11
/ I O D L B G O / - - / Lb- stg - RPG Out Motor Information Serial # / Hrs AKO In Footage/ROP I.D. O.D. Component MD INC AZI TVD VS N+/S- E+/W- DLS Geology Formation MD TVD Recent Surveys Pump Data Bit Records Accumulator Manifold Annular 1 Field Usage (24 hrs) 1 Fuel Remaining 1 0:00 1 1 1 FV PV / YP Gels Filtrate (API) cc/30min Filtrate (HTHP) cc/30min Filter Cake 32nds % Solids % Oil LGS % HGS % O/W Ratio Mud Report 96 TMK BPN 25 Csg & cmt ops. Pump 575 sxs cement. Production 5-1/2 20 HCP-110 4.771 4.625 8.5 1 SPR #1 1 SPM @ 1 Gas Data Lime Btms Up Time 1 Connection Gas Background Gas 1 1 0 Top Btm 25 105 Thread/Coupling Surface 6/15/2018 9-5/8 36 J-55 8.921 8.765 12.25 0 96 LT&C 25 1697 Conductor 43 H-40 0 96 26 Size Run Date 6/13/2018 16 ID Drift $2 Cumm Mud Cost $22 Daily Total Cost $20,060 Cumm Cost to Date $20,060 Co Man Notification Dates 1687 Start Depth 0 1687 4:30 12:00 8 End Depth 1687 Operations Summary Drill surface w/Cartel 11 to TD of 1687 NPT Time Log 22:00 4:30 Hours 7 Current Depth 24 hr Footage Avg ROP 1687 1687.00 60 Target TVD 6100 From To Casing Type Weight Grade Burst Collapse Hole Size Carl Daily Mud Cost Days from Spud -1.00 Spud Date 6/16/2018 Target Inc 91 Current Operations Next Day Operations Drilling Ahead TD Well, Circulate and Condition, Run Casing 6/24/2018 24 Hr Spud 2/7/2018 24 Hr Csg & Cmt 2/7/2018 24 Hr BOP Test 2/7/2018 Drilling Report # 1 AFE: CO118014 Report Date 6/15/2018 Formation Objective Niobrara Rig Contractor GL KB 4924 25 Well Name Cinnamon Teal 35-16HN State Weld Colorado County Patterson 346 Move in Date Field Duck Pond Estimated TD 11460 API Number 05-123-46650 Legals SESW Sec 35 T8N R60W Mud Materials & Quantities Added In Last 24 Hours: SPR #2 Trip Gas 1 SPM @ 1 Sample Time MW Bit No Depth In Type Manufacturer Size ROP Bit Hrs Footage Depth out #1 / SPR Depth: 1 Which Pump AV 9 6.5 501 501 136 9 6.5 GPM R Both SPM Jets Serial No. #2 136 LINER STROKE On BTM SPP, psi Diff PSI 0 1003 Total Flow, GPM HHP @ Bit Motor RPM TD RPM Total Bit Speed P/U S/O - BHA Total Length Length 501 11.9 BPM 11.9 Off BTM SPP, psi WOB Torque Rotating Wt

Upload: others

Post on 23-Jan-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

/

I O D L B G O

/

- -

/

Lb- stg - RPG

Out

Motor Information

Serial # / Hrs

AKO

In

Footage/ROP

I.D.O.D.ComponentMD INC AZI TVD VS N+/S- E+/W- DLS

Geology

Formation MD TVD

Recent Surveys

Pump DataBit Records

Accumulator Manifold Annular 1 Field Usage (24 hrs) 1 Fuel Remaining 1

0:00 1 1 1

FV PV / YP GelsFiltrate (API)

cc/30min

Filtrate (HTHP)

cc/30min

Filter Cake

32nds% Solids % Oil LGS % HGS %

O/W

Ratio

Mud Report

96 TMK BPN 25

Csg & cmt ops. Pump 575 sxs cement.

Production 5-1/2 20 HCP-110 4.771 4.625 8.5

1

SPR #1 1 SPM @ 1

Gas Data

Lime

Btms Up Time 1

Connection Gas

Background Gas

1

1

0

Top Btm

25 105

Thread/Coupling

Surface 6/15/2018 9-5/8 36 J-55 8.921 8.765 12.25 0 96 LT&C 25 1697Conductor 43 H-40 0 9626

SizeRun Date

6/13/2018 16

ID Drift

$2 Cumm Mud Cost $22 Daily Total Cost $20,060 Cumm Cost to Date $20,060 Co Man

Notification Dates

1687

Start Depth

0

16874:30 12:00 8

End Depth

1687

Operations Summary

Drill surface w/Cartel 11 to TD of 1687

NPT

Time Log

22:00 4:30

Hours

7

Current Depth 24 hr Footage Avg ROP

1687 1687.00 60

Target TVD

6100

From To

Casing

Type Weight Grade Burst CollapseHole Size

CarlDaily Mud Cost

Days from Spud

-1.00

Spud Date

6/16/2018

Target Inc

91

Current Operations Next Day Operations

Drilling Ahead TD Well, Circulate and Condition, Run Casing

6/24/2018

24 Hr Spud 2/7/2018 24 Hr Csg & Cmt 2/7/2018 24 Hr BOP Test 2/7/2018

Drilling Report #

1

AFE:

CO118014

Report Date6/15/2018

Formation Objective

Niobrara

Rig ContractorGL KB4924 25

Well Name

Cinnamon Teal 35-16HN

State

Weld

Colorado

County

Patterson 346

Move in Date

Field

Duck Pond

Estimated TD

11460

API Number05-123-46650

Legals

SESW Sec 35 T8N R60W

Mud Materials & Quantities Added In Last 24 Hours:

SPR #2

Trip Gas

1 SPM @ 1

Sample Time MW

Bit No Depth InTypeManufacturerSize ROPBit HrsFootageDepth out#1

/

SPR Depth: 1

Which Pump AV

9

6.5

501 501

136

9

6.5

GPM

R

Both

SPM

JetsSerial No.#2

136

LINER

STROKE

On BTM SPP, psi Diff PSI 0 1003Total Flow, GPM HHP @ Bit

Motor RPM TD RPM Total Bit Speed P/U S/O-

BHA

Total LengthLength

501 11.9BPM 11.9Off BTM SPP, psi

WOB Torque Rotating Wt

/

I O D L B G O

/

- -

/

Well Name Field AFE: Formation Objective Drilling Report #

Cinnamon Teal 35-16HN Duck Pond CO118014

Colorado 05-123-46650 4924 25 Patterson 346 6/23/2018

Niobrara 2

State API Number GL KB Rig Contractor Report Date

Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 7.00

County Legals Estimated TD Move in Date Spud Date Days from Spud

6/25/2018

Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations

Notification Dates 24 Hr Spud 6/25/2018 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test

Rig up on Cinnamon Teal

Daily Mud Cost Cumm Mud Cost Daily Total Cost $4,204 Cumm Cost to Date $24,264 Co Man

1687 0.00 0 6288 90 Moving 346 off of Kennedy Pad.

Larry Siegel

Casing

Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm

Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.921 8.765 12.25

26 0 960 96 LT&C 25 1697

Production 5-1/2 20 HCP-110 25

Time Log

From To Hours NPT Start Depth End Depth Operations Summary

4.771 4.625 8.5 0 96 TMK BPN

MIRU Patterson 3465:00 5:00 24 1687 1687

Accumulator Manifold Annular Field Usage (24 hrs) Fuel Remaining

Mud Report Gas Data

Sample Time MW FV PV / YP Gels HGS %O/W

RatioLime

Btms Up Time

Connection Gas

Background Gas

Filtrate (API)

cc/30min

Filtrate (HTHP)

cc/30min

Filter Cake

32nds% Solids % Oil LGS %

SPR #2 SPM @

SPR Depth:

Mud Materials & Quantities Added In Last 24 Hours: SPR #1 SPM @

Trip Gas/

Bit Records Pump Data

Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2

R LINER 5 5

112

12 12STROKE

SPM 112

326 326

Off BTM SPP, psi On BTM SPP, psi Diff PSI 0 Which Pump Both

GPM

BPM 7.8 7.8

Motor RPM TD RPM Total Bit Speed - WOB

Total Flow, GPM 652 HHP @ Bit 326 AV

S/O

Recent Surveys Geology BHA

Torque Rotating Wt P/U

O.D. I.D. Length Total Length

178 2 91 177.98 -0.28 -0.28

E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-

6.69 4.34261 6 91 260.77 -0.36 -0.36

0.99 3.21

431 12 106 428.65 -3.62 -3.62

17.4 3.57346 9

104 510.09 -8.77 -8.77

32.56 4.91

93 345.08 -0.79 -0.79

599 15 117 591.03 -16.41 -16.41

52.43 4.5515 16

15 114 673.19 -25.82 -25.82

73.5 4.31

115.73 7.89766 18.89 97.45 751.74 -31.82 -31.82

93.16 0.93684

937 27.67 102.19 907.83 -41.86 -41.86

147 6.8851 24.66

107.5 982.86 -52.11 -52.11

184.35 4.55

96.5 830.64 -35.61 -35.61

1106 29.12 110.61 1056.5 -65.31 -65.31

222.93 3.061022 28.41

1190 27.83 111.41 1130.34 -79.66 -79.66

261.12 1.97

335.02 0.611274 28.04 112.41 1204.55 -94.34 -94.34

298.51 1.6

Motor Information

28.88 113.73 1278.4 -110.03 -110.03 371.84 1.25

Lb- stg - RPG1443 27.11 102.52 1353.5 -122.5 -122.5 409.55 6.52

Serial # / Hrs1358

1610 28.02 101.68 1502.05 -140.22 -140.22 483.75 2.24

1.3 AKO1526 26.81 104.81 1427.48 -131.38 -131.38 446.11

1635 29.79 99.34 1523.94 -142.42 -142.42 495.63 8.4 Out

In

1685 29.79 99.34 1567.33 -146.45 -146.45 520.14 0 Footage/ROP

/

I O D L B G O

/

- -

/

Well Name Field AFE: Formation Objective Drilling Report #

Cinnamon Teal 35-16HN Duck Pond CO118014

Colorado 05-123-46650 4924 25 Patterson 346 6/24/2018

Niobrara 3

State API Number GL KB Rig Contractor Report Date

Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 8.00

County Legals Estimated TD Move in Date Spud Date Days from Spud

6/25/2018

Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations

Notification Dates 24 Hr Spud 6/25/2018 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test

Continue rigging up.

Daily Mud Cost Cumm Mud Cost Daily Total Cost $4,204 Cumm Cost to Date $28,468 Co Man

1697 0.00 0 6288 90 Moving 346 and rigging up on Cinnamon Teal

Larry Siegel

Casing

Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm

Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.921 8.765 12.25

26 0 960 96 LT&C 25 1697

Production 5-1/2 20 HCP-110 25

Time Log

From To Hours NPT Start Depth End Depth Operations Summary

4.771 4.625 8.5 0 96 TMK BPN

MIRU Patterson 3465:00 5:00 24 1697 1697

Accumulator Manifold Annular Field Usage (24 hrs) Fuel Remaining

Mud Report Gas Data

Sample Time MW FV PV / YP Gels HGS %O/W

RatioLime

Btms Up Time

Connection Gas

Background Gas

Filtrate (API)

cc/30min

Filtrate (HTHP)

cc/30min

Filter Cake

32nds% Solids % Oil LGS %

SPR #2 SPM @

SPR Depth:

Mud Materials & Quantities Added In Last 24 Hours: SPR #1 SPM @

Trip Gas/

Bit Records Pump Data

Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2

R LINER 5 5

112

12 12STROKE

SPM 112

326 326

Off BTM SPP, psi On BTM SPP, psi Diff PSI 0 Which Pump Both

GPM

BPM 7.8 7.8

Motor RPM TD RPM Total Bit Speed - WOB

Total Flow, GPM 652 HHP @ Bit 326 AV

S/O

Recent Surveys Geology BHA

Torque Rotating Wt P/U

O.D. I.D. Length Total Length

178 2 91 177.98 -0.28 -0.28

E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-

6.69 4.34261 6 91 260.77 -0.36 -0.36

0.99 3.21

431 12 106 428.65 -3.62 -3.62

17.4 3.57346 9

104 510.09 -8.77 -8.77

32.56 4.91

93 345.08 -0.79 -0.79

599 15 117 591.03 -16.41 -16.41

52.43 4.5515 16

15 114 673.19 -25.82 -25.82

73.5 4.31

115.73 7.89766 18.89 97.45 751.74 -31.82 -31.82

93.16 0.93684

937 27.67 102.19 907.83 -41.86 -41.86

147 6.8851 24.66

107.5 982.86 -52.11 -52.11

184.35 4.55

96.5 830.64 -35.61 -35.61

1106 29.12 110.61 1056.5 -65.31 -65.31

222.93 3.061022 28.41

1190 27.83 111.41 1130.34 -79.66 -79.66

261.12 1.97

335.02 0.611274 28.04 112.41 1204.55 -94.34 -94.34

298.51 1.6

Motor Information

28.88 113.73 1278.4 -110.03 -110.03 371.84 1.25

Lb- stg - RPG1443 27.11 102.52 1353.5 -122.5 -122.5 409.55 6.52

Serial # / Hrs1358

1610 28.02 101.68 1502.05 -140.22 -140.22 483.75 2.24

1.3 AKO1526 26.81 104.81 1427.48 -131.38 -131.38 446.11

1635 29.79 99.34 1523.94 -142.42 -142.42 495.63 8.4 Out

In

1685 29.79 99.34 1567.33 -146.45 -146.45 520.14 0 Footage/ROP

/

I O D L B G O

/

- -

/520.14 0 Footage/ROP1685 29.79 99.34 1567.33 -146.45 -146.45

1635 29.79 99.34 1523.94 -142.42 -142.42 495.63 8.4 Out

In1610 28.02 101.68 1502.05 -140.22 -140.22 483.75 2.24

1.3 AKO1526 26.81 104.81 1427.48 -131.38 -131.38 446.11

1443 27.11 102.52 1353.5 -122.5 -122.5 409.55 6.52

Serial # / Hrs1358 28.88 113.73 1278.4 -110.03 -110.03 371.84 1.25

Lb- stg - RPG

335.02 0.611274 28.04 112.41 1204.55 -94.34 -94.34

298.51 1.6

Motor Information

1190 27.83 111.41 1130.34 -79.66 -79.66

261.12 1.971106 29.12 110.61 1056.5 -65.31 -65.31

222.93 3.061022 28.41 107.5 982.86 -52.11 -52.11

184.35 4.55

96.5 830.64 -35.61 -35.61

937 27.67 102.19 907.83 -41.86 -41.86

147 6.8851 24.66

766 18.89 97.45 751.74 -31.82 -31.82

93.16 0.93684 15 114 673.19 -25.82 -25.82

73.5 4.31

115.73 7.89

599 15 117 591.03 -16.41 -16.41

52.43 4.5515 16 104 510.09 -8.77 -8.77

32.56 4.91

93 345.08 -0.79 -0.79

431 12 106 428.65 -3.62 -3.62

17.4 3.57346 9

6.69 4.34261 6 91 260.77 -0.36 -0.36

0.99 3.21

O.D. I.D. Length Total Length

178 2 91 177.98 -0.28 -0.28

E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-

Recent Surveys Geology BHA

Torque Rotating Wt P/U

7.8 7.8

Motor RPM TD RPM Total Bit Speed - WOB

Total Flow, GPM 652 HHP @ Bit 326 AV

S/O

326

Off BTM SPP, psi On BTM SPP, psi Diff PSI 0 Which Pump Both

GPM

BPM

SPM 112

326

112

12 12STROKE

Bit Records Pump Data

Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2

R LINER 5 5

SPR #2 SPM @

SPR Depth:

Mud Materials & Quantities Added In Last 24 Hours: SPR #1 SPM @

Trip Gas/

Mud Report Gas Data

Sample Time MW FV PV / YP Gels HGS %O/W

RatioLime

Btms Up Time

Connection Gas

Background Gas

Filtrate (API)

cc/30min

Filtrate (HTHP)

cc/30min

Filter Cake

32nds% Solids % Oil LGS %

Accumulator Manifold Annular Field Usage (24 hrs) Fuel Remaining 3645

MIRU Patterson 346 on Cinnamon Teal.5:00 5:00 24 1697 1697

Time Log

From To Hours NPT Start Depth End Depth Operations Summary

4.778 4.625 8.5 0 96 TMK BPN

25 1697Production 5-1/2 20 HCP-110 25

Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25

26 0 960 96 LT&C

Casing

Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm

Continue Rigging up on Cinnamon Teal

Daily Mud Cost Cumm Mud Cost $20 Daily Total Cost $38,338 Cumm Cost to Date $66,806 Co Man

1697 0.00 0 6288 90 Rigging up on Cinnamon Teal

Larry Siegel / Hans Cary

6/25/2016

Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations

Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test

Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 9.00

County Legals Estimated TD Move in Date Spud Date Days from Spud

Well Name Field AFE: Formation Objective Drilling Report #

Cinnamon Teal 35-16HN Duck Pond CO118014

Colorado 05-123-46650 4924 25 Patterson 346 6/25/2018

Niobrara 4

State API Number GL KB Rig Contractor Report Date

/

I O D L B G O

/

- -

/

Well Name Field AFE: Formation Objective Drilling Report #

Cinnamon Teal 35-16HN Duck Pond CO118014

Colorado 05-123-46650 4924 25 Patterson 346 6/26/2018

Niobrara 5

State API Number GL KB Rig Contractor Report Date

Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 10.00

County Legals Estimated TD Move in Date Spud Date Days from Spud

6/25/2016

Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations

Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test

Continue Rigging up on Cinnamon Teal

Daily Mud Cost $19,694 Cumm Mud Cost $19,714 Daily Total Cost $176,246 Cumm Cost to Date $243,052 Co Man

1697 0.00 0 6822 90 Rigging up top drive, and nippling up.

Larry Siegel / Hans Cary

Casing

Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm

Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25

26 0 960 96 LT&C 25 1697

Production 5-1/2 20 HCP-110 25

Time Log

From To Hours NPT Start Depth End Depth Operations Summary

4.778 4.625 8.5 0 96 TMK BPN

MIRU Patterson 346 on Cinnamon Teal.5:00 5:00 24 1697 1697

Accumulator 2695 Manifold 1554 Annular 955 Field Usage (24 hrs) 358 Fuel Remaining 3287

Mud Report Gas Data

Sample Time MW FV PV / YP Gels HGS %O/W

RatioLime

Btms Up Time

Connection Gas

Background Gas

Filtrate (API)

cc/30min

Filtrate (HTHP)

cc/30min

Filter Cake

32nds% Solids % Oil LGS %

SPR #2 SPM @

SPR Depth:

Mud Materials & Quantities Added In Last 24 Hours: SPR #1 SPM @

Trip Gas/

Bit Records Pump Data

Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2

R LINER 5 5

112

12 12STROKE

SPM 112

326 326

Off BTM SPP, psi On BTM SPP, psi Diff PSI 0 Which Pump Both

GPM

BPM 7.8 7.8

Motor RPM TD RPM Total Bit Speed - WOB

Total Flow, GPM 652 HHP @ Bit 326 AV

S/O

Recent Surveys Geology BHA

Torque Rotating Wt P/U

O.D. I.D. Length Total Length

178 2 91 177.98 -0.28 -0.28

E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-

6.69 4.34261 6 91 260.77 -0.36 -0.36

0.99 3.21

431 12 106 428.65 -3.62 -3.62

17.4 3.57346 9

104 510.09 -8.77 -8.77

32.56 4.91

93 345.08 -0.79 -0.79

599 15 117 591.03 -16.41 -16.41

52.43 4.5515 16

15 114 673.19 -25.82 -25.82

73.5 4.31

115.73 7.89766 18.89 97.45 751.74 -31.82 -31.82

93.16 0.93684

937 27.67 102.19 907.83 -41.86 -41.86

147 6.8851 24.66

107.5 982.86 -52.11 -52.11

184.35 4.55

96.5 830.64 -35.61 -35.61

1106 29.12 110.61 1056.5 -65.31 -65.31

222.93 3.061022 28.41

1190 27.83 111.41 1130.34 -79.66 -79.66

261.12 1.97

335.02 0.611274 28.04 112.41 1204.55 -94.34 -94.34

298.51 1.6

Motor Information

28.88 113.73 1278.4 -110.03 -110.03 371.84 1.25

Lb- stg - RPG1443 27.11 102.52 1353.5 -122.5 -122.5 409.55 6.52

Serial # / Hrs1358

1610 28.02 101.68 1502.05 -140.22 -140.22 483.75 2.24

1.3 AKO1526 26.81 104.81 1427.48 -131.38 -131.38 446.11

1635 29.79 99.34 1523.94 -142.42 -142.42 495.63 8.4 Out

In

1685 29.79 99.34 1567.33 -146.45 -146.45 520.14 0 Footage/ROP

/

I O D L B G O

/

- -

/

Well Name Field AFE: Formation Objective Drilling Report #

Cinnamon Teal 35-16HN Duck Pond CO118014

Colorado 05-123-46650 4924 25 Patterson 346 6/27/2018

Niobrara 6

State API Number GL KB Rig Contractor Report Date

Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 11.00

County Legals Estimated TD Move in Date Spud Date Days from Spud

6/25/2016

Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations

Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test

Nipple up and Test. Pick up BHA 1. Drill ahead.

Daily Mud Cost Cumm Mud Cost Daily Total Cost $31,019 Cumm Cost to Date $274,071 Co Man

1697 0.00 0 6288 90 Rigging up top drive, and nippling up.

Larry Siegel / Hans Cary

Casing

Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm

Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25

26 0 960 96 LT&C 25 1697

Production 5-1/2 20 HCP-110 25

Time Log

From To Hours NPT Start Depth End Depth Operations Summary

4.778 4.625 8.5 0 96 TMK BPN

MIRU on Cinnamon Teal. Spool up and raise the Derrick, pick up top drive. Rig up bails, elevators, service loop. Replace lower jaws on ST-80.

Nipple up choke line and flow lines. 5:00 5:00 24 1697 1697

Accumulator 2695 Manifold 1554 Annular 955 Field Usage (24 hrs) 1000 Fuel Remaining 11029

Mud Report Gas Data

Sample Time MW FV PV / YP Gels HGS %O/W

RatioLime

Btms Up Time

Connection Gas

Background Gas

Filtrate (API)

cc/30min

Filtrate (HTHP)

cc/30min

Filter Cake

32nds% Solids % Oil LGS %

6.4 1 8.4517:00 9.1 40 13 8 8

SPR #2 SPM @

SPR Depth:

Mud Materials & Quantities Added In Last 24 Hours: SPR #1 SPM @

80 4.18 4.27 89/11 2.99 Trip Gas/ 9

Bit Records Pump Data

Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2

R LINER 5 5

112

12 12STROKE

SPM 112

326 326

Off BTM SPP, psi On BTM SPP, psi Diff PSI 0 Which Pump Both

GPM

BPM 7.8 7.8

Motor RPM TD RPM Total Bit Speed - WOB

Total Flow, GPM 652 HHP @ Bit 326 AV

S/O

Recent Surveys Geology BHA

Torque Rotating Wt P/U

O.D. I.D. Length Total LengthE+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-

Parkman Sandstone

0.65 0.65Richard Sandstone 3248 3277 8.5 Reed TK56

6.88 3.25 24.75 25.43361 3390 2.25 Bico SS100

3.25 12.96 38.36Sussex Sandstone 4095 4124 NMPC

6.81 3.25 29.69 68.054644 4673 NMCSDCShannon Sandstone

6.53

6.5 3.25 3.69 71.74TeePee Buttes 5451 5480 Gap Sub

5.63 3.25 30.09 101.836037 6066 NMCSDCSharon Springs

Niobrara A Chalk

6.64 3.25 9.01 110.84Niobrara Top 6081 6129 NM Flex Pony

6.65 3.25 4.15 114.996109 6157 Filter Sub

3 273.41 388.4Niobrara A Chalk Base 6137 6185 3 Stands HWDP

6169 6217Niobrara B1 Chalk Top

5

Niobrara B1 Chalk Base 6184 6232

622 6268Niobrara B2 Chalk Top

NBRR B2 High Resisitivity Target6240 6288

Motor Information

Lb- stg - RPG 8-Jul

Serial # / Hrs G2363

5 0.28

AKO 2.25

Out

In 1687

Footage/ROP

/

I O D L B G O

/

- -

/

Well Name Field AFE: Formation Objective Drilling Report #

Cinnamon Teal 35-16HN Duck Pond CO118014

Colorado 05-123-46650 4924 25 Patterson 346 6/28/2018

Niobrara 7

State API Number GL KB Rig Contractor Report Date

Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 12.00

County Legals Estimated TD Move in Date Spud Date Days from Spud

6/25/2016

Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations

Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test

Drill the vertical and curve. TOOH. P/U Resistivity. Drill ahead.

Daily Mud Cost Cumm Mud Cost $19,714 Daily Total Cost $40,814 Cumm Cost to Date $314,885 Co Man

2453 756.00 840 6288 90 Drilling ahead in the tangent.

Larry Siegel / Hans Cary

Casing

Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm

Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25

26 0 960 96 LT&C 25 1697

Production 5-1/2 20 HCP-110 25

Time Log

From To Hours NPT Start Depth End Depth Operations Summary

4.778 4.625 8.5 0 96 TMK BPN

R/U Stand pipe, Install bails & elevators. Change saver sub. Rig up vibrating lines in pump house. Transfer mud to the pits. Troubleshoot link

tilt failure.

9:00 16:00 7 1697 1697 Rig up rotating head spool riser, flow nipple, chokes lines, kill line, accumulator lines, bird bath, and hand rails.

5:00 9:00 4 1697 1697

Pressure test BOP and casing. Tested BOP, 250 psi low, 5000 psi high. Testted casing to 1500 psi for 15 minutes.

21:00 21:30 1 1697 1697 Center up rig.

16:00 21:00 5 1697 1697

Pick up BHA 1 and scribe tools.

23:00 23:30 1 1697 1697 Rig Service / Repair ST-80.

21:30 23:00 2 1697 1697

Trip in hole picking up singles.

1:30 2:30 1 1697 1697 Drill out the float (1653') and shoe (1697').

23:30 1:30 2 1697 1697

Drill ahead from 1697' to 2453'2:30 5:00 3 1697 2453

Accumulator 2695 Manifold 1554 Annular 955 Field Usage (24 hrs) 573 Fuel Remaining 10456

Mud Report Gas Data

Sample Time MW FV PV / YP Gels HGS %O/W

RatioLime

Btms Up Time

Connection Gas

Background Gas

Filtrate (API)

cc/30min

Filtrate (HTHP)

cc/30min

Filter Cake

32nds% Solids % Oil LGS %

6.3 1 4.187:30 8.7 39 13 8 6

SPR #2 SPM @

SPR Depth:

Mud Materials & Quantities Added In Last 24 Hours: 50 bbls of diesel SPR #1 SPM @

81 4.18 4.27 89/11 3.38 Trip Gas/ 7

Bit Records Pump Data

Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2

R LINER 5 5

14 14 14 14 1/14 1,6871 8.5 Reed TK-56 A238624 14

112

12 12STROKE

SPM 112

326 326

Off BTM SPP, psi 1730 On BTM SPP, psi 2460 Diff PSI 730 Which Pump Both

GPM

BPM 7.8 7.8

Motor RPM 182 TD RPM 50 Total Bit Speed 232 WOB

Total Flow, GPM 652 HHP @ Bit 655 AV

95 S/O 85

Recent Surveys Geology BHA

32 Torque 7430 Rotating Wt 90 P/U

O.D. I.D. Length Total Length

1073 17.68 111.95 1056.08 -52.73 -52.73

E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-

171.66 4.08 Parkman Sandstone

0.65 0.65

1158 21.05 109.43 1136.26 -62.64 -62.64

145.29 3.03 Richard Sandstone 3718 3289 8.5 Reed TK56

6.88 3.25 24.75 25.43841 3390 2.25 Bico SS100

3.25 12.96 38.36

1325 23.75 110.32 1289.77 -85.06 -85.06

201.54 3.48 Sussex Sandstone 4731 4108 NMPC

6.81 3.25 29.69 68.055350 4679 NMCSDC

1241 23.93

109.58 1368.43 -96.92 -96.92

233.41 0.26 Shannon Sandstone

6.53110.01 1212.94 -73.36 -73.36

6.5 3.25 3.69 71.74

1494 24.37 110.4 1444.17 -108.53 -108.53

266.08 0.41 TeePee Buttes 6154 5472 Gap Sub

5.63 3.25 30.09 101.836802 6084 NMCSDC

1411 23.93

24.18 111.29 1520.74 -120.82 -120.82

297.99 0.67 Sharon Springs

356.01 0.73 Niobrara A Chalk

6.64 3.25 9.01 110.84

1645 24.63 111.77 1581.75 -130.98 -130.98

330.26 0.49 Niobrara Top 6851 6120 NM Flex Pony

6.65 3.25 4.15 114.996895 6150 Filter Sub

1578

3 273.41 388.4

1835 32.79 109.36 1750.51 -163.76 -163.76

393.7 1.63 Niobrara A Chalk Base 6936 6175 3 Stands HWDP

7001 6210

1741 25.85

106.94 1828.66 -180 -180

436.45 7.77 Niobrara B1 Chalk Top

5114.07 1668.59 -146.94 -146.94

2023 36.15 99.4 1905.28 -192.34 -192.34

486.08 2.51 Niobrara B1 Chalk Base 7033 6225

7092 6249

1929 34.73

2117 36.15 98.3 1981.18 -200.87 -200.87

539.06 4.89 Niobrara B2 Chalk Top

648.55 2.572211 35.57 94.29 2057.37 -206.92 -206.92

593.85 0.69 NBRR B2 High Resisitivity Target7105 6254

Motor Information

34.82 93.72 2134.19 -210.71 -210.71 702.59 0.87

Lb- stg - RPG 8-Jul2399 35.22 97.46 2211.18 -215.97 -215.97 756.25 2.32

Serial # / Hrs G2363 12.6

5 0.28

2305

2588 35.84 104.56 2364.62 -236.13 -236.13 864.66 2.8

1.76 AKO 2.252493 35.93 100.02 2287.64 -224.29 -224.29 810.29

2682 35.84 104.95 2440.82 -250.15 -250.15 917.88 0.24 Out

In 1687

2776 35.88 103.98 2517 -263.9 -263.9

7249

971.2 0.61 Footage/ROP 5552 731

/

I O D L B G O

0 1 CT X In No

/

- -

/2423.74 11.69 Footage/ROP7193 77.77 356.49 6279.07 -188.57 -188.57

7099 68.58 2.79 6251.87 -278.39 -278.39 2424.42 8.45 Out

In 72497006 60.72 2.92 6212.08 -362.26 -362.26 2420.24 9.37

11.22 AKO 26912 52.28 5.96 6160.24 -440.33 -440.33 2414.28

6817 41.63 5.35 6095.49 -509.32 -509.32 2407.43 7.45

Serial # / Hrs G988 0

5 0.28

6723 34.69 3.85 6021.62 -567.17 -567.17 2402.72 9.93

Lb- stg - RPG 8-Jul

2399.85 13.49

5 4.27 2634.17 3025.71

6629 25.36 3.06 5940.32 -614.06 -614.06

2398.21 7.81 NBRR B2 High Resisitivity Target7137 6276 28 Stands 5" DP

23 3048.71Motor Information Agitator 6.75 3.25

6535 12.68 3.14 5851.63 -644.59 -644.59

2398.07 6.06 Niobrara B2 Chalk Top

3.25 4.31 118.13

6442 5.52 354.59 5759.86 -659.25 -659.25

2399.09 0.24 Niobrara B1 Chalk Base 7022 6232 Filter Sub

5 3 273.41 391.547057 6249 3 Stands HWDP

6348 0.75 254.43 5666 -663.59 -663.59

2400.11 0.73 Niobrara B1 Chalk Top

6.5152.55 5478.01 -663.03 -663.03

6.44

3.25 3.68 105.97

6254 0.53 258.35 5572.01 -663.34 -663.34

2400.42 0.88 Niobrara A Chalk Base 6929 6176 Gap Sub

6.81 3.25 7.85 113.826982 6210 NMPC Flex

6160 0.31

6.67 2.75 19.63 82.84

6066 1.06 116.5 5384.02 -662.42 -662.42

2394.6 1.3 Niobrara Top 6851 6121 NMDC

6.75 2.75 19.45 102.296895 6152 NMDC

5971 5.13 103.23 5289.18 -661.06 -661.06

2385.62 1.24 Sharon Springs

2399.52 4.32 Niobrara A Chalk

2.75 14.22 61.36

5878 6.32 105.48 5196.65 -658.74 -658.74

2374.78 1.75 TeePee Buttes 6154 5472 ABS

6.92 2.75 1.85 63.216802 6084 X/O FH to IF

5783 7.42 108.92 5102.33 -655.36 -655.36

2362.11 1.84 Shannon Sandstone

6.75107.02 4917.69 -646.72 -646.72

6.8

2.75 2.49 27.45

5690 9.01 106.36 5010.29 -651.36 -651.36

2346.67 1.92 Sussex Sandstone 4731 4108 X/O IF to FH

6.84 2.75 19.69 47.145350 4679 AWR

5596 10.74

2328.89 4.73 Parkman Sandstone

0.65 0.65

5502 12.37 110.95 4825.6 -640.56 -640.56

2307.34 1.31 Richard Sandstone 3718 3289 8.5 Reed TK56

6.88 24.31 24.963841 3390 2.00 Bico SS100

O.D. I.D. Length Total Length

5408 16.66 115.66 4734.62 -631.12 -631.12

E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-

Recent Surveys Geology BHA

38 Torque 14700 Rotating Wt 180 P/U

7.8 7.8

Motor RPM 182 TD RPM 60 Total Bit Speed 242 WOB

Total Flow, GPM 652 HHP @ Bit 1027 AV

240 S/O 170

326

Off BTM SPP, psi 3687 On BTM SPP, psi 4237 Diff PSI 550 Which Pump Both

GPM

BPM

SPM 112

326

11216 16 7,249

12 125,552 7.6 731 CH STROKE

2 8.5 Reed TK-56 A249118 16 16 16

7,24914 14 14 14 1/14 1,6871 8.5 Reed TK-56 A238624 14

Bit Records Pump Data

Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2

R LINER 5 5

Cal Carb x 4 SPR #2 SPM @

SPR Depth:

N/A

Mud Materials & Quantities Added In Last 24 Hours: Bar (100 lb) x 100, Mul 3 x 2, Claytone x 3, CaCl x 20, Lime x 40, Walnut x 10, Soltex x 2, SPR #1 SPM @

81 4.87 3.28 87/13 2.73 Trip Gas/ 7 6.2 1 8.1516:20 8.9 39 12 6 6

Mud Report Gas Data

Sample Time MW FV PV / YP Gels HGS %O/W

RatioLime

Btms Up Time 22 minutes

Connection Gas 500

Background Gas 400

Filtrate (API)

cc/30min

Filtrate (HTHP)

cc/30min

Filter Cake

32nds% Solids % Oil LGS %

Accumulator 2782 Manifold 1496 Annular 1046 Field Usage (24 hrs) 1942 Fuel Remaining 8514

Pickup resistivity BHA 2.

3:30 5:00 3 7249 7249 TIH to 2100', flow test at 2000'. Pick up agitator.

1:30 3:30 2 7249 7249

Stand back BHA 1. Break motor and bit.

21:00 1:30 5 7249 7249 Repair top drive service loop.

20:30 21:00 1 7249 7249

Repair hydraulic hose on the ST-80.

18:30 20:30 2 7249 7249 TOOH from 6122' to surface.

17:30 18:30 1 7249 7249

Drill ahead from 2453' to 7249'. KOP - 6406', EOB - 7249'.

17:00 17:30 1 7249 7249 TOOH from 7249' ro 6122'.

5:00 17:00 12 2453 7249

Time Log

From To Hours NPT Start Depth End Depth Operations Summary

4.778 4.625 8.5 0 96 TMK BPN

25 1697Production 5-1/2 20 HCP-110 25

Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25

26 0 960 96 LT&C

Casing

Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm

Log Resistivity, Drill ahead to well TD. TOOH, run casing.

Daily Mud Cost $19,136 Cumm Mud Cost $46,925 Daily Total Cost $50,155 Cumm Cost to Date $365,040 Co Man

7249 4796.00 731 6270 90 Tripping back to bottom.

Larry Siegel / Hans Cary

6/25/2016

Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations

Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test

Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 13.00

County Legals Estimated TD Move in Date Spud Date Days from Spud

Well Name Field AFE: Formation Objective Drilling Report #

Cinnamon Teal 35-16HN Duck Pond CO118014

Colorado 05-123-46650 4924 25 Patterson 346 6/29/2018

Niobrara 8

State API Number GL KB Rig Contractor Report Date

/

I O D L B G O

0 1 CT X In No

/

- -

/2456.44 1.66 Footage/ROP 7143 4158710 89.71 0.25 6265.08 1318.33 1318.33

88408615 90.01 1.8 6264.85 1223.35 1223.35 2454.74 0.87 Out

In 72498521 90.81 1.96 6265.52 1129.4 1129.4 2451.66 1.1

1.15 AKO 2.258427 90.56 2.96 6266.64 1035.49 1035.49 2447.63

8334 91.58 2.64 6268.38 942.62 942.62 2443.09 0.87

Serial # / Hrs G2363 18.3

5 0.28

8239 92.27 2.19 6271.57 847.76 847.76 2439.09 1.25

Lb- stg - RPG 8-Jul

2435.33 2.82

5 4.27 2634.17 3026.15

8145 91.11 2.4 6274.34 753.88 753.88

2432.16 1.22 NBRR B2 High Resisitivity Target7137 6276 28 Stands 5" DP

23 3049.15Motor Information Agitator 6.75 3.25

8050 88.61 1.43 6274.11 658.94 658.94

2430.31 2.46 Niobrara B2 Chalk Top

3.25 4.31 118.57

7956 89.58 0.82 6272.63 564.97 564.97

2430.28 0.55 Niobrara B1 Chalk Base 7022 6232 Filter Sub

5 3 273.41 391.987057 6249 3 Stands HWDP

7862 91.25 359.22 6273.31 470.98 470.98

2431.22 0.8 Niobrara B1 Chalk Top

6.50.33 6276.4 283.01 283.01

6.44

3.25 3.68 106.41

7768 90.93 359.63 6275.1 377 377

2431.25 1.17 Niobrara A Chalk Base 6929 6176 Gap Sub

6.81 3.25 7.85 114.266982 6210 NMPC Flex

7674 90.65

6.67 2.75 19.63 83.28

7580 91.69 359.97 6278.32 189.03 189.03

2431.63 1.8 Niobrara Top 6851 6121 NMDC

6.75 2.75 19.45 102.736895 6152 NMDC

7486 92.9 359.26 6282.08 95.11 95.11

2431.59 4.67 Sharon Springs

2431 1.49 Niobrara A Chalk

2.75 14.22 61.8

7392 92.18 0.79 6286.25 1.21 1.21

2426.89 1.37 TeePee Buttes 6154 5472 ABS

6.92 2.75 1.85 63.656802 6084 X/O FH to IF

7298 90.77 4.95 6288.67 -92.62 -92.62

2421.54 16.54 Shannon Sandstone

6.754.18 6287.63 -186.25 -186.25

6.8

2.75 2.49 27.89

7235 89.92 4.79 6289.05 -155.39 -155.39

2419.12 14.75 Sussex Sandstone 4731 4108 X/O IF to FH

6.84 2.75 19.69 47.585350 4679 AWR

7204 84.83

2415.76 13.77 Parkman Sandstone

0.65 0.65

7109 71.46 359.89 6268.15 -278.93 -278.93

2415.42 14.02 Richard Sandstone 3718 3289 8.5 Reed TK56

6.88 24.75 25.43841 3390 2.25 Bico SS100

O.D. I.D. Length Total Length

7015 58.53 0.6 6228.5 -363.94 -363.94

E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-

Recent Surveys Geology BHA

32 Torque 15200 Rotating Wt 180 P/U

7.8 7.8

Motor RPM 182 TD RPM 60 Total Bit Speed 242 WOB

Total Flow, GPM 652 HHP @ Bit 1073 AV

240 S/O 135

326

Off BTM SPP, psi 3933 On BTM SPP, psi 4558 Diff PSI 625 Which Pump Both

GPM

BPM

SPM 112

326

11216 16 7,249

12 125,552 7.6 731 CH STROKE

2 8.5 Reed TK-56 A249118 16 16 16

7,24914 14 14 14 1/14 1,6871 8.5 Reed TK-56 A238624 14

Bit Records Pump Data

Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2

R LINER 5 5

SPR #2 SPM @

SPR Depth:

Mud Materials & Quantities Added In Last 24 Hours: Barite x 132, Mul 3 x 2, Soltex x 2, Cal Carb x 2 SPR #1 SPM @

80 4.87 3.3 87/13 3.38 Trip Gas/ 6 6.2 1 8.1618:00 8.9 40 13 7 5

Mud Report Gas Data

Sample Time MW FV PV / YP Gels HGS %O/W

RatioLime

Btms Up Time 27 mins

Connection Gas 1876

Background Gas 515

Filtrate (API)

cc/30min

Filtrate (HTHP)

cc/30min

Filter Cake

32nds% Solids % Oil LGS %

Accumulator 2900 Manifold 1475 Annular 950 Field Usage (24 hrs) 1478 Fuel Remaining 11935

Drill ahead from 8505' to 8840'.

4:00 5:00 1 8840 8840 Troubleshoot Resistivity Tool.

2:00 4:00 2 8505 8840

Drill ahead from 7249' to 8505'

1:00 2:00 1 8505 8505 Short trip 2 stands to repair mud line gasket. Wash back to bottom.

17:30 1:00 8 7249 8505

TIH 6808'.

15:00 17:30 3 7249 7249 Wash and ream from 6808' to 7249'.

13:00 15:00 2 7249 7249

TOOH to surface to inspect BHA.

12:30 13:00 1 7249 7249 Change out motor and scribe tools.

9:00 12:30 4 7249 7249

TIH to bottom.

7:30 9:00 2 7249 7249 Wash and ream from 6808' to 6920'.

5:00 7:30 3 7249 7249

Time Log

From To Hours NPT Start Depth End Depth Operations Summary

4.778 4.625 8.5 0 96 TMK BPN

25 1697Production 5-1/2 20 HCP-110 25

Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25

26 0 960 96 LT&C

Casing

Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm

Change out BHA, TIH to bottom, Drill ahead to TD. TOOH

Daily Mud Cost $29,635 Cumm Mud Cost $76,560 Daily Total Cost $113,509 Cumm Cost to Date $478,549 Co Man

8840 1591.00 400 6270 90 TOOH to replace resisitivity tools.

Larry Siegel / Hans Cary

6/25/2016

Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations

Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test

Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 14.00

County Legals Estimated TD Move in Date Spud Date Days from Spud

Well Name Field AFE: Formation Objective Drilling Report #

Cinnamon Teal 35-16HN Duck Pond CO118014

Colorado 05-123-46650 4924 25 Patterson 346 6/30/2018

Niobrara 9

State API Number GL KB Rig Contractor Report Date

/

I O D L B G O

0 1 CT X In No

/

- -

/2522.49 1.74 Footage/ROP 27080 56011490 89.79 0.63 6293.77 4096.43 4096.43

1154811448 89.4 0.01 6293.47 4054.43 4054.43 2522.26 1.52 Out

In 884011355 88.64 358.82 6291.88 3961.45 3961.45 2523.21 4

2.64 AKO 211260 87.8 2.53 6288.93 3866.52 3866.52 2522.09

11167 89.75 4.02 6286.94 3773.7 3773.7 2516.78 1.11

Serial # / Hrs G988 12.1

5 0.28

11072 90.06 3.01 6286.78 3678.88 3678.88 2510.96 1.2

Lb- stg - RPG 8-Jul

2505.79 1.7510979 89 3.36 6286.02 3586.03 3586.03

2501.44 1.21 NBRR B2 High Resisitivity Target7137 6276

Motor Information

10885 89.84 1.95 6285.07 3492.14 3492.14

2497.4 0.84 Niobrara B2 Chalk Top10790 89.22 2.92 6284.29 3397.23 3397.23

2493.23 0.35 Niobrara B1 Chalk Base 7022 6232

7057 6249

10696 89.48 2.17 6283.22 3303.33 3303.33

2489.92 1.81 Niobrara B1 Chalk Top

50.23 6281.55 3115.41 3115.41 3 273.41 388.4

10602 89.35 1.87 6282.26 3209.39 3209.39

2488.2 0.89 Niobrara A Chalk Base 6929 6176 3 Stands HWDP

6982 6210

10508 89.79

6.64 3.25 9.01 110.84

10414 88.95 0.19 6280.52 3021.42 3021.42

2487.33 0.57 Niobrara Top 6851 6121 NM Flex Pony

6.65 3.25 4.15 114.996895 6152 Filter Sub

10320 88.56 0.46 6278.48 2927.44 2927.44

2486.9 2.16 Sharon Springs

2487.86 0.5 Niobrara A Chalk

3.25 3.69 71.74

10226 88.2 0.06 6275.82 2833.48 2833.48

2485.57 0.83 TeePee Buttes 6154 5472 Gap Sub

5.63 3.25 30.09 101.836802 6084 NMCSDC

10132 89.57 1.56 6273.99 2739.51 2739.51

2482.44 2.07 Shannon Sandstone

6.533.32 6273.06 2551.69 2551.69

6.5

3.25 12.96 38.36

10038 89.22 2.26 6273 2645.57 2645.57

2477.86 1.33 Sussex Sandstone 4731 4108 NMPC

6.81 3.25 29.69 68.055350 4679 NMCSDC

9944 90.85

2473.18 1.83 Parkman Sandstone

0.65 0.65

9850 91.69 2.39 6275.14 2457.83 2457.83

2468.21 2.88 Richard Sandstone 3718 3289 8.5 Reed TK56

6.88 3.25 24.75 25.43841 3390 2.00 Bico SS100

O.D. I.D. Length Total Length

9756 90.54 3.67 6276.97 2363.98 2363.98

E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-

Recent Surveys Geology BHA

32 Torque 15200 Rotating Wt 180 P/U

7.8 7.8

Motor RPM 182 TD RPM 60 Total Bit Speed 242 WOB

Total Flow, GPM 652 HHP @ Bit 1135 AV

240 S/O 135

326

Off BTM SPP, psi 4255 On BTM SPP, psi 5105 Diff PSI 850 Which Pump Both

GPM

BPM

SPM 112

326

11216 16 7,249 11,548 4,259

12 125,552 7.6 731 CH STROKE

2 8.5 Reed TK-56 A249118 16 16 16

7,24914 14 14 14 1/14 1,6871 8.5 Reed TK-56 A238624 14

Bit Records Pump Data

Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2

R LINER 5 5

SPR #2 SPM @

SPR Depth:

Barite x 28, Mul 3 x 2, Clayton x 17, Calcium Chloridae x 25, Lime x 25, Walnut x 8, Cal Carb x 15 SPR #1 SPM @

79 5.06 4.09 87/13 3.12 Trip Gas/ 7 6.2 1 9.1517:00 9.1 13 6 6 6

Mud Report Gas Data

Sample Time MW FV PV / YP Gels HGS %O/W

RatioLime

Btms Up Time 32

Connection Gas 1800

Background Gas 500

Filtrate (API)

cc/30min

Filtrate (HTHP)

cc/30min

Filter Cake

32nds% Solids % Oil LGS %

Accumulator 2760 Manifold 1500 Annular 950 Field Usage (24 hrs) 2425 Fuel Remaining 9500

Pump and circulate TD sweeps. Flow Check, and Pump dry job.

3:00 5:00 2 11548 11548 TOOH to surface.

2:00 3:00 1 11548 11548

TIH to 8840'

14:30 2:00 12 8804 11548 Drill ahead from 8840' to the Well TD at 11548'.

10:30 14:30 4 8804 8804

TOOH to surface to change out MWD tools.

9:00 10:30 2 8804 8804 Laydown Resistivity BHA. Pickup conventional BHA .

5:00 9:00 4 8804 8804

Time Log

From To Hours NPT Start Depth End Depth Operations Summary

4.778 4.625 8.5 0 96 TMK BPN

25 1697Production 7/1/2018 5-1/2 20 HCP-110 25

Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25

26 0 960 96 LT&C

Casing

Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm

Laydown BHA. Run 5.5" production casing. Circ. Cement.

Daily Mud Cost $4,713 Cumm Mud Cost $81,273 Daily Total Cost $41,496 Cumm Cost to Date $538,098 Co Man

11548 2708.00 550 6290 90 TOOH to surface.

Larry Siegel / Hans Cary

6/25/2016

Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations

Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test

Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 15.00

County Legals Estimated TD Move in Date Spud Date Days from Spud

Well Name Field AFE: Formation Objective Drilling Report #

Cinnamon Teal 35-16HN Duck Pond CO118014

Colorado 05-123-46650 4924 25 Patterson 346 7/1/2018

Niobrara 10

State API Number GL KB Rig Contractor Report Date

/

I O D L B G O

0 1 CT X In No

0 1 CT X In No

/

- -

/2522.49 1.74 Footage/ROP 27080 56011490 89.79 0.63 6293.77 4096.43 4096.43

1154811448 89.4 0.01 6293.47 4054.43 4054.43 2522.26 1.52 Out

In 884011355 88.64 358.82 6291.88 3961.45 3961.45 2523.21 4

2.64 AKO 211260 87.8 2.53 6288.93 3866.52 3866.52 2522.09

11167 89.75 4.02 6286.94 3773.7 3773.7 2516.78 1.11

Serial # / Hrs G988 12.1

5 0.28

11072 90.06 3.01 6286.78 3678.88 3678.88 2510.96 1.2

Lb- stg - RPG 8-Jul

2505.79 1.7510979 89 3.36 6286.02 3586.03 3586.03

2501.44 1.21 NBRR B2 High Resisitivity Target7137 6276

Motor Information

10885 89.84 1.95 6285.07 3492.14 3492.14

2497.4 0.84 Niobrara B2 Chalk Top10790 89.22 2.92 6284.29 3397.23 3397.23

2493.23 0.35 Niobrara B1 Chalk Base 7022 6232

7057 6249

10696 89.48 2.17 6283.22 3303.33 3303.33

2489.92 1.81 Niobrara B1 Chalk Top

50.23 6281.55 3115.41 3115.41 3 273.41 388.4

10602 89.35 1.87 6282.26 3209.39 3209.39

2488.2 0.89 Niobrara A Chalk Base 6929 6176 3 Stands HWDP

6982 6210

10508 89.79

6.64 3.25 9.01 110.84

10414 88.95 0.19 6280.52 3021.42 3021.42

2487.33 0.57 Niobrara Top 6851 6121 NM Flex Pony

6.65 3.25 4.15 114.996895 6152 Filter Sub

10320 88.56 0.46 6278.48 2927.44 2927.44

2486.9 2.16 Sharon Springs

2487.86 0.5 Niobrara A Chalk

3.25 3.69 71.74

10226 88.2 0.06 6275.82 2833.48 2833.48

2485.57 0.83 TeePee Buttes 6154 5472 Gap Sub

5.63 3.25 30.09 101.836802 6084 NMCSDC

10132 89.57 1.56 6273.99 2739.51 2739.51

2482.44 2.07 Shannon Sandstone

6.533.32 6273.06 2551.69 2551.69

6.5

3.25 12.96 38.36

10038 89.22 2.26 6273 2645.57 2645.57

2477.86 1.33 Sussex Sandstone 4731 4108 NMPC

6.81 3.25 29.69 68.055350 4679 NMCSDC

9944 90.85

2473.18 1.83 Parkman Sandstone

0.65 0.65

9850 91.69 2.39 6275.14 2457.83 2457.83

2468.21 2.88 Richard Sandstone 3718 3289 8.5 Reed TK56

6.88 3.25 24.75 25.43841 3390 2.00 Bico SS100

O.D. I.D. Length Total Length

9756 90.54 3.67 6276.97 2363.98 2363.98

E+/W- DLS Formation MD TVD ComponentMD INC AZI TVD VS N+/S-

Recent Surveys Geology BHA

32 Torque 15200 Rotating Wt 180 P/U

7.8 7.8

Motor RPM 182 TD RPM 60 Total Bit Speed 242 WOB

Total Flow, GPM 652 HHP @ Bit 326 AV

240 S/O 135

326

Off BTM SPP, psi On BTM SPP, psi Diff PSI 0 Which Pump Both

GPM

BPM

12.1 530 TD SPM 112

326

11216 16 7,249 11,548 4,259

12 125,552 7.6 731 CH STROKE

2 8.5 Reed TK-56 A249118 16 16 16

7,24914 14 14 14 1/14 1,6871 8.5 Reed TK-56 A238624 14

Bit Records Pump Data

Bit No Size Manufacturer Type Serial No. Jets Depth In Depth out Footage Bit Hrs ROP#1 #2

R LINER 5 5

SPR #2 SPM @

SPR Depth:

1500

SPR #1 SPM @

79 5.06 4.09 87/13 3.12 Trip Gas/ 7 6.2 1 9.1517:00 9.1 13 6 6 6

Mud Report Gas Data

Sample Time MW FV PV / YP Gels HGS %O/W

RatioLime

Btms Up Time 35 mins

Connection Gas

Background Gas

Filtrate (API)

cc/30min

Filtrate (HTHP)

cc/30min

Filter Cake

32nds% Solids % Oil LGS %

Accumulator 2750 Manifold 1625 Annular 700 Field Usage (24 hrs) 788 Fuel Remaining 8712

Wash up surface lines. Nipple down and lift stack.

21:00 21:30 1 11548 11548 Set slips with 125k and cutoff casing. Rig Release from Cinnamon Teal 35-16HN at 21:30 on 7/1/2018.

20:30 21:00 1 11548 11548

Elasticem cement. Drop KLX wiper plug. Displace 256 bbls of freshwater. Pump plug at 5bbl/min at 2470 psi. Burst

plug at 3579 psi at 2bbl/min and pump 5 bbl wet shoe. Final lift 2005 psi at 5bbl/min. 1 .5 bbls back. Floats held. Rig down.

Fill pipe and circulate bottoms up, 15' Flare. Hold PJSM with Halliburton. Rig down Casers.

17:00 20:30 4 11548 11548 Test surface lines. Pump 50 bbls of 11.5# 3.74 yield tuned spacer, followed by 520 bbls (1860 sacks) of 13.2# 1.57 yield

16:00 17:00 1 11548 11548

Rig up casers and run 256 joints of 5.5" 20# TMK BPN P-110 CYHP production casing to 11546'. Marker joints at 11520',

9384', and 6673'. Cement baskets at 5999', 4069', and 1831'.

9:00 16:00 7 11548 11548

TOOH to surface, laydown Agitator.

8:00 9:00 1 11548 11548 Laydown MWD, Motor, and bit. Rack back Non mag tools.

5:00 8:00 2 11548 11548

Time Log

From To Hours NPT Start Depth End Depth Operations Summary

4.778 4.625 8.5 0 96 TMK BPN

25 1697Production 7/1/2018 5-1/2 20 HCP-110 25 11546

Conductor 6/13/2018 16 43 H-40 25 105Surface 6/15/2018 9-5/8 36 J-55 8.91 8.765 12.25

26 0 96 Weld

0 96 LT&C

Casing

Type Run Date Size Weight Grade ID Drift Hole Size Burst Collapse Thread/Coupling Top Btm

Skid to Cinnamon Teal 35-15HC

Daily Mud Cost Cumm Mud Cost $81,273 Daily Total Cost $336,006 Cumm Cost to Date $881,234 Co Man

11548 0.00 0 6290 90 Rig Release from CT 35-16HN at 21:30 on 7/1/208

Larry Siegel / Hans Cary

6/25/2016

Current Depth 24 hr Footage Avg ROP Target TVD Target Inc Current Operations Next Day Operations

Notification Dates 24 Hr Spud 6/25/2016 24 Hr Csg & Cmt 6/29/2018 24 Hr BOP Test

Weld SESW Sec 35 T8N R60W 11460 6/24/2018 6/16/2018 16.00

County Legals Estimated TD Move in Date Spud Date Days from Spud

Well Name Field AFE: Formation Objective Drilling Report #

Cinnamon Teal 35-16HN Duck Pond CO118014

Colorado 05-123-46650 4924 25 Patterson 346 7/2/2018

Niobrara 11

State API Number GL KB Rig Contractor Report Date