well name field afe: formation objective drilling report · 24 hr spud 2/7/2018 24 hr csg & cmt...
TRANSCRIPT
/
I O D L B G O
/
- -
/
Lb- stg - RPG
Out
Motor Information
Serial # / Hrs
AKO
In
Footage/ROP
I.D.O.D.ComponentMD INC AZI TVD VS N+/S- E+/W- DLS
Geology
Formation MD TVD
Recent Surveys
Pump DataBit Records
Accumulator Manifold Annular 1 Field Usage (24 hrs) 1 Fuel Remaining 1
0:00 1 1 1
FV PV / YP GelsFiltrate (API)
cc/30min
Filtrate (HTHP)
cc/30min
Filter Cake
32nds% Solids % Oil LGS % HGS %
O/W
Ratio
Mud Report
96 TMK BPN 25
Csg & cmt ops. Pump 575 sxs cement.
Production 5-1/2 20 HCP-110 4.771 4.625 8.5
1
SPR #1 1 SPM @ 1
Gas Data
Lime
Btms Up Time 1
Connection Gas
Background Gas
1
1
0
Top Btm
25 105
Thread/Coupling
Surface 6/15/2018 9-5/8 36 J-55 8.921 8.765 12.25 0 96 LT&C 25 1697Conductor 43 H-40 0 9626
SizeRun Date
6/13/2018 16
ID Drift
$2 Cumm Mud Cost $22 Daily Total Cost $20,060 Cumm Cost to Date $20,060 Co Man
Notification Dates
1687
Start Depth
0
16874:30 12:00 8
End Depth
1687
Operations Summary
Drill surface w/Cartel 11 to TD of 1687
NPT
Time Log
22:00 4:30
Hours
7
Current Depth 24 hr Footage Avg ROP
1687 1687.00 60
Target TVD
6100
From To
Casing
Type Weight Grade Burst CollapseHole Size
CarlDaily Mud Cost
Days from Spud
-1.00
Spud Date
6/16/2018
Target Inc
91
Current Operations Next Day Operations
Drilling Ahead TD Well, Circulate and Condition, Run Casing
6/24/2018
24 Hr Spud 2/7/2018 24 Hr Csg & Cmt 2/7/2018 24 Hr BOP Test 2/7/2018
Drilling Report #
1
AFE:
CO118014
Report Date6/15/2018
Formation Objective
Niobrara
Rig ContractorGL KB4924 25
Well Name
Cinnamon Teal 35-16HN
State
Weld
Colorado
County
Patterson 346
Move in Date
Field
Duck Pond
Estimated TD
11460
API Number05-123-46650
Legals
SESW Sec 35 T8N R60W
Mud Materials & Quantities Added In Last 24 Hours:
SPR #2
Trip Gas
1 SPM @ 1
Sample Time MW
Bit No Depth InTypeManufacturerSize ROPBit HrsFootageDepth out#1
/
SPR Depth: 1
Which Pump AV
9
6.5
501 501
136
9
6.5
GPM
R
Both
SPM
JetsSerial No.#2
136
LINER
STROKE
On BTM SPP, psi Diff PSI 0 1003Total Flow, GPM HHP @ Bit
Motor RPM TD RPM Total Bit Speed P/U S/O-
BHA
Total LengthLength
501 11.9BPM 11.9Off BTM SPP, psi
WOB Torque Rotating Wt
/
I O D L B G O
/
- -
/
Well Name Field AFE: Formation Objective Drilling Report #
Cinnamon Teal 35-16HN Duck Pond CO118014
Colorado 05-123-46650 4924 25 Patterson 346 6/23/2018
Niobrara 2
State API Number GL KB Rig Contractor Report Date
Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 7.00
County Legals Estimated TD Move in Date Spud Date Days from Spud
6/25/2018
Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations
Notification Dates 24 Hr Spud 6/25/2018 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test
Rig up on Cinnamon Teal
Daily Mud Cost Cumm Mud Cost Daily Total Cost $4,204 Cumm Cost to Date $24,264 Co Man
1687 0.00 0 6288 90 Moving 346 off of Kennedy Pad.
Larry Siegel
Casing
Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm
Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.921 8.765 12.25
26 0 960 96 LT&C 25 1697
Production 5-1/2 20 HCP-110 25
Time Log
From To Hours NPT Start Depth End Depth Operations Summary
4.771 4.625 8.5 0 96 TMK BPN
MIRU Patterson 3465:00 5:00 24 1687 1687
Accumulator Manifold Annular Field Usage (24 hrs) Fuel Remaining
Mud Report Gas Data
Sample Time MW FV PV / YP Gels HGS %O/W
RatioLime
Btms Up Time
Connection Gas
Background Gas
Filtrate (API)
cc/30min
Filtrate (HTHP)
cc/30min
Filter Cake
32nds% Solids % Oil LGS %
SPR #2 SPM @
SPR Depth:
Mud Materials & Quantities Added In Last 24 Hours: SPR #1 SPM @
Trip Gas/
Bit Records Pump Data
Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2
R LINER 5 5
112
12 12STROKE
SPM 112
326 326
Off BTM SPP, psi On BTM SPP, psi Diff PSI 0 Which Pump Both
GPM
BPM 7.8 7.8
Motor RPM TD RPM Total Bit Speed - WOB
Total Flow, GPM 652 HHP @ Bit 326 AV
S/O
Recent Surveys Geology BHA
Torque Rotating Wt P/U
O.D. I.D. Length Total Length
178 2 91 177.98 -0.28 -0.28
E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-
6.69 4.34261 6 91 260.77 -0.36 -0.36
0.99 3.21
431 12 106 428.65 -3.62 -3.62
17.4 3.57346 9
104 510.09 -8.77 -8.77
32.56 4.91
93 345.08 -0.79 -0.79
599 15 117 591.03 -16.41 -16.41
52.43 4.5515 16
15 114 673.19 -25.82 -25.82
73.5 4.31
115.73 7.89766 18.89 97.45 751.74 -31.82 -31.82
93.16 0.93684
937 27.67 102.19 907.83 -41.86 -41.86
147 6.8851 24.66
107.5 982.86 -52.11 -52.11
184.35 4.55
96.5 830.64 -35.61 -35.61
1106 29.12 110.61 1056.5 -65.31 -65.31
222.93 3.061022 28.41
1190 27.83 111.41 1130.34 -79.66 -79.66
261.12 1.97
335.02 0.611274 28.04 112.41 1204.55 -94.34 -94.34
298.51 1.6
Motor Information
28.88 113.73 1278.4 -110.03 -110.03 371.84 1.25
Lb- stg - RPG1443 27.11 102.52 1353.5 -122.5 -122.5 409.55 6.52
Serial # / Hrs1358
1610 28.02 101.68 1502.05 -140.22 -140.22 483.75 2.24
1.3 AKO1526 26.81 104.81 1427.48 -131.38 -131.38 446.11
1635 29.79 99.34 1523.94 -142.42 -142.42 495.63 8.4 Out
In
1685 29.79 99.34 1567.33 -146.45 -146.45 520.14 0 Footage/ROP
/
I O D L B G O
/
- -
/
Well Name Field AFE: Formation Objective Drilling Report #
Cinnamon Teal 35-16HN Duck Pond CO118014
Colorado 05-123-46650 4924 25 Patterson 346 6/24/2018
Niobrara 3
State API Number GL KB Rig Contractor Report Date
Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 8.00
County Legals Estimated TD Move in Date Spud Date Days from Spud
6/25/2018
Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations
Notification Dates 24 Hr Spud 6/25/2018 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test
Continue rigging up.
Daily Mud Cost Cumm Mud Cost Daily Total Cost $4,204 Cumm Cost to Date $28,468 Co Man
1697 0.00 0 6288 90 Moving 346 and rigging up on Cinnamon Teal
Larry Siegel
Casing
Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm
Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.921 8.765 12.25
26 0 960 96 LT&C 25 1697
Production 5-1/2 20 HCP-110 25
Time Log
From To Hours NPT Start Depth End Depth Operations Summary
4.771 4.625 8.5 0 96 TMK BPN
MIRU Patterson 3465:00 5:00 24 1697 1697
Accumulator Manifold Annular Field Usage (24 hrs) Fuel Remaining
Mud Report Gas Data
Sample Time MW FV PV / YP Gels HGS %O/W
RatioLime
Btms Up Time
Connection Gas
Background Gas
Filtrate (API)
cc/30min
Filtrate (HTHP)
cc/30min
Filter Cake
32nds% Solids % Oil LGS %
SPR #2 SPM @
SPR Depth:
Mud Materials & Quantities Added In Last 24 Hours: SPR #1 SPM @
Trip Gas/
Bit Records Pump Data
Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2
R LINER 5 5
112
12 12STROKE
SPM 112
326 326
Off BTM SPP, psi On BTM SPP, psi Diff PSI 0 Which Pump Both
GPM
BPM 7.8 7.8
Motor RPM TD RPM Total Bit Speed - WOB
Total Flow, GPM 652 HHP @ Bit 326 AV
S/O
Recent Surveys Geology BHA
Torque Rotating Wt P/U
O.D. I.D. Length Total Length
178 2 91 177.98 -0.28 -0.28
E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-
6.69 4.34261 6 91 260.77 -0.36 -0.36
0.99 3.21
431 12 106 428.65 -3.62 -3.62
17.4 3.57346 9
104 510.09 -8.77 -8.77
32.56 4.91
93 345.08 -0.79 -0.79
599 15 117 591.03 -16.41 -16.41
52.43 4.5515 16
15 114 673.19 -25.82 -25.82
73.5 4.31
115.73 7.89766 18.89 97.45 751.74 -31.82 -31.82
93.16 0.93684
937 27.67 102.19 907.83 -41.86 -41.86
147 6.8851 24.66
107.5 982.86 -52.11 -52.11
184.35 4.55
96.5 830.64 -35.61 -35.61
1106 29.12 110.61 1056.5 -65.31 -65.31
222.93 3.061022 28.41
1190 27.83 111.41 1130.34 -79.66 -79.66
261.12 1.97
335.02 0.611274 28.04 112.41 1204.55 -94.34 -94.34
298.51 1.6
Motor Information
28.88 113.73 1278.4 -110.03 -110.03 371.84 1.25
Lb- stg - RPG1443 27.11 102.52 1353.5 -122.5 -122.5 409.55 6.52
Serial # / Hrs1358
1610 28.02 101.68 1502.05 -140.22 -140.22 483.75 2.24
1.3 AKO1526 26.81 104.81 1427.48 -131.38 -131.38 446.11
1635 29.79 99.34 1523.94 -142.42 -142.42 495.63 8.4 Out
In
1685 29.79 99.34 1567.33 -146.45 -146.45 520.14 0 Footage/ROP
/
I O D L B G O
/
- -
/520.14 0 Footage/ROP1685 29.79 99.34 1567.33 -146.45 -146.45
1635 29.79 99.34 1523.94 -142.42 -142.42 495.63 8.4 Out
In1610 28.02 101.68 1502.05 -140.22 -140.22 483.75 2.24
1.3 AKO1526 26.81 104.81 1427.48 -131.38 -131.38 446.11
1443 27.11 102.52 1353.5 -122.5 -122.5 409.55 6.52
Serial # / Hrs1358 28.88 113.73 1278.4 -110.03 -110.03 371.84 1.25
Lb- stg - RPG
335.02 0.611274 28.04 112.41 1204.55 -94.34 -94.34
298.51 1.6
Motor Information
1190 27.83 111.41 1130.34 -79.66 -79.66
261.12 1.971106 29.12 110.61 1056.5 -65.31 -65.31
222.93 3.061022 28.41 107.5 982.86 -52.11 -52.11
184.35 4.55
96.5 830.64 -35.61 -35.61
937 27.67 102.19 907.83 -41.86 -41.86
147 6.8851 24.66
766 18.89 97.45 751.74 -31.82 -31.82
93.16 0.93684 15 114 673.19 -25.82 -25.82
73.5 4.31
115.73 7.89
599 15 117 591.03 -16.41 -16.41
52.43 4.5515 16 104 510.09 -8.77 -8.77
32.56 4.91
93 345.08 -0.79 -0.79
431 12 106 428.65 -3.62 -3.62
17.4 3.57346 9
6.69 4.34261 6 91 260.77 -0.36 -0.36
0.99 3.21
O.D. I.D. Length Total Length
178 2 91 177.98 -0.28 -0.28
E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-
Recent Surveys Geology BHA
Torque Rotating Wt P/U
7.8 7.8
Motor RPM TD RPM Total Bit Speed - WOB
Total Flow, GPM 652 HHP @ Bit 326 AV
S/O
326
Off BTM SPP, psi On BTM SPP, psi Diff PSI 0 Which Pump Both
GPM
BPM
SPM 112
326
112
12 12STROKE
Bit Records Pump Data
Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2
R LINER 5 5
SPR #2 SPM @
SPR Depth:
Mud Materials & Quantities Added In Last 24 Hours: SPR #1 SPM @
Trip Gas/
Mud Report Gas Data
Sample Time MW FV PV / YP Gels HGS %O/W
RatioLime
Btms Up Time
Connection Gas
Background Gas
Filtrate (API)
cc/30min
Filtrate (HTHP)
cc/30min
Filter Cake
32nds% Solids % Oil LGS %
Accumulator Manifold Annular Field Usage (24 hrs) Fuel Remaining 3645
MIRU Patterson 346 on Cinnamon Teal.5:00 5:00 24 1697 1697
Time Log
From To Hours NPT Start Depth End Depth Operations Summary
4.778 4.625 8.5 0 96 TMK BPN
25 1697Production 5-1/2 20 HCP-110 25
Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25
26 0 960 96 LT&C
Casing
Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm
Continue Rigging up on Cinnamon Teal
Daily Mud Cost Cumm Mud Cost $20 Daily Total Cost $38,338 Cumm Cost to Date $66,806 Co Man
1697 0.00 0 6288 90 Rigging up on Cinnamon Teal
Larry Siegel / Hans Cary
6/25/2016
Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations
Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test
Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 9.00
County Legals Estimated TD Move in Date Spud Date Days from Spud
Well Name Field AFE: Formation Objective Drilling Report #
Cinnamon Teal 35-16HN Duck Pond CO118014
Colorado 05-123-46650 4924 25 Patterson 346 6/25/2018
Niobrara 4
State API Number GL KB Rig Contractor Report Date
/
I O D L B G O
/
- -
/
Well Name Field AFE: Formation Objective Drilling Report #
Cinnamon Teal 35-16HN Duck Pond CO118014
Colorado 05-123-46650 4924 25 Patterson 346 6/26/2018
Niobrara 5
State API Number GL KB Rig Contractor Report Date
Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 10.00
County Legals Estimated TD Move in Date Spud Date Days from Spud
6/25/2016
Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations
Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test
Continue Rigging up on Cinnamon Teal
Daily Mud Cost $19,694 Cumm Mud Cost $19,714 Daily Total Cost $176,246 Cumm Cost to Date $243,052 Co Man
1697 0.00 0 6822 90 Rigging up top drive, and nippling up.
Larry Siegel / Hans Cary
Casing
Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm
Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25
26 0 960 96 LT&C 25 1697
Production 5-1/2 20 HCP-110 25
Time Log
From To Hours NPT Start Depth End Depth Operations Summary
4.778 4.625 8.5 0 96 TMK BPN
MIRU Patterson 346 on Cinnamon Teal.5:00 5:00 24 1697 1697
Accumulator 2695 Manifold 1554 Annular 955 Field Usage (24 hrs) 358 Fuel Remaining 3287
Mud Report Gas Data
Sample Time MW FV PV / YP Gels HGS %O/W
RatioLime
Btms Up Time
Connection Gas
Background Gas
Filtrate (API)
cc/30min
Filtrate (HTHP)
cc/30min
Filter Cake
32nds% Solids % Oil LGS %
SPR #2 SPM @
SPR Depth:
Mud Materials & Quantities Added In Last 24 Hours: SPR #1 SPM @
Trip Gas/
Bit Records Pump Data
Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2
R LINER 5 5
112
12 12STROKE
SPM 112
326 326
Off BTM SPP, psi On BTM SPP, psi Diff PSI 0 Which Pump Both
GPM
BPM 7.8 7.8
Motor RPM TD RPM Total Bit Speed - WOB
Total Flow, GPM 652 HHP @ Bit 326 AV
S/O
Recent Surveys Geology BHA
Torque Rotating Wt P/U
O.D. I.D. Length Total Length
178 2 91 177.98 -0.28 -0.28
E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-
6.69 4.34261 6 91 260.77 -0.36 -0.36
0.99 3.21
431 12 106 428.65 -3.62 -3.62
17.4 3.57346 9
104 510.09 -8.77 -8.77
32.56 4.91
93 345.08 -0.79 -0.79
599 15 117 591.03 -16.41 -16.41
52.43 4.5515 16
15 114 673.19 -25.82 -25.82
73.5 4.31
115.73 7.89766 18.89 97.45 751.74 -31.82 -31.82
93.16 0.93684
937 27.67 102.19 907.83 -41.86 -41.86
147 6.8851 24.66
107.5 982.86 -52.11 -52.11
184.35 4.55
96.5 830.64 -35.61 -35.61
1106 29.12 110.61 1056.5 -65.31 -65.31
222.93 3.061022 28.41
1190 27.83 111.41 1130.34 -79.66 -79.66
261.12 1.97
335.02 0.611274 28.04 112.41 1204.55 -94.34 -94.34
298.51 1.6
Motor Information
28.88 113.73 1278.4 -110.03 -110.03 371.84 1.25
Lb- stg - RPG1443 27.11 102.52 1353.5 -122.5 -122.5 409.55 6.52
Serial # / Hrs1358
1610 28.02 101.68 1502.05 -140.22 -140.22 483.75 2.24
1.3 AKO1526 26.81 104.81 1427.48 -131.38 -131.38 446.11
1635 29.79 99.34 1523.94 -142.42 -142.42 495.63 8.4 Out
In
1685 29.79 99.34 1567.33 -146.45 -146.45 520.14 0 Footage/ROP
/
I O D L B G O
/
- -
/
Well Name Field AFE: Formation Objective Drilling Report #
Cinnamon Teal 35-16HN Duck Pond CO118014
Colorado 05-123-46650 4924 25 Patterson 346 6/27/2018
Niobrara 6
State API Number GL KB Rig Contractor Report Date
Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 11.00
County Legals Estimated TD Move in Date Spud Date Days from Spud
6/25/2016
Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations
Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test
Nipple up and Test. Pick up BHA 1. Drill ahead.
Daily Mud Cost Cumm Mud Cost Daily Total Cost $31,019 Cumm Cost to Date $274,071 Co Man
1697 0.00 0 6288 90 Rigging up top drive, and nippling up.
Larry Siegel / Hans Cary
Casing
Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm
Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25
26 0 960 96 LT&C 25 1697
Production 5-1/2 20 HCP-110 25
Time Log
From To Hours NPT Start Depth End Depth Operations Summary
4.778 4.625 8.5 0 96 TMK BPN
MIRU on Cinnamon Teal. Spool up and raise the Derrick, pick up top drive. Rig up bails, elevators, service loop. Replace lower jaws on ST-80.
Nipple up choke line and flow lines. 5:00 5:00 24 1697 1697
Accumulator 2695 Manifold 1554 Annular 955 Field Usage (24 hrs) 1000 Fuel Remaining 11029
Mud Report Gas Data
Sample Time MW FV PV / YP Gels HGS %O/W
RatioLime
Btms Up Time
Connection Gas
Background Gas
Filtrate (API)
cc/30min
Filtrate (HTHP)
cc/30min
Filter Cake
32nds% Solids % Oil LGS %
6.4 1 8.4517:00 9.1 40 13 8 8
SPR #2 SPM @
SPR Depth:
Mud Materials & Quantities Added In Last 24 Hours: SPR #1 SPM @
80 4.18 4.27 89/11 2.99 Trip Gas/ 9
Bit Records Pump Data
Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2
R LINER 5 5
112
12 12STROKE
SPM 112
326 326
Off BTM SPP, psi On BTM SPP, psi Diff PSI 0 Which Pump Both
GPM
BPM 7.8 7.8
Motor RPM TD RPM Total Bit Speed - WOB
Total Flow, GPM 652 HHP @ Bit 326 AV
S/O
Recent Surveys Geology BHA
Torque Rotating Wt P/U
O.D. I.D. Length Total LengthE+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-
Parkman Sandstone
0.65 0.65Richard Sandstone 3248 3277 8.5 Reed TK56
6.88 3.25 24.75 25.43361 3390 2.25 Bico SS100
3.25 12.96 38.36Sussex Sandstone 4095 4124 NMPC
6.81 3.25 29.69 68.054644 4673 NMCSDCShannon Sandstone
6.53
6.5 3.25 3.69 71.74TeePee Buttes 5451 5480 Gap Sub
5.63 3.25 30.09 101.836037 6066 NMCSDCSharon Springs
Niobrara A Chalk
6.64 3.25 9.01 110.84Niobrara Top 6081 6129 NM Flex Pony
6.65 3.25 4.15 114.996109 6157 Filter Sub
3 273.41 388.4Niobrara A Chalk Base 6137 6185 3 Stands HWDP
6169 6217Niobrara B1 Chalk Top
5
Niobrara B1 Chalk Base 6184 6232
622 6268Niobrara B2 Chalk Top
NBRR B2 High Resisitivity Target6240 6288
Motor Information
Lb- stg - RPG 8-Jul
Serial # / Hrs G2363
5 0.28
AKO 2.25
Out
In 1687
Footage/ROP
/
I O D L B G O
/
- -
/
Well Name Field AFE: Formation Objective Drilling Report #
Cinnamon Teal 35-16HN Duck Pond CO118014
Colorado 05-123-46650 4924 25 Patterson 346 6/28/2018
Niobrara 7
State API Number GL KB Rig Contractor Report Date
Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 12.00
County Legals Estimated TD Move in Date Spud Date Days from Spud
6/25/2016
Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations
Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test
Drill the vertical and curve. TOOH. P/U Resistivity. Drill ahead.
Daily Mud Cost Cumm Mud Cost $19,714 Daily Total Cost $40,814 Cumm Cost to Date $314,885 Co Man
2453 756.00 840 6288 90 Drilling ahead in the tangent.
Larry Siegel / Hans Cary
Casing
Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm
Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25
26 0 960 96 LT&C 25 1697
Production 5-1/2 20 HCP-110 25
Time Log
From To Hours NPT Start Depth End Depth Operations Summary
4.778 4.625 8.5 0 96 TMK BPN
R/U Stand pipe, Install bails & elevators. Change saver sub. Rig up vibrating lines in pump house. Transfer mud to the pits. Troubleshoot link
tilt failure.
9:00 16:00 7 1697 1697 Rig up rotating head spool riser, flow nipple, chokes lines, kill line, accumulator lines, bird bath, and hand rails.
5:00 9:00 4 1697 1697
Pressure test BOP and casing. Tested BOP, 250 psi low, 5000 psi high. Testted casing to 1500 psi for 15 minutes.
21:00 21:30 1 1697 1697 Center up rig.
16:00 21:00 5 1697 1697
Pick up BHA 1 and scribe tools.
23:00 23:30 1 1697 1697 Rig Service / Repair ST-80.
21:30 23:00 2 1697 1697
Trip in hole picking up singles.
1:30 2:30 1 1697 1697 Drill out the float (1653') and shoe (1697').
23:30 1:30 2 1697 1697
Drill ahead from 1697' to 2453'2:30 5:00 3 1697 2453
Accumulator 2695 Manifold 1554 Annular 955 Field Usage (24 hrs) 573 Fuel Remaining 10456
Mud Report Gas Data
Sample Time MW FV PV / YP Gels HGS %O/W
RatioLime
Btms Up Time
Connection Gas
Background Gas
Filtrate (API)
cc/30min
Filtrate (HTHP)
cc/30min
Filter Cake
32nds% Solids % Oil LGS %
6.3 1 4.187:30 8.7 39 13 8 6
SPR #2 SPM @
SPR Depth:
Mud Materials & Quantities Added In Last 24 Hours: 50 bbls of diesel SPR #1 SPM @
81 4.18 4.27 89/11 3.38 Trip Gas/ 7
Bit Records Pump Data
Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2
R LINER 5 5
14 14 14 14 1/14 1,6871 8.5 Reed TK-56 A238624 14
112
12 12STROKE
SPM 112
326 326
Off BTM SPP, psi 1730 On BTM SPP, psi 2460 Diff PSI 730 Which Pump Both
GPM
BPM 7.8 7.8
Motor RPM 182 TD RPM 50 Total Bit Speed 232 WOB
Total Flow, GPM 652 HHP @ Bit 655 AV
95 S/O 85
Recent Surveys Geology BHA
32 Torque 7430 Rotating Wt 90 P/U
O.D. I.D. Length Total Length
1073 17.68 111.95 1056.08 -52.73 -52.73
E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-
171.66 4.08 Parkman Sandstone
0.65 0.65
1158 21.05 109.43 1136.26 -62.64 -62.64
145.29 3.03 Richard Sandstone 3718 3289 8.5 Reed TK56
6.88 3.25 24.75 25.43841 3390 2.25 Bico SS100
3.25 12.96 38.36
1325 23.75 110.32 1289.77 -85.06 -85.06
201.54 3.48 Sussex Sandstone 4731 4108 NMPC
6.81 3.25 29.69 68.055350 4679 NMCSDC
1241 23.93
109.58 1368.43 -96.92 -96.92
233.41 0.26 Shannon Sandstone
6.53110.01 1212.94 -73.36 -73.36
6.5 3.25 3.69 71.74
1494 24.37 110.4 1444.17 -108.53 -108.53
266.08 0.41 TeePee Buttes 6154 5472 Gap Sub
5.63 3.25 30.09 101.836802 6084 NMCSDC
1411 23.93
24.18 111.29 1520.74 -120.82 -120.82
297.99 0.67 Sharon Springs
356.01 0.73 Niobrara A Chalk
6.64 3.25 9.01 110.84
1645 24.63 111.77 1581.75 -130.98 -130.98
330.26 0.49 Niobrara Top 6851 6120 NM Flex Pony
6.65 3.25 4.15 114.996895 6150 Filter Sub
1578
3 273.41 388.4
1835 32.79 109.36 1750.51 -163.76 -163.76
393.7 1.63 Niobrara A Chalk Base 6936 6175 3 Stands HWDP
7001 6210
1741 25.85
106.94 1828.66 -180 -180
436.45 7.77 Niobrara B1 Chalk Top
5114.07 1668.59 -146.94 -146.94
2023 36.15 99.4 1905.28 -192.34 -192.34
486.08 2.51 Niobrara B1 Chalk Base 7033 6225
7092 6249
1929 34.73
2117 36.15 98.3 1981.18 -200.87 -200.87
539.06 4.89 Niobrara B2 Chalk Top
648.55 2.572211 35.57 94.29 2057.37 -206.92 -206.92
593.85 0.69 NBRR B2 High Resisitivity Target7105 6254
Motor Information
34.82 93.72 2134.19 -210.71 -210.71 702.59 0.87
Lb- stg - RPG 8-Jul2399 35.22 97.46 2211.18 -215.97 -215.97 756.25 2.32
Serial # / Hrs G2363 12.6
5 0.28
2305
2588 35.84 104.56 2364.62 -236.13 -236.13 864.66 2.8
1.76 AKO 2.252493 35.93 100.02 2287.64 -224.29 -224.29 810.29
2682 35.84 104.95 2440.82 -250.15 -250.15 917.88 0.24 Out
In 1687
2776 35.88 103.98 2517 -263.9 -263.9
7249
971.2 0.61 Footage/ROP 5552 731
/
I O D L B G O
0 1 CT X In No
/
- -
/2423.74 11.69 Footage/ROP7193 77.77 356.49 6279.07 -188.57 -188.57
7099 68.58 2.79 6251.87 -278.39 -278.39 2424.42 8.45 Out
In 72497006 60.72 2.92 6212.08 -362.26 -362.26 2420.24 9.37
11.22 AKO 26912 52.28 5.96 6160.24 -440.33 -440.33 2414.28
6817 41.63 5.35 6095.49 -509.32 -509.32 2407.43 7.45
Serial # / Hrs G988 0
5 0.28
6723 34.69 3.85 6021.62 -567.17 -567.17 2402.72 9.93
Lb- stg - RPG 8-Jul
2399.85 13.49
5 4.27 2634.17 3025.71
6629 25.36 3.06 5940.32 -614.06 -614.06
2398.21 7.81 NBRR B2 High Resisitivity Target7137 6276 28 Stands 5" DP
23 3048.71Motor Information Agitator 6.75 3.25
6535 12.68 3.14 5851.63 -644.59 -644.59
2398.07 6.06 Niobrara B2 Chalk Top
3.25 4.31 118.13
6442 5.52 354.59 5759.86 -659.25 -659.25
2399.09 0.24 Niobrara B1 Chalk Base 7022 6232 Filter Sub
5 3 273.41 391.547057 6249 3 Stands HWDP
6348 0.75 254.43 5666 -663.59 -663.59
2400.11 0.73 Niobrara B1 Chalk Top
6.5152.55 5478.01 -663.03 -663.03
6.44
3.25 3.68 105.97
6254 0.53 258.35 5572.01 -663.34 -663.34
2400.42 0.88 Niobrara A Chalk Base 6929 6176 Gap Sub
6.81 3.25 7.85 113.826982 6210 NMPC Flex
6160 0.31
6.67 2.75 19.63 82.84
6066 1.06 116.5 5384.02 -662.42 -662.42
2394.6 1.3 Niobrara Top 6851 6121 NMDC
6.75 2.75 19.45 102.296895 6152 NMDC
5971 5.13 103.23 5289.18 -661.06 -661.06
2385.62 1.24 Sharon Springs
2399.52 4.32 Niobrara A Chalk
2.75 14.22 61.36
5878 6.32 105.48 5196.65 -658.74 -658.74
2374.78 1.75 TeePee Buttes 6154 5472 ABS
6.92 2.75 1.85 63.216802 6084 X/O FH to IF
5783 7.42 108.92 5102.33 -655.36 -655.36
2362.11 1.84 Shannon Sandstone
6.75107.02 4917.69 -646.72 -646.72
6.8
2.75 2.49 27.45
5690 9.01 106.36 5010.29 -651.36 -651.36
2346.67 1.92 Sussex Sandstone 4731 4108 X/O IF to FH
6.84 2.75 19.69 47.145350 4679 AWR
5596 10.74
2328.89 4.73 Parkman Sandstone
0.65 0.65
5502 12.37 110.95 4825.6 -640.56 -640.56
2307.34 1.31 Richard Sandstone 3718 3289 8.5 Reed TK56
6.88 24.31 24.963841 3390 2.00 Bico SS100
O.D. I.D. Length Total Length
5408 16.66 115.66 4734.62 -631.12 -631.12
E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-
Recent Surveys Geology BHA
38 Torque 14700 Rotating Wt 180 P/U
7.8 7.8
Motor RPM 182 TD RPM 60 Total Bit Speed 242 WOB
Total Flow, GPM 652 HHP @ Bit 1027 AV
240 S/O 170
326
Off BTM SPP, psi 3687 On BTM SPP, psi 4237 Diff PSI 550 Which Pump Both
GPM
BPM
SPM 112
326
11216 16 7,249
12 125,552 7.6 731 CH STROKE
2 8.5 Reed TK-56 A249118 16 16 16
7,24914 14 14 14 1/14 1,6871 8.5 Reed TK-56 A238624 14
Bit Records Pump Data
Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2
R LINER 5 5
Cal Carb x 4 SPR #2 SPM @
SPR Depth:
N/A
Mud Materials & Quantities Added In Last 24 Hours: Bar (100 lb) x 100, Mul 3 x 2, Claytone x 3, CaCl x 20, Lime x 40, Walnut x 10, Soltex x 2, SPR #1 SPM @
81 4.87 3.28 87/13 2.73 Trip Gas/ 7 6.2 1 8.1516:20 8.9 39 12 6 6
Mud Report Gas Data
Sample Time MW FV PV / YP Gels HGS %O/W
RatioLime
Btms Up Time 22 minutes
Connection Gas 500
Background Gas 400
Filtrate (API)
cc/30min
Filtrate (HTHP)
cc/30min
Filter Cake
32nds% Solids % Oil LGS %
Accumulator 2782 Manifold 1496 Annular 1046 Field Usage (24 hrs) 1942 Fuel Remaining 8514
Pickup resistivity BHA 2.
3:30 5:00 3 7249 7249 TIH to 2100', flow test at 2000'. Pick up agitator.
1:30 3:30 2 7249 7249
Stand back BHA 1. Break motor and bit.
21:00 1:30 5 7249 7249 Repair top drive service loop.
20:30 21:00 1 7249 7249
Repair hydraulic hose on the ST-80.
18:30 20:30 2 7249 7249 TOOH from 6122' to surface.
17:30 18:30 1 7249 7249
Drill ahead from 2453' to 7249'. KOP - 6406', EOB - 7249'.
17:00 17:30 1 7249 7249 TOOH from 7249' ro 6122'.
5:00 17:00 12 2453 7249
Time Log
From To Hours NPT Start Depth End Depth Operations Summary
4.778 4.625 8.5 0 96 TMK BPN
25 1697Production 5-1/2 20 HCP-110 25
Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25
26 0 960 96 LT&C
Casing
Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm
Log Resistivity, Drill ahead to well TD. TOOH, run casing.
Daily Mud Cost $19,136 Cumm Mud Cost $46,925 Daily Total Cost $50,155 Cumm Cost to Date $365,040 Co Man
7249 4796.00 731 6270 90 Tripping back to bottom.
Larry Siegel / Hans Cary
6/25/2016
Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations
Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test
Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 13.00
County Legals Estimated TD Move in Date Spud Date Days from Spud
Well Name Field AFE: Formation Objective Drilling Report #
Cinnamon Teal 35-16HN Duck Pond CO118014
Colorado 05-123-46650 4924 25 Patterson 346 6/29/2018
Niobrara 8
State API Number GL KB Rig Contractor Report Date
/
I O D L B G O
0 1 CT X In No
/
- -
/2456.44 1.66 Footage/ROP 7143 4158710 89.71 0.25 6265.08 1318.33 1318.33
88408615 90.01 1.8 6264.85 1223.35 1223.35 2454.74 0.87 Out
In 72498521 90.81 1.96 6265.52 1129.4 1129.4 2451.66 1.1
1.15 AKO 2.258427 90.56 2.96 6266.64 1035.49 1035.49 2447.63
8334 91.58 2.64 6268.38 942.62 942.62 2443.09 0.87
Serial # / Hrs G2363 18.3
5 0.28
8239 92.27 2.19 6271.57 847.76 847.76 2439.09 1.25
Lb- stg - RPG 8-Jul
2435.33 2.82
5 4.27 2634.17 3026.15
8145 91.11 2.4 6274.34 753.88 753.88
2432.16 1.22 NBRR B2 High Resisitivity Target7137 6276 28 Stands 5" DP
23 3049.15Motor Information Agitator 6.75 3.25
8050 88.61 1.43 6274.11 658.94 658.94
2430.31 2.46 Niobrara B2 Chalk Top
3.25 4.31 118.57
7956 89.58 0.82 6272.63 564.97 564.97
2430.28 0.55 Niobrara B1 Chalk Base 7022 6232 Filter Sub
5 3 273.41 391.987057 6249 3 Stands HWDP
7862 91.25 359.22 6273.31 470.98 470.98
2431.22 0.8 Niobrara B1 Chalk Top
6.50.33 6276.4 283.01 283.01
6.44
3.25 3.68 106.41
7768 90.93 359.63 6275.1 377 377
2431.25 1.17 Niobrara A Chalk Base 6929 6176 Gap Sub
6.81 3.25 7.85 114.266982 6210 NMPC Flex
7674 90.65
6.67 2.75 19.63 83.28
7580 91.69 359.97 6278.32 189.03 189.03
2431.63 1.8 Niobrara Top 6851 6121 NMDC
6.75 2.75 19.45 102.736895 6152 NMDC
7486 92.9 359.26 6282.08 95.11 95.11
2431.59 4.67 Sharon Springs
2431 1.49 Niobrara A Chalk
2.75 14.22 61.8
7392 92.18 0.79 6286.25 1.21 1.21
2426.89 1.37 TeePee Buttes 6154 5472 ABS
6.92 2.75 1.85 63.656802 6084 X/O FH to IF
7298 90.77 4.95 6288.67 -92.62 -92.62
2421.54 16.54 Shannon Sandstone
6.754.18 6287.63 -186.25 -186.25
6.8
2.75 2.49 27.89
7235 89.92 4.79 6289.05 -155.39 -155.39
2419.12 14.75 Sussex Sandstone 4731 4108 X/O IF to FH
6.84 2.75 19.69 47.585350 4679 AWR
7204 84.83
2415.76 13.77 Parkman Sandstone
0.65 0.65
7109 71.46 359.89 6268.15 -278.93 -278.93
2415.42 14.02 Richard Sandstone 3718 3289 8.5 Reed TK56
6.88 24.75 25.43841 3390 2.25 Bico SS100
O.D. I.D. Length Total Length
7015 58.53 0.6 6228.5 -363.94 -363.94
E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-
Recent Surveys Geology BHA
32 Torque 15200 Rotating Wt 180 P/U
7.8 7.8
Motor RPM 182 TD RPM 60 Total Bit Speed 242 WOB
Total Flow, GPM 652 HHP @ Bit 1073 AV
240 S/O 135
326
Off BTM SPP, psi 3933 On BTM SPP, psi 4558 Diff PSI 625 Which Pump Both
GPM
BPM
SPM 112
326
11216 16 7,249
12 125,552 7.6 731 CH STROKE
2 8.5 Reed TK-56 A249118 16 16 16
7,24914 14 14 14 1/14 1,6871 8.5 Reed TK-56 A238624 14
Bit Records Pump Data
Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2
R LINER 5 5
SPR #2 SPM @
SPR Depth:
Mud Materials & Quantities Added In Last 24 Hours: Barite x 132, Mul 3 x 2, Soltex x 2, Cal Carb x 2 SPR #1 SPM @
80 4.87 3.3 87/13 3.38 Trip Gas/ 6 6.2 1 8.1618:00 8.9 40 13 7 5
Mud Report Gas Data
Sample Time MW FV PV / YP Gels HGS %O/W
RatioLime
Btms Up Time 27 mins
Connection Gas 1876
Background Gas 515
Filtrate (API)
cc/30min
Filtrate (HTHP)
cc/30min
Filter Cake
32nds% Solids % Oil LGS %
Accumulator 2900 Manifold 1475 Annular 950 Field Usage (24 hrs) 1478 Fuel Remaining 11935
Drill ahead from 8505' to 8840'.
4:00 5:00 1 8840 8840 Troubleshoot Resistivity Tool.
2:00 4:00 2 8505 8840
Drill ahead from 7249' to 8505'
1:00 2:00 1 8505 8505 Short trip 2 stands to repair mud line gasket. Wash back to bottom.
17:30 1:00 8 7249 8505
TIH 6808'.
15:00 17:30 3 7249 7249 Wash and ream from 6808' to 7249'.
13:00 15:00 2 7249 7249
TOOH to surface to inspect BHA.
12:30 13:00 1 7249 7249 Change out motor and scribe tools.
9:00 12:30 4 7249 7249
TIH to bottom.
7:30 9:00 2 7249 7249 Wash and ream from 6808' to 6920'.
5:00 7:30 3 7249 7249
Time Log
From To Hours NPT Start Depth End Depth Operations Summary
4.778 4.625 8.5 0 96 TMK BPN
25 1697Production 5-1/2 20 HCP-110 25
Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25
26 0 960 96 LT&C
Casing
Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm
Change out BHA, TIH to bottom, Drill ahead to TD. TOOH
Daily Mud Cost $29,635 Cumm Mud Cost $76,560 Daily Total Cost $113,509 Cumm Cost to Date $478,549 Co Man
8840 1591.00 400 6270 90 TOOH to replace resisitivity tools.
Larry Siegel / Hans Cary
6/25/2016
Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations
Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test
Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 14.00
County Legals Estimated TD Move in Date Spud Date Days from Spud
Well Name Field AFE: Formation Objective Drilling Report #
Cinnamon Teal 35-16HN Duck Pond CO118014
Colorado 05-123-46650 4924 25 Patterson 346 6/30/2018
Niobrara 9
State API Number GL KB Rig Contractor Report Date
/
I O D L B G O
0 1 CT X In No
/
- -
/2522.49 1.74 Footage/ROP 27080 56011490 89.79 0.63 6293.77 4096.43 4096.43
1154811448 89.4 0.01 6293.47 4054.43 4054.43 2522.26 1.52 Out
In 884011355 88.64 358.82 6291.88 3961.45 3961.45 2523.21 4
2.64 AKO 211260 87.8 2.53 6288.93 3866.52 3866.52 2522.09
11167 89.75 4.02 6286.94 3773.7 3773.7 2516.78 1.11
Serial # / Hrs G988 12.1
5 0.28
11072 90.06 3.01 6286.78 3678.88 3678.88 2510.96 1.2
Lb- stg - RPG 8-Jul
2505.79 1.7510979 89 3.36 6286.02 3586.03 3586.03
2501.44 1.21 NBRR B2 High Resisitivity Target7137 6276
Motor Information
10885 89.84 1.95 6285.07 3492.14 3492.14
2497.4 0.84 Niobrara B2 Chalk Top10790 89.22 2.92 6284.29 3397.23 3397.23
2493.23 0.35 Niobrara B1 Chalk Base 7022 6232
7057 6249
10696 89.48 2.17 6283.22 3303.33 3303.33
2489.92 1.81 Niobrara B1 Chalk Top
50.23 6281.55 3115.41 3115.41 3 273.41 388.4
10602 89.35 1.87 6282.26 3209.39 3209.39
2488.2 0.89 Niobrara A Chalk Base 6929 6176 3 Stands HWDP
6982 6210
10508 89.79
6.64 3.25 9.01 110.84
10414 88.95 0.19 6280.52 3021.42 3021.42
2487.33 0.57 Niobrara Top 6851 6121 NM Flex Pony
6.65 3.25 4.15 114.996895 6152 Filter Sub
10320 88.56 0.46 6278.48 2927.44 2927.44
2486.9 2.16 Sharon Springs
2487.86 0.5 Niobrara A Chalk
3.25 3.69 71.74
10226 88.2 0.06 6275.82 2833.48 2833.48
2485.57 0.83 TeePee Buttes 6154 5472 Gap Sub
5.63 3.25 30.09 101.836802 6084 NMCSDC
10132 89.57 1.56 6273.99 2739.51 2739.51
2482.44 2.07 Shannon Sandstone
6.533.32 6273.06 2551.69 2551.69
6.5
3.25 12.96 38.36
10038 89.22 2.26 6273 2645.57 2645.57
2477.86 1.33 Sussex Sandstone 4731 4108 NMPC
6.81 3.25 29.69 68.055350 4679 NMCSDC
9944 90.85
2473.18 1.83 Parkman Sandstone
0.65 0.65
9850 91.69 2.39 6275.14 2457.83 2457.83
2468.21 2.88 Richard Sandstone 3718 3289 8.5 Reed TK56
6.88 3.25 24.75 25.43841 3390 2.00 Bico SS100
O.D. I.D. Length Total Length
9756 90.54 3.67 6276.97 2363.98 2363.98
E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-
Recent Surveys Geology BHA
32 Torque 15200 Rotating Wt 180 P/U
7.8 7.8
Motor RPM 182 TD RPM 60 Total Bit Speed 242 WOB
Total Flow, GPM 652 HHP @ Bit 1135 AV
240 S/O 135
326
Off BTM SPP, psi 4255 On BTM SPP, psi 5105 Diff PSI 850 Which Pump Both
GPM
BPM
SPM 112
326
11216 16 7,249 11,548 4,259
12 125,552 7.6 731 CH STROKE
2 8.5 Reed TK-56 A249118 16 16 16
7,24914 14 14 14 1/14 1,6871 8.5 Reed TK-56 A238624 14
Bit Records Pump Data
Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2
R LINER 5 5
SPR #2 SPM @
SPR Depth:
Barite x 28, Mul 3 x 2, Clayton x 17, Calcium Chloridae x 25, Lime x 25, Walnut x 8, Cal Carb x 15 SPR #1 SPM @
79 5.06 4.09 87/13 3.12 Trip Gas/ 7 6.2 1 9.1517:00 9.1 13 6 6 6
Mud Report Gas Data
Sample Time MW FV PV / YP Gels HGS %O/W
RatioLime
Btms Up Time 32
Connection Gas 1800
Background Gas 500
Filtrate (API)
cc/30min
Filtrate (HTHP)
cc/30min
Filter Cake
32nds% Solids % Oil LGS %
Accumulator 2760 Manifold 1500 Annular 950 Field Usage (24 hrs) 2425 Fuel Remaining 9500
Pump and circulate TD sweeps. Flow Check, and Pump dry job.
3:00 5:00 2 11548 11548 TOOH to surface.
2:00 3:00 1 11548 11548
TIH to 8840'
14:30 2:00 12 8804 11548 Drill ahead from 8840' to the Well TD at 11548'.
10:30 14:30 4 8804 8804
TOOH to surface to change out MWD tools.
9:00 10:30 2 8804 8804 Laydown Resistivity BHA. Pickup conventional BHA .
5:00 9:00 4 8804 8804
Time Log
From To Hours NPT Start Depth End Depth Operations Summary
4.778 4.625 8.5 0 96 TMK BPN
25 1697Production 7/1/2018 5-1/2 20 HCP-110 25
Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25
26 0 960 96 LT&C
Casing
Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm
Laydown BHA. Run 5.5" production casing. Circ. Cement.
Daily Mud Cost $4,713 Cumm Mud Cost $81,273 Daily Total Cost $41,496 Cumm Cost to Date $538,098 Co Man
11548 2708.00 550 6290 90 TOOH to surface.
Larry Siegel / Hans Cary
6/25/2016
Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations
Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test
Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 15.00
County Legals Estimated TD Move in Date Spud Date Days from Spud
Well Name Field AFE: Formation Objective Drilling Report #
Cinnamon Teal 35-16HN Duck Pond CO118014
Colorado 05-123-46650 4924 25 Patterson 346 7/1/2018
Niobrara 10
State API Number GL KB Rig Contractor Report Date
/
I O D L B G O
0 1 CT X In No
0 1 CT X In No
/
- -
/2522.49 1.74 Footage/ROP 27080 56011490 89.79 0.63 6293.77 4096.43 4096.43
1154811448 89.4 0.01 6293.47 4054.43 4054.43 2522.26 1.52 Out
In 884011355 88.64 358.82 6291.88 3961.45 3961.45 2523.21 4
2.64 AKO 211260 87.8 2.53 6288.93 3866.52 3866.52 2522.09
11167 89.75 4.02 6286.94 3773.7 3773.7 2516.78 1.11
Serial # / Hrs G988 12.1
5 0.28
11072 90.06 3.01 6286.78 3678.88 3678.88 2510.96 1.2
Lb- stg - RPG 8-Jul
2505.79 1.7510979 89 3.36 6286.02 3586.03 3586.03
2501.44 1.21 NBRR B2 High Resisitivity Target7137 6276
Motor Information
10885 89.84 1.95 6285.07 3492.14 3492.14
2497.4 0.84 Niobrara B2 Chalk Top10790 89.22 2.92 6284.29 3397.23 3397.23
2493.23 0.35 Niobrara B1 Chalk Base 7022 6232
7057 6249
10696 89.48 2.17 6283.22 3303.33 3303.33
2489.92 1.81 Niobrara B1 Chalk Top
50.23 6281.55 3115.41 3115.41 3 273.41 388.4
10602 89.35 1.87 6282.26 3209.39 3209.39
2488.2 0.89 Niobrara A Chalk Base 6929 6176 3 Stands HWDP
6982 6210
10508 89.79
6.64 3.25 9.01 110.84
10414 88.95 0.19 6280.52 3021.42 3021.42
2487.33 0.57 Niobrara Top 6851 6121 NM Flex Pony
6.65 3.25 4.15 114.996895 6152 Filter Sub
10320 88.56 0.46 6278.48 2927.44 2927.44
2486.9 2.16 Sharon Springs
2487.86 0.5 Niobrara A Chalk
3.25 3.69 71.74
10226 88.2 0.06 6275.82 2833.48 2833.48
2485.57 0.83 TeePee Buttes 6154 5472 Gap Sub
5.63 3.25 30.09 101.836802 6084 NMCSDC
10132 89.57 1.56 6273.99 2739.51 2739.51
2482.44 2.07 Shannon Sandstone
6.533.32 6273.06 2551.69 2551.69
6.5
3.25 12.96 38.36
10038 89.22 2.26 6273 2645.57 2645.57
2477.86 1.33 Sussex Sandstone 4731 4108 NMPC
6.81 3.25 29.69 68.055350 4679 NMCSDC
9944 90.85
2473.18 1.83 Parkman Sandstone
0.65 0.65
9850 91.69 2.39 6275.14 2457.83 2457.83
2468.21 2.88 Richard Sandstone 3718 3289 8.5 Reed TK56
6.88 3.25 24.75 25.43841 3390 2.00 Bico SS100
O.D. I.D. Length Total Length
9756 90.54 3.67 6276.97 2363.98 2363.98
E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-
Recent Surveys Geology BHA
32 Torque 15200 Rotating Wt 180 P/U
7.8 7.8
Motor RPM 182 TD RPM 60 Total Bit Speed 242 WOB
Total Flow, GPM 652 HHP @ Bit 326 AV
240 S/O 135
326
Off BTM SPP, psi On BTM SPP, psi Diff PSI 0 Which Pump Both
GPM
BPM
12.1 530 TD SPM 112
326
11216 16 7,249 11,548 4,259
12 125,552 7.6 731 CH STROKE
2 8.5 Reed TK-56 A249118 16 16 16
7,24914 14 14 14 1/14 1,6871 8.5 Reed TK-56 A238624 14
Bit Records Pump Data
Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2
R LINER 5 5
SPR #2 SPM @
SPR Depth:
1500
SPR #1 SPM @
79 5.06 4.09 87/13 3.12 Trip Gas/ 7 6.2 1 9.1517:00 9.1 13 6 6 6
Mud Report Gas Data
Sample Time MW FV PV / YP Gels HGS %O/W
RatioLime
Btms Up Time 35 mins
Connection Gas
Background Gas
Filtrate (API)
cc/30min
Filtrate (HTHP)
cc/30min
Filter Cake
32nds% Solids % Oil LGS %
Accumulator 2750 Manifold 1625 Annular 700 Field Usage (24 hrs) 788 Fuel Remaining 8712
Wash up surface lines. Nipple down and lift stack.
21:00 21:30 1 11548 11548 Set slips with 125k and cutoff casing. Rig Release from Cinnamon Teal 35-16HN at 21:30 on 7/1/2018.
20:30 21:00 1 11548 11548
Elasticem cement. Drop KLX wiper plug. Displace 256 bbls of freshwater. Pump plug at 5bbl/min at 2470 psi. Burst
plug at 3579 psi at 2bbl/min and pump 5 bbl wet shoe. Final lift 2005 psi at 5bbl/min. 1 .5 bbls back. Floats held. Rig down.
Fill pipe and circulate bottoms up, 15' Flare. Hold PJSM with Halliburton. Rig down Casers.
17:00 20:30 4 11548 11548 Test surface lines. Pump 50 bbls of 11.5# 3.74 yield tuned spacer, followed by 520 bbls (1860 sacks) of 13.2# 1.57 yield
16:00 17:00 1 11548 11548
Rig up casers and run 256 joints of 5.5" 20# TMK BPN P-110 CYHP production casing to 11546'. Marker joints at 11520',
9384', and 6673'. Cement baskets at 5999', 4069', and 1831'.
9:00 16:00 7 11548 11548
TOOH to surface, laydown Agitator.
8:00 9:00 1 11548 11548 Laydown MWD, Motor, and bit. Rack back Non mag tools.
5:00 8:00 2 11548 11548
Time Log
From To Hours NPT Start Depth End Depth Operations Summary
4.778 4.625 8.5 0 96 TMK BPN
25 1697Production 7/1/2018 5-1/2 20 HCP-110 25 11546
Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25
26 0 96 Weld
0 96 LT&C
Casing
Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm
Skid to Cinnamon Teal 35-15HC
Daily Mud Cost Cumm Mud Cost $81,273 Daily Total Cost $336,006 Cumm Cost to Date $881,234 Co Man
11548 0.00 0 6290 90 Rig Release from CT 35-16HN at 21:30 on 7/1/208
Larry Siegel / Hans Cary
6/25/2016
Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations
Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test
Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 16.00
County Legals Estimated TD Move in Date Spud Date Days from Spud
Well Name Field AFE: Formation Objective Drilling Report #
Cinnamon Teal 35-16HN Duck Pond CO118014
Colorado 05-123-46650 4924 25 Patterson 346 7/2/2018
Niobrara 11
State API Number GL KB Rig Contractor Report Date