilfield
Welder 10
Instrument Workers 12
Camp Maintenance Personnel 8
Electrician 7
Pipe Fitter 3
Field Supervisor 6
Total 54
![Page 25: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/25.jpg)
Project Manpower Category Quantity
Well Pads and Oil Gathering System at the West Qurna Oilfield
Welder 10
Instrument Workers 12
Camp Maintenance Personnel 8
Electrician 7
Pipe Fitter 3
Field Supervisor 6
Total 54
![Page 26: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/26.jpg)
Camp Maintenance
Welder Qualification Test
Welding
![Page 27: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/27.jpg)
Power Pole Installation
Valve InstallationPipe Rack
Prefabrication
![Page 28: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/28.jpg)
Unique Delta Technical Service L.L.CP.O. Box: 300873,Dubai, UAEContact Person: Mr. Jerry Kim/ Mr. Xu Ling
Phone No +82-1025161014 /+971-507924330Fax: +971-4-3699758Email: [email protected]
![Page 29: Welcome to Unique Delta Technical Service L.Lalghaley.com/wp-content/uploads/2017/10/Unique-Delta... · 2017. 10. 10. · CNOOC Deepwater Onshore Terminal Gas Plant (Gaolan) 2006.5-2007.9](https://reader036.vdocuments.net/reader036/viewer/2022070216/611cacb23d68bd6b3d5af467/html5/thumbnails/29.jpg)
We will strive to meet your expectations