West Campus Power Plant Tabular Report The University of Iowa Iowa City, IA Final August 2009

Upload: vanmien

Post on 22-Jun-2018

224 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

West Campus Power Plant Tabular Report

The University of Iowa Iowa City, IA

Final August 2009

Page 2: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Executive Summary

As new facilities are located on the West Campus, the utility load increases and additional equipment capacity must be added to address the new utility requirements. There is little or no room to expand the existing plant to accommodate additional generation capacity, and a plant located on the West Campus would increase reliability to the utility system.

Several steam and electric generation possibilities are available to meet the needs of the West Campus. These possibilities typically include multiple equipment component options. The purpose of this study is to present various equipment component options in tabular format to assist the University of Iowa in determining the most suitable and cost effective configuration for a West Campus Power Plant (WCPP).

The component tabs include general descriptions, schedule projections, emissions discussions, layouts, conceptual capital costs, and other considerations associated with the component. The conceptual cost estimates are general in nature and do not account for the following:

• Relocation of displaced Finkbine Commuter Lot parking to existing Grant Field.

• Minimizing building profile by locating major equipment in a basement.

• Using a common stack for the site (single shell, multiple flues).

• Duct work to a common stack.

• Structural provisions related to actual soil conditions at proposed site.

• Disposal of hazardous materials encountered during excavation.

• Noise abatement provisions.

de:mkc:21212\Admin_Asst\Aug-2009\ExecSum.doc i Stanley Consultants

Page 3: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\ExecSum.doc ii Stanley Consultants

Building costs were estimated based on cost per square foot of building. An assumed value of $245 per square foot was used in an effort to reduce visual impact of the building.

An Options Matrix was developed based on discussions with the University of Iowa and is included at the end of this Executive Summary. The matrix uses the breakout conceptual capital cost estimation information from Appendix B to develop specific combustion turbine and boiler project options. This allows an easy way to compare various projects on a relative basis. It should be noted, however, that a more detailed project cost estimate should be performed once a project is selected.

Additionally, it should be noted that the tabular format does not lend itself well to combining multiple options and being able to determine whether or not a PSD review is required. In those instances, a separate analysis on the combined “project” will need to be performed to determine whether or not a PSD review is required.

Page 4: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Table of Contents

Executive Summary 

Section 1 Introduction ............................................................................................................................... 1-1 

Section 2 Site and Building Overview ...................................................................................................... 2-1 Site Location ............................................................................................................................. 2-1 Building and Facility Description ............................................................................................. 2-1 Conceptual Capital Costs .......................................................................................................... 2-5 

Section 3 CT Option 1 .............................................................................................................................. 3-1 One (1) 10 MW Combustion Turbine with HRSG ................................................................... 3-1 Generating Capacity and Fuel Consumption ............................................................................ 3-1 Description ................................................................................................................................ 3-1 Arrangement ............................................................................................................................. 3-2 Schedule .................................................................................................................................... 3-2 Emission Restrictions ................................................................................................................ 3-2 Conceptual Capital Costs .......................................................................................................... 3-3 Other Considerations ................................................................................................................ 3-3 

Section 4 CT Option 2 .............................................................................................................................. 4-1 One (1) 23 MW Simple Cycle Combustion Turbine ................................................................ 4-1 Generating Capacity and Fuel Consumption ............................................................................ 4-1 Description ................................................................................................................................ 4-1 Arrangement ............................................................................................................................. 4-2 Schedule .................................................................................................................................... 4-2 Emission Restrictions ................................................................................................................ 4-2 Conceptual Capital Costs .......................................................................................................... 4-2 Other Considerations ................................................................................................................ 4-3 

iii Stanley Consultants

Page 5: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 5 CT Option 3 .............................................................................................................................. 5-1 One (1) 33 MW Simple Cycle Combustion Turbine ................................................................ 5-1 Generating Capacity and Fuel Consumption ............................................................................ 5-1 Description ................................................................................................................................ 5-1 Arrangement ............................................................................................................................. 5-2 Schedule .................................................................................................................................... 5-2 Emission Restrictions ................................................................................................................ 5-2 Conceptual Capital Costs .......................................................................................................... 5-2 Other Considerations ................................................................................................................ 5-3 

Section 6 CT Option 4 .............................................................................................................................. 6-1 One (1) 33 MW Combustion Turbine with HRSG ................................................................... 6-1 Generating Capacity and Fuel Consumption ............................................................................ 6-1 Description ................................................................................................................................ 6-1 Arrangement ............................................................................................................................. 6-2 Schedule .................................................................................................................................... 6-2 Emission Restrictions ................................................................................................................ 6-2 Conceptual Capital Costs .......................................................................................................... 6-3 Other Considerations ................................................................................................................ 6-3 

Section 7 CT Option 5 .............................................................................................................................. 7-1 One (1) 40 MW Simple Cycle Combustion Turbine ................................................................ 7-1 Generating Capacity and Fuel Consumption ............................................................................ 7-1 Description ................................................................................................................................ 7-1 Arrangement ............................................................................................................................. 7-2 Schedule .................................................................................................................................... 7-2 Emission Restrictions ................................................................................................................ 7-2 Conceptual Capital Costs .......................................................................................................... 7-3 Other Considerations ................................................................................................................ 7-3 

Section 8 Boiler Option 1 ......................................................................................................................... 8-1 165 psig Package Boiler ............................................................................................................ 8-1 Generating Capacity and Fuel Consumption ............................................................................ 8-1 Description ................................................................................................................................ 8-1 Arrangement ............................................................................................................................. 8-1 Schedule .................................................................................................................................... 8-2 Emission Restrictions ................................................................................................................ 8-2 Conceptual Capital Costs .......................................................................................................... 8-2 Other Considerations ................................................................................................................ 8-2 

Section 9 Boiler Option 2 ......................................................................................................................... 9-1 165 psig Hurst Boiler ................................................................................................................ 9-1 Generating Capacity and Fuel Consumption ............................................................................ 9-1 Description ................................................................................................................................ 9-1 Arrangement ............................................................................................................................. 9-2 Schedule .................................................................................................................................... 9-2 Emission Restrictions ................................................................................................................ 9-2 

iv Stanley Consultants

Page 6: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Conceptual Capital Costs .......................................................................................................... 9-2 Other Considerations ................................................................................................................ 9-3 

Section 10 Boiler Option 3 ....................................................................................................................... 10-1 900 psig Hurst Boiler .............................................................................................................. 10-1 Generating Capacity and Fuel Consumption .......................................................................... 10-1 Description .............................................................................................................................. 10-1 Arrangement ........................................................................................................................... 10-2 Schedule .................................................................................................................................. 10-2 Conceptual Capital Costs ........................................................................................................ 10-2 Other Considerations .............................................................................................................. 10-3 

Section 11 Boiler Option 4 ....................................................................................................................... 11-1 900 psig CFB Boiler ............................................................................................................... 11-1 Generating Capacity and Fuel Consumption .......................................................................... 11-1 Description .............................................................................................................................. 11-1 Arrangement ........................................................................................................................... 11-2 Schedule .................................................................................................................................. 11-2 Emission Restrictions .............................................................................................................. 11-2 Conceptual Capital Costs ........................................................................................................ 11-2 Other Considerations .............................................................................................................. 11-3 

Section 12 ST Option 1 ............................................................................................................................. 12-1 4 MW Backpressure Steam Turbine ....................................................................................... 12-1 Generating Capacity ................................................................................................................ 12-1 Description .............................................................................................................................. 12-1 Arrangement ........................................................................................................................... 12-1 Schedule .................................................................................................................................. 12-1 Conceptual Capital Costs ........................................................................................................ 12-2 Other Considerations .............................................................................................................. 12-2 

Section 13 ST Option 2 ............................................................................................................................. 13-1 14 MW Extraction/Condensing Steam Turbine ...................................................................... 13-1 Generating Capacity ................................................................................................................ 13-1 Description .............................................................................................................................. 13-1 Arrangement ........................................................................................................................... 13-1 Schedule .................................................................................................................................. 13-2 Conceptual Capital Costs ........................................................................................................ 13-2 Other Considerations .............................................................................................................. 13-2 

Section 14 Water Treatment Option 1 ...................................................................................................... 14-1 170 psig Boiler Cycles ............................................................................................................ 14-1 General .................................................................................................................................... 14-1 Description .............................................................................................................................. 14-1 Conceptual Capital Costs ........................................................................................................ 14-2 

v Stanley Consultants

Page 7: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 15 Water Treatment Option 2 ...................................................................................................... 15-1 Boiler Cycles above 600 psig ................................................................................................. 15-1 General .................................................................................................................................... 15-1 Description .............................................................................................................................. 15-1 Conceptual Capital Costs ........................................................................................................ 15-2 

Section 16 Fuel Supply ............................................................................................................................. 16-1 Natural Gas Pipeline Options .................................................................................................. 16-1 Solid Biomass Fuel ................................................................................................................. 16-3 

Section 17 Mechanical Distribution System ............................................................................................. 17-1 Description .............................................................................................................................. 17-1 Routing .................................................................................................................................... 17-1 Conceptual Cost Estimate ....................................................................................................... 17-2 Other Considerations .............................................................................................................. 17-2 

Section 18 Sub U Upgrades ...................................................................................................................... 18-1 Description .............................................................................................................................. 18-1 

Section 19 13.8 kV Electrical Duct Bank ................................................................................................. 19-1 Description .............................................................................................................................. 19-1 Routing .................................................................................................................................... 19-1 Conceptual Cost Estimate ....................................................................................................... 19-2 Other Considerations .............................................................................................................. 19-2 

Section 20 Water Supply and Discharge .................................................................................................. 20-1 Description .............................................................................................................................. 20-1 Routing .................................................................................................................................... 20-1 Conceptual Cost Estimate ....................................................................................................... 20-2 Other Considerations .............................................................................................................. 20-2 

Section 21 Emissions ................................................................................................................................ 21-1 Non-PSD Permit Strategies ..................................................................................................... 21-1 TOC ......................................................................................................................................... D-1 

FIGURES

Figure 2-1 Tall Plant Profile (Intersection of Mormon Trek Blvd and Highway 6) ..................... 2-2 

Figure 2-2 Tall Plant Profile (Intersection of Hawkins Drive and Highway 6) ............................ 2-2 

Figure 2-3 Tall Plant Profile (Newton Road East of Carver Hawkeye Arena) ............................. 2-3 

Figure 2-4 Short Plant Profile (Intersection of Mormon Trek Blvd and Highway 6) ................... 2-3 

Figure 2-5 Short Plant Profile (Intersection of Hawkins Drive and Highway 6) .......................... 2-4 

Figure 2-6 Short Plant Profile (Newton Road East of Carver Hawkeye Arena) ........................... 2-4 

Figure 16-1 Natural Gas Supply Option 1 .................................................................................. 16-2 

vi Stanley Consultants

Page 8: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

vii Stanley Consultants

Figure 16-2 Natural Gas Supply Option 2 .................................................................................. 16-2 

Figure 16-3 Natural Gas Supply Option 3 .................................................................................. 16-3 

APPENDICES Appendix A Site Plan and Utilities Drawing ............................................................................... A-1 

Appendix B Cost Estimate Spreadsheets ..................................................................................... B-1 

Appendix C Baseline Equipment Emission Projections .............................................................. C-1 

Appendix D OEM Quotes ............................................................................................................ D-1 

Page 9: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 1

Introduction

This report breaks out various components associated with constructing a steam and electric generation facility in the Finkbine Commuter Lot on the University of Iowa’s west campus. The components are presented in the report in a tabular format. Each tab includes equipment descriptions, arrangements of the equipment, proposed routings for underground utilities (as applicable), conceptual capital cost estimate(s), and commentary on anticipated PSD review requirements for potential emission sources. Several combustion turbine, steam generator, and steam turbine options were investigated.

It should be noted that the emission projections made for each tab relate only to the equipment in that tab. The tabular format does not lend itself well to combining multiple options and being able to determine whether or not a PSD review is required. In those instances, a separate analysis on the combined “project” will need to be performed to determine whether or not a PSD review is required.

Conceptual capital cost estimates tallied for various “projects” should be considered on a relative basis. Once a “project” is selected, a more detailed project cost estimate should be performed.

de:mkc:21212\Admin_Asst\Aug-2009\Section1.doc 1-1 Stanley Consultants

Page 10: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 2

Site and Building Overview

Site Location The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine Commuter Lot. Displaced parking will be relocated to an alternate location such as the existing Grant Field, which is no longer used for athletic purposes.

The Finkbine Commuter Lot is situated on sloped property. Site preparation costs will be minimized by limiting parking lot demolition and grading work. The result will be sloped topography within the boundaries of the WCPP.

Vehicle access to the site will be from Finkbine Commuter Drive.

Building and Facility Description A conceptual site arrangement for the WCPP is included in Appendix A. Biomass and ash storage silos, truck unloading / loading building, and cooling tower(s), if required, will be located outdoors on the south side of the WCPP building. All other equipment will be housed inside the prefabricated metal building. A multi-level auxiliary bay, that includes a basement and equipment hatch, will be located on the north side of the building for housing balance-of-plant mechanical, electrical, and water treatment equipment. A roll-up door will be located on the east side of the building for equipment access and removal via a 12 feet wide walkway/maintenance aisle. Steam, condensate, potable water, and electrical duct bank utility tie-ins will be located in the northeast corner of the building. Natural gas and plant effluent utility tie-ins will be located on the south side of the building. Adjacent space west of the proposed WCPP will be allocated for future plant expansion.

For solid fuel options, a service road will be provided around the south side of the WCPP for biomass delivery, ash removal, and maintenance trucks. Biomass unloading and ash loading will be conducted inside the truck unloading / loading building.

de:mkc:21212\Admin_Asst\Aug-2009\Section2.doc 2-1 Stanley Consultants

Page 11: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

The height of the WCPP building depends on equipment heights for the options selected, but could be as short as 50 feet or as tall as 100 feet. Ash and biomass storage silos, if required, will be approximately 90 feet tall. Renderings showing visual impact a taller WCPP building versus a shorter building are included in Figures 2-1 thru 2-6. Each arrangement is shown from three different vantage points. Final stack heights will be determined during the permitting phase.

Tall Plant Profile

(Intersection of Mormon Trek Blvd and Highway 6) Figure 2-1

Tall Plant Profile

(Intersection of Hawkins Drive and Highway 6) Figure 2-2

de:mkc:21212\Admin_Asst\Aug-2009\Section2.doc 2-2 Stanley Consultants

Page 12: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Tall Plant Profile

(Newton Road east of Carver Hawkeye Arena) Figure 2-3

Short Plant Profile (Intersection of Mormon Trek Blvd and Highway 6)

Figure 2-4

de:mkc:21212\Admin_Asst\Aug-2009\Section2.doc 2-3 Stanley Consultants

Page 13: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Short Plant Profile

(Intersection of Hawkins Drive and Highway 6) Figure 2-5

Short Plant Profile

(Newton Road East of Carver Hawkeye Arena) Figure 2-6

de:mkc:21212\Admin_Asst\Aug-2009\Section2.doc 2-4 Stanley Consultants

Page 14: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section2.doc 2-5 Stanley Consultants

Conceptual Capital Costs A conceptual capital cost estimate for site preparation and parking relocation were developed based on past similar projects and cost estimating references. Cost estimate details for site preparation and parking relocation are included in Table B-2 in Appendix B.

The estimated capital cost for site preparation and parking relocation is $1,961,949.

Page 15: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 3

CT Option 1 One (1) 10 MW Simple Cycle Combustion Turbine and

One (1) 10 MW Combustion Turbine with HRSG

Generating Capacity and Fuel Consumption This option will use natural gas to produce up to 20 MW of electrical generation and 100 kpph of 165 psig steam for West Campus use.

Each combustion turbine will use approximately 118 Mcfh of natural gas at full load operation. The duct burners included with the HRSG will be designed to burn up to 64 Mcfh of fuel for supplemental firing. The maximum fuel consumption rate for this option is approximately 300 Mcfh.

Description The following equipment will be included with this option:

• Two (2) – 10 MW (each) axial exhaust combustion turbines.

• One (1) – 100 kpph, 165 psig supplemental fired HRSG.

• One (1) – 500 kW black start gas-fired generator.

• Three (3) – Reciprocating natural gas compressors.

• One (1) – 30,000 gallon condensate storage tank.

• Refer to Table B-3 in Appendix B for a complete list of equipment.

One of the combustion turbines will be used as a simple cycle unit for generating electricity. The other combustion turbine will be coupled to an HRSG and will capable of cogenerating steam and electricity or electricity only via an exhaust gas bypass system. Each combustion turbine will use

de:mkc:21212\Admin_Asst\Aug-2009\Section3.doc 3-1 Stanley Consultants

Page 16: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

a stand-alone inlet air chilling system to increase electrical output of the machines when outdoor ambient temperatures are high.

The HRSG will be coupled in-line with the axial exhaust combustion turbine. A diverter damper and bypass stack will be included for simple cycle operation. Duct burners will be used to supplement steam generation in the HRSG. Each exhaust stack will include a silencer to reduce the noise emitted from the exhaust path.

The black start generator will operate on natural gas. The generator will be sized to start a gas compressor and a combustion turbine during an electrical black out event.

High-speed reciprocating gas compressors will be used to meet combustion turbine inlet gas pressure requirements. Each motor-driven compressor will be sized to provide 100% gas flow requirements of a combustion turbine. The compressors will alternate operation with one compressor available as a backup to improve reliability of the gas supply system.

A lined carbon steel condensate storage tank will be used to store condensate returned from campus. The tank will store approximately 2 ½ hours of condensate at full load.

This option also includes condensate, feedwater, compressed air, and service water equipment to support the operation of the combustion turbines and HRSG.

Arrangement A floor plan for this option is shown on Drawing X511 included herein. All equipment will be located within the WCPP building. Refer to Site and Building Overview for building and facility description.

Schedule Assuming a PSD review of the project is avoided (refer to Section 21), it is anticipated the air permitting process would take approximately 6 months (includes application preparation and permit approval phases). Construction activity normally starts after the air permit is received.

The gas pipeline construction schedule is a critical component of making the plant operational. Natural Gas Supply Option 3 (refer to Section 16), also referred to as the “Melrose pipeline”, meets the capacity requirements and does not require approval from the Iowa Utilities Board. Consequently, the anticipated construction duration of 2 to 4 months for the Melrose pipeline will easily fit into the overall project schedule. Pipeline construction can start after the pipeline permit is received.

The combustion turbine and HRSG delivery lead-times are 15 months and 12 months after receipt of order, respectively. The plant can be made operational 24 months after beginning design.

Emission Restrictions To avoid a PSD review, annual emissions from the WCPP must not exceed PSD thresholds. Refer to Appendix C for annual emission projections for this option.

de:mkc:21212\Admin_Asst\Aug-2009\Section3.doc 3-2 Stanley Consultants

Page 17: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section3.doc 3-3 Stanley Consultants

The baseline design for this option includes dry low NOX burner technology on the combustion turbines and low NOX duct burners in the HRSG. Assuming full load operation, it is estimated that the facility will be limited to approximately 4300 hrs of annual operation before exceeding the PSD threshold for NOX.

Alternatively, a urea based SCR system could be added to the simple cycle and the combined cycle units to reduce NOX emissions below the NOX threshold. Cost associated with this additional emission control equipment is included in the sub-section that follows.

CO, PM, PM10, VOCs, and SO2 emissions are projected not to exceed respective annual PSD thresholds.

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Tables B-3, B-4, and B-5 in Appendix B. A summary of the results follows.

Baseline Equipment Capital Costs – Baseline equipment is defined as equipment with standard emission control provisions. The estimated baseline equipment capital cost for this option is $38,805,922.

Building Capital Cost – Cost is based on estimated square footage requirements to house the equipment included in this option. The estimated building capital cost for this option is $3,983,868.

Emission Control Equipment Capital Cost – Costs associated with the addition of emission control equipment to allow year-round (8760 hrs) full load operation while staying under PSD emission thresholds. The estimated emission control equipment capital cost for this option is $4,939,658.

Other Considerations This option offers up to 100 kpph of 165 psig steam production for the campus, and provides up to 20 MW of electrical generation to serve as backup power for research and hospital facilities. Both steam and electric generation capacities fall significantly short of those desired by the University. Consequently, this option is not recommended as a viable option for the University.

Page 18: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine
Page 19: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 4

CT Option 2 One (1) 23 MW Simple Cycle Combustion Turbine

Generating Capacity and Fuel Consumption This option will use natural gas to produce up to 23 MW of electrical generation for West Campus use.

The maximum fuel consumption rate for this option is approximately 234 Mcfh.

Description The following equipment will be included with this option:

• One (1) – 23 MW radial exhaust combustion turbine.

• One (1) – 1000 kW black start gas-fired generator.

• Two (2) – Reciprocating natural gas compressors.

• Refer to Table B-6 in Appendix B for a complete list of equipment.

The combustion turbine will be used in a simple cycle arrangement for generating electricity. A stand-alone inlet air chilling system is included to increase electrical output of the combustion turbine when outdoor ambient temperatures are high. The exhaust stack will include a silencer to reduce the noise emitted from the exhaust path.

The black start generator will operate on natural gas. The generator will be sized to start a gas compressor and the combustion turbine during an electrical black out event.

High-speed reciprocating gas compressors will be used to meet the combustion turbine inlet gas pressure requirements. Each motor-driven compressor will be sized to provide 100% gas flow

de:mkc:21212\Admin_Asst\Aug-2009\Section4.doc 4-1 Stanley Consultants

Page 20: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

requirements of the combustion turbine. The compressors will alternate operation with one compressor available as a backup to improve reliability of the gas supply system.

Arrangement A floor plan for this option is shown on Drawing X512 included herein. All equipment will be located within the WCPP building. Refer to Site and Building Overview for building and facility description.

Schedule Assuming a PSD review of the project is avoided (refer to Section 21), it is anticipated the air permitting process would take approximately 6 months (includes application preparation and permit approval phases). Construction activity normally starts after the air permit is received.

The gas pipeline construction schedule is a critical component of making the plant operational. Natural Gas Supply Option 3 (refer to Section 16), also referred to as the “Melrose pipeline”, meets the capacity requirements and does not require approval from the Iowa Utilities Board. Consequently, the anticipated construction duration of 2 to 4 months for the Melrose pipeline will easily fit into the overall project schedule. Pipeline construction can start after the pipeline permit is received.

The combustion turbine delivery lead-time is 15 months after receipt of order. The plant can be made operational 24 months after beginning design.

Emission Restrictions To avoid a PSD review, annual emissions from the WCPP must not exceed PSD thresholds. Refer to Appendix C for annual emission projections for this option.

The baseline design for this option includes dry low NOX burner technology on the combustion turbine. Assuming full load operation, it is estimated that the facility will be limited to approximately 2700 hrs of annual operation before exceeding the PSD threshold for NOX.

Alternatively, a urea based SCR system could be added to reduce NOX emissions below the NOX threshold. Cost associated with this additional emission control equipment is included in the sub-section that follows.

CO, PM, PM10, VOCs, and SO2 emissions are projected not to exceed respective annual PSD thresholds.

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Tables B-6, B-7, and B-8 in Appendix B. A summary of the results follows.

Baseline Equipment Capital Costs – Baseline equipment is defined as equipment with standard emission control provisions. The estimated baseline equipment capital cost for this option is $32,984,364.

de:mkc:21212\Admin_Asst\Aug-2009\Section4.doc 4-2 Stanley Consultants

Page 21: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section4.doc 4-3 Stanley Consultants

Building Capital Cost – Cost is based on estimated square footage requirements to house the equipment included in this option. The estimated building capital cost for this option is $2,395,105.

Emission Control Equipment Capital Cost – These costs associated with the addition of emission control equipment to allow year-round (8760 hrs) full load operation while staying under PSD emission thresholds. The estimated emission control equipment capital cost for this option is $5,164,736.

Other Considerations This option offers up to 23 MW of electrical generation to serve as backup power for research and hospital facilities, but does not provide additional steam production for the campus. Both steam and electric generation capacities fall significantly short of those desired by the University. Consequently, this option is not recommended as a viable option for the University.

Page 22: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine
Page 23: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 5

CT Option 3 One (1) 33 MW Simple Cycle Combustion Turbine

Generating Capacity and Fuel Consumption This option will use natural gas to produce up to 33 MW of electrical generation for West Campus use.

The maximum fuel consumption rate for this option is approximately 315 Mcfh.

Description The following equipment will be included with this option:

• One (1) – 33 MW radial exhaust combustion turbine.

• One (1) – 1000 kW black start gas-fired generator.

• Two (2) – Reciprocating natural gas compressors.

• Refer to Table B-9 in Appendix B for a complete list of equipment.

The combustion turbine will be used in a simple cycle arrangement for generating electricity. A stand-alone inlet air chilling system is included to increase electrical output of the combustion turbine when outdoor ambient temperatures are high. The exhaust stack will include a silencer to reduce the noise emitted from the exhaust path.

The black start generator will operate on natural gas. The generator will be sized to start a gas compressor and the combustion turbine during an electrical black out event.

High-speed reciprocating gas compressors will be used to meet the combustion turbine inlet gas pressure requirements. Each motor-driven compressor will be sized to provide 100% gas flow

de:mkc:21212\Admin_Asst\Aug-2009\Section5.doc 5-1 Stanley Consultants

Page 24: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

requirements of the combustion turbine. The compressors will alternate operation with one compressor available as a backup to improve reliability of the gas supply system.

Arrangement A floor plan for this option is shown on Drawing X513 included herein. All equipment will be located within the WCPP building. Refer to Site and Building Overview for building and facility description.

Schedule Assuming a PSD review of the project is avoided (refer to Section 21), it is anticipated the air permitting process would take approximately 6 months (includes application preparation and permit approval phases). Construction activity normally starts after the air permit is received.

The gas pipeline construction schedule is a critical component of making the plant operational. Natural Gas Supply Option 3 (refer to Section 16), also referred to as the “Melrose pipeline”, meets the capacity requirements and does not require approval from the Iowa Utilities Board. Consequently, the anticipated construction duration of 2 to 4 months for the Melrose pipeline will easily fit into the overall project schedule. Pipeline construction can start after the pipeline permit is received.

The combustion turbine delivery lead-time is 15 months after receipt of order. The plant can be made operational 24 months after beginning design.

Emission Restrictions To avoid a PSD review, annual emissions from the WCPP must not exceed PSD thresholds. Refer to Appendix C for annual emission projections for this option.

The baseline design for this option includes dry low NOX burner technology on the combustion turbine. Assuming full load operation, it is estimated that the facility will be limited to approximately 2500 hrs of annual operation before exceeding the PSD threshold for NOX.

Alternatively, a urea based SCR system could be added to reduce NOX emissions below the NOX threshold. Cost associated with this additional emission control equipment is included in the sub-section that follows.

CO, PM, PM10, VOCs, and SO2 emissions are projected not to exceed respective annual PSD thresholds.

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Tables B-9, B10, and B-11 in Appendix B. A summary of the results follows.

Baseline Equipment Capital Costs – Baseline equipment is defined as equipment with standard emission control provisions. The estimated baseline equipment capital cost for this option is $37,458,105.

de:mkc:21212\Admin_Asst\Aug-2009\Section5.doc 5-2 Stanley Consultants

Page 25: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section5.doc 5-3 Stanley Consultants

Building Capital Cost – Cost is based on estimated square footage requirements to house the equipment included in this option. The estimated building capital cost for this option is $2,395,105.

Emission Control Equipment Capital Cost – These costs associated with the addition of emission control equipment to allow year-round (8760 hrs) full load operation while staying under PSD emission thresholds. The estimated emission control equipment capital cost for this option is $5,606,854.

Other Considerations Low speed reciprocating gas compressors require less maintenance than their high speed counterparts, but are significantly more expensive. For this option, high speed compressors were included with one of them being designated as a spare to serve full gas requirements of one combustion turbine.

The diesel fired black start generator is approximately one-half to one-third the cost of the gas-fired counterpart, but has added constraints associated with storage and handling of the diesel fuel. For this option, a gas-fired black start generator was included.

Stand-alone chilled water units require water treatment for skid-mounted cooling towers and are expensive. The University of Iowa has spare capacity in the chilled water system, however interconnection to the system requires underground chilled water supply and return pipelines be routed about a half mile. A stand-alone chilled water unit was included for this option; however, a more detailed comparison should be performed prior to project approval.

This option offers up to 33 MW of electrical generation to serve as backup power for research and hospital facilities, but does not provide additional steam production for the campus.

Page 26: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine
Page 27: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 6

CT Option 4 One (1) 33 MW Combustion Turbine with HRSG

Generating Capacity and Fuel Consumption This option will use natural gas to produce up to 33 MW of electrical generation and 200 kpph of 165 psig steam for West Campus use.

The combustion turbine will use approximately 314 Mcfh of natural gas at full load operation. The duct burners included with the HRSG will be designed to burn up to 127 Mcfh of fuel for supplemental firing. The maximum fuel consumption rate for this option is approximately 441 Mcfh. The capacity of the Melrose gas pipeline is 400 Mcfh. Duct firing may need to be curtailed to stay under pipeline capacity limitations.

Description The following equipment will be included with this option:

• One (1) – 33 MW radial exhaust combustion turbine.

• One (1) – 200 kpph, 165 psig supplemental fired HRSG.

• One (1) – 1000 kW black start gas-fired generator.

• Two (2) – Reciprocating natural gas compressors.

• One (1) – 30,000 gallon condensate storage tank.

• Refer to Table B-12 in Appendix B for a complete list of equipment.

The radial exhaust combustion turbine will be direct coupled to the HRSG for cogenerating steam and electricity. The combustion turbine will use a stand-alone inlet air chilling system to increase electrical output of the machines when outdoor ambient temperatures are high.

de:mkc:21212\Admin_Asst\Aug-2009\Section6.doc 6-1 Stanley Consultants

Page 28: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Duct burners will be used to supplement steam generation in the HRSG. The exhaust stack will include a silencer to reduce the noise emitted from the exhaust path.

The black start generator will operate on natural gas. The generator will be sized to start a gas compressor and a combustion turbine during an electrical black out event.

High-speed reciprocating gas compressors will be used to meet combustion turbine inlet gas pressure requirements. Each motor-driven compressor will be sized to provide 100% gas flow requirements of a combustion turbine. A spare compressor will be included to improve reliability of the gas supply system.

A lined carbon steel condensate storage tank will be used to store condensate returned from campus. The tank will store approximately two hours of condensate during unfired operation.

This option also includes condensate, feedwater, compressed air, and service water equipment to support the operation of the combustion turbine and HRSG.

Arrangement A floor plan for this option is shown on Drawing X514 included herein. All equipment will be located within the WCPP building. Refer to Site and Building Overview for building and facility description.

Schedule Assuming a PSD review of the project is avoided (refer to Section 21), it is anticipated the air permitting process would take approximately 6 months (includes application preparation and permit approval phases). Construction activity normally starts after the air permit is received.

The gas pipeline construction schedule is a critical component of making the plant operational. Natural Gas Supply Option 3 (refer to Section 16), also referred to as the “Melrose pipeline”, meets the capacity requirements with curtailment of duct burner use, when necessary, and does not require approval from the Iowa Utilities Board. Consequently, the anticipated construction duration of 2 to 4 months for the Melrose pipeline will easily fit into the overall project schedule. Pipeline construction can start after the pipeline permit is received.

The combustion turbine and HRSG delivery lead-times are 15 months and 12 months after receipt of order, respectively. The plant can be made operational 24 months after beginning design.

Emission Restrictions To avoid a PSD review, annual emissions from the WCPP must not exceed PSD thresholds. Refer to Appendix C for annual emission projections for this option.

The baseline design for this option includes dry low NOX burner technology on the combustion turbine and low NOX duct burners in the HRSG. Without additional emission control equipment, operation will be limited to approximately 1800 hours per year for NOX and 6750 hours per year for CO.

de:mkc:21212\Admin_Asst\Aug-2009\Section6.doc 6-2 Stanley Consultants

Page 29: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section6.doc 6-3 Stanley Consultants

Alternatively, a urea based SCR and CO catalyst system could be added in the HRSG to reduce NOX and CO emissions below their respective thresholds. Cost associated with this additional emission control equipment is included in the sub-section that follows.

PM, PM10, VOCs, and SO2 emissions are projected not to exceed respective annual PSD thresholds.

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Tables B-12, B-13, and B-14 in Appendix B. A summary of the results follows.

Baseline Equipment Capital Costs – Baseline equipment is defined as equipment with standard emission control provisions. The estimated baseline equipment capital cost for this option is $46,175,818.

Building Capital Cost – Cost is based on estimated square footage requirements to house the equipment included in this option. The estimated building capital cost for this option is $6,878,334.

Emission Control Equipment Capital Cost – Costs associated with the addition of emission control equipment to allow year-round (8760 hrs) full load operation while staying under PSD emission thresholds. The estimated emission control equipment capital cost for this option is $2,893,860.

Other Considerations Low speed reciprocating gas compressors require less maintenance than their high speed counterparts, but are significantly more expensive. For this option, high speed compressors were included with one of them being designated as a spare to serve full gas requirements of one combustion turbine.

The diesel fired black start generator is approximately one-half to one-third the cost of the gas-fired counterpart, but has added constraints associated with storage and handling of the diesel fuel. For this option, a gas-fired black start generator was included.

Stand-alone chilled water units require water treatment for skid-mounted cooling towers and are expensive. The University of Iowa has spare capacity in the chilled water system, however interconnection to the system requires underground chilled water supply and return pipelines be routed about a half mile. A stand-alone chilled water unit was included for this option; however, a more detailed comparison should be performed prior to project approval.

This option offers up to 33 MW of electrical generation to serve as backup power for research and hospital facilities, and provides up to 200 kpph of 165 psig steam production as desired by the University.

Page 30: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine
Page 31: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 7

CT Option 5 One (1) 40 MW Simple Cycle Combustion Turbine

Generating Capacity and Fuel Consumption This option will use natural gas to produce up to 40 MW of electrical generation for West Campus use.

The maximum fuel consumption rate for this option is approximately 525 Mcfh.

Description The following equipment will be included with this option:

• One (1) – 40 MW radial exhaust combustion turbine.

• One (1) – 1000 kW black start gas-fired generator.

• Two (2) – Reciprocating natural gas compressors.

• Refer to Table B-15 in Appendix B for a complete list of equipment.

The combustion turbine will be used in a simple cycle arrangement for generating electricity. A stand-alone inlet air chilling system is included to increase electrical output of the combustion turbine when outdoor ambient temperatures are high. The exhaust stack will include a silencer to reduce the noise emitted from the exhaust path.

The black start generator will operate on natural gas. The generator will be sized to start a gas compressor and the combustion turbine during an electrical black out event.

High-speed reciprocating gas compressors will be used to meet the combustion turbine inlet gas pressure requirements. Each motor-driven compressor will be sized to provide 100% gas flow

de:mkc:21212\Admin_Asst\Aug-2009\Section7.doc 7-1 Stanley Consultants

Page 32: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

requirements of the combustion turbine. The compressors will alternate operation with one compressor available as a backup to improve reliability of the gas supply system.

Arrangement A floor plan for this option is shown on Drawing X515 included herein. All equipment will be located within the WCPP building. Refer to Site and Building Overview for building and facility description.

Schedule Assuming a PSD review of the project is avoided (refer to Section 21), it is anticipated the air permitting process would take approximately 6 months (includes application preparation and permit approval phases). Construction activity normally starts after the air permit is received.

The combustion turbine delivery lead-time is 15 months after receipt of order.

The gas pipeline construction schedule is a critical component of making the plant operational. The fuel capacity requirements of this option necessitate the use of either the natural gas pipeline that originates in Ainsworth, Iowa (refer to Natural Gas Supply Option 1 in Section 16) or the natural gas pipeline that originates in Iowa City (Natural Gas Supply Option 2). Though Natural Gas Supply Option 2 typically operates between 300 and 350 psig, it is expected that gas compression is required to reach full load capability of the combustion turbine.

Both natural gas supply options require approval from Iowa Utilities Board (IUB). The IUB approval process is expected to take 18 to 36 months after receipt of application depending on public support for the project. Application preparation is expected to take 2 to 3 months (including title search). Pipeline permit is required prior to constructing the pipeline. The construction duration is estimated at 2 to 4 months depending on weather. Consequently, natural gas may not be available to the project for 3 ½ years or more.

Emission Restrictions To avoid a PSD review, annual emissions from the WCPP must not exceed PSD thresholds. Refer to Appendix C for annual emission projections for this option.

The baseline design for this option includes dry low NOX burner technology on the combustion turbine. Assuming full load operation, it is estimated that the facility will be limited to approximately 2700 hrs of annual operation before exceeding the PSD threshold for NOX.

Alternatively, a urea based SCR system could be added to reduce NOX emissions below the NOX threshold. Cost associated with this additional emission control equipment is included in the sub-section that follows.

CO, PM, PM10, VOCs, and SO2 emissions are projected not to exceed respective annual PSD thresholds.

de:mkc:21212\Admin_Asst\Aug-2009\Section7.doc 7-2 Stanley Consultants

Page 33: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section7.doc 7-3 Stanley Consultants

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Tables B-15, B-16, and B-17 in Appendix B. A summary of the results follows.

Baseline Equipment Capital Costs – Baseline equipment is defined as equipment with standard emission control provisions. The estimated baseline equipment capital cost for this option is $51,974,927.

Building Capital Cost – Cost is based on estimated square footage requirements to house the equipment included in this option. The estimated building capital cost for this option is $5,319,756.

Emission Control Equipment Capital Cost – These costs associated with the addition of emission control equipment to allow year-round (8760 hrs) full load operation while staying under PSD emission thresholds. The estimated emission control equipment capital cost for this option is $6,631,763.

Other Considerations This option offers up to 40 MW of electrical generation to serve as backup power for research and hospital facilities, but does not provide additional steam production for the campus. This option would likely require electrical upgrades at Substation U resulting in significant cost addition to the project. In addition, this option requires more natural gas capacity than the “Melrose pipeline” has available. The alternative gas supply pipeline options require approval from the Iowa Board of Utilities prior to construction which could result in significant delay of the project. Consequently, this option is not recommended as a viable option for the University.

Page 34: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine
Page 35: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 8

Boiler Option 1 165 psig Package Boiler

Generating Capacity and Fuel Consumption This option will use natural gas to produce up to 100 kpph of 165 psig, saturated steam for West Campus use.

The maximum fuel consumption rate for this option is approximately 123 Mcfh.

Description The following equipment will be included with this option:

• One (1) – 100 kpph, 165 psig package boiler.

• One (1) – 30,000 gallon condensate storage tank.

• Refer to Table B-18 in Appendix B for a complete list of equipment.

The package boiler will be of the force recirculation water tube steam generator type.

A lined carbon steel condensate storage tank will be used to store condensate returned from campus. The tank will store approximately 2 ½ hours of condensate at full load.

This option also includes condensate, feedwater, compressed air, and service water equipment to support the operation of the package boiler.

Arrangement A floor plan for this option is shown on Drawing X521 included herein. All equipment will be located within the WCPP building. Refer to Site and Building Overview for building and facility description.

de:mkc:21212\Admin_Asst\Aug-2009\Section8.doc 8-1 Stanley Consultants

Page 36: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section8.doc 8-2 Stanley Consultants

Schedule Assuming a PSD review of the project is avoided (refer to Section 21), it is anticipated the air permitting process would take approximately 6 months (includes application preparation and permit approval phases). Construction activity normally starts after the air permit is received.

The gas pipeline construction schedule is a critical component of making the plant operational. Natural Gas Supply Option 3 (refer to Section 16), also referred to as the “Melrose pipeline”, meets the capacity requirements and does not require approval from the Iowa Utilities Board. Consequently, the anticipated construction duration of 2 to 4 months for the Melrose pipeline will easily fit into the overall project schedule. Pipeline construction can start after the pipeline permit is received.

The package boiler delivery lead-time is 9 months after receipt of order. The plant can be made operational 18 to 24 months after beginning design.

Emission Restrictions NOX, CO, PM, PM10, VOCs, and SO2 emissions are projected not to exceed respective annual PSD thresholds. Consequently a PSD review of this option is not anticipated. Refer to Appendix C for annual emission projections for this option.

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Tables B-18, B-19, and B-20 in Appendix B. A summary of the results follows.

Baseline Equipment Capital Costs – Baseline equipment is defined as equipment with standard emission control provisions. The estimated baseline equipment capital cost for this option is $5,281,029.

Building Capital Cost – Cost is based on estimated square footage requirements to house the equipment included in this option. The estimated building capital cost for this option is $1,293,805.

Emission Control Equipment Capital Cost – Annual emission for this option are not projected to exceed PSD emission thresholds. Consequently, no emission control equipment costs have been estimated for this option.

Other Considerations This option offers up to 100 kpph of 165 psig steam production for the campus, but no electrical generation to serve as backup power for research and hospital facilities. The steam production capacity is short of the 200 kpph desired by the University.

Page 37: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine
Page 38: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 9

Boiler Option 2 165 psig Hurst Boiler

Generating Capacity and Fuel Consumption This option will use solid biomass fuel to produce approximately 120 kpph of 165 psig, saturated steam for West Campus use.

Assuming a solid fuel heating value of 3800 btu/lb (HHV, as received), the estimated fuel consumption rate for this option is approximately 20 tons per hour.

Description The following equipment will be included with this option:

• Two (2) – 60 kpph, 165 psig Hurst boilers.

• One (1) – 30,000 gallon condensate storage tank.

• Four (4) – Biomass storage silos and associated material handling equipment.

• One (1) – Ash storage silo and associated material handling equipment.

• One (1) – Truck loading/unloading building.

• Refer to Table B-21 in Appendix B for a complete list of equipment.

The Hurst boiler will be a prefabricated hybrid type boiler that uses stoker technology to burn biomass. The boiler proposed for this option has a water tube lower section and a two-pass fire tube scotch marine vessel in an upper section.

A lined carbon steel condensate storage tank will be used to store condensate returned from campus. The tank will store approximately two hours of condensate at full load.

de:mkc:21212\Admin_Asst\Aug-2009\Section9.doc 9-1 Stanley Consultants

Page 39: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

The biomass storage silos will have a combined storage capacity of 24 hours, to support full load operation on biomass for the two 60 kpph boilers.

A single-bay truck loading and unloading building will be arranged so that solid fuel can be unloaded from either a walking-floor or bottom-dump truck.

This option also includes condensate, feedwater, compressed air, and service water equipment to support the operation of the Hurst boilers.

Arrangement A floor plan for this option is shown on Drawing X522 included herein. All equipment will be located within the WCPP building. Refer to Site and Building Overview for building and facility description.

Schedule The Hurst boiler delivery lead-time is 8 months after receipt of order. However, the schedule for this option will be driven by the air permit. Based on annual emission projections for this option, it is likely that a PSD review will be required for CO. Consequently, the air permitting process may take 2 years or more. Construction activity normally does not begin until after the air permit is received. The construction duration is estimated at 18 to 24 months. Consequently, the plant may not be operational for 3 ½ years or more after submitting an air permit application.

Emission Restrictions To avoid a PSD review, annual emissions from the WCPP must not exceed PSD thresholds. Refer to Appendix C for annual emission projections for this option.

The baseline design for this option includes a mechanical collector for removing particulate. Without additional emission control equipment, full load operation will be limited to approximately 1400 hours per year for NOX, 2500 hours per year for CO, 750 hours per year for PM, and 500 hours per year for PM10. A solid fuel Hurst boiler does not lend itself well to limited hours of operation.

Alternatively, an SCR and a dry ESP could be added on the backend of each boiler to reduce NOX, PM, and PM10 to below PSD thresholds. A CO catalyst could be added to reduce CO emissions, but likely not enough to stay out of PSD review. Cost associated with this additional emission control equipment is included in the sub-section that follows.

VOCs and SO2 emissions are projected not to exceed respective annual PSD thresholds.

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Tables B-21, B-22, and B-23 in Appendix B. A summary of the results follows.

de:mkc:21212\Admin_Asst\Aug-2009\Section9.doc 9-2 Stanley Consultants

Page 40: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section9.doc 9-3 Stanley Consultants

Baseline Equipment Capital Costs – Baseline equipment is defined as equipment with standard emission control provisions. The estimated baseline equipment capital cost for this option is $27,030,011.

Building Capital Cost – Cost is based on estimated square footage requirements to house the equipment included in this option. The estimated building capital cost for this option is $8,572,901.

Emission Control Equipment Capital Cost – Costs associated with the addition of emission control equipment to allow year-round (8760 hrs) full load operation. Even with this equipment, this option will likely require PSD review on CO emissions. The estimated emission control equipment capital cost for this option is $7,684,806.

Other Considerations Solid fuel source with potential for long-term supply contract needs to be identified.

This option offers up to 120 kpph of 165 psig steam production for the campus, but no electrical generation to serve as backup power for research and hospital facilities. The steam production capacity is short of the 200 kpph desired by the University. Solid fuel handling and storage, as well as, ash removal is required for this option. In addition, this option will likely require a PSD review of CO which could result in significant delay of the project. Consequently, this option is not recommended as a viable option for the University.

Page 41: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine
Page 42: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 10

Boiler Option 3 900 psig Hurst Boiler

Generating Capacity and Fuel Consumption This option will use solid biomass fuel to produce approximately 120 kpph of 900 psig, saturated steam for West Campus use.

Assuming a solid fuel heating value of 3800 btu/lb (HHV, as received), the estimated fuel consumption rate for this option is approximately 23 tons per hour.

Description The following equipment will be included with this option:

• Two (2) – 60 kpph, 900 psig Hurst boilers.

• One (1) – 30,000 gallon condensate storage tank.

• Four (4) – Biomass storage silos and associated material handling equipment.

• One (1) – Ash storage silo and associated material handling equipment.

• One (1) – Truck loading/unloading building.

• Refer to Table B-24 in Appendix B for a complete list of equipment.

The Hurst boiler will be a prefabricated hybrid type boiler that uses stoker technology to burn biomass. The boiler proposed for this option has a water tube lower section and a packaged water tube boiler upper section capable of achieving higher steam pressures.

A lined carbon steel condensate storage tank will be used to store condensate returned from campus. The tank will store approximately two hours of condensate at full load.

de:mkc:21212\Admin_Asst\Aug-2009\Section10.doc 10-1 Stanley Consultants

Page 43: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

The biomass storage silos will have a combined storage capacity of 24 hours, to support full load operation on biomass for the two 60 kpph boilers.

A single-bay truck loading and unloading building will be arranged so that solid fuel can be unloaded from either a walking-floor or bottom-dump truck.

This option also includes condensate, feedwater, compressed air, and service water equipment to support the operation of the Hurst boilers.

Arrangement A floor plan for this option is shown on Drawing X523 included herein. All equipment will be located within the WCPP building. Refer to Site and Building Overview for building and facility description.

Schedule The Hurst boiler delivery lead-time is 8 months after receipt of order. However, the schedule for this option will be driven by the air permit. Based on annual emission projections for this option, it is likely that a PSD review will be required for CO. Consequently, the air permitting process may take 2 years or more. Construction activity normally does not begin until after the air permit is received. The construction duration is estimated at 18 to 24 months. Consequently, the plant may not be operational for 3 ½ years or more after submitting an air permit application.

To avoid a PSD review, annual emissions from the WCPP must not exceed PSD thresholds. Refer to Appendix C for annual emission projections for this option.

The baseline design for this option includes a mechanical collector for removing particulate. Without additional emission control equipment, full load operation will be limited to approximately 1200 hours per year for NOX, 2150 hours per year for CO, 650 hours per year for PM, and 400 hours per year for PM10. A solid fuel Hurst boiler does not lend itself well to limited hours of operation.

Alternatively, an SCR and a dry ESP could be added on the backend of each boiler to reduce NOx, PM, and PM10 to below PSD thresholds. A CO catalyst could be added to reduce CO emissions, but likely not enough to stay out of PSD review. Cost associated with this additional emission control equipment is included in the sub-section that follows.

VOCs and SO2 emissions are projected not to exceed respective annual PSD thresholds.

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Tables B-24, B-25, and B-26 in Appendix B. A summary of the results follows.

Baseline Equipment Capital Costs – Baseline equipment is defined as equipment with standard emission control provisions. The estimated baseline equipment capital cost for this option is $33,232,090.

de:mkc:21212\Admin_Asst\Aug-2009\Section10.doc 10-2 Stanley Consultants

Page 44: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section10.doc 10-3 Stanley Consultants

Building Capital Cost – Cost is based on estimated square footage requirements to house the equipment included in this option. The estimated building capital cost for this option is $8,699,852.

Emission Control Equipment Capital Cost – Costs associated with the addition of emission control equipment to allow year-round (8760 hrs) full load operation. Even with this equipment, this option will likely require PSD review on CO emissions. The estimated emission control equipment capital cost for this option is $7,974,192.

Other Considerations Solid fuel source with potential for long-term supply contract needs to be identified.

This option offers up to 120 kpph of 900 psig steam production. It is not complete without the addition of a steam turbine (backpressure or condensing) to generate electricity with the 900 psig steam. Solid fuel handling and storage, as well as, ash removal is required for this option. In addition, this option will likely require a PSD review of CO which could result in significant delay of the project. Consequently, this option is not recommended as a viable option for the University.

Page 45: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine
Page 46: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 11

Boiler Option 4 900 psig CFB Boiler

Generating Capacity and Fuel Consumption This option will use solid biomass fuel to produce approximately 120 kpph of 900 psig, saturated steam for West Campus use.

Assuming a solid fuel heating value of 3800 btu/lb (HHV, as received), the estimated fuel consumption rate for this option is approximately 22 tons per hour.

Description The following equipment will be included with this option:

• One (1) – 120 kpph, 900 psig circulating fluidized bed boiler.

• One (1) – 30,000 gallon condensate storage tank.

• Four (4) – Biomass storage silos and associated material handling equipment.

• One (1) – Ash storage silo and associated material handling equipment.

• One (1) – Truck loading/unloading building.

• Refer to Table B-27 in Appendix B for a complete list of equipment.

The circulating fluidized bed (CFB) boiler will be field erected.

A lined carbon steel condensate storage tank will be used to store condensate returned from campus. The tank will store approximately two hours of condensate at full load.

The biomass storage silos will have a combined storage capacity of 24 hours, to support full load operation on biomass for the CFB.

de:mkc:21212\Admin_Asst\Aug-2009\Section11.doc 11-1 Stanley Consultants

Page 47: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A single-bay truck loading and unloading building will be arranged so that solid fuel can be unloaded from either a walking-floor or bottom-dump truck.

This option also includes condensate, feedwater, compressed air, and service water equipment to support the operation of the CFB.

Arrangement A floor plan for this option is shown on Drawing X524 included herein. All equipment will be located within the WCPP building. Refer to Site and Building Overview for building and facility description.

Schedule The construction duration for a CFB boiler is approximately 2 years. The schedule, however, also needs to account for obtaining the air permit. Based on annual emission projections for this option, it is likely that a PSD review will be required for at least CO. Consequently, the air permitting process may take two years or more. Construction activity normally does not begin until after the air permit is received. Consequently, the plant may not be operational for four years or more after submitting an air permit application

Emission Restrictions To avoid a PSD review, annual emissions from the WCPP must not exceed PSD thresholds. Refer to Appendix C for annual emission projections for this option.

The baseline design for this option includes a mechanical collector for removing particulate. Without additional emission control equipment, full load operation will be limited to approximately 1800 hours per year for NOX, 7750 hours per year for CO, 700 hours per year for PM, and 450 hours per year for PM10. A CFB unit does not lend itself well to limited hours of operation.

Alternatively, an SCR and a dry ESP could be added on the backend of each boiler to reduce NOX, PM, and PM10 to below PSD thresholds. A CO catalyst could be added to reduce CO emissions, but likely not enough to stay out of PSD review. Cost associated with this additional emission control equipment is included in the sub-section that follows.

VOCs and SO2 emissions are projected not to exceed respective annual PSD thresholds.

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Tables B-27, B-28, and B-29 in Appendix B. A summary of the results follows.

Baseline Equipment Capital Costs – Baseline equipment is defined as equipment with standard emission control provisions. The estimated baseline equipment capital cost for this option is $44,915,908.

de:mkc:21212\Admin_Asst\Aug-2009\Section11.doc 11-2 Stanley Consultants

Page 48: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section11.doc 11-3 Stanley Consultants

Building Capital Cost – Cost is based on estimated square footage requirements to house the equipment included in this option. The estimated building capital cost for this option is $6,296,424.

Emission Control Equipment Capital Cost – Costs associated with the addition of emission control equipment to allow year-round (8760 hrs) full load operation. Even with this equipment, this option will likely require PSD review on CO emissions. The estimated emission control equipment capital cost for this option is $7,556,190.

Other Considerations Solid fuel source with potential for long-term supply contract needs to be identified.

This option offers up to 120 kpph of 900 psig steam production. It is not complete without the addition of a steam turbine (backpressure or condensing) to generate electricity with the 900 psig steam. Solid fuel handling and storage, as well as, ash removal is required for this option. This option will likely require a PSD review of CO which could result in significant delay of the project. In addition, this option is the most capital intense. Consequently, this option is not recommended as a viable option for the University

Page 49: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine
Page 50: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 12

ST Option 1 4 MW Backpressure Steam Turbine

Generating Capacity This option will produce approximately 4 MW of electrical generation for West Campus use.

Description The following equipment will be included with this option:

• One (1) – 4 MW non-condensing back pressure steam turbine.

• Refer to Table B-30 in Appendix B for a complete list of equipment.

The non-condensing back pressure steam turbine will take in up to 120 kpph of 900 psig/ 750F of steam to generate electrical power. Steam leaving the steam turbine will be sent to the 155 psig campus distribution system. A steam pressure reducing station is included for bypassing the steam turbine if it is out of service.

Arrangement A floor plan for this option is shown on Drawing X531 included herein. All equipment will be located within the WCPP building. Refer to Site and Building Overview for building and facility description.

Schedule The steam turbine delivery lead-time is 15 months from receipt of order. The equipment associate with this option can be operational within 24 months after beginning design.

de:mkc:21212\Admin_Asst\Aug-2009\Section12.doc 12-1 Stanley Consultants

Page 51: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section12.doc 12-2 Stanley Consultants

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Tables B-30 and B-31 in Appendix B. A summary of the results follows.

Equipment Capital Costs – The estimated baseline equipment capital cost for this option is $4,480,925.

Building Capital Cost – Cost is based on estimated square footage requirements to house the equipment included in this option. The estimated building capital cost for this option is $297,711.

Other Considerations This option offers approximately 4 MW of electrical generation to serve as backup power for research and hospital facilities. It is not a complete option as it does not include costs for steam generation and auxiliaries.

Page 52: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine
Page 53: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 13

ST Option 2 14 MW Extraction/Condensing Steam Turbine

Generating Capacity This option will produce approximately 14 MW of electrical generation for West Campus use.

Description The following equipment will be included with this option:

• One (1) – 14 MW extraction/condensing steam turbine.

• One (1) – Mechanical draft cooling tower

• Refer to Table B-32 in Appendix B for a complete list of equipment.

The extraction/condensing steam turbine will take in up to 120 kpph of 900 psig/ 750F of steam to generate electrical power (assuming no extraction flow). Extraction flow from the turbine will be limited to approximately 100 kpph to ensure enough steam passes through the low-pressure section of the steam turbine for maintaining proper cooling. The extraction steam will be sent to the 155 psig campus distribution system. Steam turbine generator output will need to be kept above 3000 KW in order to ensure proper operation of the voltage control equipment. A steam pressure reducing station will be included for bypassing the steam turbine if it is out of service.

Arrangement A floor plan for this option is shown on Drawing X532 included herein. All equipment will be located within the WCPP building. Refer to Site and Building Overview for building and facility description.

de:mkc:21212\Admin_Asst\Aug-2009\Section13.doc 13-1 Stanley Consultants

Page 54: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section13.doc 13-2 Stanley Consultants

Schedule The steam turbine delivery lead-time is 15 months from receipt of order. The equipment associate with this option can be operational within 24 months after beginning design.

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Tables B-32 and B-33 in Appendix B. A summary of the results follows.

Equipment Capital Costs – The estimated baseline equipment capital cost for this option is $13,809,911.

Building Capital Cost – Cost is based on estimated square footage requirements to house the equipment included in this option. The estimated building capital cost for this option is $572,578.

Other Considerations This option offers approximately 14 MW of electrical generation to serve as backup power for research and hospital facilities. It is not a complete option as it does not include costs for steam generation and auxiliaries. In addition, this option requires a condenser, cooling tower and associated cooling water chemical treatment system for condensing steam exhausted from the steam turbine.

Page 55: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine
Page 56: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 14

Water Treatment Option 1 170 psig Boiler Cycles

General Boiler options that generate steam at 170 psig have relatively low water quality requirements as compared to boiler cycles above 600 psig. This option identifies the recommended water treatment equipment and associated costs for 170 psig boiler cycles.

Description The following equipment will be included with this option:

• Sodium regenerated condensate polishing system

• Sodium zeolite softening system

Condensate returned from the campus distribution system will be stored in a condensate storage tank at the West Campus Power Plant (WCPP). During normal operation, the condensate polishing system will be used to treat condensate from the storage tank. The treated water will then be used as feedwater to the boiler cycle. The condensate polishing system will be designed to treat 100% of the flow requirements to the boiler cycle and will include a sodium regeneration system.

When condensate is not available, sodium zeolite softening will be used to treat potable water supplied from an existing campus water distribution pipe located near the Substation U. Based on discussions with the University of Iowa, at least 50 gpm of demineralized make-up water flow could be made available for the WCPP during a campus black-out event. Consequently, the make-up water system for the WCPP will be designed to treat 190 gpm of the 240 gpm make-up flow requirement.

de:mkc:21212\Admin_Asst\Aug-2009\Section14.doc 14-1 Stanley Consultants

Page 57: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section14.doc 14-2 Stanley Consultants

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Table B-34 in Appendix B.

The estimated capital cost for this option is $459,695.

Page 58: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 15

Water Treatment Option 2 Boiler Cycles above 600 psig

General Boiler options that generate steam above 600 psig require high water. This option identifies the recommended water treatment equipment and associated costs for boiler cycles above 600 psig.

Description The following equipment will be included with this option:

• Amine regenerated condensate polishing system

• Sodium zeolite softening system

• Two-pass reverse osmosis (RO) system with a mixed bed.

Condensate returned from the campus distribution system will be stored in a condensate storage tank at the West Campus Power Plant (WCPP). During normal operation, the condensate polishing system will be used to treat condensate from the storage tank. The treated water will then be used as feedwater to the boiler cycle. The condensate polishing system will be designed to treat 100% of the flow requirements to the boiler cycle and will include an amine regeneration system.

When condensate is not available, sodium zeolite softening followed by a two-pass RO system with a mixed bed will be used to treat potable water supplied from an existing campus water distribution pipe located near the Substation U. Based on discussions with the University of Iowa, at least 50 gpm of demineralized make-up water flow could be made available for the WCPP during a campus black-out event. Consequently, the make-up water system for the WCPP will be designed to treat 190 gpm of the 240 gpm make-up flow requirement.

de:mkc:21212\Admin_Asst\Aug-2009\Section15.doc 15-1 Stanley Consultants

Page 59: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section15.doc 15-2 Stanley Consultants

Conceptual Capital Costs Conceptual capital cost estimates were developed based on past similar projects, cost estimating references, and budgetary pricing from vendors. Cost estimate details for this option are included in Table B-35 in Appendix B.

The estimated capital cost for this option is $2,980,614.

Page 60: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 16

Fuel Supply

Natural Gas Pipeline Options MidAmerican Energy proposed three options for supplying gas to the WCPP. For all options, MidAmerican Energy will design and install the gas pipeline and associated regulating station and sell them to the University of Iowa. Gas compression, if required, has not been included with MidAmerican’s proposal.

Natural Gas Supply Option 1 will entail installing approximately 23 miles of dedicated 10 inch transmission pipeline from Ainsworth, Iowa. Refer to Figure 16-1 for conceptual routing. The pipeline will deliver 800 Mcfh of natural gas at 540 psig. This option requires approval from the Iowa Utilities Board, which is anticipated to take 18 to 36 months after receipt of application. The application is anticipated to take 60 to 90 days to prepare. The estimated capital cost for this option is $28,061,080, including 30% gross up costs. This option appears to be cost prohibitive.

Natural Gas Supply Option 2 will entail installing approximately 9000 feet of 8 inch transmission pipeline from a tap near 10th Avenue and 2nd Street in Iowa City. Refer to Figure 16-2 for conceptual routing. The pipeline will typically operate between 300 and 350 psig and deliver up to 667 Mcfh. This option requires approval from the Iowa Utilities Board, which is anticipated to take 18 to 36 months after receipt of application. The application is anticipated to take 60 to 90 days to prepare. The estimated capital cost for this option is $3,760,900, including 30% gross up costs.

Natural Gas Supply Option 3, also referred to as the “Melrose pipeline”, will entail installing approximately 2500 feet of 8 inch transmission pipeline from a tap near the Athletic Club which is located east of the entrance to Finkbine Commuter Lot. Refer to Figure 16-3 for conceptual routing. The pipeline will typically operate between 85 and 90 psig and deliver up to 400 Mcfh. This option does not require approval from the Iowa Utilities Board. The estimated capital cost for this option is $1,107,600, including 30% gross up costs.

de:mkc:21212\Admin_Asst\Aug-2009\Section16.doc 16-1 Stanley Consultants

Page 61: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Natural Gas Supply Option 1

Figure 16-1

Natural Gas Supply Option 2

Figure 16-2

de:mkc:21212\Admin_Asst\Aug-2009\Section16.doc 16-2 Stanley Consultants

Page 62: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Natural Gas Supply Option 3

Figure 16-3

Solid Biomass Fuel The University of Iowa is currently investigating construction and demolition material, wood chips, Cedar River paper sludge, oat hulls, corn cobs, corn stover, corn kernels, and switchgrass as potential solid biomass fuel sources. Details, including availability and cost, are to be provided when completed.

Solid fuel will likely be delivered to site by truck. Trucks will access the WCPP from Hawkins Drive via Finkbine Commuter Lot Drive. The service road around the south side of the plant will prevent truck traffic from disrupting commuter access or Cambus service.

de:mkc:21212\Admin_Asst\Aug-2009\Section16.doc 16-3 Stanley Consultants

Page 63: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 17

Mechanical Distribution System

Description A steam supply pipeline and condensate return pipeline will be installed underground between the West Campus Power Plant (WCPP) and the basement in the West Campus Chilled Water Plant (WCCWP). The pressure testable pre-engineered pipelines will be direct-buried with vaults with expansion joints for thermal growth. Slip-type expansion joints are included for the expansion joints. The steam and condensate pipes will be installed adjacent to each other in a common trench. Each pipeline will be approximately 3300 feet in length.

The 12 inch carbon steel steam supply pipeline will be capable of transporting 200 kpph of 155 psig saturated steam for operating steam turbine driven chillers or for campus heating.

The 6 inch stainless steel condensate return pipeline will transport campus condensate collected and pumped from a new condensate return pumping station located in the basement of the WCCWP. The condensate return system will be capable of transferring 400 gpm of 200F condensate.

Routing The conceptual routing for the steam supply and condensate return pipelines is shown in Appendix A. The pipelines parallel each other and run along the east side of Finkbine Commuter Drive to Hawkins Drive; and along the south side of Hawkins Drive to the WCCWP. The pipelines cross the railroad tracks and several driveways. Space will be allocated adjacent to the pipelines for a future 12 inch steam pipeline and 6 inch condensate pipeline. Vaults will be sized for future build-out.

de:mkc:21212\Admin_Asst\Aug-2009\Section17.doc 17-1 Stanley Consultants

Page 64: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section17.doc 17-2 Stanley Consultants

Conceptual Cost Estimate Conceptual capital cost estimate for the mechanical distribution system were developed based on past similar projects and cost estimating references. Cost estimate details are included in Table B-39 in Appendix B.

The estimated capital cost for the mechanical distribution system is $7,065,055.

Other Considerations With regard to constructability, permits for boring and jacking will be necessary to cross the railroad tracks. Traffic impacts during construction along Hawkins Drive are expected to be minimal.

Page 65: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 18

Sub U Upgrades

Description The proposed location for electric tie-in from the West Campus Power Plant (WCPP) is Substation U. Substation U is connected to MidAmerican Energy’s 161 kV transmission system. Based on preliminary evaluation, connecting the 33 MW combustion turbine will not require substation upgrades.

There are, however, two potential concerns with installing 40-megawatts of new generation and interconnecting it into the existing Substation U. These limitations are the maximum current carrying capacity of the Substation U breakers and bus, and terminating all the cables on the existing breaker.

The available 15kV circuit breaker in Substation U, intended for interconnection to the new generation station, has a continuous rating of 2000A. At 13.8kV, 2000A equates to approximately 47.8MVA of capacity. Ultimately, the limitations at the substation that would restrict the capacity of the new generation station, is the 2,000A rating. The new generation is limited to a combination of 2,000A of real and reactive power. Depending on the VAR support required from the generator to provide adequate voltage support to the campus, the generator may or may not be megawatt limited. As long as the combination of real and reactive amps do not exceed the 2,000A limit of Substation U modifications are not required. Other potential modifications that have not been evaluated are if adequate room exists on the 2,000A breaker cable terminations. Because the power is being transmitted underground through a duct bank system, the cables are larger in size and quantity then would typically be expected for a 2,000A breaker. This larger number and size of cables is due to the thermal limit of the cable insulation and special considerations must be taken to not overheat the cables when at their deepest point in the duct bank system. Breaker cable terminal pad upgrades are relatively easy and can be done at relatively low cost.

de:mkc:21212\Admin_Asst\Aug-2009\Section18.doc 18-1 Stanley Consultants

Page 66: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 19

13.8 kV Electrical Duct Bank

Description The generation side at the West Campus Power Plant (WCPP) will produce electric power at 13.8kV on a low impedance grounded system. The existing underground campus electric distribution system operates at 13.8kV on a solidly grounded system. Because the systems are grounded differently, it is necessary to include an isolation transformer to segregate the generator grounding system from the distribution grounding system. The isolation transformer will be located at the WCPP with the generator breaker. Power on the distribution side of the transformer will be transmitted approximately 1000 feet to interconnect at Substation U.

Two concrete duct banks will be installed underground between the WCPP and a new manhole behind the control buildings at Substation U. One duct bank will house supply cables from the WCPP, and the second duct bank will be available for a future plant of the same size. The duct banks will run parallel with a minimum spacing of 72 inches.

Each duct bank will contain 24 - 6 inch conduits for electrical distribution cables and 4 - 2 inch conduits for communication cables. The distribution circuit will consist of 5 - 1000 kcmil conductors per phase and 3 - 500 kcmil neutral conductors, with 1 conductor installed per conduit. Six spare 6 inch conduits will remain in each duct bank.

Routing The conceptual 13.8kV electrical duct bank routing is shown in Appendix A. Two duct banks (one with cables and one sized for future plant expansion) will parallel each other and run along the east side of Finkbine Commuter Drive. The duct bank will turn and run parallel to the railroad tracks before crossing under and entering a new manhole behind the control buildings at Substation U. Several manhole pits will be located throughout the routing to accommodate cable installation.

de:mkc:21212\Admin_Asst\Aug-2009\Section19.doc 19-1 Stanley Consultants

Page 67: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section19.doc 19-2 Stanley Consultants

Conceptual Cost Estimate Conceptual capital cost estimate for the conceptual 13.8kV electrical duct banks were developed based on past similar projects and cost estimating references. Cost estimate details are included in Table B-40 in Appendix B.

The estimated capital cost for the two 13.8kV electrical duct banks as described above, is $2,976,143.

Other Considerations With regard to constructability, permits for boring and jacking will be necessary to cross the railroad tracks.

Page 68: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 20

Water Supply and Discharge

Description An underground potable water supply pipeline will be direct-buried between the West Campus Power Plant (WCPP) and tie-in on an existing campus water distribution pipe located near Substation U. The 6 inch ductile iron pipeline will supply water to the plant to be used for cycle make-up, service water, fire water, and potable water services. The pipeline will be approximately 800 feet in length.

An underground discharge water pipeline will be direct-buried between the West Campus Power Plant (WCPP) and tie-in on an existing city sanitary sewer pipeline located near the Athletic Club on Melrose Avenue. An oil/water separator will be located at the WCPP to ensure plant discharge effluent is free of oil and grease prior to leaving the plant premises. The 6 inch ductile iron pipeline will transport plant discharge effluent into the City’s sanitary sewer system. The pipeline will be approximately 2500 feet in length.

Routing The conceptual routing for the potable water pipeline and plant discharge effluent pipeline is shown in Appendix A.

The potable water supply pipeline will parallel the steam and condensate pipelines along the east side of Finkbine Commuter Drive before tying into an existing campus potable water distribution pipeline. The pipeline will cross the railroad tracks and a campus sidewalk.

The plant discharge effluent pipeline is will parallel the driveway between Finkbine Commuter Lot and Melrose Avenue.

de:mkc:21212\Admin_Asst\Aug-2009\Section20.doc 20-1 Stanley Consultants

Page 69: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

de:mkc:21212\Admin_Asst\Aug-2009\Section20.doc 20-2 Stanley Consultants

Conceptual Cost Estimate Conceptual capital cost estimate for the water supply and discharge pipelines were developed based on past similar projects and cost estimating references. Cost estimate details are included in Table B-41 in Appendix B.

The estimated capital cost for the water supply and discharge pipelines is $480,375.

Other Considerations With regard to constructability, permits for boring and jacking will be necessary to cross the railroad tracks.

Page 70: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Section 21

Emissions

Non-PSD Permit Strategies It is estimated that a PSD review for air emissions could extend the project schedule by 2 years or more, depending on which pollutant(s) is being reviewed. The University of Iowa has expressed concern that the longer schedule could result in timing issues related to the WCPP’s ability to serve as a backup power source for the Iowa Institute for Biomedical Discovery (IIBD) project currently scheduled to go operational in the fourth quarter of 2013.

To avoid a PSD review, annual emissions from the WCPP must not exceed PSD thresholds. This can be accomplished either by limiting the number of hours of operation or by including additional emission control equipment.

Annual emissions for the various options were projected to determine if PSD pollutant threshold limits would be exceeded for continuous full load operation. Emission rates used were based on vendor supplied information or emission factors from EPA’s AP-42 tables. Where a pollutant exceeded the PSD threshold, an annual operating limit was calculated. As an alternate approach, emission control equipment was identified for reducing emissions below PSD thresholds. Emission control equipment capital costs were then estimated and are included in Sections 3 through 11 of this report.

Results from the emission projection analysis are summarized in Appendix C.

de:mkc:21212\Admin_Asst\Aug-2009\Section21.doc 21-1 Stanley Consultants

Page 71: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Appendix A

Site Plan and Utilities Drawing

de:mkc:21212\Admin_Asst\Aug-2009\AppA.doc A-1 Stanley Consultants

Page 72: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine
Page 73: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Appendix B

Cost Estimate Spreadsheets

de:mkc:21212\Admin_Asst\Aug-2009\AppB.doc B-1 Stanley Consultants

Page 74: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-1SUMMARY TABLE

OptionsEstimated

costs1 Site Preparation $1,961,9492 CT Option 1 $38,805,9223 Building $3,983,8684 Emission Control Equipment $4,939,6585 CT Option 2 $32,984,3646 Building $2,395,1057 Emission Control Equipment $5,164,7368 CT Option 3 $37,458,1059 Building $2,395,105

10 Emission Control Equipment $5,606,85411 CT Option 4 $46,175,81812 Building $6,878,33413 Emission Control Equipment $2,893,86014 CT Option 5 $51,974,92715 Building $5,319,75616 Emission Control Equipment $6,631,76317 Boiler Option 1 $5,281,02918 Building $1,293,80519 Emission Control Equipment $020 Boiler Option 2 $27,030,01121 Building $8,572,90122 Emission Control Equipment $7,684,80623 Boiler Option 3 $33,232,09024 Building $8,699,85225 Emission Control Equipment $7,974,19226 Boiler Option 4 $44,915,90827 Building $6,296,42428 Emission Control Equipment $7,556,19029 Steam Turbine Option 1 $4,480,92530 Building $297,71131 Steam Turbine Option 2 $13,809,91132 Building $572,57833 Water Treatment Option 1 (155 psig) $459,69534 Water Treatment Option 2 (900 psig) $2,980,61435 Natural Gas Pipeline Option 1 $28,061,80036 Natural Gas Pipeline Option 2 $3,760,90037 Natural Gas Pipeline Option 3 $1,107,60038 Mechanical Distribution $7,065,05539 13.8kV Electrical ductbank $2,976,14340 Water Supply and Discharge Pipelines $480,37541 Sub U Upgrades $0

NOTES:1 Above is a summary of the results from the conceptual capital cost estimate ("estimate") tables that follow.2

3

4

5

6

7 Costs for site specific noise abatement requirements have not been accounted for in any of the estimates that follow.8 For visual impact considerations, building cost was assumed to be $245 per square foot for all options.

Costs associated with relocating displaced Finkbine Commuter Lot parking to existing Grant Field have not been accounted for in any of the estimates that follow.

Costs associated with minimizing the building profile by locating major equipment in a basement have not been accounted for in any of the estimates that follow.

Costs associated with a common stack for the site (single shell, multiple flue) and associated ductwork have not been accounted for in any of the estimates that follow.

Costs for special structural provisions related to soil conditions at the proposed plant site have not been accounted for in any of the estimates that follow.

Costs for disposal of hazardous materials encountered during excavation, if any, have not been accounted for in any of the estimates that follow.

1 of 19

Page 75: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-2SITE PREPARATION

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $0234 Balance-Of-Plant (BOP) Equipment $1,404,1505 Finkbine parking lot demolition $695,750 1 $695,750 incl. $695,7506 Grant field parking addition modifications $708,400 1 $708,400 incl. $708,40078 Equipment Subtotal $1,404,1509

10 Major Equipment Installation Contract: (10% of Major Equipment cost) $011 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $210,62312 Direct Cost Subtotal $1,614,7731314 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $137,25615 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $161,47716 Procure, Design, and Construct: (3% of Direct Cost) $48,44317 Total Cost $1,961,949

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 2 of 19

Page 76: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-3CT OPTION 1: BASELINE EQUIPMENT

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $19,706,2502 Solar Mars 100 (10.7 MW at ISO) $5,650,000 2 $11,300,000 $2,260,000 $13,560,0003 Inlet air chilling system $1,385,000 2 $2,770,000 $554,000 $3,324,0004 Simple cycle stack and silencer $75,000 2 $150,000 $30,000 $180,0005 HRSG (100 kpph, 170 psia) with diverter damper $1,815,000 1 $1,815,000 $635,250 $2,450,2506 CEMS $160,000 1 $160,000 $32,000 $192,00078 Balance-Of-Plant (BOP) Equipment $8,772,0009 Black start gas-fired generator (500 kW) $420,000 1 $420,000 $84,000 $504,000

10 Gas compressor $390,000 3 $1,170,000 $234,000 $1,404,00011 Gas conditioning equipment $30,000 2 $60,000 $12,000 $72,00012 Condensate storage tank $65,000 1 $65,000 $13,000 $78,00013 Condensate pump (200 gpm, SS, horizontal) $55,000 2 $110,000 $22,000 $132,00014 Deaerator $65,000 1 $65,000 $13,000 $78,00015 Boiler feedwater pump (200 gpm/155 psig) $165,000 3 $495,000 $99,000 $594,00016 Steam line and boiler warming system $50,000 1 $50,000 $10,000 $60,00017 Miscellaneous (compressed air, service water, fire protection) $320,000 1 $320,000 Incl. $320,00018 Transformers $600,000 2 $1,200,000 $240,000 $1,440,00019 Piping $1,570,00020 $1,820,00021 I & C $700,0002223 Equipment Subtotal $28,478,2502425 Major Equipment Installation Contract: (10% of Major Equipment cost) $1,970,62526 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $2,301,11327 Direct Cost Subtotal $32,749,9882829 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $2,783,74930 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $2,289,68631 Procure, Design, and Construct: (3% of Direct Cost) $982,50032 Total Cost $38,805,922

TABLE B-4CT OPTION 1: BUILDING

Unit Price Total

Equipment

Electrical

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 3 of 19

DescriptionUnit Price (Materials) Total Units

Equipment Price Labor Price Total Installed

40 Building - prefabricated metal 2,958,904 1 $2,958,904 Incl. $2,958,90441 Mechanical 320,000 1 $320,000 Incl. $320,00042 Direct Cost Subtotal $3,278,9044344 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $278,70745 Contingency: (10% of Direct Cost) $327,89046 Procure, Design, and Construct: (3% of Direct Cost) $98,36747 Total Cost $3,983,868

TABLE B-5CT OPTION 1: EMISSION CONTROL EQUIPMENT

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed50 Major Equipment $3,687,00051 SCR and CO catalyst for simple cycle 1,300,000 1 $1,300,000 $455,000 $1,755,00052 SCR and CO catalyst for HRSG 710,000 1 $710,000 $142,000 $852,00053 Urea conversion system 900,000 1 $900,000 $180,000 $1,080,0005455 Major Equipment Installation Contract: (10% of Major Equipment cost) $368,70056 Undeveloped Design Details: (5% of Major Equipment cost) $184,35057 Direct Cost Subtotal $4,240,0505859 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $360,40460 Contingency: (5% of Direct Cost) $212,00361 Procure, Design, and Construct: (3% of Direct Cost) $127,20262 Total Cost $4,939,658

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 3 of 19

Page 77: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-6CT OPTION 2: BASELINE EQUIPMENT

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $18,672,0002 GE LM2500 (22.8 MW at ISO) $13,230,000 1 $13,230,000 $2,646,000 $15,876,0003 Inlet air chilling system $1,810,000 1 $1,810,000 $362,000 $2,172,0004 Simple cycle stack and silencer $320,000 1 $320,000 $112,000 $432,0005 CEMS $160,000 1 $160,000 $32,000 $192,00067 Balance-Of-Plant (BOP) Equipment $5,602,8008 Black start gas-fired generator (1000 kW) $475,000 1 $475,000 $95,000 $570,0009 Gas compressor $500,000 2 $1,000,000 $200,000 $1,200,000

10 Gas conditioning equipment $44,000 1 $44,000 $8,800 $52,80016 Miscellaneous (compressed air, service water, fire protection) $250,000 1 $250,000 Incl. $250,00017 Transformers $1,050,000 1 $1,050,000 $210,000 $1,260,00018 Piping $440,00019 Electrical $1,400,00020 I & C $430,0002122 Equipment Subtotal $24,274,8002324 Major Equipment Installation Contract: (10% of Major Equipment cost) $1,867,20025 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $1,774,02026 Direct Cost Subtotal $27,916,0202728 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $2,372,86229 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $1,858,00230 Procure, Design, and Construct: (3% of Direct Cost) $837,48131 Total Cost $32,984,364

TABLE B-7CT OPTION 2: BUILDING

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed40 Building - prefabricated metal 1,781,280 1 $1,781,280 Incl. $1,781,28041 Mechanical 190,000 1 $190,000 Incl. $190,00042 Direct Cost Subtotal $1,971,280

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 4 of 19

42 Direct Cost Subtotal $1,971,2804344 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $167,55945 Contingency: (10% of Direct Cost) $197,12846 Procure, Design, and Construct: (3% of Direct Cost) $59,13847 Total Cost $2,395,105

TABLE B-8CT OPTION 2: EMISSION CONTROL EQUIPMENT

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed50 Major Equipment $3,855,00051 SCR and CO catalyst for simple cycle 2,100,000 1 $2,100,000 $735,000 $2,835,00052 Urea conversion system 850,000 1 $850,000 $170,000 $1,020,0005354 Major Equipment Installation Contract: (10% of Major Equipment cost) $385,50055 Undeveloped Design Details: (5% of Major Equipment cost) $192,75056 Direct Cost Subtotal $4,433,2505758 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $376,82659 Contingency: (5% of Direct Cost) $221,66360 Procure, Design, and Construct: (3% of Direct Cost) $132,99861 Total Cost $5,164,736

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 4 of 19

Page 78: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-9CT OPTION 3: BASELINE EQUIPMENT

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $21,359,1782 GE LM2500+G4 (32.6 MW at ISO) $15,139,315 1 $15,139,315 $3,027,863 $18,167,1783 Inlet air chilling system $2,140,000 1 $2,140,000 $428,000 $2,568,0004 Simple cycle stack and silencer $360,000 1 $360,000 $72,000 $432,0005 CEMS $160,000 1 $160,000 $32,000 $192,00067 Balance-Of-Plant (BOP) Equipment $6,213,6008 Black start gas-fired generator (1000 kW) $475,000 1 $475,000 $95,000 $570,0009 Gas compressor $590,000 2 $1,180,000 $236,000 $1,416,000

10 Gas conditioning equipment $48,000 1 $48,000 $9,600 $57,60016 Miscellaneous (compressed air, service water, fire protection) $230,000 1 $230,000 Incl. $230,00017 Transformers $1,250,000 1 $1,250,000 $250,000 $1,500,00018 Piping $440,00019 Electrical $1,570,00020 I & C $430,0002122 Equipment Subtotal $27,572,7782324 Major Equipment Installation Contract: (10% of Major Equipment cost) $2,135,91825 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $1,999,99926 Direct Cost Subtotal $31,708,6952728 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $2,695,23929 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $2,102,91130 Procure, Design, and Construct: (3% of Direct Cost) $951,26131 Total Cost $37,458,105

TABLE B-10CT OPTION 3: BUILDING

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed40 Building - prefabricated metal 1,781,280 1 $1,781,280 Incl. $1,781,28041 Mechanical 190,000 1 $190,000 Incl. $190,00042 Direct Cost Subtotal $1,971,280

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 5 of 19

42 Direct Cost Subtotal $1,971,2804344 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $167,55945 Contingency: (10% of Direct Cost) $197,12846 Procure, Design, and Construct: (3% of Direct Cost) $59,13847 Total Cost $2,395,105

TABLE B-11CT OPTION 3: EMISSION CONTROL EQUIPMENT

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed50 Major Equipment $4,185,00051 SCR and CO catalyst for simple cycle 2,300,000 1 $2,300,000 $805,000 $3,105,00052 Urea conversion system 900,000 1 $900,000 $180,000 $1,080,0005354 Major Equipment Installation Contract: (10% of Major Equipment cost) $418,50055 Undeveloped Design Details: (5% of Major Equipment cost) $209,25056 Direct Cost Subtotal $4,812,7505758 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $409,08459 Contingency: (5% of Direct Cost) $240,63860 Procure, Design, and Construct: (3% of Direct Cost) $144,38361 Total Cost $5,606,854

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 5 of 19

Page 79: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-12CT OPTION 4: BASELINE EQUIPMENT

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $24,707,1782 GE LM2500+G4 (32.6 MW at ISO) $15,139,315 1 $15,139,315 $3,027,863 $18,167,1783 Inlet air chilling system $2,140,000 1 $2,140,000 $428,000 $2,568,0004 HRSG (200 kpph, 170 psia) with duct firing $2,800,000 1 $2,800,000 $980,000 $3,780,0005 CEMS $160,000 1 $160,000 $32,000 $192,00067 Balance-Of-Plant (BOP) Equipment $9,224,6008 Black start gas-fired generator (1000 kW) $475,000 1 $475,000 $95,000 $570,0009 Gas compressor $590,000 2 $1,180,000 $236,000 $1,416,000

10 Gas conditioning equipment $48,000 1 $48,000 $9,600 $57,60011 Condensate storage tank $65,000 1 $65,000 Incl. $65,00012 Condensate pump (400 gpm, SS, horizontal) $85,000 2 $170,000 $34,000 $204,00013 Deaerator $65,000 1 $65,000 $13,000 $78,00014 Boiler feedwater pump (200 gpm/155 psig) $165,000 3 $495,000 $99,000 $594,00015 Steam line and boiler warming system $50,000 1 $50,000 $10,000 $60,00016 Miscellaneous (compressed air, service water, fire protection) $410,000 1 $410,000 Incl. $410,00017 Transformers $1,250,000 1 $1,250,000 $250,000 $1,500,00018 Piping $1,820,00019 Electrical $1,570,00020 I & C $880,0002122 Equipment Subtotal $33,931,7782324 Major Equipment Installation Contract: (10% of Major Equipment cost) $2,470,71825 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $2,619,04926 Direct Cost Subtotal $39,021,5452728 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $3,316,83129 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $2,666,79630 Procure, Design, and Construct: (3% of Direct Cost) $1,170,64631 Total Cost $46,175,818

TABLE B-13CT OPTION 4: BUILDING

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 6 of 19

Description (Materials) Total Units Price Labor Price Total Installed40 Building - prefabricated metal 5,121,180 1 $5,121,180 Incl. $5,121,18041 Mechanical 540,000 1 $540,000 Incl. $540,00042 Direct Cost Subtotal $5,661,1804344 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $481,20045 Contingency: (10% of Direct Cost) $566,11846 Procure, Design, and Construct: (3% of Direct Cost) $169,83547 Total Cost $6,878,334

TABLE B-14CT OPTION 4: EMISSION CONTROL EQUIPMENT

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed50 Major Equipment $2,160,00051 SCR and CO catalyst 800,000 1 $800,000 $280,000 $1,080,00052 Urea conversion system 900,000 1 $900,000 $180,000 $1,080,0005354 Major Equipment Installation Contract: (10% of Major Equipment cost) $216,00055 Undeveloped Design Details: (5% of Major Equipment cost) $108,00056 Direct Cost Subtotal $2,484,0005758 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $211,14059 Contingency: (5% of Direct Cost) $124,20060 Procure, Design, and Construct: (3% of Direct Cost) $74,52061 Total Cost $2,893,860

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 6 of 19

Page 80: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-15CT OPTION 5: BASELINE EQUIPMENT

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $30,672,0002 GE Frame 6B (42.1 MW at ISO) $22,575,000 1 $22,575,000 $4,515,000 $27,090,0003 Inlet air chilling system $2,400,000 1 $2,400,000 $480,000 $2,880,0004 Simple cycle stack and silencer $405,000 1 $405,000 $81,000 $486,0005 CEMS $180,000 1 $180,000 $36,000 $216,00067 Balance-Of-Plant (BOP) Equipment $7,623,6008 Black start gas-fired generator (1000 kW) $475,000 1 $475,000 $95,000 $570,0009 Gas compressor $700,000 2 $1,400,000 $280,000 $1,680,000

10 Gas conditioning equipment $53,000 1 $53,000 $10,600 $63,60016 Miscellaneous (compressed air, service water, fire protection) $280,000 1 $280,000 Incl. $280,00017 Transformers $1,900,000 1 $1,900,000 $380,000 $2,280,00018 Piping $530,00019 Electrical $1,740,00020 I & C $480,0002122 Equipment Subtotal $38,295,6002324 Major Equipment Installation Contract: (10% of Major Equipment cost) $3,067,20025 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $2,677,14026 Direct Cost Subtotal $44,039,9402728 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $3,743,39529 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $2,870,39430 Procure, Design, and Construct: (3% of Direct Cost) $1,321,19831 Total Cost $51,974,927

TABLE B-16CT OPTION 5: BUILDING

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed40 Building - prefabricated metal 3,958,400 1 $3,958,400 Incl. $3,958,40041 Mechanical 420,000 1 $420,000 Incl. $420,00042 Direct Cost Subtotal $4,378,400

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 7 of 19

42 Direct Cost Subtotal $4,378,4004344 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $372,16445 Contingency: (10% of Direct Cost) $437,84046 Procure, Design, and Construct: (3% of Direct Cost) $131,35247 Total Cost $5,319,756

TABLE B-17CT OPTION 5: EMISSION CONTROL EQUIPMENT

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed50 Major Equipment $4,950,00051 SCR and CO catalyst for simple cycle 2,600,000 1 $2,600,000 $910,000 $3,510,00052 Urea conversion system 1,200,000 1 $1,200,000 $240,000 $1,440,0005354 Major Equipment Installation Contract: (10% of Major Equipment cost) $495,00055 Undeveloped Design Details: (5% of Major Equipment cost) $247,50056 Direct Cost Subtotal $5,692,5005758 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $483,86359 Contingency: (5% of Direct Cost) $284,62560 Procure, Design, and Construct: (3% of Direct Cost) $170,77561 Total Cost $6,631,763

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 7 of 19

Page 81: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-18BOILER OPTION 1: BASELINE EQUIPMENT

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $1,800,0002 Package boiler (100kpph, 155 psig) and stack (3.5 ft dia, 50 ft, 9ppm ) $1,500,000 1 $1,500,000 $300,000 $1,800,00034567 Balance-Of-Plant (BOP) Equipment $2,044,0008 Condensate storage tank (lined CS; 30,000 gal) $65,000 1 $65,000 $13,000 $78,0009 Condensate pump (200 gpm, SS, horizontal) $55,000 2 $110,000 $22,000 $132,000

10 Deaerator $65,000 1 $65,000 $13,000 $78,00011 Boiler feedwater pump (200 gpm/155 psig) $165,000 2 $330,000 $66,000 $396,00013 Steam line and boiler warming system $50,000 1 $50,000 $10,000 $60,00014 Miscellaneous (compressed air, service water, fire protection) $270,000 1 $270,000 Incl. $270,00015 Piping $350,00016 Electrical $360,00017 I & C $320,0001819 Equipment Subtotal $3,844,0002021 Major Equipment Installation Contract: (10% of Major Equipment cost) $180,00022 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $396,60023 Direct Cost Subtotal $4,420,6002425 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $375,75126 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $352,06027 Procure, Design, and Construct: (3% of Direct Cost) $132,61828 Total Cost $5,281,029

TABLE B-19BOILER OPTION 1: BUILDING

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed40 Building - prefabricated metal 964,860 1 $964,860 Incl. $964,86041 Mechanical 100,000 1 $100,000 Incl. $100,000

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 8 of 19

41 Mechanical 100,000 1 $100,000 Incl. $100,00042 Direct Cost Subtotal $1,064,8604344 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $90,51345 Contingency: (10% of Direct Cost) $106,48646 Procure, Design, and Construct: (3% of Direct Cost) $31,94647 Total Cost $1,293,805

TABLE B-20BOILER OPTION 1: EMISSION CONTROL EQUIPMENT

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed50 Major Equipment $051525354 Major Equipment Installation Contract: (10% of Major Equipment cost) $055 Undeveloped Design Details: (5% of Major Equipment cost) $056 Direct Cost Subtotal $05758 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $059 Contingency: (5% of Direct Cost) $060 Procure, Design, and Construct: (3% of Direct Cost) $061 Total Cost $0

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 8 of 19

Page 82: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-21BOILER OPTION 2: BASELINE EQUIPMENT

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $10,464,0002 Biomass boiler with natural gas backup (60kpph, 155 psig) $4,200,000 2 $8,400,000 $1,680,000 $10,080,0003 CEMS $160,000 2 $320,000 $64,000 $384,000456 Balance-Of-Plant (BOP) Equipment $9,255,6007 Condensate storage tank (lined CS; 30,000 gal) $65,000 1 $65,000 $13,000 $78,0008 Condensate pump (120 gpm, SS, horizontal) $40,000 3 $120,000 $24,000 $144,0009 Deaerator $65,000 1 $65,000 $13,000 $78,000

10 Boiler feedwater pump (120 gpm/155 psig) $121,000 3 $363,000 $72,600 $435,60011 Steam line and boiler warming system $50,000 1 $50,000 $10,000 $60,00012 Biomass / ash storage silos $1,500,000 1 $1,500,000 incl. $1,500,00013 Loading and unloading building $1,000,000 1 $1,000,000 incl. $1,000,00014 Biomass handling equipment $3,000,000 1 $3,000,000 $600,000 $3,600,00015 Miscellaneous (compressed air, service water, fire protection) $340,000 1 $340,000 Incl. $340,00016 Piping $1,220,00017 Electrical $360,00018 I & C $440,0001920 Equipment Subtotal $19,719,6002122 Major Equipment Installation Contract: (10% of Major Equipment cost) $1,046,40023 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $1,911,54024 Direct Cost Subtotal $22,677,5402526 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $1,927,59127 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $1,744,55428 Procure, Design, and Construct: (3% of Direct Cost) $680,32629 Total Cost $27,030,011

TABLE B-22BOILER OPTION 2: BUILDING

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed40 Building - prefabricated metal 6,528,886 1 $6,528,886 Incl. $6,528,88641 Mechanical 527,000 1 $527,000 Incl. $527,00042 Direct Cost Subtotal $7,055,88643

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 9 of 19

42 Direct Cost Subtotal $7,055,8864344 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $599,75045 Contingency: (10% of Direct Cost) $705,58946 Procure, Design, and Construct: (3% of Direct Cost) $211,67747 Total Cost $8,572,901

TABLE B-23BOILER OPTION 2: EMISSION CONTROL EQUIPMENT

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed50 Major Equipment $5,736,00051 Dry ESP $1,070,000 2 $2,140,000 $428,000 $2,568,00052 Urea conversion system $800,000 2 $1,600,000 $320,000 $1,920,00053 SCR and CO Catalyst $520,000 2 $1,040,000 $208,000 $1,248,0005455 Major Equipment Installation Contract: (10% of Major Equipment cost) $573,60056 Undeveloped Design Details: (5% of Major Equipment cost) $286,80057 Direct Cost Subtotal $6,596,4005859 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $560,69460 Contingency: (5% of Direct Cost) $329,82061 Procure, Design, and Construct: (3% of Direct Cost) $197,89262 Total Cost $7,684,806

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 9 of 19

Page 83: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-24BOILER OPTION 3: BASELINE EQUIPMENT

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $14,064,0002 Biomass boiler with natural gas backup (60kpph, 900 psig) $5,700,000 2 $11,400,000 $2,280,000 $13,680,0003 CEMS $160,000 2 $320,000 $64,000 $384,000456 Balance-Of-Plant (BOP) Equipment $10,223,2007 Condensate storage tank (lined CS; 30,000 gal) $65,000 1 $65,000 $13,000 $78,0008 Condensate pump (120 gpm, CS, vertical) $37,000 3 $111,000 $22,200 $133,2009 Deaerator $65,000 1 $65,000 $13,000 $78,000

10 Boiler feedwater pump (120 gpm/900 psig) $190,000 3 $570,000 $114,000 $684,00011 Condensate transfer pump (120 gpm, SS, horizontal) $40,000 3 $120,000 $24,000 $144,00012 LP feedwater heater $55,000 1 $55,000 $11,000 $66,00013 HP feedwater heater $75,000 1 $75,000 $15,000 $90,00014 Steam line and boiler warming system $50,000 1 $50,000 $10,000 $60,00015 Biomass / ash storage silos $1,500,000 1 $1,500,000 incl. $1,500,00016 Loading and unloading building $1,000,000 1 $1,000,000 incl. $1,000,00017 Biomass handling equipment $3,000,000 1 $3,000,000 $600,000 $3,600,00018 Miscellaneous (compressed air, service water, fire protection) $340,000 1 $340,000 Incl. $340,00019 Piping $1,650,00020 Electrical $360,00021 I & C $440,0002223 Equipment Subtotal $24,287,2002425 Major Equipment Installation Contract: (10% of Major Equipment cost) $1,406,40026 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $2,236,68027 Direct Cost Subtotal $27,930,2802829 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $2,374,07430 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $2,089,82831 Procure, Design, and Construct: (3% of Direct Cost) $837,90832 Total Cost $33,232,090

TABLE B-25BOILER OPTION 3: BUILDING

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed40 Building - prefabricated metal 6,625,372 1 $6,625,372 Incl. $6,625,37241 Mechanical 535,000 1 $535,000 Incl. $535,000

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 10 of 19

41 Mechanical 535,000 1 $535,000 Incl. $535,00042 Direct Cost Subtotal $7,160,3724344 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $608,63245 Contingency: (10% of Direct Cost) $716,03746 Procure, Design, and Construct: (3% of Direct Cost) $214,81147 Total Cost $8,699,852

TABLE B-26BOILER OPTION 3: EMISSION CONTROL EQUIPMENT

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed50 Major Equipment $5,952,00051 Dry ESP $1,100,000 2 $2,200,000 $440,000 $2,640,00052 Urea conversion system $850,000 2 $1,700,000 $340,000 $2,040,00053 SCR and CO Catalyst $530,000 2 $1,060,000 $212,000 $1,272,0005455 Major Equipment Installation Contract: (10% of Major Equipment cost) $595,20056 Undeveloped Design Details: (5% of Major Equipment cost) $297,60057 Direct Cost Subtotal $6,844,8005859 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $581,80860 Contingency: (5% of Direct Cost) $342,24061 Procure, Design, and Construct: (3% of Direct Cost) $205,34462 Total Cost $7,974,192

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 10 of 19

Page 84: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-27BOILER OPTION 4: BASELINE EQUIPMENT

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $22,872,0002 CFB boiler w/ NG backup (120 kpph, 900 psig) $10,800,000 1 $10,800,000 $11,880,000 $22,680,0003 CEMS $160,000 1 $160,000 $32,000 $192,000456 Balance-Of-Plant (BOP) Equipment $10,092,4007 Condensate storage tank (lined CS; 30,000 gal) $65,000 1 $65,000 $13,000 $78,0008 Condensate pump (240 gpm, CS, vertical) $56,000 2 $112,000 $22,400 $134,4009 Deaerator $65,000 1 $65,000 $13,000 $78,000

10 Boiler feedwater pump (240 gpm/900 psig) $230,000 2 $460,000 $92,000 $552,00011 Condensate transfer pump (240 gpm, SS, horizontal) $60,000 2 $120,000 $24,000 $144,00012 LP feedwater heater $55,000 1 $55,000 $11,000 $66,00013 HP feedwater heater $75,000 1 $75,000 $15,000 $90,00014 Steam line and boiler warming system $50,000 1 $50,000 $10,000 $60,00015 Biomass / ash storage silos $1,500,000 1 $1,500,000 incl. $1,500,00016 Loading and unloading building $1,000,000 1 $1,000,000 incl. $1,000,00017 Biomass handling equipment $3,000,000 1 $3,000,000 $600,000 $3,600,00018 Miscellaneous (compressed air, service water, fire protection) $340,000 1 $340,000 Incl. $340,00019 Piping $1,650,00020 Electrical $360,00021 I & C $440,0002223 Equipment Subtotal $32,964,4002425 Major Equipment Installation Contract: (10% of Major Equipment cost) $2,287,20026 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $2,657,46027 Direct Cost Subtotal $37,909,0602829 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $3,222,27030 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $2,647,30631 Procure, Design, and Construct: (3% of Direct Cost) $1,137,27232 Total Cost $44,915,908

TABLE B-28BOILER OPTION 4: BUILDING

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed40 Building - prefabricated metal 4,782,242 1 $4,782,242 Incl. $4,782,24241 Mechanical 400,000 1 $400,000 Incl. $400,000

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 11 of 19

41 Mechanical 400,000 1 $400,000 Incl. $400,00042 Direct Cost Subtotal $5,182,2424344 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $440,49145 Contingency: (10% of Direct Cost) $518,22446 Procure, Design, and Construct: (3% of Direct Cost) $155,46747 Total Cost $6,296,424

TABLE B-29BOILER OPTION 4: EMISSION CONTROL EQUIPMENT

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed50 Major Equipment $5,640,00051 Baghouse $2,700,000 1 $2,700,000 $540,000 $3,240,00052 Urea conversion system $1,300,000 1 $1,300,000 $260,000 $1,560,00053 SCR and CO Catalyst $700,000 1 $700,000 $140,000 $840,0005455 Major Equipment Installation Contract: (10% of Major Equipment cost) $564,00056 Undeveloped Design Details: (5% of Major Equipment cost) $282,00057 Direct Cost Subtotal $6,486,0005859 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $551,31060 Contingency: (5% of Direct Cost) $324,30061 Procure, Design, and Construct: (3% of Direct Cost) $194,58062 Total Cost $7,556,190

Notes:1. Stack will be furnished with the emission control equipment.

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 11 of 19

Page 85: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-30ST OPTION 1: BASELINE EQUIPMENT

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $2,600,0002 Backpressure turbine (4 MW) $2,000,000 1 $2,000,000 $600,000 $2,600,00056 Balance-Of-Plant (BOP) Equipment $700,0007 Turbine bypass letdown station $75,000 1 $75,000 $15,000 $90,0008 Piping $310,0009 Electrical $170,000

10 I & C $130,0001622 Equipment Subtotal $3,300,0002324 Major Equipment Installation Contract: (10% of Major Equipment cost) $260,00025 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $235,00026 Direct Cost Subtotal $3,795,0002728 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $322,57529 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $249,50030 Procure, Design, and Construct: (3% of Direct Cost) $113,85031 Total Cost $4,480,925

TABLE B-31ST OPTION 1: BUILDING

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed40 Building - prefabricated metal 235,030 1 $235,030 Incl. $235,03041 Mechanical 10,000 1 $10,000 Incl. $10,00042 Direct Cost Subtotal $245,0304344 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $20,82845 Contingency: (10% of Direct Cost) $24,50346 Procure, Design, and Construct: (3% of Direct Cost) $7,35147 Total Cost $297,711

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 12 of 19

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 12 of 19

Page 86: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-32ST OPTION 2: BASELINE EQUIPMENT

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $7,410,0002 Condensing steam turbine (14 MW) $5,700,000 1 $5,700,000 $1,710,000 $7,410,00034567 Balance-Of-Plant (BOP) Equipment $2,738,8008 Cooling tower $710,000 1 $710,000 $142,000 $852,0009 Circulating water pump $182,000 2 $364,000 $72,800 $436,800

10 Circulating water chemical feed $150,000 1 $150,000 $30,000 $180,00016 Condenser air extraction $50,000 1 $50,000 $10,000 $60,00017 Transformers $500,000 1 $500,000 $100,000 $600,00018 Piping $310,00019 Electrical $170,00020 I & C $130,0002122 Equipment Subtotal $10,148,8002324 Major Equipment Installation Contract: (10% of Major Equipment cost) $741,00025 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $781,32026 Direct Cost Subtotal $11,671,1202728 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $992,04529 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $796,61230 Procure, Design, and Construct: (3% of Direct Cost) $350,13431 Total Cost $13,809,911

TABLE B-33ST OPTION 2: BUILDING

DescriptionUnit Price (Materials) Total Units

Total Equipment

Price Labor Price Total Installed40 Building - prefabricated metal 451,258 1 $451,258 Incl. $451,25841 Mechanical 20,000 1 $20,000 Incl. $20,00042 Direct Cost Subtotal $471,258

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 13 of 19

42 Direct Cost Subtotal $471,2584344 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $40,05745 Contingency: (10% of Direct Cost) $47,12646 Procure, Design, and Construct: (3% of Direct Cost) $14,13847 Total Cost $572,578

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 13 of 19

Page 87: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-34WT OPTION 1: 155 PSIG FEEDWATER

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $0234 Balance-Of-Plant (BOP) Equipment $329,0005 Sodium regenerated condensate polisher $150,000 1 $150,000 $75,000 $225,0006 Sodium zeolite softener (80% makeup water) $74,000 1 $74,000 $30,000 $104,0007 Equipment Subtotal $329,00089 Major Equipment Installation Contract: (10% of Major Equipment cost) $0

10 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $49,35011 Direct Cost Subtotal $378,3501213 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $32,16014 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $37,83515 Procure, Design, and Construct: (3% of Direct Cost) $11,35116 Total Cost $459,695

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 14 of 19

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 14 of 19

Page 88: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-35WT OPTION 2: 900 PSIG FEEDWATER

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $0234 Balance-Of-Plant (BOP) Equipment $2,133,2005 Amine regenerated condensate polisher $505,000 1 $505,000 $101,000 $606,0006 Sodium zeolite softener (80% makeup water) $74,000 1 $74,000 $30,000 $104,0007 Two-pass RO with mixbed (80% makeup water) $1,186,000 1 $1,186,000 $237,200 $1,423,2008 Equipment Subtotal $2,133,2009

10 Major Equipment Installation Contract: (10% of Major Equipment cost) $011 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $319,98012 Direct Cost Subtotal $2,453,1801314 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $208,52015 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $245,31816 Procure, Design, and Construct: (3% of Direct Cost) $73,59517 Total Cost $2,980,614

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 15 of 19

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 15 of 19

Page 89: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-36NATURAL GAS OPTION 1: AINSWORTH PIPELINE (800 MCFH; APPROX 23 MILES)

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price10 10" Transmission pipeline $21,586,00011 plus 30% gross-up $6,475,80012 Total Cost $28,061,800

TABLE B-37NATURAL GAS OPTION 2: 10th AVENUE AND 2nd STREET PIPELINE (677 MCFH; APPROX 9000 FEET)

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price20 8" Transmission pipeline $2,893,00021 plus 30% gross-up $867,90022 Total Cost $3,760,900

TABLE B-38NATURAL GAS OPTION 3: MELROSE PIPELINE (400 MCFH, APPROX 2500 FEET)

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price30 8" Transmission pipeline $852,00031 plus 30% gross-up $255,60032 Total Cost $1,107,600

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 16 of 19

Page 90: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-39MECHANCAL DISTRIBUTION

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $0234 Balance-Of-Plant (BOP) Equipment $5,056,4005 Condensate return unit (200 gpm) $47,000 1 $47,000 $9,400 $56,4006 12" steam (CS) and 6" condensate (SS) distribution (3300 ft, 5 vaults) $5,000,000 1 $5,000,000 incl. $5,000,0007 Equipment Subtotal $5,056,40089 Major Equipment Installation Contract: (10% of Major Equipment cost) $0

10 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $758,46011 Direct Cost Subtotal $5,814,8601213 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $494,26314 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $581,48615 Procure, Design, and Construct: (3% of Direct Cost) $174,44616 Total Cost $7,065,055

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 17 of 19

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 17 of 19

Page 91: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-4013.8kV ELECTRIC DUCTBANK

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $0234 Balance-Of-Plant (BOP) Equipment $2,130,0005 13.8kV Electric ductbank $2,130,000 1 $2,130,000 incl. $2,130,0006 Equipment Subtotal $2,130,00078 Major Equipment Installation Contract: (10% of Major Equipment cost) $09 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $319,500

10 Direct Cost Subtotal $2,449,5001112 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $208,20813 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $244,95014 Procure, Design, and Construct: (3% of Direct Cost) $73,48515 Total Cost $2,976,143

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 18 of 19

Page 92: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Conceptual Capital Cost Estimate

TABLE B-41WATER SUPPLY AND DISCHARGE

DescriptionUnit Price

(Equipment) Total UnitsEquipment

Price Labor PriceTotal Installed

Price1 Major Equipment $02 $034 Balance-Of-Plant (BOP) Equipment $343,8005 Service water supply pipeline $113,800 1 $113,800 Incl. $113,8006 Discharge water pipeline with O/W separator $230,000 1 $230,000 Incl. $230,0007 Equipment Subtotal $343,80089 Major Equipment Installation Contract: (10% of Major Equipment cost) $0

10 Undeveloped Design Details: (5% of Major Equipment cost + 15% of BOP Equipment cost) $51,57011 Direct Cost Subtotal $395,3701213 Engineering, Permitting and Administrative / Commissioning: (8.5% of Direct Cost) $33,60614 Contingency: (5% of Major Equipment cost + 10% of Direct Cost less Major Equipment cost) $39,53715 Procure, Design, and Construct: (3% of Direct Cost) $11,86116 Total Cost $480,375

*** Refer to "Notes" on page 1 for assumptions used in the development of the Table(s) above.*** 19 of 19

Page 93: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Appendix C

Baseline Equipment Emission Projections

de:mkc:21212\Admin_Asst\Aug-2009\AppC.doc C-1 Stanley Consultants

Page 94: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

University of IowaWest Campus Power Plant Study

August 27, 2009Preliminary Baseline Equipment Emission Projections

TABLE C-1: EMISSION RATE DATA:Boiler Emission Rates (ppm @ 3% O2) CT and HRSG Emission Rates (ppm @ 15% O2)

Boiler Option 1 Boiler Option 2 Boiler Option 3 Boiler Option 4 CT Option 1 CT Option 2 CT Option 3 CT Option 4 CT Option 5type Pkg Blr (165 psig) Hurst (165 psig) Hurst (900 psig) BFB (900 psig) Mars 100 HRSG LM2500 LM2500+G4 LM2500+G4 w/HRSG HRSG Frame 6Boutput 100 kpph 2x60 kpph 2x60 kpph 120kpph 2x11MW 1x100 kpph 23MW 33MW 33MW 1x200 kpph 42MWfuel Natural gas Solid biomass Solid biomass Solid biomass Natural gas Natural gas Natural gas Natural gas Natural gas Natural gas Natural gasNotes: 2, 3, 7 7 7 7 4, 5, 6, 7 4, 5, 7 5, 7 5, 7 5, 7 4, 5, 7 5, 7

NOx, ppm: 30 25 54 25 25 25 54 15NOx, lb/mmbtu: 0.036 0.35 0.35 0.25 0.0980 0.0980

NOx, lb/hr: 4.52 54.70 63.93 42.65 11.89 6.36 29 31 31 12.73 29CO, ppm: 50 50 25 25 25 15

CO, lb/mmbtu: 0.037 0.5 0.5 0.15 0.082 0.082CO, lb/hr: 4.64 78.14 91.33 25.59 14.48 5.32 17.35 18.73 18.73 10.64 17

PM, lb/mmbtu 0.0075 0.4 0.4 0.4 0.0066 0.0075 0.0066 0.0066 0.0066 0.0075 0.0066PM, lb/hr 0.93 62.51 73.06 68.23 1.59 0.49 1.58 2.12 2.12 0.49 3.12

PM10, lb/mmbtu: 0.0075 0.36 0.36 0.36 0.0066 0.0075 0.0066 0.0066 0.0066 0.0075 0.0066PM10, lb/hr: 0.93 56.26 65.76 61.41 1.59 0.49 1.58 2.12 2.12 0.49 3.12

VOC, lb/mmbtu: 0.0054 0.017 0.017 0.017 0.0021 0.0054 0.0021 0.0021 0.0021 0.0054 0.0021VOC, lb/hr: 0.68 2.66 3.11 2.90 0.50 0.35 0.50 0.67 0.67 0.35 0.99

SO2, lb/mmbtu: 0.0006 0.025 0.025 0.025 0.0034 0.0006 0.0034 0.0034 0.0034 0.0006 0.0034SO2, lb/hr: 0.07 3.91 4.57 4.26 0.82 0.04 0.81 1.09 1.09 0.04 1.60

TABLE C-2: PROJECTED ANNUAL EMISSIONS:boiler efficiency (HHV)steam production lb/hrsteam pressure and temperature psig / Fsteam enthalpy (pressure, sat) btu/lbfeedwater (200F) btu/lbheat input mmbtu/hr (HHV) 125.5 156.3 182.7 170.6 240.2 64.9 238.7 320.9 320.9 129.8 472Annual NOx emissions (8760 hrs full load operation) tpy 19.8 239.6 280.0 186.8 127.0 135.8 127.0Hours limit (limit to 39.4 tpy) hrs of operation Unlimited 1441 1233 1848 2717 2542 2717Annual CO emissions (8760 hrs full load operation) tpy 20.3 342.2 400.0 112.1 76.0 82.0 74.5Hours limit (limit to 99.4 tpy) hrs of operation Unlimited 2544 2177 7769 Unlimited Unlimited UnlimitedAnnual PM emissions (8760 hrs full load operation) tpy 4.09 273.8 320.0 298.9 6.9 9.3 13.6Hours limit (limit to 24.4 tpy) hrs of operation Unlimited 781 668 715 Unlimited Unlimited UnlimitedAnnual PM10 emissions (8760 hrs full load operation) tpy 4.09 246.4 288.0 269.0 6.9 9.3 13.6Hours limit (limit to 14.4 tpy) hrs of operation Unlimited 512 438 469 Unlimited Unlimited UnlimitedAnnual VOC emissions (8760 hrs full load operation) tpy 2.96 11.6 13.6 12.7 2.2 3.0 4.3Hours limit (limit to 39.4 tpy) hrs of operation Unlimited Unlimited Unlimited Unlimited Unlimited Unlimited UnlimitedAnnual SO2 emissions (8760 hrs full load operation) tpy 0.32 17.1 20.0 18.7 3.6 4.8 7.0Hours limit (limit to 39.4 tpy) hrs of operation Unlimited Unlimited Unlimited Unlimited Unlimited Unlimited Unlimited

79.9431786.7

Unlimited9.1

Unlimited9.1

Unlimited3.74

Unlimited3.74

Unlimited

191.51802128.7676811.4

Unlimited11.4

Unlimited4.48

Unlimited4.95

Unlimited

1 of 1 8/27/2009

Notes:1. PSD threshold for NOx, SO2, and VOC is 40 TPY; CO is 100 TPY; PM is 25 TPY; PM10 is 15 TPY. 2. Nebraska Boiler indicated they could get down to 9 ppm with 25% excess air / 25% FGR system.3. PPM values from Nebraska Boiler during phone conversation on 5/29/09. Use "Emission Calculator" to convert rates.4. Option includes one (1) simple cycle CT and one (1) CT/HRSG with supplemental firing.5. Combustion turbine heat consumptions based on heat rates and outputs of the machine at ISO conditions.6. HRSG heat consumption based on Solar Mars 100 proposal.7. Where not furnished by vendor, emission rates are based on emission factors from EPA's AP-42 tables.

1 of 1 8/27/2009

Page 95: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Appendix D

OEM Quotes

TOC  Combustion Turbine – Solar (10 MW CT) ...................................................................................... 1 Combustion Turbine – GE (23 MW CT) ......................................................................................... 4 Combustion Turbine – GE (33 MW CT) ....................................................................................... 46 Combustion Turbine – GE (40 MW CT) ....................................................................................... 76 Package Boiler – Nebraska Boiler (100 kpph) ............................................................................... 90 HRSG – Rentech (For 15 MW CT) ............................................................................................. 120 HRSG – Rentech (For 33 MW CT) ............................................................................................. 123 Solid Fuel Boiler – Hurst (60 kpph, 250 psig & 850 psig) .......................................................... 126 Solid Fuel Boiler – Hurst (60 kpph, 750 psig) ............................................................................. 148 BFB – B&W (120 kpph) .............................................................................................................. 168 Back Pressure Steam Turbine – Dresser Rand (40 MW) ............................................................. 171 Condensing Pressure Steam Turbine – Dresser Rand (4 MW) .................................................... 174 Urea Conversion System – Fuel Tech (For 35 MW CT) ............................................................. 176 Simple Cycle SCR – Braden (For 33 MW CT) ........................................................................... 205 SCR – Peerless (For 33 MW CT) ................................................................................................ 214 Inlet Air Chilling – T.A.S. (For 33 MW CT) ............................................................................... 231 Gas Compressor – Ariel Compressors (For 33 MW CT) ............................................................ 239 Diesel Generator – Altorfer (750 kw) .......................................................................................... 251 Gas Pipeline Cost – MidAmerican Engery .................................................................................. 253 

de:mkc:21212\Admin_Asst\Aug-2009\AppD.doc D-1 Stanley Consultants

Page 96: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Gas Turbine Equipment

Electrical Equipment

Mechanical Equipment

Feedwater Pumps and Valves…………………………….

Miscellaneous

6% Balance of Plant Contingency…………………………………………………

*Duties and taxes not included in estimate. Caterpillar Confidential: Green CEP Ver. 4.5

HRSG Options………………………………………………. none selected

$2,134,200Total for Heat Recovery Steam System……………………………………………

Diverter Valve Options……………………………………… $9,400Deaerator………………..…………………………………… $58,600

$491,200

$357,900Special or Avoided Capital Items……………………………………………………

Estimation of cost per ISO rating kilowatt for selected equipment………………

Total for BOP Equipment and Installation…………………………………….

$2,561,600

$0

$662,100$164,500

Grand Total for Turbomachinery and Balance of Plant…………………….$6,322,700

$11,741,000$1,099

Switchgear, motor control center, auxiliary power transformer, and generator grounding resistor.

Total for Electrical Equipment……………………………………………………… $442,400

Diverter Valve………………………………………………..

1 Heat Recovery Steam Generator with ductburners……

$305,300

Shipping………………………………………………………………………………Development Costs……………………………………………………………………

$0

$1,269,700

Construction Estimate……………………………………………………………….Project Management & Engineering……………………………………………….

Solar Turbines Incorporated

$272,900

Budgetary Quotation for University of IowaInquiry # TBD prepared on July 23, 2008

(1) Gas Fuel MARS 100-T15000S Turbine Generator Set……………………………………

Included in SCS$169,500

Commissioning Parts, Startup, and Site Testing…………………………………

For more information contact:

This quote is provided for budgetary purposes only and does not represent a firm quote.

Power and Utility Breaker Control Options…………………

$150,000

Stefan Krajewski, 416 949 2281 , [email protected]

$5,268,300

Station Control System………………………………………

(Prices shown below quoted in US Dollars $)

Switchgear and MCC are shipped loose.

Switchgear and MCC (design description below)…………

Page 1 of 3000001

Page 97: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Engine: Two shaft turbine, designed for industrial use Axial compressor design Annual type combustor employing dry, low NOx technology

Basic Options: Fully enclosed, generator set package requiring 460V, 3-phase, 60 Hz AC power Rated Class I, Div II, Groups C,D per NEC 120V, 1-phase, 50/60 Hz internal lighting and heater power Gas turbine engine in upward oriented air inlet, and upward oriented exhaust outlet 1800 rpm; 60 Hz Gearbox Continuous Duty, Open Drip Proof generator rated for 13,800 VAC with Class F insulation, B rise

Included Package Features: Direct AC start motor system Simplex lube oil filter system Allen-Bradley based Turbotronics IV control system including:

- Ethernet network interface- Touch Screen display with Engine Performance map- Software for heat recovery interface (without diverter valve control)- Software for CO2 system "lock out" (maintenance access to enclosure)- Backup Safety Shutdown System- kW Control- kVAR/Power Factor Control

Included Factory Testing/Customer Witness/Quality Control Documentation: Standard package static testing Factory vibration testing Factory emissions testing per Solar's ES 9-97 Observation on "Non-Interference" basis Quality Control documentation

Field-installed Ancillary Equipment (excludes ducting): Cross-flow type, self-cleaning engine air inlet filter (customer-supplied air), with bottom outlet Engine air inlet silencer Exhaust bellows (interface to waste heat recovery equipment) "Elbow" type enclosure inlet/exhaust ventilation system with silencer

Included "Off-Skid" Components/Systems: Remote desktop PC/monitor and Printer/Logger Gas fuel flow meter (for Gas-only and Dual Fuel configurations) AC motor-driven Liquid Fuel boost pump skid (for Liquid Fuel configurations) 3-micron duplex filter/coalescer with auto drain (for Liquid Fuel configurations) CO2 system cabinet Air/Oil lube oil cooler VRLA Batteries with 120V DC charging system (back-up post lube) Portable engine cleaning cart

Miscellaneous Short-term preservation for shipment Four (4) paper copies of Solar's Instruction, Operation and Maintenance manuals Four (4) CD-ROM copies of Solar's Instruction, Operation and Maintenance manuals UV Light and Gas Sensor test kit Internal equipment handling system

Caterpillar Confidential: Green CEP Ver. 4.5

MARS 100-T15000S Generator Set Package Features

Page 2 of 3000002

Page 98: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Gas Turbine:KW°Ffeet%"H2O"H2OMMBtu/hrKW

KWKW

KWBlack Start kW Requirement (Turbine Generator Set Only) 232 KW

Boiler:%°F°Fpsig°F

lb/hrlb/hrMMBtu/hrlb/hr

lb/hrlb/hr

Cycle Performance (lower heating value basis):Btu/kWHRBtu/kWHR%

Purpa Calculations (for reference only):Useful Thermal Output: %Total Efficiency Standard: %Caterpillar Confidential: Green CEP Ver. 4.5

57,494

7,424

10,030

27

375

58.5

70170.0

107,424100,000

52.0

10,8203,990

85.5

76.9

Overall Cycle Thermal Efficiency (LHV):

49,930

27

10,003

60212

Steam Flow to Process:Boiler Steam Flow:

Turbine Fuel Consumption @ specified site conditions (LHV):KW Gross Output @ specified site conditions:

KW Gross Output @ ISO Conditions:Site Ambient Temperature for Performance Analysis:

Process Steam Pressure:Process Steam Temperature:

Turbine Inlet Pressure Loss:Turbine Outlet Pressure Loss:

Total Auxiliary Power Consumption:

60Site Elevation for Performance Analysis:

10,680

July 23, 2008

Cogeneration Plant Estimated Performance Summary

Performance listed below is estimated, not guaranteed.

Gross Plant Heat Rate (Process steam or Tons converted to equivalent KW):

Net Turbine Power Production:

Condensate Return:Condensate Temperature:Makeup Water Temperature:

Steam Contributed by Gas Turbine:

Deaerator Steam Consumption:

Steam Contributed by Ductburners:Ductburner Fuel Consumption (LHV):

Net Turbine Heat Rate:

Turbine Auxiliary Power Consumption:

108.2

University of IowaSolar Turbines Incorporated

Site Ambient Relative Humidity for Performance Analysis:

59

4.010.0

730

Page 3 of 3000003

Page 99: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

��

���������� �������� �� �����

���

�� ������� ���������������� ���������������

�������� ��� ����� ����� ��

������� � ������������� �

��������������� ��� ��������

��������� ! " # ���$! %&#&'!!(����������������� ������ ��������� ��!!"�

#�$�% ��������� ��������

&�� ����������� �� ������ �'�'�����

��(�� )�*�+� "�,**-!� . �/ ����� ��0 ��1�

� �(��� )�*�+�-� ,-"�.� 2 ��� 3�����**!�*�

'� �(�� 4�� ��56����7 ��6� � � ��(���)*. +�"! ,!�!!�

� 8�9��)*. +�"! ,! �!�

� �

��'��#: �#;'�&#<�;= 8: #�&�;: =

��������� ������������������������� ����������������� ������ ��������������!����������������"#������

������� ����������!!���$�����%����!������������������������& �������'�����& �����������������"#�

���������(�)�������������������& ��!�������%�������������!!���������� ������������������& ��!�������"

�)��� ������*�+� �������,���,��- .� �

� ��������������������� �! �"�#$%����&'�

000004

Page 100: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�-��

�,-����.�/��/�+

�,-����.�/��/�+ """"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""�

0"� +.�1���+211�3 """"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""0

#3# ���-6��6��*��*�6�-�(-�) 33333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 #

#3#3# �+�7-)*3333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 #

#3#3� �*)*��(��333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 #

#3#32 �+�7-)*��)6���+�*333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 #

#3#38 �+�7-)*����*���(*333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 #

#3#39 �-���)�*(��"�(* 333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 #

#3#3� �+�7-)*��:;�+�(333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 �

#3#31 �+*���"�(* 333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 �

#3#3& �+7*�� -���"�(* �3333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 �

#3#3$ ��*6(����"<��+�-6��(��(��"�(* 3333333333333333333333333333333333333333333333333333333333333333333333 �

#3#3#� �-�*����(*6(-�)��"�(* 33333333333333333333333333333333333333333333333333333333333333333333333333333333 2

#3#3## �-5-(�����)(�����"�(* 333333333333333333333333333333333333333333333333333333333333333333333333333333333 2

#3#3#� ��((*�"��"�(* 33333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 2

#3#3#2 �*)*��(������(*6(-.*�*��"�333333333333333333333333333333333333333333333333333333333333333333333333 2

#3#3#8 =� //��-)*=����>�? ��;��"�(* 3333333333333333333333333333333333333333333333333333333333333333333333 2

#3#3#9 �� ��)*)(��*�(-)5��)<���6>�5*��*�(333333333333333333333333333333333333333333333333333333333 8

#3#3#� ���0 -)5�%���(���)<� �)+���33333333333333333333333333333333333333333333333333333333333333333333333 8

#3#3#1 ���-)-)5 3333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 8

#3#3#& � ���.* *)(���)<��;�)5*�333333333333333333333333333333333333333333333333333333333333333333333333 9

#3#3#$ �*�/�� �)6*��*�(-)5 33333333333333333333333333333333333333333333333333333333333333333333333333333333333 9

#3� � �(-�)����@+-� *)(��)<��*�.-6*���;*6>�-�(��)<��*�6�-�(-�)�333333333333333333333333333333333333 �

#3�3# ��6(��"�� �(-�)�333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 �

#3�3� �:(*)<*<��6��*��@+-� *)(�� �(-�)�33333333333333333333333333333333333333333333333333333333333333 �

#3�32 �*�.-6*�� �(-�)� 333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 1

#3�38 ��6(��"�� �(-�)���*�6�-�(-�)�3333333333333333333333333333333333333333333333333333333333333333333333333 &

#3�39 �:(*)<*<��6��*��@+-� *)(�� �(-�)���*�6�-�(-�)� 333333333333333333333333333333333333333 #2

#3�3� �:(*)<*<��6��*��@+-� *)(��)<��*�.-6*�� �(-�)���*�6�-�(-�)�333333333333333333333 #�

#32 �- -(���/�� ���)*�5"��6��*�A ��:6�+�-�)�3333333333333333333333333333333333333333333333333333333333333333333 #&

000005

Page 101: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�--��

#323# �- -(���/�� ���)*�5"��6��*3333333333333333333333333333333333333333333333333333333333333333333333333333 #&

#323� �:6�+�-�)�3333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 #$

#38 �*�-5)���-(*�-� 33333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 ��

�"� .�� � ��.#,����� + """"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""�0

�3# ���-���/���-6-)5 33333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 �#

�3#3# B��-<-("33333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 �#

�3#3� ��:*�33333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 �#

�3� ��-6*333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 �#

�32 ��" *)(��6;*<+�* 33333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 ��

�38 �*� -)�(-�)��6;*<+�* 333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 ��

�39 �;-� *)(��6;*<+�*� 333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 �2

�3� �(�)<��<��*� ��A ���)<-(-�)�3333333333333333333333333333333333333333333333333333333333333333333333333333333333 �2

4"� ,11�/ 5#*"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""�6

23# �����+-<���*6-/-6�(-�)�33333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 �9

23#3# ���*�+���+*���! �����������#' 333333333333333333333333333333333333333333333333333333333333333333 ��

23#3� �-@+-<��+*���! ������������' 3333333333333333333333333333333333333333333333333333333333333333333333 �1

23#32 ? �(*��! �����������2'3333333333333333333333333333333333333333333333333333333333333333333333333333333 �&

23#38 ? �(*��? ��;�! �����������8' 333333333333333333333333333333333333333333333333333333333333333333333 �$

23#39 �-@+-<��*(*�5*)(�! �����������9' 33333333333333333333333333333333333333333333333333333333333333 2�

23#3� �+7*�� -��! ������������'3333333333333333333333333333333333333333333333333333333333333333333333333333 2#

23� �"�-6������0 -)5��-�(�A ��6;*<+�*333333333333333333333333333333333333333333333333333333333333333333333333333333 2�

232 �"�-6����*�/�� �)6* 33333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 29

238 ��<*��A ��(�)<��<�33333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 2�

239 �(*�;**(3333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 21

23� ������*��+�*�*@+-�* *)(�333333333333333333333333333333333333333333333333333333333333333333333333333333333333 2&

231 �(�)<��<��*� ��A ���)<-(-�)�3333333333333333333333333333333333333333333333333333333333333333333333333333333333 2$

000006

Page 102: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�#��

0"� +.�1���+211�3

#3# ���-6��6��*��*�6�-�(-�)�

"$"$" ���)� �

�;*�� �9���/� -�"��/�5���(+�7-)*����*�(0 ���;�/(�5���(+�7-)*��6�)�-�(-)5��/���5���5*)*��(���

�)<����-:��(�5*���0 *��(+�7-)*3���;�/(���0 *��-��(��)� -((*<�(��(;*�<�-.*)�*@+-� *)(��(�(;*�

;�(�*)<�7"� *�)���/���/�*:-7�*�6�+��-)5�*:(*)<-)5�(;��+5;���(+))*��0 -(;-)�(;*�*:;�+�(�

6���*6(��3���;*�5���5*)*��(���6�)�-�(���/���.��-�7�*�5*� *(�"�6� ��*����%����-)5�*��))+����

6� 7+�(��%���;-5;���*��+�*�(+�7-)*%��)��66*����"�5*��7�:%��)<�6�)(������)<��66*����-*�3��

�;*���0 *��(+�7-)*��-�����-:��(�5*���0 *��(+�7-)*%��*��<")� -6���"�6�+��*<�(��(;*�5���

5*)*��(����)<�<�-.*)�7"�(;*�5���5*)*��(���*:;�+�(�5��3�

�;*�-)�*(��*6(-�)%�����(�/�� �(;*�(+�7-)*� �+)(*<�-)�*(�7*�� �+(;%�-��*@+-��*<�0 -(;���

�(�-)�*����(**�� *�;��6�**)��)<���)"��)���6>�-)�(;*�-)�*(��-���(�*� �/���=���(�6;�)6*=�

���(*6(-�)��5�-)�(�/��*-5)��7C*6(�<� �5*�(��(;*�(+�7-)*3���;*�(+�7-)*�-���;�6>� �+)(*<�

0 ;*)��;-��*<�-)����-(-�)�-)�-<*�(;*���6>�5*3���;*�6�+��-)5�-���* �.*<��)<��;-��*<�-)���

�*����(*�6�)(�-)*�3�

"$"$' +� ������

�;*���*)%��-��6���*<%������*�5*)*��(���-��6���7�*��/�;�)<�-)5�(;*�/+���6�)(-)+�+����0 *���/�

(;*�5���(+�7-)*��(��)"�� 7-*)(�(* �*��(+�*�(;��+5;�+(�(;*���*��(-)5���)5*3����6���-)5�

0 �(*��������)<�-(������6-�(*<�/�)���)<��+ �����*�)�(��*@+-�*<3���;*�5*)*��(���-)6�+<*����

7�+�;�*���*:6-(�(-�)��"�(* �0 -(;����*� �)*)(� �5)*(�5*)*��(��3��D *+(�����)<��-)*��-<*�

6+7-6�*����*�-)6�+<*<3���;*�5*)*��(���-�� �+)(*<��)���6+�(� *���+���-*<�6�)6�*(*���<3�

"$"$# ���)� �� ,������

�;*��(�)<��<�*@+-� *)(�-���+���-*<�0 -(;���0 *�(;*�����/��6�+�(-6�*)6���+�*�/���(;*�(+�7-)*3��

�;*�*)6���+�*����*�<*�-5)*<�(���6;-*.*�)�-�*��7�(* *)(�(���)��.*��5*��/�$��<�!�'��(�2�/(3�

!#3�� '��0 �"��)<�9�/(3�!#39� '��7�.*�5��<*�<+�-)5�/+������<���*��(-�)�3�����.-�-�)��/���

(+�7-)*��* �.���.-�����/���*�-)6�+<*<3���;*�(+�7-)*�6� ���( *)(�-��/+��"�.*)(-��(*<�0 -(;���

/�)3�����*<+)<�)(�/�)�-���.�-��7�*�����)���(-�)%��)<����7�6>+���-5;(-)5�6�)�7*����.-<*<�����)�

��(-�)�!�**�� �(-�)��'3���66*���<������)<�*:����-�)�����/��-5;(-)5���*����.-<*<3�

"$"$/ ���)� �0���.����

���(**��7��*���(*�-�����.-<*<�/���(;*�5���(+�7-)*3���;*�7��*���(*�-��<*�-5)*<�(�����.-<*�

�+-(�7�*��(�*)5(;��)<�-)�(����(-�)����.-�-�)���(��-(*3�������+�/�6*����*�6��(*<��*������)*�5"�

�(�)<��<�(����*.*)(�6�����-�)3�

"$"$1 ���� ��������-

�;*�5���(+�7-)*���6>�5*�-���+���-*<�0 -(;��� �<+���%� +�(-��(�5*�/-�(��(-�)��"�(* �6�)�-�(-)5�

�/�0 *�(;*�����(*6(-�)��)<�-)�*(��6�**)�%�����*/-�(*��!��(-�)��'��)<���/-)���7���-*��/-�(*�3���-��

/���(;*�(+�7-)*�.*)(-��(-�)��"�(* �-��/-�(*�*<�(��(;*��� *��*.*�����(+�7-)*�6� 7+�(-�)��-�3��

�-�(*�*<��-��-���-�*)6*<�7*/��*�*)(*�-)5�(;*�(+�7-)*���*)+ 3���;-��<*�-5)��*�+�(��-)���6� ��6(�

000007

Page 103: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*����

����)5* *)(��)<�*�- -)�(*��(;*�)**<�/���6+�(� *���+���-*<�-)�*(�<+6(-)5�0 ;*)�(;*�

�(�)<��<�<*�-5)�-��+(-�-�*<3�

�;*�5*)*��(���-���+���-*<�0 -(;���/-�(��(-�)��"�(* �6�)�-�(-)5��/�0 *�(;*�����(*6(-�)%�-)�*(�

�6�**)���)<�7���-*��/-�(*��3�

�;*��+���-*<����(/�� ���)<���<<*���(���*�.-6*�(;*�-)�*(�/-�(*����*���6>�5*<��*����(*�"�/���

�;-� *)(3����*6-������6+�(� -�*<�/-�(*������)5* *)(��6�)�7*��+���-*<%��)<�(;*"���*�@+�(*<�

�)��)�-)<-.-<+���7��-�3�

"$"$2 ���)� ��3*����

�;*��(�)<��<�*@+-� *)(�-���+���-*<�0 -(;����*6(�)5+���%�-5;(���)<�;��-��)(���!�/(����>-)5�

/��0 ��<'�*:;�+�(��+(�*(�0 -(;�6�))*6(-�)�/��)5*�(��/�6-�-(�(*�-)��-)*� �+)(-)5��/��)���� ����

�- ��*�6"6�*�*:;�+�(��(�6>3���+�(� *��/+�)-�;*<�*:��)�-�)�C�-)(%�<+6(-)5��+����(�%��)<�

�+)(-)5�;��<0 ��*���*��*@+-�*<�/���;*�(��*6�.*�"�����-6�(-�)�3���/��*@+-�*<%�(;*�*:;�+�(�

/��)5*�6�)�7*���(�(*<�(�����*/(���)<�6�)/-5+��(-�)�����)���(-�)3�������- ��*�6"6�*�

����-6�(-�)�%�0 *��//*���)�*:;�+�(��-�*)6*�����* 7�"�����)���(-�)3�

"$"$ 4��������-

�;*��(�)<��<�*@+-� *)(�-���+���-*<�0 -(;���)�(+����5���/+*���"�(* �+�-)5��)�*�*6(��)-6���"�

6�)(����*<�/+*�� *(*�-)5�.��.*3���**����*)<-:�23��/���5�����*��+�*��*@+-�* *)(�3������/+*��

+�(� **(��*)*������*6(�-6���*6-/-6�(-�)� �����������#�!�**��*6(-�)�23#3#'3���-@+-<�/+*���)<�

<+���/+*���"�(* ����*��.�-��7�*����/�6(��"���(-�)�3�

"$"$( ��)���������- �

�;*��(�)<��<�*@+-� *)(�-���+���-*<�0 -(;�(0 ���*����(*��+7*��-���"�(* �%��)*�/���(;*�5���

(+�7-)*�!�")(;*(-6��-�'��)<��)*�/���(;*�5*)*��(���! -)*�����-�'3���;*��-�-)5�-�������(�-)�*���

�(**�%��)<�(;*��+7*��-���"�(* �.��.*��;�.*��(�-)�*����(**��(�- 3���;*�6���*��%�/-�(*��%��)<�

(+�7-)*��+7*��-���*�*�.�-����*� �+)(*<��)��)��+:-�-��"�*@+-� *)(� �<+�*���6�(*<�)*:(�(��

(;*�5���(+�7-)*�7��*���(*3���;*�5*)*��(����+7*��-��*@+-� *)(��)<��-���*�*�.�-����*� �+)(*<�

)*���(;*�5*)*��(��3���;*��+:-�-��"�*@+-� *)(� �<+�*����.-<*���- ��-/-*<��-�-)5�6�))*6(-�)��

�)<��*<+6*��6+�(� *�E��-)�(����(-�)�(- *��)<�6��(�3���+��*:��;*��,(+7*�6���*����)<�/-)�/�)�

6���*�����*��.�-��7�*������(-�)�3���+�7-)*��+7*��-�� +�(� **(� �������������!�**��*6(-�)�

23#3�'3�

"$"$% ���,���56�7�����,����������-

�;*��(�)<��<�*@+-� *)(�-���+���-*<�0 -(;���;"<��+�-6��(��(-)5��"�(* %�0 ;-6;�-)6�+<*���)�

*�*6(�-6%� �(���<�-.*)%�;"<��+�-6��+ �����* 7�"%�/-�(*��%�6���*���)<�6�)(����%� �+)(*<��)�

(;*��+:-�-��"�*@+-� *)(� �<+�*3����;"<��+�-6� �(���-�� �+)(*<��)�(;*�5���(+�7-)*�

�66*����"�5*��7�:�(��(+�)�5���5*)*��(����;�/(3�������-�*��)<�/-((-)5���)�(;*�7��*���(*�%���+��

;"<��+�-6�(+7-)5�(��6�))*6(�7*(0 **)�(;*��+:-�-��"�*@+-� *)(� �<+�*��)<�(;*� �-)�

7��*���(*���*������/+�)-�;*<3�

000008

Page 104: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�2��

"$"$"! 4��������,��� �����-

�;*��(�)<��<�*@+-� *)(�-���+���-*<�0 -(;��)�-)�(���*<�/-�*����(*6(-�)��"�(* �6� ��*(*�0 -(;�

;"<��6��7�)��*)�-)5��)<�(;*� ���<*(*6(���%��-�-)5��)<�)����*��-)�(;*�(+�7-)*�

6� ���( *)(3���;*�/-�*����(*6(-�)��"�(* �-)6�+<*��6"�-)<*���6�)(�-)-)5��� �� �+)(*<��)���

�*����(*��>-<3�����8�B����7�((*�"��)<�6;��5*��(����0 *��(;*�/-�*����(*6(-�)��"�(* �-�������

-)6�+<*<3���������� ���)<��;+(<�0 )����*��))+)6-�(*<��(�(;*��+�7-)*���)(������)*��!���'3���)�

���� ���+)<���(�(;*�(+�7-)*�-/�(;*�5���<*(*6(����<*(*6(�;-5;�5����*.*��%����-/�(;*��"�(* �-��

��*���-)5�(���*�*��*�(;*��� �3��? ;*)��6(-.�(*<%�(;*���6>�5*��;+(��<�0 )%��)<�(;*���- ��"�

�� ��6"�-)<*��-��<-�6;��5*<�-)(��(;*�(+�7-)*�6� ���( *)(�.-�� +�(-��*�)����*�%��)<�(;*�

.*)(-��(-�)�<� �*���+(� �(-6���"�6���*�3���/(*����(- *�<*��"��)<�-/��*@+-�*<%�(;*��*�*�.*�

�+���"��/��� ��-��<-�6;��5*<3�

"$"$"" 8�9������ ���������-

�;*��(�)<��<�*@+-� *)(�-���+���-*<�0 -(;���/�**��(�)<-)5������+-(�7�*�/��� �+)(-)5�-)��)�

-)<���%�)�)�;����<�+����*�3���;*�6�)(�����"�(* �/*�(+�*�������5�� �7�*�6�)(����*��%���

.-7��(-�)� �)-(��%���/-�*����(*6(-�)��"�(* %���<-5-(��� *(*�%��)<���<-5-(���5*)*��(���

���(*6(-.*��*��"� �<+�*3���)��)��>-<�/+*�� �)�5* *)(��"�(* ��)<������� ����*������

���.-<*<�(��6� ��*(*�(;*��"�(* 3���;*���*��(����*�*6(��� ��<-����"��0 -(;�6�).*)-*)(�(�+6;�

�6�**)�6�)(���3������ ��)<��;+(<�0 )�*.*)(����*�<-����"*<��)�(;*�� ���+(� �(-6���"3���)�

�(;*�)*(����,�����������8&9� �<7+�����(�-�����.-<*<�(��(��)� -(�+)-(�6�)<-(-�)��!�(�(+�%�

��*��+�*�%�(* �*��(+�*%�*(63'�(��(;*�6+�(� *�E��<-�(�-7+(*<�6�)(�����"�(* 3����0 *��/���(;*�

6�)(������)*��-�����.-<*<�7"���<*<-6�(*<��8�B����7�((*�"��"�(* �0 -(;�<+���#��F �6���6-("�

6;��5*��3�

"$"$"' 0�����������-

�;*�*@+-� *)(���6>�5*�-���+���-*<�0 -(;��8�B����7�((*�"��"�(* ��/���(;*�/-�*����(*6(-�)��)<�

5���(+�7-)*�5*)*��(���6�)(�����"�(* �%����<*�6�-7*<�-)�(;��*��*6(-�)�3������7�((*�"��"�(* ��

��*�.��.*��*5+��(*<��*�<��6-<�!B��'�("�*3����((*�"��"�(* ���;-������*�/���-)<����6+�(� *��

-)�(����(-�)3���/�(;*���(-�)�����0 *����)(���� �<+�*�-���*�*6(*<%�����)*�5"�0 -���-)�(����(;*�� ��

�+���-*<����7�((*�"��"�(* ��-)�(;�(� �<+�*3�

"$"$"# +� �����������,����������

�;*��(�)<��<�*@+-� *)(�-���+���-*<�0 -(;��� -6�����6*�����7��*<�-)(*5��(*<�5*)*��(���

���(*6(-.*��"�(* �!����'%� �+)(*<�-)�(;*����3���;*����(*6(-.*��*��"��"�(* �-)6�+<*������

/+)6(-�)��)*6*����"�/������(*6(-�)��/�(;*�5*)*��(��3�

"$"$"/ :���5�� �:���;< ��*�����-

�;*��(�)<��<�*@+-� *)(�-���+���-*<�0 -(;��)�=�//��-)*=�6�*�)-)5��"�(* %�0 -(;��� �7-�*�0 �(*��

0 ��;�6��(�(;�(�6�)�7*�+�*<�/��� +�(-��*�+)-(�3���;*��� *��"�(* �6�)�7*�+�*<�/����)��-)*�

6�*�)-)5����0 *��%�0 ;-6;�-���//*�*<�����)���(-�)3���+�(� *��-���*@+-�*<�(�����.-<*��+�-/-*<�

0 �(*�� **(-)5� �����������8�!�**��*6(-�)�23#38'%�<*(*�5*)(� **(-)5� �����������9�!�**�

�*6(-�)�23#39'%��)<��-���(�#�����-5�!�$��>��5'�/-�(*�*<�(�������132��(�)<��<�3�

000009

Page 105: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�8��

"$"$"1 ��- .� � ������ 9� 7��,;�9�����

�.*�"�)*0 �5���(+�7-)*�-���*�/�� �)6*�(*�(*<�+)<*�����<�-)�������*�(��*��%�+�-)5����6*<+�*��

<*.*���*<�/���/�-5;(�(+�7-)*��*�-�7-�-("3���;*�5*)*��(���-��(*�(*<�(���D����9�3#8��������2832�

�(�)<��<���(�-(��/�6(��"��/� �)+/�6(+�*3���

����5���(+�7-)*�5*)*��(����*(���*6*-.*����(�(-6�(*�(�-)6�+<-)5G�

• �0 -(6;��(�(*�!D 3� 3����D 3�3%��6(+�(-�)%�0 -�-)5%��)<��*(��-)('�

• �* �*��(+�*�*�* *)(��+(�+(%��)<�0 -�-)5�

• ���)� -((*����)5*%��+(�+(%��)<�0 -�-)5�

• ���*)�-<���*��(-�)�

• ��)(����.��.*�(��@+*� �(��%�*:6-(�(-�)%��)<��*(+�)��-5)���

• �-�*��"�(* �6�)(-)+-("%��)<�<*.-6*��6(+�(-�)�

• �"�(* �/�+�;-)5�.*�-/-6�(-�)�

• �+7-)5�-)(*5�-("�

��/+������<��(�-)5�(*�(�-���.�-��7�*�����)���(-�)3�

"$"$"2 8��� � 9��8���� 7�� ����

�;*���6>�5*�-���+���-*<�0 -(;���6+�(� *��<��0 -)5���6>�5*�(;�(�-)6�+<*��5*)*����

����)5* *)(�<��0 -)5�%�/��0 ��)<�-)�(�+ *)(�<-�5�� �%�*�*6(�-6����)*��-)*�<��0 -)5���)<�

-)(*�6�))*6(-�)����)�<��0 -)5�3���<<-(-�)���*�*6(�-6��������<-�5�� ���)<���5-6�<��0 -)5����*�

���.-<*<�/����*6��<3���**�23��/�����<*(�-�*<�("�-6����-�(��)<�("�-6���<��0 -)5�<*�-.*�"3�

� �*��(-�)�A � �-)(*)�)6*�!�A '��)<��)�(����(-�)�A ��� -��-�)-)5�!�A �'� �)+������*�

���.-<*<��)<���*���-)(*<�-)��)5�-�;3���-:�;��<6��-*���/�(;*�� A � �)+���%�(;�**�;��<6��-*��

�/�(;*��A �� �)+���%��)<��)*��� �0 -(;�7�(;���*�-)6�+<*<�-)�(;*�7��*��//*�-)53���;*� �)+����

6�.*����*��(-)5�6�)6*�(��/�����0 *��5*)*��(-)5�*@+-� *)(%�5+-<*��(��(��+7�*�;��(-)5%�7��-6�

-)/�� �(-�)��)�6� ��)*)(�%��)<�*@+-� *)(�0 -(;-)�(;*�(+�7-)*�5*)*��(����*(3�

����)*�5"����.-<*������*)5-)**�-)5�<��0 -)5���)����*6+�*��*�.*��0 0 0 3���C*6(�)*(36� 3����6;�

6+�(� *��6�)�*)(*��(;-��<�(�7��*��)<�.-*0 %���-)(�����))�(�(*����C*6(�<��0 -)5�3�����C*6(D*(�

���.-<*��(;*�6+�(� *��0 -(;�- *<-�(*��66*���(��(;*���(*�(�<��0 -)5��*.-�-�)�3�����C*6(D*(�

��**<��C�7�6� ��*(-�)��)<���.*��0 **>���/�(- *� �-�-)5�<��0 -)5��7�6>��)<�/��(;3�

"$"$" ���� � 9

�;*�7��*��6��*��/��+���"�-)6�+<*��;�)<���)�(��-)-)5�/���+��(��#����*��(�����)<��+�*�.-����%�

0 ;*�*��(+<*)(����*����+ *<�(��;�.*��(��*��(���C�+�)*" �)E��>)�0 �*<5*��/�*�*6(�-6���

5*)*��(-)5����)(���*��(-�)��)<�(��7*����/-6-*)(�-)��*�<-)5��-�-)5�/��0 ��)<�-)�(�+ *)(�

<��0 -)5�%� *6;�)-6���<��0 -)5�%��)<�;�.*���0 ��>-)5�>)�0 �*<5*��/�*�*6(�-6���5*)*��(���%��)<�

5���(+�7-)*�3���;*�6�+��*�-��<*�-5)*<����+)<��)�*-5;(�;�+��<�"%�/-.*�6�)�*6+(-.*�<�"�

�6;*<+�*�0 -(;��)�;�+���+)6;�7�*�>��)<�/-/(**)� -)+(*�7�*�>��*.*�"��)*��)<��)*�;��/�;�+��3��

�:�*�-*)6*<�-)�(�+6(���%�+�-)5���*6-���"�<*.*���*<�(��-)-)5� �(*�-���%����.-<*���/-� �

000010

Page 106: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�9��

5��+)<0 ��>��/�7��-6�(;*��"%���+���<.�)6*<�6�)6*�(��0 -(;�6������� ��)<�;�)<���)�(��-)-)53��

���-)-)5�-)6�+<*�������+�7-)*��� -�-��-��(-�)���+���"�(* ��*�-5)�A �� �*��(-�)���)<�

�-)(*)�)6*3�

�;*�(��-)*��6�)<+6(��(;*�6�+��*�-)����*6(+�*,�* -)���/�� �(�0 ;*�*�*�6;� �C���(��-6�-��

�+����(*<�7"��-(*��(+�*�0 -(;�<*(�-�*<�<*�6�-�(-�)���)<�����6-�(*<�*)5-)**�-)5�<��0 -)5�3����

�(+<*)(�(��-)-)5� �)+���-��5-.*)�(��*�6;��(+<*)(��)<�(;*�6�-*)(H��(+�7-)*�5*)*��(����"�(* �

-��+�*<�/���;�)<���)�(��-)-)5�(���+���* *)(�(;*�6������� �-)�(�+6(-�)3���(�(;*�6� ��*(-�)��/�

�*.*�����*��(*<�(��-6��(;*��(+<*)(����*�5-.*)������5�*��-.*�*:� -)�(-�)�(�� *��+�*�(;*�

*//*6(-.*)*����/�(;*���*�*)(�(-�)��)<������(����(��-<*)(-/"�-/��)"��(+<*)(�;���)�(�5����*<�(;*�

�(*�-��3���(�(;*�6� ��*(-�)��/�(;*�6�+��*���/-)���*:� -)�(-�)�-��5-.*)�0 ;-6;�6�.*���(;*�

*)(-�*�6�+��*� �(*�-����)<��(+<*)(����*�5-.*)���6*�(-/-6�(*��/�6� ��*(-�)3�

���-)-)5�-��6�)<+6(*<�-)���+�(�)��(�(;*� �)+/�6(+�-)5�/�6-�-("3����6���(��-)-)5��(�(;*�

�+�(� *�H��/�6-�-("�-���.�-��7�*�+��)��*@+*�(3���;*��+�(� *��0 �+�<�7*��*���)�-7�*�/���

���.-<-)5�����)*6*����"�(��-)-)5�*@+-� *)(�!�-��6�)<-(-�)*<�6������� %�B����������/�� �(�

.-<*�����"*�%��.*�;*�<����C*6(��%�<�"7���<�%�6;��>7���<�%�*(63'�/���6����*��)�(�;*�<��(�(;*�

�)+/�6(+�-)5���6�(-�)3�

"$"$"( �- .����- � ��� 7�*� 9��

�(�-��+)<*��(��<�(;�(�(;*��*��*��;���(;*��-5;(�(�� �>*�6;�)5*��-)����<+6(�<*�-5)��)<��<<�

- ���.* *)(��(�����<+6(������*�.-6*���(��)"�(- *�0 -(;�+(�-)6+��-)5��)"��7�-5�(-�)��(��

-)�(����(;*��� *��)����-)�6�))*6(-�)�0 -(;�(;*��@+-� *)(�����*�.-6*�����.-<*<�;*�*+)<*�3�

"$"$"% ������- � ,������ 9

����)*�5"�0 -���/+�)-�;��)��)��-(*�(*�(��*��*�*)(�(-.*�(��7*���*�*)(�<+�-)5�(;*�*:*6+(-�)��/�

(;*�5���(+�7-)*��*�/�� �)6*�(*�(�/�����0 *���+(�+(��)<�;*�(���(*��)�"�!)*(��/����*@+-� *)(�

�)�"�-)��- ��*�6"6�*�����-6�(-�)�'3�������(;*���*�/�� �)6*�(*�(��*���))*�%�* -��-�)��(*�(-)5%�

)�-�*�(*�(-)5��)<��(;*��(*�(����*�(;*��*���)�-7-�-("��/�(;*�6+�(� *��7+(� �"�7*��//*�*<�

�*����(*�"3�

000011

Page 107: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*����

#3� � �(-�)����@+-� *)(��)<��*�.-6*���;*6>�-�(��)<��*�6�-�(-�)��

!�'��)6�+<*<� !�'�I +�(*<��*����(*�"�

"$'$" 4�,�����.��� �

� � �(-�)��� � ����������+�7-)*�

!�'� � �(-�)��� � �9��������+�7-)*�

� � �(-�)��� � �9��J������+�7-)*�

� � �(-�)�� � � �9��J��8������+�7-)*�

� � �(-�)��� ��(���"��)6���*<�? �(*���-������*<��*)*��(���!��? ��'�

� � �(-�)��� ��(���"��)6���*<��-���-������*<��*)*��(���!�����'�

� � �(-�)�� � ��(*�)�(*��-<*��:;�+�(��)<��+:-�-��"��>-<�

� � �(-�)�� � ��(*�)�(*��-<*��-)*�-<*��)<�D *+(�����+7-6�*��

� � �(-�)��� �-@+-<��+*���"�(* �

� � �(-�)�K� �+����+*���"�(* �

� � �(-�)�L� ? �(*���)C*6(-�)��"�(* �

!�'� � �(-�)��� ��"���0 �� -��-�)���"�(* �!���'�

� � �(-�)� � �+��*���*�)��-���-�(*��

� � �(-�)�D � �� 7+�(-�)��-������-)5�M��.�����(-.*�����-)5�

� � �(-�)�� � �� 7+�(-�)��-������-)5�M��;-��*����-��

� � �(-�)��� �� 7+�(-�)��-���*�(-)5�M��+�(� *���*�(*<�

� � �(-�)�I � �+7*�� -������*��M��-),��)�

� � �(-�)�� �+7*�� -������*��M��+��*:��;*���A ��+7*�

� � �(-�)��� �����6>+���-5;(-)5�

� � �(-�)��� *<+)<�)(�B*)(-��(-�)��"�(* �

!�'� � �(-�)�� � D -6>*����< -+ ���((*�-*��

� � �(-�)�B� � )��-)*�? �(*��? ��;��"�(* �

� � �(-�)�? � � �(-6������ *��*(*6(����

� � �(-�)��� * �(*�? ��>�(�(-�)�

� � �(-�)�� �+������<��(�-)5��*�(�

!�'� � �(-�)�N� ? -)(*�-��(-�)�(��M���,��&��

"$'$' �3�� 7�7�,�.��=��.- � ��.��� �

� � �(-�)����� ���6>��(��(��"�(* �

� � �(-�)���� ��0 *����)(���� �<+�*�

� � �(-�)���� � )-(� �(�����)(�����*)(*��

� � �(-�)���� �0 -(6;5*���

� � �(-�)���� #�9�B������((*�"��"�(* �

� � �(-�)���� �)�*(��-���;-��-)5��"�(* �

� � �(-�)��� � �- ��*��"6�*��:;�+�(��"�(* �

� � �(-�)��� � �*)*��(����(*��� �����)�/�� *��

!�'� � �(-�)���� �-��(��-����/��+7�-6�)(��

� � �(-�)�KK� �-@+-<��+*���*)(�-/+5*� �<+�*�

!�'� � �(-�)�LL� �)6;��-)5��"�(* �

000012

Page 108: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�1��

� � �(-�)���� ? �(*����*�( *)(��"�(* �

"$'$# �����,��.��� �

� � �(-�)����� �*6;)-6����+�*�.-�-�)�

� � �(-�)����� ���)����(�(-�)��*�.-6*��

000013

Page 109: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�&��

"$'$/ 4�,�����.��� �8��,��.��� �

������, �� ����������$���

�*�/�� �)6*#�-��)� -)���"���(*<��(�����0 *���+(�+(��/�#13#� ? ��)<���;*�(���(*��/�$%19$�

�(+,>? �;3���;-�����<+6(�+(-�-�*����� ���*���-��/-�(*��;�+�*��)<�5*)*��(���(;�)�(;*�� �9���(��

���.-<*�(;*���0 *�(�O�,� ? �����-7�*3�������5*���-��/-�(*��;�+�*%�5*)*��(��%��)<��66*����-*��6�)�

7*����.-<*<�������*����(*���(-�)�/���/+(+�*�5���(+�7-)*�+�5��<*�3�

������- �� ����������$���

�*�/�� �)6*#�-��)� -)���"���(*<��(�����0 *���+(�+(��/���3&� ? ��)<���;*�(���(*��/�$%82��

�(+,>? �;3���;-�����<+6(�+(-�-�*����� ���*���-��/-�(*��;�+�*�(;�)�(;*�� �9��J�(�����.-<*�(;*�

��0 *�(�O�,� ? �����-7�*3�������5*���-��/-�(*��;�+�*�(;�)�(;*�� ����%�5*)*��(��%��)<�

�66*����-*��6�)�7*����.-<*<�������*����(*���(-�)�/���/+(+�*�5���(+�7-)*�+�5��<*�3�

������. �� ����������$���

�*�/�� �)6*#�-��)� -)���"���(*<��(�����0 *���+(�+(��/��$3$� ? ��)<���;*�(���(*��/�&%$81�

�(+,>? �;3���;-�����<+6(�+(-�-�*����� ���*���-��/-�(*��;�+�*�(;�)�(;*�� �9��J��8�(�����.-<*�

(;*���0 *�(�O�,� ? �����-7�*3�������5*���-��/-�(*��;�+�*%�5*)*��(��%��)<��66*����-*��6�)�7*�

���.-<*<�������*����(*���(-�)�/���/+(+�*�5���(+�7-)*�+�5��<*�3�

������5 �� �����6� �����$���

�*�/�� �)6*#�-��)� -)���"���(*<��(�����0 *���+(�+(��/�2�3�� ? ��)<���;*�(���(*��/�&%&�1�

�(+,>? �;3���

������� ����!! ���!����7 ����8, ��.��!��� ��������9��7 ,.:

����6+�(� *���0 ;����*/*����6���*<�6-�6+-(��-���"�(* �0 -(;�0 �(*�,�-��6���-)5�-)����6*��/�(;*�

/-�(*�*<��-��6���-)5��"�(* �)�� ���"����.-<*<3���+�(� *�� +�(��+���"�(�*�(*<�0 �(*�%�&9�°��!�$�°�'����6���*�%�(��(;*�5*)*��(��3��D *6*����"�/��0 ���(*�%���*��+�*��)<�;*�(��*C*6(-�)�)+ 7*�����*�7��*<��)�(;*�5*)*��(���6;��*)3���/�(;*�6���-)5�0 �(*��-��(��7*��*+�*<%���

6+�(� *���+���-*<�6-�6+��(-�)�0 �(*��6���-)5������-���*@+-�*<�/���(;*�����*��;*�(��*C*6(-�)3��

�+��*)(�"%��)�"�����+�;�5*)*��(���-���.�-��7�*�0 -(;�(;-����(-�)3�

������� ����!! ���!����, ��8, ��.��!��� ��������9��,,.:

����6+�(� *���0 ;����*/*����6���*<�6-�6+-(��-���"�(* �0 -(;��-�,�-��6���-)5�-)����6*��/�(;*�

/-�(*�*<��-���"�(* �)�� ���"����.-<*<3���+��*)(�"%��)�"�����+�;�5*)*��(���-���.�-��7�*�0 -(;�

(;-����(-�)3

���������������������������������������� ��������������#���� �6�)<-(-�)��0 -(;�8P�� �� �-)�*(�������)<��P���� �*:;�+�(�����%�)��D � :��7�(* *)(%�#$%�����(+,�7���B�)�(+����5��%�#23&�

>B��)<��3$���0 *��/�6(��3�

000014

Page 110: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�$��

������� ,!�������+����'��������,�'�!��� +;��

���.-*0 *<�/�� �(;*�*:6-(*��*)<��/����(�)<��<�+)-(%�(;*�*:;�+�(��)<��+:-�-��"��>-<���*���6�(*<�

�)�(;*��-5;(��-<*��/�(;*�+)-(3��? ;*)���*6-/-*<%�(;*�*�6� ��)*)(��6�)�7*��0 -(6;*<�(��(;*��*/(�

�-<*3�

������� ,!�������+��������������/ �����!.�$��!��

���.-*0 *<�/�� �(;*�*:6-(*��*)<��/����(�)<��<�+)-(%�(;*�5*)*��(����-)*��-<*�6+7-6�*�-���)�(;*�

�*/(�;�)<��-<*��)<�(;*�)*+(����6+7-6�*�-���)�(;*��-5;(�;�)<��-<*3��? ;*)���*6-/-*<%�(;*�

��6�(-�)��/�(;*�*�6+7-6�*��6�)�7*��*.*��*<3����0 *.*�%�(;*�(*� -)�(-�)�7�:�/���5*)*��(���

-)�(�+ *)(��)<�6�)(����0 -�-)5�7�:�! ���'%� +�(��* �-)��)�(;*��-5;(�;�)<��-<*3�

������# ��<������!+ ����

�;*�5��*�+��/+*���"�(* �-��<*�*(*<��)<��*���6*<�7"����-@+-<�/+*���"�(* 3���"�-6����-@+-<�/+*���

-)6�+<*���#%����%����K�83��+�(� *�� +�(��+���"��-@+-<�/+*��(��(;*�6�))*6(-�)��(�(;*��+:-�-��"�

�>-<��(����8����-5�!#2&��1��>��5'��)<��(��*��(����°��!##�°�'��7�.*�(;*�0 �:���-)(�(* �*��(+�*3���+�(� *���+���-*<�/+*�� +�(�7*�6�*�)%�/-�(*�*<��)<� **(�(;*������*6-/-6�(-�)�

�������������!�**��*6(-�)�23#3�'3���;-����(-�)�-���)�"��.�-��7�*�0 -(;�(;*��-)5�*��))+����

6� 7+�(��3���+�(� *�� +�(����.-<*��+���"��-�-)53�

������= 5��!���!+ ����

? ;*)���*6-/-*<%�(;*���6>�5*�6�)�7*�/+�)-�;*<�0 -(;�6� ��*(*�/+*���"�(* ��/���(0 ��<-//*�*)(�

/+*��3���;-��6�+�<�-)6�+<*�(0 ��5��*�+��/+*��%�(0 ���-@+-<�/+*�������)*�5��*�+���)<��)*��-@+-<�

/+*�3���;�)5*�.*��-��-)-(-�(*<� �)+���"��(�(;*�+)-(�6�)(������)*�%�����+(� �(-6���"%�-/�(;*�

��*��(-)5�/+*���+���"���*��+�*��;�+�<�5��<+���"�<*6�*��*3���;-����(-�)�-���)�"��.�-��7�*�0 -(;�

(;*��-)5�*��))+����6� 7+�(��3�

������> 7 ����#�?������+ ����

��������-6�(-�)��0 -(;�D � :�* -��-�)���- -(�(-�)�%�0 �(*��-)C*6(-�)� �"�7*��*@+-�*<3���;*�0 �(*��

-)C*6(-�)��"�(* �6�)�-�(���/�-)�*(��(��-)*�%��+ �%�.��.*�%��-�-)5��)<�6�)(�����/���+�*�0 -(;���

5��*�+��/+*�%��-@+-<�/+*�����<+���/+*���"�(* 3�? �(*��-)C*6(-�)�6�)��*<+6*�D � :�* -��-�)��(���9�

�� �!9#� 5,D � 2'��)�5��*�+��/+*���)<�8���� �!&�� 5,D � 2'��)��-@+-<�/+*�3���+�(� *�� +�(�

���.-<*����+���"��/��+�-/-*<�0 �(*���*�����0 �(*����*6-/-6�(-�)� �����������2�!�**��*6(-�)�

23#32'�(��(;*�0 �(*��-)C*6(-�)��>-<��(�9�#9���-5�!28�#�2�>��5'3�

������� 5� ��& �� �������+ ���� 95��:

��<�"���0 �* -��-�)���"�(* �6�)�7*����.-<*<�/���+�*��)�5��*�+��/+*�3���;-���"�(* ��*<+6*��

* -��-�)���.*��(;*�*)(-�*���0 *����)5*�0 -(;�+(�0 �(*������(*� 3���;*� �-)�6� ��)*)(���/�

(;-���"�(* �-)6�+<*�����* -:*<�6� 7+�(��%�6� ��*������*���/�� *%�6� ��*�����<-//+�*�%�

;-5;���*��+�*�(+�7-)*�)����*%�6�)(�����"�(* %�/+*���+���"��"�(* ��)<�6;�� �(�5���;3���;-��

��(-�)�-��)�(��.�-��7�*�0 -(;�<+�������-@+-<�/+*����*��(-�)3�

000015

Page 111: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�#���

������� 1�!��.!���, ����!���

����)*�5"�6�)�/+�)-�;����+��*�6�*�)��-��/-�(*��/���(;*�5���(+�7-)*���6>�5*�-)��-*+��/�(;*�

�(�)<��<�7���-*��/-�(*�3���;-��(0 ���(�5*��*�/�6�*�)-)5�/-�(��(-�)��"�(* �-������+��/���<�"%�;-5;�

<+�(���*���!<*�*�(��->*�6�)<-(-�)�'����0 *������6��<�0 *�(;*��*).-��) *)(�;����<���+6;����

7��0 -)5��)�0 %�;���/���(��)<�-6*�/�53���-�(��(-�)�*�* *)(����*��+��*<�(��6�*�)�(;*�/-�(*��3���;*�

�+��-)5�-���*�*�(*<�+)(-������*<*(*� -)*<�.��+*�-���*�6;*<3���;*��*@+-�*<��-��6� ��*�����-��

���(��/�(;*�6+�(� *���6��*3�

������/ .�� $������, ��.��!��(@�)�������)�.��!��(

��������-6�(-�)��0 ;*)�;-5;�<�"�7+�7�(* �*��(+�*����*�6� �)��(���0 ��*��(-.*�;+ -<-("%�

*.�����(-.*�6���-)5�6�)�7*�+(-�-�*<�(��-)6�*��*���0 *���+(�+(3�

�;-���"�(* �-��<*�-5)*<�/����*6-�6+��(-�)��/�*.�����(-.*�6���-)5�0 �(*��/�� ����+ ��-)�(;*�

7�((� ��/�(;*�-)�*(��-��/-�(*�3���+�(� *�� +�(��+���"�/-�(*�*<%���(�7�*�0 �(*��(����/��)5*<�

6�))*6(-�)��)�(;*�/-�(*��;�+�*��)<� +�(�<-����*��/�0 ��(*�0 �(*��/�� �(;*�7��0 <�0 )�.��.*3�

������� .�� $������, ��.��!��(@.��!!��.��!

��0 *�-)5�(;*�6� 7+�(-�)��-��-)�*(�(* �*��(+�*�6�)�-)6�*��*�(;*���0 *���+(�+(3��? ;*)�

��*6-/-*<%�����)*�5"�6�)�/+�)-�;�;-5;��*�/�� �)6*�-)�*(��-��6;-��-)5�6�-�������)�-)(*5�������(�

�/�(;*��-��-)�*(��"�(* 3���+�(� *�����.-<*���<*@+�(*�@+�)(-(-*���/�6;-��*<�0 �(*���)<�

-)(*�6�))*6(-)5��-�-)5�(��� ���)*�5"�/+�)-�;*<�6;-��-)5�6�-����(�/-�(*��;�+�*3�

������1 .�� $������, ��������(@.����� ��������

�)(-��6*�6�-�����*��*6� *)<*<�(������0 ���/*���*��(-�)�<+�-)5�-6-)5,0 -)(*��6�)<-(-�)�3���;*�

�"�(* ��*@+-�*����;�(�0 �(*�,5�"6������+(-�)%�(��7*�/+�)-�;*<�7"�(;*�6+�(� *�%�(��6-�6+��(*�

(;��+5;�(;*�;*�(�*:6;�)5*��6�-���-)�(;*�-)�*(��-���"�(* 3�

������A ��$���!.��!��@���B���

�;-���*���6*��(;*��(�)<��<��- ��*:��;*����)<�(+7*�6���*���/���(;*��+7*��-���"�(* �3�����- ��*:�

6��*�/-)�/�)�6���*��0 -(;�<+���/�)��-�� �+)(*<��)����*����(*�/�+)<�(-�)3�

������� ��$���!.��!��@5��!�'+��!!C ��$�

�+�(� *���0 ;����*/*��<+��*:��;*����)<�(+7*��-��6���*���6�)��*�*6(�(;* �����)���(-�)�(��

�*���6*��+���(�)<��<��- ��*:��;*����)<�(+7*3�

������+ 5.-��;����(����(

����)*�5"�6�)�/+�)-�;����* *�5*)6"��-5;(-)5�-)�(;*�(+�7-)*�*)6���+�*�����)���(-�)3�����

�-5;(��(+�)��)�-/������0 *��/�-��3�

������� ���������D����!�����+ ����

����)*�5"�6�)�/+�)-�;����*<+)<�)(�/�)��)<�/-�*�<� �*��/���(;*�(+�7-)*�.*)(-��(-�)��"�(* 3

000016

Page 112: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�##��

������2 / ��;�!.��� ��� -��������

����)*�5"�6�)�/+�)-�;�)-6>*��6�< -+ �7�((*�-*������)���(-�)�(���*���6*��+���(�)<��<��*�<�

6��6-+ �7�((*�-*�3�

������D ��8����7 ����7 ���+ ����

? ;*)���*6-/-*<%�(;*���6>�5*�6�)�7*��+���-*<�0 -(;��)�Q�)��-)*P�0 ��;��"�(* %�0 ;-6;�����0 ��

6+�(� *���(��6�*�)�(;*�6� ��*������*6(-�)��/�(;*�(+�7-)*�<+�-)5�/+�����0 *����*��(-�)3���;*�

)*6*����"�)����*���)<��-�-)5���*��+���-*<��)<�(;*��� *��-���)<�0 �(*���*@+-�* *)(��+(-�-�*<�

7"�(;*��(�)<��<�Q�//��-)*P��"�(* ���*�)**<*<3�

������7 ������!�!�� �5 ��������

����)*�5"�6�)����.-<*�/-�*����(*6(-�)��"�(* ���(-6���/�� *�<*(*6(����/���(;*�(+�7-)*�

*)6���+�*�0 ;*)��*@+-�*<�7"�(;*�6+�(� *�3�

������* ��� ���7 ��;�������

����)*�5"�6�)�/+�)-�;���* �(*�? ��>�(�(-�)�������(��/�(;*�6�)(�����"�(* 3���;*� �<+�*�

6�)�-�(���/G�

• �*�>(������*@+-��*<�0 -(;��)��(;*�)*(����,����*�-������(�/���6� +)-6�(-�)�0 -(;�

(;*���)(�����"�(* ��

• �)- �(*<�5���;-6���<-����"���/�(;*�(+�7-)*%�5*)*��(��%��)<��+:-�-��"��"�(* ��)���5�

�)<�<-5-(������� *(*���

• � -�(��-6�����55-)5��)<�(�*)<-)5��"�(* �(;�(�6�)��(��*,<-����"�;-�(��-6���<�(��

• �)6�+<*��(;*�6���7-�-("�(�����.-<*��*�-�<-6��*���(��

• ���.-<*��(;*�6���7-�-("�(���(��(%��(��%��)<�6�)(����(;*�5���(+�7-)*�5*)*��(����"�(* �

�/(*���� �)+����0 -(6;��)�(;*��+�7-)*���)(������)*��-���0 -(6;*<�(���* �(*�6�)(���3�

������3 ��!!����+����(����

����)*�5"�6�)�6�)<+6(���/+�����**<%�/+������<��(�-)5�(*�(�0 -(;�(;*�*:6*�(-�)��/�0 �(*��-)C*6(-�)�

D � :��7�(* *)(��"�(* �3�

������E 7 ������ �������@���B8�F.

����*@+-� *)(���*��(-)5�-)�6��<�6�- �(*�%�7*��0 �8��R��!838�R�'%�� ���*6� *)<����

0 -)(*�-��(-�)���(-�)3���;-����(-�)� �"�-)6�+<*%�7+(�)�(��- -(*<�(��(;*�/����0 -)5�

�<-/-6�(-�)��<*�*)<-)5��)�(;*��*.*���/�0 -)(*�-��(-�)��*@+-�*<G�

• �)�*(��-���)(-�-6-)5�!�**���(-�)�� ��)<���(-�)��'�

• �*�(�(��6-)5��)<�-)�+��(-�)��/�����-6�7�*�+)-(� �+)(*<��-�-)5�

• �)6���-)5��)<�;*�(-)5�*:���*<�-)�(�+ *)(���)<�*@+-� *)(%�����*�*6(*<�7"����

�)*�5"3�

• ? -)(*�-��(-�)�*)6���+�*��/���(;*��+:-�-��"��>-<��)<�(;*�5*)*��(��%�����*�*6(*<�7"����

�)*�5"3���;*�*)6���+�*�%�0 ;*)��*@+-�*<%����(*6(�*@+-� *)(�-)�6��<�0 *�(;*���)<���*�

*@+-��*<�0 -(;�;�)<�;*�<�/-�*�*:(-)5+-�;*��3�

000017

Page 113: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�#���

����� 7-*)(�(* �*��(+�*��7*��0 ��°��!M#13&°�'%�(;*��7�.*� �<-/-6�(-�)����+���<<-(-�)���

��*6-���*@+-� *)(�0 -���7*��*@+-�*<3����)�+�(�����)*�5"�/���<*(�-��3�

000018

Page 114: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�#2��

"$'$1 �3�� 7�7�,�.��=��.- � ��.��� �8��,��.��� �

������,, -!��;+����+ ����

����7��6>��(��(�%�(;*�<-*�*��5*)*��(������.-<*����0 *��/���.*)(-��(-�)�/�)�%��66*����-*���)<�

�(��(*�� �(��3�������5*��<-*�*��5*)*��(����*(� �"�7*��*@+-�*<�-/���)�(+����5���/+*��

6� ��*���������(;*����*6-����+:-�-��-*����*���*��(*<�<+�-)5�(;*��(��(-)5��*@+*)6*3�

������-- 1�& ��.�����!� ���!�

����)*�5"����.-<*����0 ��>�-)%���*�/�7�-6�(*<���0 *����)(���� �<+�*�!�� '�<*�-5)*<�/���(;*�

-)�(����(-�)��/�(;*�5���(+�7-)*���6>�5*�*�*6(�-6���6�)(����5*�����-���(��(;*����-.����(�(;*�

C�7�-(*3�������:- �(*�<- *)�-�)���/�(;*��� ���*��9�/(�:�#9�/(%�29�/(�:�#9�/(%����9��/(�:�#9�/(3��

�;*��� �6� *��6� ��*(*�0 -(;��)�* *�5*)6"��-5;(-)5��"�(* %�-)(*�-���6�7�*�(��"%��-5;(-)5�

�)<�6�).*)-*)6*��*6*�(�6�*�3�

�;*���*�/�7�-6�(*<�6�)(����7+-�<-)5��;����6�)/�� �-)�<*�-5)%����* 7�"%� �(*�-�����)<�

�*�/�� �)6*�0 -(;�(;*��*@+-�* *)(���/�(;*���(*�(�*<-(-�)��/�(;*�/����0 -)5��(�)<��<�G�

• D�(-�)�����*6(�-6� �)+/�6(+�*������6-�(-�)�

• D�(-�)�����*6(�-6���<*�

• D�(-�)����-�*����(*6(-�)�����6-�(-�)�

• � *�-6�)��)�(-(+(*��/��(**����)�(�+6(-�)�

• � *�-6�)�? *�<-)5���6-*("�

• � *�-6�)�D �(-�)����(�)<��<���)�(-(+(*�

• � *�-6�)���6-*("�/����*�(-)5��)<� �(*�-����

• �)�(-(+(*��/���*6(�-6����)<���*6(��)-6��)5-)**���

• �)-/�� ��+-�<-)5���<*�

• �(**���(�+6(+�*����-)(-)5���+)6-��

• � 66+��(-�)�����/*("��)<��*��(;��< -)-�(��(-�)�

• ����)*�5"���*6�I ���9���? *�<-)5��)��*6(-�)�

• ����)*�5"�M��*)*������*6-/-6�(-�)�

• ��)�<-�)��(�)<��<������6-�(-�)�

��-���(���;-� *)(%�(;*�/����0 -)5�*@+-� *)(�0 -���7*���*�-)�(���*<��)<�0 -�*<�-)(��(;*��� G�

• �����+�7-)*���)(������)*��

• �����+�7-)*� �(�����)(�����*)(*��

• �8�B�����)<�#�9�B������((*�"��"�(* ��

������.. 2 ���� ����.�����!.�����

��/�**�(�)<-)5��-)*+���/� �(���6�)(�����/������� �(����/+�)-�;*<�7"�����)*�5"�6�)�7*��+���-*<3��

�;*� ���-���+-(�7�*�/���-)<����-)�(����(-�)�-)��)���(-�)��� �<+����6�)(������� �����(;*��)�)�

;����<�+����*��-)��66��<�)6*�0 -(;�����)*�5"��)<+�(�-��� �(�����)(������*6-/-6�(-�)�3�

000019

Page 115: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�#8��

������55 +& ����(���

����)*�5"�6�)��+���"�(;*�5*)*��(���6-�6+-(�7�*�>*���)<��*��(*<��0 -(6;5*�����������(��/��+��

*@+-� *)(��6��*3���@+-� *)(�6�)/�� ��(��(;*�����)*�5"��)<+�(�-����0 -(6;5*���

��*6-/-6�(-�)�%����(����*6-/-6�(-�)��/+�)-�;*<�7"�(;*�6+�(� *���)<��*.-*0 *<�7"�����)*�5"�

7*/��*�@+�(�(-�)3�

�������� 0��D5.-����� + ����

����)*�5"����.-<*����6� �)�#�9�B����7�((*�"��"�(* �/���(;*�5���(+�7-)*���6>�5*3���;*�

�"�(* �-)6�+<*��7�((*�-*�%�6;��5*����)<�#�9�B����6-�6+-(�7�*�>*���(;�(���*�-)�(���*<�-)���

/�**�(�)<-)5�.*)(-��(*<�6�7-)*(�/���-)�(����(-�)�-)�(;*���0 *����)(���� �<+�*�!�� '3���;*�

7�((*�"��"�(* �*)6���+�*�-)6�+<*������-���6�)(�-) *)(�(��"3�

�;*�<*�-5)�6;���6(*�-�(-6���/�(;*�#�9�B����7�((*�"��"�(* ���*����/����0 �G�

��((*�"��"�*� D -��<�

��((*�"��-�*�!��;�'� #���

�������� #�!��, ��.��!!��(+ ����

����6>�5*<�6;-��*�� �<+�*%�6�)(�-)-)5�(;*� �C��-("��/�(;*�*@+-� *)(�)*6*����"�(��6�)<-(-�)�

���6;-���(;*�-)�*(��-��(��(;*�5���(+�7-)*��)<� �-)(�-)�(;*�<*�-�*<���0 *���+(�+(�<+�-)5�;�(�<�"�

6�)<-(-�)�3���)��<<-(-�)�(��*.�����(����+ ��%�6�)<*)�*���+ ��%�7���)6*�.��.*�%�6;*6>�

.��.*�%��;+(�//�.��.*�%�*:��)�-�)�(�)>%��)<�-)(*5�����-�-)5S�(;*���6>�5*�6�)(�-)��(;*�0 �(*��

6���*<�6*)(�-/+5���6;-��*�����.-<-)5�6;-��*<�0 �(*��(��(;*��-��-)�*(�6�-�3�

��6� ��*(*�-)<���� �(���6�)(����6*)(*���)<�6�)(������)*��6�)(�-)-)5�����(;*�*�*6(�-6���

�0 -(6;5*��%�7�*�>*����)<���0 *��<-�(�-7+(-�)��"�(* �-����6�(*<�-)�(;*��6�+�(-6���"�(�*�(*<%�

*).-��) *)(���"�6�)<-(-�)*<� �<+�*3���;-��6*)(*�����.-<*��(;*�-)(*�/�6*�7*(0 **)�(;*� �-)�

6�)(������� ��)<�(;*�-)�*(�6;-��-)5��"�(* 3���)��<<-(-�)�(��("�-6���(* �*��(+�*��-5)���-)�+(%�

(;*�+)-(��66*�(������ ��)<��;+(<�0 )�<-�*6(-�)��)<��+(�+(��6� ��*(*���*)����(�6���

�)-(��-)5�7"�;��<0 -�*<��*�-���6�))*6(-�)3�

�;*�*)6���+�*�-(�*�/�-�����*�/�6�)(�-)*<�*)6���+�*�0 -(;��(��(*5-6���"���6�(*<�!-)6�+<-)5�

�* �.�7�*����/���)*��'��66*����)<�*)(�"�<����3���;*�7��-6��>-<�-�����.-<*<�0 -(;��)6;���7��(�

;��*���)<��*.*�-)5�7��(��/���/�+)<�(-�)� �+)(-)5��+����*�3���;*�6���-)5�(�0 *��-��)�(�

-)6�+<*<3�

�������� +�� �!�. �!��'�����+ ����

����)*�5"�6�)�/+�)-�;��)�*:;�+�(��-�*)6*�����* 7�"�/����- ��*�6"6�*�-)�(����(-�)�3���;*�

���* 7�"�-)6�+<*���)�*:;�+�(�*:��)�-�)�C�-)(%���$��<*5�**�*�7�0 %��)<���$��<�!�'��-�*)6*��0 -(;�

-)(*�)���"�-)�+��(*<�8�$��(�-)�*����(**���-)-)5��)<��)�*:;�+�(��(�6>�0 -(;���(�(���;*-5;(��/�2��/(�

!$3#� '3����(-�)��-)6�+<*�<-//*�*)(��(�6>�;*-5;(�%��)�&9�<�!�'��-�*)6*�%������� ��-)5����(���)<�

���(/�� �%��)<���<-.*�(*��.��.*�/���/+(+�*�����<+6(-)53�

000020

Page 116: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�#9��

�������� ���������+���82 ���������� ��

����)*�5"����.-<*����7+�(%�;-5;�*//-6-*)6"��(*��+��(��)�/�� *��%�<*�-5)*<��)<�(*�(*<�(��

������(�)<��<�3�����)�/�� *��;-5;�.��(�5*��*.*��%�(���6;�)5*����)<���/*("�/*�(+�*����*�7+-�(�

(�� �(6;�6+�(� *�H���-(*��*@+-�* *)(3�

������## �������!!����$�������

����)*�5"�/+�)-�;��/-��(�/-����/��+7�-6�)(������)���(-�)3���+7�-6�)(��(��-)6�+<*�(+�7-)*��+7*��-�%�

5*)*��(����+7*��-���)<�;"<��+�-6��(��(�/�+-<3�

������== ��<������!.�������(�� ���!�

���-@+-<�/+*��6*)(�-/+5*��>-<�-�����.-<*<�(���* �.*�0 �(*��7��*<�6�)(� -)�)(��-)�(;*�

6+�(� *���+���-*<�/+*�3���;*��"�(* �6�*�)��(;*�/+*��/�� �(;*�6+�(� *���+���-*<��(���5*�

(�)>��)<�/��0 ��<��-(�(��(;*�6+�(� *���+���-*<�<�"�(�)>3

������>> ,�������(+ ����

����)*�5"����.-<*�����"�(* �+(-�-�-)5�/-:�(����(���)6;���(;*�5���(+�7-)*�5*)*��(�����6>�5*�

(��(;*�6+�(� *��/�+)<�(-�)3���;*��"�(* �����0 ��/�������*��-)�(����(-�)��)<���-5) *)(��/�(;*�

����+���-*<�*@+-� *)(3�

�������� 7 ���������� ���+ ����

����)*�5"�6�)��+���"���0 �(*��(�*�( *)(��"�(* �6�)/-5+�*<�(�����.-<*�(;*��*@+-�*<�@+�)(-("�

�)<�@+��-("��/�0 �(*�3���;*�<*�-5)�-)6������(*��/*�(+�*��(��*);�)6*��*�/�� �)6*%��*�-�7-�-("%�

�)<�-)6������(*���<.�)6*<�*�*6(���<*-�)-��(-�)�(*6;)���5"�(��<*�-.*��;-5;��+�-("�0 �(*��

0 -(;�+(�(;*�)**<�/���;����<�+��6;* -6���3���(�-�����.-<*<�6� ��*(*�"����* 7�*<%�-)�(���*<�

�)<�0 -�*<�-)����*����(*��(�)<����)*�*)6���+�*3���-*�<����* 7�"�-��.-�(+���"�*�- -)�(*<��)<�

6�))*6(-�)��*@+-�* *)(���(�(;*�C�7��-(*���*� -)- ��%����(;�(�/-*�<���7���6��(����*���0 3��� -5;�

�+�-("�0 �(*��-���*@+-�*<�-)�(;*�(+�7-)*���*��(-�)��������*(�*�( *)(�(����(- -�*�*//-6-*)6"%�

��*6-/-6���"�-)�(;*���*����)�D � :��+���*��-�)3�

000021

Page 117: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�#���

"$'$2 �3�� 7�7�,�.��=��.- � �� 7�����,��.��� �8��,��.��� �

������,,, ��������!+����)�����

����)*�5"�0 -������.-<*�(*6;)-6����<.-���"��+�*�.-�-�)��*�.-6*��/���(;*��)�(����(-�)��)<�

�� -��-�)-)5��/�(;*�6� 7+�(-�)�(+�7-)*���6>�5*3���)�(����(-�)��*�.-6*��0 -���-)6�+<*�

�+�*�.-�-)5�(;*�-)�(����(-�)��/�(;*�6� 7+�(-�)�(+�7-)*���6>�5*�7"�(;*�� 0 )*�H��6�)�(�+6(-�)�

6�)(��6(��3���� -��-�)-)5��*�.-6*��0 -���-)6�+<*�/�+�;-)5��+�*�.-�-�)%�6;*6>�+(%��)<�

6� -��-�)-)5��+�*�.-�-�)��/�6� 7+�(-�)�(+�7-)*� *6;�)-6����"�(* �%�6;*6>�+(��)<�

6� -��-�)-)5��+�*�.-�-�)��/�6� 7+�(-�)�(+�7-)*�*�*6(�-6����"�(* �%��)<�6;*6>�+(��)<�

6� -��-�)-)5��/�(;*�6� 7+�(-�)�(+�7-)*���6>�5*�6�)(�����"�(* 3������)*�5"�0 -������.-<*�

����5*)*����;�)<�(������*@+-�*<�/���(;*�6� -��-�)-)5��/�(;*�+)-(3����+�;-)5��)<�6��-7��(-�)�

>-(��6�)������7*����.-<*<��(�����)*�5"��(�)<��<��+7�-�;*<���(*�3���

�;*��*���))*���*@+-�*<��(��-(*�/���(;*�-)�(����(-�)��)<�6� -��-�)-)5��/�(;*�6� 7+�(-�)�

(+�7-)*���6>�5*��-�����)�(*<�7*��0 3���;*��6��*��/�0 ��>�-)6�+<*<�-)�(;-��������������+ *��

(;�(�(;*�-)�(����(-�)��)<�6� -��-�)-)5��6;*<+�*��/�(;*�6� 7+�(-�)�(+�7-)*���6>�5*�-��)�(�

- ��6(*<�7"�(;*�-)�(����(-�)��)<�6� -��-�)-)5��6;*<+�*���/��<<-(-�)���7���)6*��/����)(�

*@+-� *)(�(;�(�-��)�(����.-<*<�7"�� ���)*�5"�!�+6;������<* -)*���-�*<�0 �(*�����)(%��(*� �

(+�7-)*%�5���6� ��*�����%�*(63'3�

����)*�5"��-(*� �)�5*�M�� )*�!#'�-)<-.-<+���/�����(�(����/���� � �)�;�+��3�

*6;�)-6����)<���)(��������M���(����/���� � �)�;�+���7*(0 **)�(;*�*�-)<-.-<+����

�����-)6�+<*<�-)�(;*��*�.-6*��@+�(*<���*�(;*�.��-�+��6� 7+�(-�)�(+�7-)*���6>�5*�.*)<����

0 -���7*��*@+-�*<�(��6� -��-�)���*6-/-6�6� 7+�(-�)�(+�7-)*���6>�5*�6� ��)*)(�3���;*�*�

��*����)�(*<�7*��0 G�

�*)*��(�����*6-��-�(�M��;-��-)<-.-<+���0 -���7*��*���)�-7�*�/���(*�(-)5��/�(;*�5*)*��(����)<�

6� -��-�)-)5��/�(;*��+(� �(-6�.��(�5*��*5+��(����"�(* 3�

�;*�)�� ���0 ��>0 **>�0 -���7*��- -(*<�(�����;�+���!(*)�!#�'�;�+����*��<�"�/����-:�!�'�<�"���*��

0 **>'3���(�)<7"�(- *�0 -���7*�7-��*<�-)6�* *)(���(��(;*�;�+���)�(*<��7�.*��(�(;*�*//*6(-.*�

��(*���(�(- *��/��*�.-6*3���/�(;*��)�(����(-�)��)<��� -��-�)-)5��6;*<+�*�<-6(�(*����)5*��

0 ��>-)5�;�+��<+��(-�)��(;*)��<<-(-�)����*��+�6*��6�)�7*����.-<*<��)��)�-)6�* *)(���<�-�"�

��(*�7��-�3���;*���-6-)5�/���(;*�*��*�.-6*��-)6�+<*������(��.*���)<��-.-)5�*:�*)�*���)<�-��7��*<�

�)����-)5�*� �7-�-��(-�)�/���*�6;�-)<-.-<+��3�� +�(-��*� �7-�-��(-�)��������*�+�(��/�(;*�

� 0 )*�H��6�)�(�+6(-�)��6;*<+�*�0 -���7*�7-��*<��66��<-)5�"3�

����)*�5"�;������.-<*<��)�*�(- �(*%��)����+ ���+ �7��-�%�/���(;*�/-*�<��*�.-6*��*@+-�* *)(��

�����*��*<��+(�-)�(;-���*6(-�)��/�(;*���������3���)���<*��(�����.-<*����+ ���+ �)+ 7*�����

�)*�5"�;������+ *<���6�)�(�+6(-�)��6;*<+�*�(�����-.*��(�(;*� �)�;�+��*�(- �(*��-��+�(��(*<�

�7�.*��)<�(;*���(*�;**(��(�(- *��/�(;*����������!�**��*6(-�)�239'3����0 *.*�%�(;*��*�.-6*��

0 -���7*�7-��*<��(�(;*���(*��(�(- *��/��*�.-6*3���;�+�<�(;*�� 0 )*�H���6;*<+�*����(;*�� 0 )*�H��

000022

Page 118: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�#1��

6�)�(�+6(-�)�6�)(��6(��H��*:�*�-*)6*��*�+�(�-)��)�-)6�*��*�-)�(;*�6�)�(�+6(-�)�<+��(-�)�

���+ *<�(;*���(*�(�.*��-�)��/�(;*�*)6���*<��*�.-6*��(*��0 �+�<�7*�����-*<�����������-�(*3�

������--- ��������������+��)����

����)*�5"�0 -���6���<-)�(*��)<����.-<*�(��)����(�(-�)��*�.-6*��/�������5���(+�7-)*�5*)*��(���

*@+-� *)(�(��(;*�6+�(� *��C�7�-(*3��!D � ��G�����)����(�(-�)�/����*�*6(*<�����)6*��/����)(�

*@+-� *)(�6�)������7*����.-<*<�+��)��*@+*�(3'��� //����<-)5��(�C�7�-(*�-��7"��(;*��3�����

�)*�5"�0 -���*.��+�(*%�7��*<��)�(;*����C*6(��-(*�6�)<-(-�)�%�(;*� ��(�*:�*<-(-�+�� *�)���/�

(��)����(-)5�(;*�*@+-� *)(�(��*)�+�*�(- *�"��)<�6� ��-�)(����-.��3���

�*� ���/�<*�-.*�"��/�(;*�� ���)*�5"��+���-*<�*@+-� *)(�0 -���7*����(��)<��)�+��)6*���-<�(��

� 0 )*�H��C�7�-(*�!��������*���)6�(*� ������'3���/��6*�)��;-� *)(�-���*@+-�*<%�����)*�5"��;����

+(-�-�*���D � D ����/��55*<�.*��*�3������)*�5"�;���-)6�+<*<��)�-)<-6�(-.*�(��)����(�(-�)�6��(�

/���(;-���//*���(�-6(�"��)�����������7��-���(�(;-��(- *3���6(+���(��)����(�(-�)�6��(���;����7*�

7-��*<�(��(;*��+�(� *���)��)��6(+���6��(�J#�F �7��-�3�

000023

Page 119: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�#&��

#32 �- -(���/�� ���)*�5"��6��*�A ��:6�+�-�)��

"$#$" ��- �����+�� ��9��,�.�

�-�(*<�7*��0 ���*�(;*��- -(�,*:6�+�-�)��(��(;*�����)*�5"��(�)<��<��6��*��/��+���"3�������-�-)5%�

0 -�-)5%�6�7�*�%�<+6(�%�*(63�6�))*6(-)5�(��(;*�*���-)(��-��/+�)-�;*<�7"�6+�(� *��!�(;*��'�

+)�*��� �<-/-*<�7"���*6-/-6�(-�)��5�** *)(3�

�<���� ���+ ���� � ��� �����������( +�����

• �����-�-)5%�-)6�+<-)5��+*�����%��+*��� -�%�

�(*� %�����-)5�? �(*�%��*�(-)5�? �(*�%�

�* -)*���-�*<�? �(*�%��+7*�� -�%�

�� ��*��*<��-�%��)�(�+ *)(��-�%�

�"<��+�-6��(��(�� -�

• ���)5*<����(;�*�<*<�6�))*6(-�)��)�����)*�5"�

7��*���(*3

• �)�*(��-��(���-�(*�� • �( ���;*�*�!)�)��(�)<��<�<+6(�7"��(;*��'�

• �+�7-)*���6>�5*�B*)(-��(-�),����-)5�

�-��

• �( ���;*�*�!)�)��(�)<��<�<+6(�7"��(;*��'�

• �+�7-)*��:;�+�(� • �:;�+�(�/��)5*��)� �-)�7��*���(*�

• �)�(�+ *)(���)�����)*�5"H�����*���(*� • �*� -)���7�:��)�7��*���(*�

• �)�(�+ *)(�0 -�-)5�-)��+�7-)*���)(����

��)*��

• �*� -)���-)��+�7-)*���)(������)*��

• � -5;�B��(�5*���))*6(-�)�� • �+��7���-)�� ���)*�5"��-)*�-<*�6+7-6�*�

• �*)*��(������+)<���))*6(-�)�� • ����)*�5"�D *+(����6+7-6�*�

• ��*6(�-6� �(���� • �*� -)���7�:��)�-)<-.-<+��� �(���

• ��<<*����)<����(/�� ��/����-���-�(*�� • ��<<*����)<����(/�� ��/����)�*(��-���-�(*��

�-)(*)�)6*��)�"�

• �8�B������((*�-*���)<��;��5*���/���

��)(�����"�(* ��)<��-�*��)<�����

�"�(* ��

• ��((*�"�(*� -)����(��7��*���(*�!-/��+���-*<�

����*'�

000024

Page 120: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�#$��

"$#$' �3,����� �

• �-.-��*)5-)**�-)5�<*�-5)��/��)"�>-)<�

• �+-�<-)5��)<�6-.-��0 ��>��

• �-(*�/�6-�-(-*��

• �+����(��(**�0 ��>���)<�;�)5*���/���(;*�5���(+�7-)*�<+6(-)5%��-�*)6-)5%��)<��-�*�

0 ��>�

• ����-)�*(%�*:;�+�(%��)<�.*)(-��(-�)�<+6(-)5��(;*��(;�)�-)6�+<*<�-)�(;*��6��*��/�

�+���"�

• ���-)���)<,���.*)(��-�-)5�/�� �(;*�5���(+�7-)*���6>�5*�(�����* �(*���-)(�

• �+*���(���5*%�(�*�( *)(��)<�/��0 ��<-)5��"�(* �

• �-(*�5��+)<-)5�

• �-5;()-)5����(*6(-�)�

• ��0 *���"�(* ��(+<-*��

• �*)�-)5��)<� *(*�-)5�.��(�5*�(��)�/�� *���

• �6;-)*���0 *��(��)�/�� *��%��)<�����6-�(*<����(*6(-�)�

• ��-<�/�-�+�*�<*(*6(-�)�*@+-� *)(�

• �//����<-)5%�(��)����(�(-�)��)<��(���5*�

• �//��>-<�6�7�-)5%��)<�<*�-5)��/��//��>-<�6�7�*���+(-)5�

• ����)6*��/����)(��)<�*)*�5"���(- -��(-�)�6�)(�����

• �)6;���7��(�%�* 7*< *)(�%��)<�5��+(-)5�!@+�(*<��*����(*�"'�

• �-�(�-7+(*<����)(�6�)(����

• �+�(� *�E���* �(*�6�)(����

• �-*�<��+�*�.-�-�)�!@+�(*<��*����(*�"'�

• �-5;�.��(�5*�(��)�/�� *�!�'%�6�7�*�%��)<�����6-�(*<�*@+-� *)(�

• �)(*�6�))*6(-)5��-�-)5%�6�)<+-(%��)<�0 -�-)5�7*(0 **)�*@+-� *)(� �<+�*��

• ���)(�+(-�-(-*�%�-)6�+<-)5�6� ��*��*<��-���+���"��)<��//��>-<��-�-)5�

• ��((*�"�6�)(�-) *)(�

• �+7*��-�� *��+�* *)(��(;*��(;�)�(;�(�<*/-)*<�-)�(;*��6��*��/��+���"�

• �<<-(-�)����+7*��-��7�*�(;*��<+6(-)5��(;*��(;�)�(;�(�<*/-)*<�-)�(;*��6��*��/�

�+���"�

• �+*��(��)�/*���+ ��

• �//��>-<�/+*��7��6>��)<�.*)(�.��.*��

• �+*���+���"��-�*0 ��>�7*"�)<�(;*��6��*��/��+���"�

• �*)*��(���6�)(������(;*��(;�)�(;�(�<*/-)*<�-)�(;*��6��*��/��+���"�

• ���<��;��-)5�6�)(����

• ����)6*��/����)(�6�)(�����

• �-*�<��*�/�� �)6*��*�(-)5�

• �-(*���7���

• ��<<*��%��(�-��%��)<����(/�� ��/���*@+-� *)(�7*"�)<�(;*�5���(+�7-)*�

000025

Page 121: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�����

#38 �*�-5)���-(*�-��

�;*�/����0 -)5�(�7�*��+(�-)*��(;*�6�-(*�-��6�)<-(-�)���(�(;*�������*<�C�7�-(*�/���(;*�<*�-5)��/�

(;*�*@+-� *)(G�

��6�(-�)� ��� �

��*.�(-�)� ��� �

-)- + ��-(*��* �*��(+�*� ����

�:- + ��-(*��* �*��(+�*� ����

�*�-5)���-)(�� 7-*)(��* �*��(+�*�,�*��(-.*�

�+ -<-("�

��� �

��- ��"��+*����+�6*� ����

�*6�)<��"��+*����+�6*� ����

�*-� -6��*�-5)���-(*�-��!�� ���@+-� *)('� ��� �

�*-� -6��*�-5)���-(*�-��!��� ���6>�5*'� ��������%��-(*��������%��*�-5)���(*5��"�

�%���(*5��"������6-�-("�0 -(;�#3�9�

� ���(�)6*���6(���

�:- + �? -)<���**<�!? -)<����<'� #8�� ���! �-)��)-('�

#�9� ���!�-���-�(*�'�

��/��-.*�,��)�0 ����<� �������

D *����-*�<�D �-�*��(�2�/(�;��-��)(����)<�9�/(�

.*�(-6��%�D � ���#�

$��<�!�'�

�����-*�<�D�-�*%�D � ���#� ��� �<�!�'��(�8���/(�,���� ��(�1���/(�

D � ���#G������/-*�<�)�-�*�-��7��*<��)��-)5�*�+)-(��)�"���*��(-�)3�� +�(-��*�+)-(����*��(-)5��(�

(;*��� *�(- *�0 -���;�.*��)�- ��6(��)�7�(;�)*����)<�/���/-*�<�)�-�*��*.*��3�

000026

Page 122: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*��#��

�"� .�� � ��.#,����� +

�3# ���-���/���-6-)5�

'$"$" >���7���

�;-�����������-��.��-<�+)(-���*�(* 7*��2�%����&3�

'$"$' ��3��

D�����*�����+�*�(�:*��;�.*�7**)�-)6�+<*<�-)�(;-��@+�(�(-�)3���;*���-6*��@+�(*<�*:6�+<*��)"�

�*<*���%��(�(*������6���(�:*�%����/**�%�0 ;-6;� �"�7*�����6-�(*<�0 -(;�(;*��+�6;��*�*@+-� *)(�

�)<,����*�.-6*�3�

�3� ��-6*�

� )*����� �9��J�)�(+����5����)�"������+�7-)*��*)*��(����*(�-)6�+<-)5���(-�)���*@+-� *)(�

��*6-/-*<����-)6�+<*<�!�'�-)��*6(-�)�#3�����<*�6�-7*<�-)�(;*��6��*��/��+���"3��������-6-)5�-��

7��*<��)�*:�0 ��>��/�6(��"�<*�-.*�"�+)�*����(;*�0 -�*��(�(*<3�

��� 2 /#��

� *)*��(����*(���-6*�!*�6;' 3333333333333333333333333333333333333333333333333333333333333333333333333333��O� #�%�2�%����

�,.���3�1�#�/+

� �(-�)��� � ����������+�7-)*� ��O� ��� �

� �(-�)��� � �9��������+�7-)*� ��O� �)6�+<*<�

� �(-�)��� � �9��J������+�7-)*� ��O� ��� �

� �(-�)�� � � �9��J��8������+�7-)*� ��O� ��� �

� �(-�)��� ��(���"��)6���*<�? �(*���-������*<��*)*��(���!��? ��'� ��O� ��� �

� �(-�)��� ��(���"��)6���*<��-���-������*<��*)*��(���!�����'� ��O� ��� �

� �(-�)�� � ��(*�)�(*��-<*��:;�+�(��)<��+:-�-��"��>-<� ��O� ��� �

� �(-�)�� � ��(*�)�(*��-<*��-)*�-<*��)<�D *+(�����+7-6�*�� ��O� ����

� �(-�)��� �-@+-<��+*���"�(* � ��O� ����

� �(-�)�K� �+����+*���"�(* � ��O� ����

� �(-�)�L� ? �(*���)C*6(-�)��"�(* � ��O� ����

� �(-�)��� ��"���0 �� -��-�)���"�(* �!���'� ��O� �)6�+<*<�

� �(-�)� � �+��*���*�)��-���-�(*�� ��O� ����

� �(-�)�D � �� 7+�(-�)��-������-)5�M��.�����(-.*�����-)5� ��O� ��� �

� �(-�)�� � �� 7+�(-�)��-������-)5�M��;-��*����-�� ��O� ��� �

� �(-�)��� �� 7+�(-�)��-���*�(-)5�M��+�(� *���*�(*<� ��O� ����

� �(-�)�I �� �+7*�� -������*��M��-),��)� ��O� ����

� �(-�)�� �+7*�� -������*��M��+��*:��;*���A ��+7*� ��O� ����

� �(-�)��� �����6>+���-5;(-)5� ��O� ��� �

� �(-�)��� *<+)<�)(�B*)(-��(-�)��"�(* � ��O� ����

� �(-�)�� � D -6>*����< -+ ���((*�-*�� ��O� �)6�+<*<�

� �(-�)�B� � )��-)*�? �(*��? ��;��"�(* � ��O� ����

000027

Page 123: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�����

� �(-�)�? � � �(-6������ *��*(*6(���� ��O� ����

� �(-�)��� * �(*�? ��>�(�(-�)� ��O� ��� �

� �(-�)�� �+������<��(�-)5��*�(� ��O� ����

� �(-�)�N� ? -)(*�-��(-�)�(��M���,��&�� ��O� �)6�+<*<�

�*��/5�5 +.�1��A 2 #1� �/ ��1�#�/+

� �(-�)���� ���6>��(��(��"�(* � ��O� ����

� �(-�)���� ��0 *����)(���� �<+�*� ��O� ����

� �(-�)���� � )-(� �(�����)(�����*)(*�� ��O� ����

� �(-�)��� � �0 -(6;5*��� ��O� ����

� �(-�)���� #�9�B������((*�"��"�(* � ��O� ����

� �(-�)���� �)�*(��-���;-��-)5��"�(* � ��O� ����

� �(-�)��� � �- ��*��"6�*��:;�+�(��"�(* � ��O� ����

� �(-�)��� � �*)*��(����(*��� �����)�/�� *�� ��O� ����

� �(-�)���� �-��(��-����/��+7�-6�)(�� ��O� ����

� �(-�)�KK� �-@+-<��+*���*)(�-/+5*� �<+�*� ��O� ����

� �(-�)�LL� �)6;��-)5��"�(* � ��O� �)6�+<*<�

� �(-�)���� ? �(*����*�( *)(��"�(* � ��O� ����

+��D#.��1�#�/+

� �(-�)����� �*6;)-6����+�*�.-�-�)� ��O� �(*��;**(�

� �(-�)����� ���)����(�(-�)��*�.-6*�� ��O� ���(�J�#9F �

�32 ��" *)(��6;*<+�*�

�;-�����������-��7��*<�+��)��*6*-�(��/�(;*�/����0 -)5����5�*�����" *)(���)<�����)(��6(�

�5�** *)(�7"�7�(;����(-*��7"�(;*�B��-<-("�<�(*�!�**��*6(-�)��3#3#'3�

1� � ����)���G ���<���� ���

1����

#� ? -(;-)�(*)�<�"���/��-5)�(+�*��/�(;*���)(��6(��5�** *)(�7"�

7�(;����(-*�%���-<��5�-)�(��*��*�H��-).�-6*3�

��F �

�� �)�*@+��� �)(;�"�-)�(��� *)(�%�6� *)6-)5�(;-�("�<�"��

/����0 -)5��-5)�(+�*��/�(;*���)(��6(��5�** *)(�+)(-��(;-�("�

<�"��7*/��*�(;*�/-��(��6;*<+�*<��;-� *)(���(*%���-<��5�-)�(�

�*��*�H��-).�-6*�3�

1�F �

2� � ��)�)�(-6*��/�*�<"�(���;-�%�������(��7"��;-� *)(�� #�F �

� )�(;*�D �(-6*��/�*�<-)*���(���;-�� -�*�(�)*%���" *)(� +�(�7*��*6*-.*<��(��*��(�9�<�"��

7*/��*��;-� *)(%�7+(�)����(*��(;�)�2��<�"��/�� �)�(-/-6�(-�)��/�*�<-)*���(���;-�3�

�38 �*� -)�(-�)��6;*<+�*�

�*� -)�(-�)�-��(��7*�6�)6+��*)(�0 -(;�(;*���" *)(��6;*<+�*��;�0 )�-)��*6(-�)��323�

000028

Page 124: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*��2��

�39 �;-� *)(��6;*<+�*��

���*<�+��)�*:*6+(-�)��/���6�)(��6(��5�** *)(��)<��*6*-�(��/���" *)(��.*)(�4#�7"�(;*�

B��-<-("�<�(*�!�**��*6(-�)��3#3#'%�(;*�/����0 -)5��;-� *)(�<�(*����*��//*�*<%��+7C*6(�(����-���

���*3�

2 ���� / ����������� ��+������� ���� �

#� #8�#9� �)(;���� � �:�0 ��>������+�(�)�

�3� �(�)<��<��*� ��A ���)<-(-�)��

�**�2313�

000029

Page 125: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*��8��

4"� ,11�/5#*

000030

Page 126: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*��9��

23# �����+-<���*6-/-6�(-�)��

000031

Page 127: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�����

#$"$" +������4����?��85�85!!!!5"@

000032

Page 128: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*��1��

#$"$' ��=��74����?��85�85!!!!5'@

000033

Page 129: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*��&��

#$"$# < ����?��85�85!!!!5#@

000034

Page 130: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*��$��

#$"$/ < ����< ��*?��85�85!!!!5/@

000035

Page 131: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�2���

#$"$1 ��=��78����9� �?��85�85!!!!51@

000036

Page 132: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�2#��

#$"$2 ��)����?��85�85!!!!52@

000037

Page 133: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�2���

23� �"�-6������0 -)5��-�(�A ��6;*<+�*�

5��& ��(���!��

5��& ��(

� ��4

�����

+�$� ����!5���

9& ��;��������

��+:6%�%�

�*)*��������)5* *)(%� �-)�� )-(� ��� #� 2&�

� )*��-)*�� -�5�� %��*)*��(��� ��� #� 2&�

�)�(����(-�)����(���-)(%� �-)�� )-(� ��� #� 2&�

�)6;������(�A �K�6>��6�*0 ��*(�-�%� �-)�� )-(� ��� #� 2&�

�-/(�����)5* *)(� ��� 9� 2��

�;-��-)5���(�� ��� 9� 2��

���0 �A ��@+-� *)(��" 7���%� *6;�)-6��� ��� �� 2��

���0 �A ��)�(�+ *)(�� -�5�� %��+�7-)*��+*���"�(* � ��� �� 2��

���0 �A ��)�(�+ *)(�� -�5�� %��+�7-)*��+7*�� -���"�(* � ��� �� 2��

���0 �A ��)�(�+ *)(�� -�5�� %��*)*��(����+7*�� -���"�(* � ��� �� 2��

���0 �A ��)�(�+ *)(�� -�5�� %�? �(*��? ��;��"�(* � ��� �� 2��

���0 �A ��)�(�+ *)(�� -�5�� %�B*)(-��(-�)�A ��� 7+�(-�)��-���"�(* � ��� �� 2��

���0 �A ��)�(�+ *)(�� -�5�� %��-�*����(*6(-�)��"�(* 1� ��� �� 2��

���0 �A ��)�(�+ *)(�� -�5�� %��"<��+�-6��(��(��"�(* � ��� �� 2��

���0 �A ��)�(�+ *)(�� -�5�� %�? �(*���)C*6(-�)��"�(* � ��� �� 2��

���0 �A ��)�(�+ *)(�� -�5�� %��+*���"�(* � ��� �� 2��

���0 �A ��)�(�+ *)(�� -�5�� %��-@+-<��+*���+ ��!����('� ��� �� 2��

�)�(�+ *)(�(-�)�� -�5�� %��+:-�-��"��"�(* �� ��� �� 2��

���(����)�!�8��)�"'� ��� #� 2&�

�*)*��������)5* *)(%���+)<�(-�)�A ���*.�(-�)����(����)� ��� #� 2&�

�*)*��������)5* *)(%��+:-�-��"��>-<� ��� #� 2&�

�*)*��������)5* *)(%��-���-�(*�%���<<*���)<����(/�� �� ��� #� 2&�

�*)*��������)5* *)(%�? �(*���)C*6(-�)��>-<� ��� #� 2&�

�*)*��������)5* *)(%��-@+-<��+*���+ ���>-<�!����('� ��� #� 2&�

�*)*��������)5* *)(%�? �(*��? ��;����(� ��� #� 2&�

�*)*��������)5* *)(%��*�����:�!9�����8��)�"'1� ��� #� 2&�

�*)*��������)5* *)(%��-�*����(*6(-�)��>-<1� ��� #� 2&�

�*)*��������)5* *)(%��;�� �(�5���;�!�����)�"'�1� ��� #� 2&�

�77�3%��" 7����A �*/*�*)6*���(�%���*6(�-6��� ��� #� 2&�

�;�**��-)*�� -�5�� %��*)*��(��� *(*�-)5� ��� 2� 28�

���������������������������������������� ������������������ *��/�(;*��7�.*�<��0 -)5�� �"�)�(�7*��*@+-�*<��)���*6-/-6�C�7�3�2����M��+�(� *�������.���

�����M��+�(� *���)/�� �(-�)�

�����M�*/*�*)6*����0 -)5��8��+�(� �/*�(+�*��/�����*6-/-6����C*6(��*@+-�* *)(�� �"��*@+-�*��<<-(-�)���(- *3�9��+7 -((���(- *�-��/����(�)<��<�*@+-� *)(��)<�-���;�0 )�-)�0 **>����-���(��)�(-6*��/����!*�<"�(���;-�'�<�(*%��/(*��

�*6*-�(��/��� +(+���"��5�**<�+��)��+�6;��*���<*�%���/+��"�6�)/�� *<�<*�-5)���*6-/-6�(-�)��)<�/����0 -)5�6� ��*(-�)��/�

(;*����(��0 ��<�� �<*���*/-)-(-�)� **(-)5�!� � '3��� � �(��(�>*����6*��� -)+ + ��/�#��0 **>����-���(��/-��(��*(�!���+��

#'��/�<��0 -)5�<+*�<�(*�3�����<��0 -)5�-��6�)�-<*�*<��+7 -((*<�0 ;*)�+����<*<�(��(;*�0 0 0 3���C*6()*(36� ��-(*3�1�B*)<����+���-*<����0 -)5�

000038

Page 134: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�22��

5��& ��(���!��

5��& ��(

� ��4

�����

+�$� ����!5���

9& ��;��������

��+:6%�%�

�6;* �(-6%��*)*��(����:6-(�(-�)��"�(* � ��� 2� 28�

�6;* �(-6�� -�5�� %� �(�����)(�����*)(*�� ��� 2� 28�

�6;* �(-6�� -�5�� %���-(-6�����(;�� *�5*)6"��(��%������0 *�� ��� 2� 28�

�6;* �(-6�� -�5�� %������0 *��� -�(�-7+(-�)� ��� 2� 28�

�6;* �(-6�� -�5�� %���-(-6�����(;��;+(<�0 )� ��� 2� 28�

�6;* �(-6�� -�5�� %� -�6*���)*�+�� ��� 9� 2��

�6;* �(-6�� -�5�� %��+�7-)*��� �����-5;(-)5� ��� 9� 2��

�6;* �(-6�� -�5�� %�#�9B���� �(����(��(*�� ��� 9� 2��

�)(*�6�))*6(����)%���*6(�-6����"�(* � ��� �� 2��

�)(*�6�))*6(-�)�? -�-)5�� -�5�� %��+�(� *�� ��� 8� 2��

�6;*<+�*%� �(�����)(�����*)(*�� ��� �� 2��

�)�(�+ *)(������� -�5�� %��"<��+�-6��(��(��"�(* � ��� 9� 2��

�)�(�+ *)(������� -�5�� %�B*)(-��(-�)�A ��� 7+�(-�)��-���"�(* � ��� 9� 2��

�)�(�+ *)(������� -�5�� %��+�7-)*��+7*�� -���"�(* � ��� 9� 2��

�)�(�+ *)(������� -�5�� %��*)*��(����+7*�� -���"�(* � ��� 9� 2��

�)�(�+ *)(������� -�5�� %������+*���"�(* ����� ��� 9� 2��

�)�(�+ *)(������� -�5�� %��-@+-<��+*���"�(* � ��� 9� 2��

�)�(�+ *)(������� -�5�� %������+*���"�(* � ��� 9� 2��

�)�(�+ *)(������� -�5�� %�D � :�? �(*���)C*6(-�)��"�(* � ��� 9� 2��

�)�(�+ *)(������� -�5�� %�? �(*��? ��;��"�(* � ��� 9� 2��

�)�(�+ *)(������� -�5�� %�B-7��(-�)��"�(* � ��� 9� 2��

�)�(�+ *)(������� -�5�� %��+:-�-��"��"�(* � ��� 9� 2��

�)�(�+ *)(������� -�5�� %���7-)*(��*�(��:6;�)5*��� ��� 9� 2��

�)�(�+ *)(������� -�5�� %������0 *��� -�(�-7+(-�)� ��� 9� 2��

�)�(�+ *)(������� -�5�� %���-(-6����;+(<�0 )���(;� ��� 9� 2��

�)�(�+ *)(������� -�5�� %� -�6*���)*�+�� ��� 9� 2��

�)�(�+ *)(������� -�5�� %��*)*��(��� ��� 9� 2��

�)�(�+ *)(������� -�5�� %��*)*��(����*��7�:�!� )�"�� 8�9����+)-(�'� ��� 9� 2��

�)(*�6�))*6(���7�*��6;*<+�*�� ��� 8� 2��

���)�A ���*.�(-�)%��8B������)(������0 *�� ��� #� 2&�

���)�A ���*.�(-�)%�#�9�B�����((*�"��"�(* � ��� #� 2&�

���)�A ���*.�(-�)%��+�7-)*���)(������)*�� ��� 2� 28�

���)�A ���*.�(-�)%��-)*�-<*��+7-6�*� ��� #� 2&�

���)�A ���*.�(-�)%�D *+(�����+7-6�*� ��� #� 2&�

�6;* �(-6%�� -�5�� %��-�6+-(���*�>*����)(���� ��� 2� 28�

�6;* �(-6%��-5;(-)5�A �� -�(�-7+(-�)� ��� 2� 28�

�6;* �(-6%��� +)-6�(-�)� ��� 2� 28�

�*)*��(������(*6(-.*�*��"��*((-)5�� ��� 9� 2��

� -5-(��� +�(-�/+)6(-�)� *(*���*((-)5�� ��� 9� 2��

� -5-(����")6;��)-�*���*((-)5�� ��� 9� 2��

�B��*((-)5�� ��� 9� 2��

��*�������-/-6�(-�)����0 -)5� ��� 2� 28�

��*�������-/-6�(-�)�*���(� ��� 2� 28�

? -�-)5�� -�5�� %��-)*�-<*��+7-6�*� � � �

? -�-)5�� -�5�� %�D *+(�����+7-6�*� � � �

? -�-)5�� -�5�� %��+�7-)*���)(������)*�%���)(�����+7-6�*� � � �

? -�-)5�� -�5�� %��+�7-)*���)(������)*�%��*� -)�(-�)��+7-6�*� � � �

? -�-)5�� -�5�� %��+:-�-��"��>-<� � � �

000039

Page 135: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�28��

5��& ��(���!��

5��& ��(

� ��4

�����

+�$� ����!5���

9& ��;��������

��+:6%�%�

? -�-)5�� -�5�� %��*)*��(����>-<� � � �

? -�-)5�� -�5�� %��*)*��(����+7*�� -�� � � �

? -�-)5�� -�5�� %� �-)��+�7-)*��*� -)�����:�! ���'� � � �

? -�-)5�� -�5�� %��+�7-)*��>-<� � � �

? -�-)5�� -�5�� %��-���-�(*�� � � �

? -�-)5�� -�5�� %��-�*�A ��������(*6(-�)��"�(* T� � � �

? -�-)5�� -�5�� %��*)*��(����*��7�:� � � �

D � *���(*��-�(%��)5��.-)5��6;*<+�*��)<��0 -(6;��*.*��� *)(� � � �

? ��>�;**(%��+*����)(����� � � �

? ��>�;**(��*@+*)6*�� � � �

? ��>�;**(%���+�*�A ��//*6(�� � � �

000040

Page 136: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�29��

232 �"�-6����*�/�� �)6*�

����������� �

�������������������������� ���������� �

000041

Page 137: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�2���

238 ��<*��A ��(�)<��<��

000042

Page 138: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�21��

239 �(*�;**(�

000043

Page 139: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�2&��

23� ������*��+�*�*@+-�* *)(��

�����+*����*��+�*�

!��-5'�

�����+*����*��+�*�

!��-5'�

�� -)� D � -)��� �:� -)� D � -)��� �:�

� ����� 2�9� 2&9� 8�9� 82�� 89�� 81��

� �9��� 2�9� 2&9� 8�9� 82�� 89�� 81��

� �9��J� 9��� 9��� 98�� 9��� 9��� 98��

� �9��J��8� 9��� 9��� 98�� 9��� 9��� 98��

000044

Page 140: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

� �� �*������$������������+���

� ��� �(�)�*"���)�+�(�)(�� ,�)-.��/���0 �� � ��1�1#12� �*�(�2%����&�*.3�4�� ��5*�2$��

231 �(�)<��<��*� ��A ���)<-(-�)��

����)*�5"��(�)<��<��*� ���)<���)<-(-�)���/����*��;��������"3�

��������������������� ��!����"

000045

Page 141: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

BUDGETARY COMMERCIAL PROPOSAL

FOR

LM2500+G4 60 Hz Gas Turbine Generator LM2X Package

CUSTOMER: Stanley Consultants

PROJECT: University of Iowa

PROJECT LOCATION: Iowa City, IA

PROJECT NO: 707173 Rev. 2 7/6/2009 Prepared by: Jim Burns Date: 7/6/2009

Account Manager: Jim Burns GE Energy Tel: (972) 350-7976 1333 West Loop South Mobile: (972) 523-5891 Houston, TX 77027 Email: [email protected] Tel: (713) 803-0900

Fax: (713) 803-0390

GE PROPRIETARY INFORMATION The information contained in this document is GE proprietary information and is disclosed in confidence. It is

the property of GE and shall not be used, disclosed to others or reproduced without express written consent of GE. If consent is given for reproduction in whole or part, this notice shall appear in any such reproduction in

whole or part.

A business of the General Electric Company LM2X-60 Hz Proposal Form (May 19, 2008)

000046

Page 142: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page i

TABLE OF CONTENTS

TABLE OF CONTENTS................................................................................................................................. i

1.0 SCOPE OF SUPPLY......................................................................................................................... 1

1.1 Basic Scope Description ...................................................................................................................... 1

1.1.1 Turbine.......................................................................................................................................... 1

1.1.2 Generator .................................................................................................................................... 1

1.1.3 Turbine Enclosure .................................................................................................................... 1

1.1.4 Turbine Baseplate.................................................................................................................... 1

1.1.5 Air Inlet System......................................................................................................................... 1

1.1.6 Turbine Exhaust........................................................................................................................ 2

1.1.7 Fuel System ................................................................................................................................ 2

1.1.8 Lube Oil Systems...................................................................................................................... 2

1.1.9 Electro-Hydraulic Start System ......................................................................................... 2

1.1.10 Fire Protection System........................................................................................................ 3

1.1.11 Digital Control System......................................................................................................... 3

1.1.12 Battery System....................................................................................................................... 3

1.1.13 Generator Protective Relays ............................................................................................ 3

1.1.14 "Off-Line" Soak Wash System.......................................................................................... 3

1.1.15 Component Testing and Package Test ....................................................................... 4

1.1.16 Drawings, Data and Manuals .......................................................................................... 4

1.1.17 Training...................................................................................................................................... 4

1.1.18 Improvements and Changes ........................................................................................... 5

1.1.19 Performance Testing ........................................................................................................... 5

1.2 Optional Equipment and Services Checklist and Descriptions........................................... 6

1.2.1 Factory Options ........................................................................................................................ 6

1.2.2 Extended Scope Equipment Options .............................................................................. 6

1.2.3 Service Options ......................................................................................................................... 7

1.2.4 Factory Options Descriptions ............................................................................................. 8

1.2.5 Extended Scope Equipment Options Descriptions .................................................12

1.2.6 Extended Scope Equipment and Service Options Descriptions........................15

1.3 Limits of GE Energy Scope & Exclusions.....................................................................................17

1.3.1 Limits of GE Energy Scope .................................................................................................17

000047

Page 143: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page ii

1.3.2 Exclusions..................................................................................................................................18

1.4 Design Criteria........................................................................................................................................19

2.0 COMMERCIAL TERMS .................................................................................................................20

2.1 Basis of Pricing.......................................................................................................................................20

2.1.1 Validity ........................................................................................................................................20

2.1.2 Taxes ...........................................................................................................................................20

2.2 Price ............................................................................................................................................................20

2.4 Termination Schedule.........................................................................................................................22

2.5 Shipment Schedule ..............................................................................................................................22

2.6 Standard Terms & Conditions .........................................................................................................22

3.0 APPENDIX.....................................................................................................................................23

3.1 GE Fluid Specifications .......................................................................................................................23

3.1.1 Gaseous Fuels (MID-TD-0000-1) .....................................................................................23

3.1.2 Water (MID-TD-0000-3) .......................................................................................................23

3.1.3 Water Wash (MID-TD-0000-4)..........................................................................................23

3.1.4 Liquid Detergent (MID-TD-0000-5) .................................................................................23

3.1.5 Lube Oil (MID-TD-0000-6) ...................................................................................................23

3.2 Typical Drawing List & Schedule....................................................................................................24

3.3 Typical Performance ...........................................................................................................................27

3.4 Codes & Standards ..............................................................................................................................27

3.5 Rate Sheet................................................................................................................................................27

3.6 Gas Pressure Requirements.............................................................................................................27

3.7 Standard Terms & Conditions .........................................................................................................27

000048

Page 144: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 1

1.0 SCOPE OF SUPPLY

1.1 Basic Scope Description

1.1.1 Turbine

The LM2500 family of gas turbines are two-shaft gas turbines consisting of a gas generator and a six-stage power turbine. Shaft power is transmitted to the driven equipment at the hot-end by means of a flexible coupling extending through a tunnel within the exhaust collector. The gas generator consists of a variable geometry compressor, a single annular combustor, a high-pressure turbine, an accessory gearbox, and controls and accessories. The power turbine is a six-stage power turbine, aerodynamically coupled to the gas generator and driven by the gas generator exhaust gas.

The inlet section, apart from the turbine mounted inlet bellmouth, is equipped with a stainless steel mesh screen and a nylon sock in the inlet air stream for "last-chance" protection against foreign object damage to the turbine. The turbine is shock-mounted when shipped in position inside the package. The coupling is removed and shipped in a separate container.

1.1.2 Generator

The open, air-cooled, 2-pole generator is capable of handling the full continuous power of the gas turbine at any ambient temperature throughout the operating range. A cooling water loop and its associated fans and pumps are not required. The generator includes a brushless excitation system with a permanent magnet generator. Neutral and line side cubicles are included. The generator is mounted on a customer supplied concrete pad.

1.1.3 Turbine Enclosure

The standard equipment is supplied with a weatherproof acoustic enclosure for the turbine. The enclosures are designed to achieve noise abatement to an average of 90 dB(A) at 3 ft. (1.0 m) away and 5 ft. (1.5 m) above grade during full load operations. Provisions for turbine removal via roof are included. The turbine compartment is fully ventilated with a fan. A redundant fan is available as an option, and DC backup lighting can be provided as an option (See Option S). Access doors and explosion-proof lighting are provided.

1.1.4 Turbine Baseplate

A steel baseplate is provided for the gas turbine. The baseplate is designed to provide suitable strength and installation provisions at site. All surfaces are coated per GE Energy standard to prevent corrosion.

1.1.5 Air Inlet System

The gas turbine package is supplied with a modular, multi-stage filtration system consisting of weather protection and inlet screens, a prefilter (optional) and a final barrier filter. Air for the turbine ventilation system is filtered to the same level as turbine

000049

Page 145: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 2

combustion air. Filtered air is silenced before entering the turbine plenum. This design results in a compact arrangement and eliminates the need for customer-supplied inlet ducting when the standard design is utilized.

The generator is supplied with a filtration system consisting of weather protection, inlet screens and barrier filters.

The supplied platforms and ladders to service the inlet filter are packaged separately for shipment. Special or customized filter arrangements can be supplied, and they are quoted on an individual basis.

1.1.6 Turbine Exhaust

The standard equipment is supplied with a rectangular, Right-Hand horizontal (aft looking forward) exhaust outlet with connection flange to facilitate in-line mounting of an HRSG or simple cycle exhaust stack. Customer furnished expansion joint, ducting supports, and mounting hardware are required for heat recovery applications. If required, the exhaust flange can be rotated to a Left-Hand configuration as an option. For simple cycle applications, we offer an exhaust silencer assembly as an option.

1.1.7 Fuel System

The standard equipment is supplied with a natural gas fuel system using an electronically controlled fuel-metering valve. See Appendix 3.6 for gas pressure requirements. Gas fuel must meet General Electric Specification MID-TD-0000-1 (See Section 3.1.1). Liquid fuel and dual fuel systems are available as factory options.

1.1.8 Lube Oil Systems

The standard equipment is supplied with two separate lube oil systems, one for the gas turbine (synthetic oil) and one for the generator (mineral oil). The piping is all stainless steel, and the lube oil system valves have stainless steel trim. The coolers, filters, and turbine lube oil reservoir are mounted on an auxiliary equipment module located next to the gas turbine baseplate. The generator lube oil equipment and oil reservoir are mounted near the generator. The auxiliary equipment module provides simplified piping connections and reduces customer's installation time and costs. Duplex shell/tube coolers and fin fan coolers are available as options. Turbine lube oil must meet MID-TD-0000-6 (See Section 3.1.5).

1.1.9 Electro-Hydraulic Start System

The standard equipment is supplied with a hydraulic starting system, which includes an electric, motor-driven, hydraulic pump assembly, filters, cooler and controls, mounted on the auxiliary equipment module. A hydraulic motor is mounted on the gas turbine accessory gearbox to turn gas generator shaft. All pipe and fittings on the baseplates, plus hydraulic tubing to connect between the auxiliary equipment module and the main baseplate are also furnished.

000050

Page 146: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 3

1.1.10 Fire Protection System

The standard equipment is supplied with an installed fire protection system complete with hydrocarbon sensing and thermal detectors, piping and nozzles in the turbine compartment. The fire protection system includes cylinders containing CO2 mounted on a separate skid. A 24 V DC battery and charger to power the fire protection system is also included. All alarms and shutdowns are annunciated at the Turbine Control Panel (TCP). An alarm sounds at the turbine if the gas detectors detect high gas levels, or if the system is preparing to release the CO2. When activated, the package shuts down, and the primary CO2 cylinder is discharged into the turbine compartment via multiple nozzles, and the ventilation damper automatically closes. After a time delay and if required, the reserve supply of CO2 is discharged.

1.1.11 Digital Control System

The standard equipment is supplied with a free-standing TCP suitable for mounting in an indoor, non-hazardous area. The control system features a programmable controller , a vibration monitor, a fire protection system, a digital meter, and a digital generator protective relay module. An on-skid fuel management system and a PC HMI are also provided to complete the system. The operator selects HMI displays with convenient touch screen control. Alarm and shutdown events are displayed on the HMI automatically. An Ethernet TCP/IP EGD or RS485 Modbus Port is provided to transmit unit conditions (status, pressures, temperature, etc.) to the customer's distributed control system. Power for the control panel is provided by a dedicated 24 V DC battery system with dual 100% capacity chargers.

1.1.12 Battery System

The equipment package is supplied with 24 V DC battery systems for the fire protection and gas turbine generator control systems, as described in those sections. All battery systems are valve-regulated lead acid (VLRA) type. Battery systems ship loose for indoor customer installation. If the optional Power Control Module is selected, GE Energy will install the GE supplied DC battery systems in that module.

1.1.13 Generator Protective Relays

The standard equipment is supplied with a microprocessor-based integrated generator protective system (IGPS), mounted in the TCP. The protective relay system includes all functions necessary for protection of the generator.

1.1.14 "Off-Line" Soak Wash System

The standard equipment is supplied with an "off-line" cleaning system, with a mobile water wash cart that can be used for multiple units. The same system can be used for on-line cleaning as well, which is offered as an option. Customer is required to provide purified water meeting MID-TD-0000-4 (See Section 3.1.3), detergent meeting MID-TD-0000-5 (See Section 3.1.4), and air at 100 psig (690 kPag) filtered to ISA S7.3 standards.

000051

Page 147: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 4

1.1.15 Component Testing and Package Test

Every new gas turbine is performance tested under load in a GE Test Cell, using procedures developed for flight turbine reliability. The generator is tested to ANSI C50.14 or IEC 34.3 standards at its factory of manufacture.

All gas turbine generator sets receive a static test including:

• Switch State (N.O. or N.C., actuation, wiring, and setpoint) • Temperature element output, and wiring • Transmitter range, output, and wiring • Solenoid operation • Control valve torque motor, excitation, and return signal • Fire system continuity, and device actuation • System flushing verification • Tubing integrity

A full load string test is available as an option.

1.1.16 Drawings, Data and Manuals

The package is supplied with a customer drawing package that includes general arrangement drawings, flow and instrument diagrams, electrical one-line drawings and interconnection plan drawings. Additional electrical loop diagrams and logic drawings are provided for record. See 3.2 for a detailed typical list and typical drawing delivery.

Operation & Maintenance (O&M) and Installation & Commissioning (I&C) manuals are provided and are printed in English. Six hardcopies of the O&M Manuals, three hardcopies of the I&C manuals, and one CD with both are included in the base offering. The manuals cover operating concepts for power generating equipment, guides to troubleshooting, basic information on components, and equipment within the turbine generator set.

GE Energy provides all engineering drawings on a secure server www.project-net.com. Each customer can enter this database and view, print or annotate project drawings. ProjectNet provides the customer with immediate access to the latest drawing revisions. ProjectNet speeds job completion and saves weeks of time mailing drawings back and forth.

1.1.17 Training

The base scope of supply includes hands-on training for up to 10 operators and supervisors, where students are assumed to have at least a journeyman's knowledge of electrical generating plant operation and to be proficient in reading piping flow and instrument drawings, mechanical drawings, and have a working knowledge of electrical generators, and gas turbines. The course is designed around an eight-hour day, five consecutive day schedule with an hour lunch break and fifteen minute breaks every one and one half hours. Experienced instructors, using specially developed training

000052

Page 148: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 5

materials, provide a firm groundwork of basic theory, plus advanced concepts with classroom and hands-on training. Training includes Gas Turbine Familiarization plus System Design & Operations and Maintenance.

The trainer conducts the course in a lecture/seminar format where each major topic is supported by literature with detailed descriptions and associated engineering drawings. A student-training manual is given to each student and the client’s turbine-generator system is used for hands-on training to supplement the classroom instruction. At the completion of several related topics the students are given a progressive examination to measure the effectiveness of the presentation and as a tool to identify if any student has not grasped the material. At the completion of the course a final examination is given which covers the entire course material and students are given a certificate of completion.

Training is conducted in Houston at the manufacturing facility. Local training at the Customer’s facility is available upon request. The Customer would be responsible for providing all necessary training equipment (air conditioned classroom, VHS or PAL format video player, overhead projector, dryboards, chalkboards, etc.) for classes not held at the manufacturing location.

1.1.18 Improvements and Changes

It is understood that the Seller has the right to make changes in product design and add improvements to products or services at any time without incurring any obligations to install the same on or in connection with the Equipment or Services provided hereunder.

1.1.19 Performance Testing

GE Energy will furnish an on-site test representative to be present during the execution of the gas turbine performance test for power output and heat rate only (net of GE equipment only in simple cycle applications). All other performance test personnel, emissions testing, noise testing and other tests are the responsibility of the customer but may be offered separately.

000053

Page 149: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 6

1.2 Optional Equipment and Services Checklist and Descriptions

(I) Included (S) Quoted Separately

1.2.1 Factory Options

Option A LM2000 Gas Turbine Option B LM2500 Gas Turbine Option C LM2500+ Gas Turbine

(I) Option D LM2500+ G4 Gas Turbine Option E Totally Enclosed Water-Air Cooled Generator (TEWAC) Option F Totally Enclosed Air-Air Cooled Generator (TEAAC) Option G Alternate Side Exhaust and Auxiliary Skid Option H Alternate Side Lineside and Neutral Cubicles Option I Liquid Fuel System Option J Dual Fuel System Option K Water Injection System

(I) Option L Dry Low Emissions System (DLE) Option M Pulse Clean Air Filter Option N Combustion Air Cooling – Evaporative Cooling Option O Combustion Air Cooling – Chiller Coil

(S) Option P Combustion Air Heating – Customer Heated Option Q Lube Oil Cooler – Fin/Fan Option R Lube Oil Cooler – Duplex Shell & Tube

(S) Option S DC Backup Lighting (S) Option T Redundant Ventilation System (I) Option U Nickel Cadmium Batteries Option V On-Line Water Wash System

(S) Option W Optical Flame Detectors (S) Option X Remote Workstation (S) Option Y Full Load String Test (I) Option Z Winterization to –20F/-28C

1.2.2 Extended Scope Equipment Options

(S) Option AA Black Start System (S) Option BB Power Control Module (S) Option CC Unit Motor Control Center (S) Option DD Switchgear (S) Option EE 125 V DC Battery System (S) Option FF Inlet Air Chilling System Option GG Simple Cycle Exhaust System Option HH Generator Step-Up Transformer

(I) Option II First Fill of Lubricants Option JJ Liquid Fuel Centrifuge Module

(S) Option KK Anchoring System (S) Option LL Water Treatment System

000054

Page 150: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 7

1.2.3 Service Options

(S) Option AAA Technical Supervision (S) Option BBB Transportation Services

000055

Page 151: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 8

1.2.4 Factory Options Descriptions

Option A LM2000 Gas Turbine

Performance1 is nominally rated at a power output of 17.1 MW and a heat rate of 9,759 Btu/kW h. This product utilizes a smaller air filter house and generator than the LM2500 to provide the lowest $ / MW possible. A larger air filter house, generator, and accessories can be provided as a separate option for future gas turbine upgrades.

Option B LM2500 Gas Turbine

Performance1 is nominally rated at a power output of 22.8 MW and a heat rate of 9,432 Btu/kW h. This product utilizes a smaller air filter house than the LM2500+ to provide the lowest $ / MW possible. A larger air filter house than the LM2000, generator, and accessories can be provided as a separate option for future gas turbine upgrades.

Option C LM2500+ Gas Turbine

Performance1 is nominally rated at a power output of 29.9 MW and a heat rate of 8,947 Btu/kW h. This product utilizes a smaller air filter house than the LM2500+ G4 to provide the lowest $ / MW possible. A larger air filter house, generator, and accessories can be provided as a separate option for future gas turbine upgrades.

Option D LM2500+ G4 Gas Turbine

Performance1 is nominally rated at a power output of 32.6 MW and a heat rate of 8,867 Btu/kW h.

Option E Totally Enclosed Water-Air Cooled Generator (TEWAC)

For customers who prefer a closed circuit air system with water/air cooling in place of the filtered air-cooling system normally provided. Customer must supply treated water, 85 °F (29 °C) or cooler, to the generator. Necessary flow rates, pressure and heat rejection numbers are based on the generator chosen. If the cooling water is to be reused, a customer supplied circulation water-cooling loop is required for the proper heat rejection. Currently, only a Brush generator is available with this option.

Option F Totally Enclosed Air-Air Cooled Generator (TEAAC)

For customers who prefer a closed circuit air system with air/air cooling in place of the filtered air system normally provided. Currently, only a Brush generator is available with this option.

Option G Alternate Side Exhaust and Auxiliary Skid

As viewed from the exciter end of a standard unit, the exhaust and auxiliary skid are located on the right side of the unit. When specified, these components can be switched to the left side.

1 ISO conditions with 4” H2O inlet loss and 6” H2O exhaust loss, no NOx abatement, 19,000 Btu/lb LHV natural gas, 13.8 kV and 0.9 power factor.

000056

Page 152: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 9

Option H Alternate Side Lineside and Neutral Cubicles

As viewed from the exciter end of a standard unit, the generator line-side cubicle is on the left-hand side and the neutral cubicle is on the right-hand side. When specified, the location of these cubicles can be reversed. However, the termination box for generator instrument and control wiring box (MGTB), must remain on the right-hand side.

Option I Liquid Fuel System

The gaseous fuel system is deleted and replaced by a liquid fuel system. Typical liquid fuels include DF1, DF2, or JP4. Customer must supply liquid fuel to the connection at the auxiliary skid at 20-40 psig (138-276 kPag) and at least 20 °F (11 °C) above the wax point temperature. Customer supplied fuel must be clean, filtered and meet the GE Specification MID-TD-0000-2 (See Section Error! Reference source not found.). This option is only available with the single annular combustor. Customer must provide supply piping.

Option J Dual Fuel System

When specified, the package can be furnished with complete fuel systems for two different fuels. This could include two gaseous fuels, two liquid fuels or one gaseous and one liquid fuel. Changeover is initiated manually at the unit control panel, or automatically, if the operating fuel supply pressure should gradually decrease. This option is only available with the single annular combustor.

Option K Water Injection System

For applications with NOx emissions limitations, water injection may be required. The water injection system consists of inlet strainer, pump, valves, piping and controls for use with a gaseous fuel, liquid fuel or dual fuel system. Water injection can reduce NOx emissions to 25 ppm (51 mg/N m3) on gaseous fuel and 42 ppm (86 mg/N m3) on liquid fuel. Customer must provide a supply of purified water per GE water specification MID-TD-0000-3 (See Section 3.1.2) to the water injection skid at 5-15 psig (34-103 kPag).

Option L Dry Low Emissions System (DLE)

A dry low emissions system can be provided for use on gaseous fuel. This system reduces emissions over the entire power range without water or steam. The main components of this system include a premixed combustor, compressor rear frame, compressor diffuser, high pressure turbine nozzle, control system, fuel supply system and chromatograph. This option is not available with dual or liquid fuel operation.

Option M Pulse Clean Air Filter

GE Energy can furnish a pulse clean air filter for the gas turbine package in lieu of the standard barrier filter. This two-stage self-cleaning filtration system is a plus for dry, high dust areas (desert-like conditions) as well as cold weather environment hazards such as blowing snow, hoarfrost and ice fog. Filtration elements are pulsed to clean the filters. The pulsing is repeated until a predetermined value is reached. The required air compressor is part of the customer scope.

000057

Page 153: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 10

Option N Combustion Air Cooling – Evaporative Cooling

For applications when high dry bulb temperatures are common at low relative humidity, evaporative cooling can be utilized to increase power output.

This system is designed for recirculation of evaporative cooling water from a sump in the bottom of the inlet air filter. Customer must supply filtered, potable water to a flanged connection on the filter house and must dispose of waste water from the blowdown valve.

Option O Combustion Air Cooling – Chiller Coil

Lowering the combustion air inlet temperature can increase the power output. When specified, GE Energy can furnish high performance inlet air chilling coils as an integral part of the air inlet system. Customer provides adequate quantities of chilled water and interconnecting piping to GE Energy furnished chilling coils at filter house.

Option P Combustion Air Heating – Customer Heated

Anti-Ice coils are recommended to allow safe operation during icing/winter conditions. The system requires a hot water/glycol solution, to be furnished by the customer, to circulate through the heat exchanger coils in the inlet air system.

Option Q Lube Oil Cooler – Fin/Fan

This replaces the standard simplex shell and tube coolers for the lube oil systems. A simplex core fin-fan cooler with dual fans is mounted on a separate foundation.

Option R Lube Oil Cooler – Duplex Shell & Tube

Customers who prefer duplex shell and tube oil coolers can select them as an option to replace our standard simplex shell and tube.

Option S DC Backup Lighting

GE Energy can furnish DC emergency lighting in the turbine enclosure as an option. DC lights turn on if AC power fails.

Option T Redundant Ventilation System

GE Energy can furnish a redundant fan and fire damper for the turbine ventilation system.

Option U Nickel Cadmium Batteries

GE Energy can furnish nickel-cadmium batteries as an option to replace our standard lead-calcium batteries.

Option V On-Line Water Wash System

When specified, the package can be supplied with an “on-line” wash system, which allows customers to clean the compressor section of the turbine during full power

000058

Page 154: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 11

operation. The necessary nozzles and piping are supplied and the same air and water requirements utilized by the standard “off-line” system are needed.

Option W Optical Flame Detectors

GE Energy can provide fire protection system optical flame detectors for the turbine enclosure when required by the customer.

Option X Remote Workstation

GE Energy can furnish a Remote Workstation as part of the control system. The module consists of:

• Desktop PC equipped with an Ethernet TCP/IP serial port for communication with the Control System

• Animated graphical displays of the turbine, generator, and auxiliary system analog and digital parameters

• Historical logging and trending system that can store/display historical data • Includes the capability to provide periodic reports • Provides the capability to start, stop, and control the gas turbine generator

system after a manual switch on the Turbine Control Panel is switched to remote control.

Option Y Full Load String Test

GE Energy can conduct a full speed, full load string test with the exception of water injection NOx abatement systems.

Option Z Winterization to –20F/-28C

For equipment operating in cold climates, below 40 °F (4.4 °C), GE recommends a winterization option. This option may include, but not limited to the following modifications depending on the level of winterization required:

• Inlet air anti-icing (See Option O and Option P) • Heat tracing and insulation of applicable unit mounted piping • Enclosing and heating exposed instruments and equipment, as selected by GE

Energy. • Winterization enclosures for the auxiliary skid and the generator, as selected by

GE Energy. The enclosures, when required, protect equipment in cold weather and are equipped with hand held fire extinguishers.

For ambient temperatures below 0°F (–17.8°C), the above modifications plus additional special equipment will be required. Consult GE Energy for details.

000059

Page 155: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 12

1.2.5 Extended Scope Equipment Options Descriptions

Option AA Black Start System

For black starts, the diesel generator provides power for ventilation fans, accessories and starter motor. A larger diesel generator set may be required if a natural gas fuel compressor or other special auxiliaries are operated during the starting sequence.

Option BB Power Control Module

GE Energy provides a walk-in, pre-fabricated Power Control Module (PCM) designed for the installation of the gas turbine package electrical control gear prior to the arrival at the jobsite. Approximate dimensions of the PCM are 25 ft x 15 ft, 35 ft x 15 ft, or 50 ft x 15 ft. The PCM comes complete with an emergency lighting system, interior cable tray, lighting and convenience receptacles.

The pre-fabricated control building shall conform in design, assembly, materials and performance with the requirements of the latest edition of the following standards:

• National Electric Manufactures Association • National Electric Code • National Fire Protection Association • American Institute of Steel Construction • American Welding Society • American National Standards Institute • American Society for Testing and Materials • Institute of Electrical and Electronic Engineers • Uniform Building Code • Steel Structures Painting Council • Occupational Safety and Health Administration • GE Energy Spec QS005 - Welding Inspection • GE Energy – General Specification • Canadian Standards Association

Prior to shipment, the following equipment will be pre-installed and wired into the PCM:

• Gas Turbine Control Panel • Gas Turbine Motor Control Center • 24 V DC and 125 V DC Battery Systems

Option CC Unit Motor Control Center

A freestanding lineup of motor controls for all motors furnished by GE Energy can be supplied. The MCC is suitable for indoor installation in an optional modular control room or other non-hazardous area in accordance with GE Energy Industrial Motor Control Specifications.

000060

Page 156: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 13

Option DD Switchgear

GE Energy can supply the generator circuit breaker and related switchgear as a part of our equipment scope. Equipment conforms to the GE Energy Industrial Switchgear Specifications, or to specifications furnished by the customer and reviewed by GE Energy before quotation.

Option EE 125 V DC Battery System

GE Energy provides a common 125 V DC battery system for the gas turbine package. The system includes batteries, chargers and 125 V DC circuit breakers that are installed in a freestanding ventilated cabinet for installation in the Power Control Module (PCM). The battery system enclosure includes a spill containment tray.

The design characteristics of the 125 V DC battery system are as follows:

Battery Type NiCad Battery Size (A hr) 160

Option FF Inlet Air Chilling System

A packaged chiller module, containing the majority of the equipment necessary to condition or chill the inlet air to the gas turbine and maintain the desired power output during hot day conditions. In addition to evaporator pumps, condenser pumps, balance valves, check valves, shutoff valves, expansion tank, and integral piping; the package contains the water-cooled centrifugal chiller providing chilled water to the air inlet coil.

A complete indoor motor control center and control panel containing all the electrical switchgear, breakers and power distribution system is located in the acoustically treated, environmentally conditioned module. This center provides the interface between the main control room and the inlet chilling system. In addition to typical temperature signal input, the unit accepts alarm and shutdown direction and outputs complete open protocol monitoring by hardwired serial connection.

The enclosure itself is a self-contained enclosure with strategically located (including removable roof panels) access and entry doors. The basic skid is provided with anchor bolt holes and leveling bolts for foundation mounting purposes. The cooling tower is not included.

Option GG Simple Cycle Exhaust System

GE Energy can furnish an exhaust silencer assembly for simple cycle installations. The assembly includes an exhaust expansion joint, a 90-degree elbow, and a 90 dB(A) silencer with internally insulated 409 stainless steel lining and an exhaust stack with a total height of 30 ft (9.1 m). Options include different stack heights, an 85 dB(A) Silencer, EPA sampling ports and platforms, and a diverter valve for future HRSG ducting.

000061

Page 157: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 14

Option HH Generator Step-Up Transformer

GE Energy provides robust, high efficiency step-up transformers, designed and tested to IEEE standards. Transformer high voltage levels, tap changers and safety features are built to match customer’s site requirement.

Option II First Fill of Lubricants

GE Energy furnishs first fill of lubricants as an option. Lubricants to include turbine lube oil, generator lube oil and hydraulic start fluid.

Option JJ Liquid Fuel Centrifuge Module

A liquid fuel centrifuge skid is provided to remove water-based contaminants in the customer supplied fuel. The system cleans the fuel from the customer-supplied storage tank and forwards it to the customer-supplied day tank.

Option KK Anchoring System

GE Energy provides a system utilizing fixators to anchor the gas turbine generator package to the customer foundation. The system allows for proper installation and alignment of the GE supplied equipment.

Option LL Water Treatment System

GE Energy can supply a water treatment system configured to provide the required quantity and quality of water. The design incorporates features to enhance performance, reliability, and incorporates advanced electro-deionization technology to deliver high purity water without the need for hazardous chemicals. It is provided completely assembled, installed and wired in a separate stand-alone enclosure. Field assembly is virtually eliminated and connection requirements at the job site are minimal, so that field labor costs are low. High purity water is required in the turbine operation as a pretreatment to optimize efficiency, specifically in the areas on NOx suppression.

000062

Page 158: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 15

1.2.6 Extended Scope Equipment and Service Options Descriptions

Option AAA Technical Supervision

GE Energy will provide technical advisory supervision services for the Installation and Commissioning of the combustion turbine package. Installation services will include supervising the installation of the combustion turbine package by the Owner’s construction contractor. Commissioning services will include flushing supervision, checkout, and commissioning supervision of combustion turbine mechanical systems, checkout and commissioning supervision of combustion turbine electrical systems, and checkout and commissioning of the combustion turbine package control system. GE Energy will provide all general hand tools required for the commissioning of the unit. Flushing and calibration kits can also be provided at GE Energy standard published rates.

The personnel required at site for the installation and commissioning of the combustion turbine packages is as noted below. The scope of work included in this proposal assumes that the installation and commissioning schedule of the combustion turbine package is not impacted by the installation and commissioning schedules of additional balance of plant equipment that is not provided by GE Energy (such as a demineralized water plant, steam turbine, gas compressors, etc.).

GE Energy Site Manager– One (1) individual for a total of TBD man-hours.

Mechanical and Controls TA – Total of TBD man-hours between these individuals

Also included in the services quoted are the various combustion turbine package vendors will be required to commission specific combustion turbine package components. These are as noted below:

Generator Specialist – This individual will be responsible for testing of the generator and commissioning of the automatic voltage regulator system.

The normal workweek will be limited to 60 hours (ten (10) hours per day for six (6) days per week). Standby time will be billed incremental to the hours noted above at the effective rates at time of service. If the Installation and Commissioning schedule dictates longer working hour durations then additional resources can be provided on an incremental daily rate basis. The pricing for these services includes all travel and living expenses and is based on a single mobilization for each individual. Multiple mobilizations as a result of the Owner’s construction schedule will be billed accordingly.

GE Energy has provided an estimate, on a lump sum basis, for the field service requirements as spelled out in this section of the proposal. In order to provide a lump sum number GE Energy has assumed a construction schedule to arrive at the man-hour estimates illustrated above and the ratesheet at time of the Proposal (See Section 3.5). However, the Services will be billed at the rate at time of service. Should the Owner’s schedule or the Owner’s construction contractor’s experience result in an increase in the construction duration assumed the latest version of the enclosed Service Rates would be applied as appropriate.

000063

Page 159: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 16

Option BBB Transportation Services

GE Energy will coordinate and provide transportation services for all gas turbine generator equipment to the customer jobsite. (NOTE: Transportation for selected Balance of Plant equipment can also be provided upon request.) Off-loading at jobsite is by others. GE Energy will evaluate, based on the project site conditions, the most expeditious means of transporting the equipment to ensure timely and compliant arrival.

Terms of delivery of the GE Energy supplied equipment will be Cost and Insurance Paid to Owner’s jobsite (CIP as per Incoterms 2000). If ocean shipment is required, GE Energy shall utilize a NON-US flagged vessel. GE Energy has included an indicative transportation cost for this offer strictly on a BUDGETARY basis at this time. Actual transportation costs shall be billed to the Customer on an actual cost +10% basis.

000064

Page 160: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 17

1.3 Limits of GE Energy Scope & Exclusions

1.3.1 Limits of GE Energy Scope

Listed below are the limits/exclusions to the GE Energy standard Scope of Supply. All piping, wiring, cables, ducts, etc. connecting to these points is furnished by customer (others) unless modified by specification agreement.

Equipment System Limits of GE Energy Scope

• All piping, including Fuel Gas, Fuel Oil, Steam, Cooling Water, Heating Water, Demineralized Water, Lube Oil, Compressed Air, Instrument Air, Hydraulic Start Oil

• Flanged or threaded connection on GE Energy baseplate.

• Inlet Air-to-Filter • Atmosphere (non-standard duct by others)

• Turbine Package Ventilation/Cooling Air

• Atmosphere (non-standard duct by others)

• Turbine Exhaust • Exhaust flange on main baseplate

• Instruments on GE Energy’s Baseplate • Terminal box on baseplate

• Instrument wiring in Turbine Control Panel

• Terminal in Turbine Control Panel

• High Voltage Connections • Bus bar in GE Energy Lineside cubicle

• Generator Ground Connections • GE Energy Neutral cubicle

• Electric Motors • Terminal box on individual motor

• Ladders and Platforms for Air Filter • Ladders and Platforms for Inlet Air Filter maintenance only

• 24 V DC Batteries and Chargers for Control System and Fire and Gas Systems

• Battery terminals to baseplate (if supplied loose)

000065

Page 161: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 18

1.3.2 Exclusions

• Civil engineering design of any kind • Building and civil works • Site facilities • Support steelworks and hangers for the gas turbine ducting, silencing, and

pipe work • All inlet, exhaust, and ventilation ducting other than included in the scope of

supply • Drains and/or vent piping from the gas turbine package to a remote point • Fuel storage, treatment and forwarding system • Site grounding • Lightning protection • Power system studies • Sensing and metering voltage transformers • Machine power transformers, and associated protection • Grid failure detection equipment • Off-loading, transportation and storage • Off-skid cabling, and design of off-skid cable routing • Balance of plant and energy optimization controls • Anchor bolts, embedments, and grouting (quoted separately) • Distributed plant control • Customer's remote control • Field supervision (quoted separately) • High voltage transformer(s), cables, and associated equipment • Interconnecting piping, conduit, and wiring between equipment modules • Plant utilities, including compressed air supply and off-skid piping • Battery containment • Lube oil measurement other than that defined in the scope of supply • Additional lube oil breather ducting other than that defined in the scope of

supply • Fuel transfer pump • Off-skid fuel block and vent valves • Fuel supply pipework beyond the scope of supply • Generator controls other than that defined in the scope of supply • Load sharing control • Balance of plant controls • Field Performance Testing • Site Labor • Ladders, Stairs, and Platforms for equipment beyond the gas turbine

000066

Page 162: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 19

1.4 Design Criteria

The following table outlines the criteria conditions at the proposed jobsite for the design of the equipment:

Location Cedar Rapids, Iowa

Elevation 730 Ft

Minimum Site Temperature 5 F

Maximum Site Temperature 95 F

Design Point Ambient Temperature / Relative Humidity

46 F / 70% RH

Primary Fuel Source Natural Gas

Secondary Fuel Source N/A

Seismic Design Criteria (BOP Equipment) TBD

Seismic Design Criteria (CTG Package) IBC 2000, Site Class D, Design Category F, Category II Facility with 1.25 Importance Factor

Maximum Wind Speed (Wind Load) 140 MPH (Main Unit)

125 MPH (Air Filter)

Roof Live / Snow Load 20 PSF

Near Field Noise at 3 ft horizontal and 5 ft vertical, NOTE 1

90 dB(A)

Far Field Noise, NOTE 1 TBD dB(A) at 400 ft / TBD at 700 ft

NOTE 1: Far field noise is based on single-unit only operation. Multiple units operating at the same time will have an impact on both near and far field noise levels.

000067

Page 163: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 20

2.0 COMMERCIAL TERMS

2.1 Basis of Pricing

2.1.1 Validity

This proposal is budgetary and subject to prior sale.

2.1.2 Taxes

No sales or use taxes have been included in this quotation. The prices quoted exclude any Federal, State or local taxes, or fees, which may be associated with the purchase equipment and/or services.

2.2 Price

One GE LM2500+G4 natural gas only Gas Turbine Generator Set including optional equipment specified as included (I) in Section 1.2 as described in the scope of supply. All pricing is based on ex-works factory delivery unless otherwise stated.

GTG UNIT

Generator set price (each) ..................................................................................................US$ 14,100,000

FACTORY OPTIONS

Option A LM2000 Gas Turbine US$ N/A Option B LM2500 Gas Turbine US$ N/A Option C LM2500+ Gas Turbine US$ N/A Option D LM2500+ G4 Gas Turbine US$ Included Option E Totally Enclosed Water-Air Cooled Generator (TEWAC) US$ N/A Option F Totally Enclosed Air-Air Cooled Generator (TEAAC) US$ N/A Option G Alternate Side Exhaust and Auxiliary Skid US$ N/A Option H Alternate Side Lineside and Neutral Cubicles US$ N/A Option I Liquid Fuel System US$ N/A Option J Dual Fuel System US$ N/A Option K Water Injection System US$ N/A Option L Dry Low Emissions System (DLE) US$ Included Option M Pulse Clean Air Filter US$ N/A Option N Combustion Air Cooling – Evaporative Cooling US$ N/A Option O Combustion Air Cooling – Chiller Coil US$ N/A Option P Combustion Air Heating – Customer Heated US$ 111,300 Option Q Lube Oil Cooler – Fin/Fan US$ N/A Option R Lube Oil Cooler – Duplex Shell & Tube US$ N/A Option S DC Backup Lighting US$ TBD Option T Redundant Ventilation System US$ TBD Option U Nickel Cadmium Batteries US$ Included Option V On-Line Water Wash System US$ N/A Option W Optical Flame Detectors US$ TBD

000068

Page 164: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 21

Option X Remote Workstation US$ 50,000 Option Y Full Load String Test US$ 250,000 Option Z Winterization to –20F/-28C US$ Included

EXTENDED SCOPE EQUIPMENT OPTIONS

Option AA Black Start System US$ TBD Option BB Power Control Module US$ 277,450 Option CC Unit Motor Control Center US$ 71,125 Option DD Switchgear US$ TBD Option EE 125 V DC Battery System US$ 101,780 Option FF Inlet Air Chilling System US$ 405,000 Option GG Simple Cycle Exhaust System US$ N/A Option HH Generator Step-Up Transformer US$ N/A Option II First Fill of Lubricants US$ Included Option JJ Liquid Fuel Centrifuge Module US$ N/A Option KK Anchoring System US$ 27,660 Option LL Water Treatment System US$ N/A

SERVICE OPTIONS

Option AAA Technical Supervision US$ Rate Sheet Option BBB Transportation Services US$ Cost + 15%

2.3 Payment Schedule

Payment Event % of Equipment

Price

1 Within ten days of signature of the Contract Agreement by both Parties, paid against Seller’s invoice.

20%

2 In equal monthly installments, commencing thirty days following signature of the Contract Agreement until thirty days before the first scheduled Shipment Date, paid against Seller’s invoices.

70%

3 Upon notice of Ready to Ship, pro-rata by shipment 10%

On the Notice of Readiness to Ship Milestone, payment must be received at least 5 days before shipment, but no later than 30 days from notification of Readiness to Ship.

000069

Page 165: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 22

2.4 Termination Schedule

Termination is to be concurrent with the payment schedule shown in Section 2.3.

2.5 Shipment Schedule

Based upon execution of a contract agreement and receipt of Payment Event #1 by the Validity date (See Section 2.1.1), the following shipment dates are offered, subject to prior sale.

Units Notice of Ready to Ship date Terms

1 14-15 months ARO Ex-works - Houston

2.6 Standard Contract Terms & Conditions

This proposal is based upon GE Energy’s standard Contract Agreement and Terms and Conditions of Sale. See Section 3.7.

000070

Page 166: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 23

3.0 APPENDIX

3.1 GE Fluid Specifications

3.1.1 Gaseous Fuels (MID-TD-0000-1)

mid-td-0000-1.pd

f

3.1.2 Water (MID-TD-0000-3)

mid-td-0000-3.pd

f 3.1.3 Water Wash (MID-TD-0000-4)

mid-td-0000-4.pd

f 3.1.4 Liquid Detergent (MID-TD-0000-5)

mid-td-0000-5.pd

f

3.1.5 Lube Oil (MID-TD-0000-6)

mid-td-0000-6.pd

f

000071

Page 167: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 24

3.2 Typical Drawing List & Schedule

Drawing Title2 Drawing

Type3 Group

Submittal Date (weeks prior to

RTS)4,5,6

General Arrangement, Main Unit CA 1 38 One Line Diagram, Generator CA 1 38 Installation Foot Print, Main Unit CI 1 38 Anchor Bolt & Jack Screw Detail, Main Unit CI 1 38 Lift Arrangement CI 5 30 Shipping Data CI 5 30 Flow & Equipment Symbols, Mechanical CI 2 36 Flow & Instrument Diagram, Turbine Fuel System CI 2 36 Flow & Instrument Diagram, Turbine Lube Oil System CI 2 36 Flow & Instrument Diagram, Generator Lube Oil System CI 2 36 Flow & Instrument Diagram, Water Wash System CI 2 36 Flow & Instrument Diagram, Ventilation & Combustion Air System CI 2 36 Flow & Instrument Diagram, Fire Protection System7 CI 2 36 Flow & Instrument Diagram, Hydraulic Start System CI 2 36 Flow & Instrument Diagram, Water Injection System CI 2 36 Flow & Instrument Diagram, Fuel System CI 2 36 Flow & Instrument Diagram, Liquid Fuel Pump (Boost) CI 2 36 Instrumentation Diagram, Auxiliary Systems CI 2 36 Plot Plan (G4 only) CI 1 38 General Arrangement, Foundation & Elevation Plot Plan CI 1 38 General Arrangement, Auxiliary Skid CI 1 38 General Arrangement, Air Filter, Ladder and Platforms CI 1 38 General Arrangement, Water Injection Skid CI 1 38 General Arrangement, Liquid Fuel Pump Skid (Boost) CI 1 38 General Arrangement, Water Wash Cart CI 1 38 General Arrangement, Gear Box (50Hz G4 only)7 CI 1 38 General Arrangement, Fire Protection Skid7 CI 1 38 General Arrangement, Chromatograph (DLE only) 7 CI 1 38 Abbr., Symbols & Reference Data, Electrical CI 1 38 Three Line Diagram, Generator Metering CI 3 34 Schematic, Generator Excitation System CI 3 34 Schematic Diagram, Motor Control Center CI 3 34 Schematic Diagram, Critical Path Emergency Stop, DC Power CI 3 34

2 Some of the above drawings may not be required on specific jobs. 3 CA – Customer Approval CI – Customer Information REF – Reference Drawings 4 Custom features for specific project requirements may require additional time. 5 Submittal time is for standard equipment and is shown in weeks prior to notice of RTS (Ready to Ship) date, after receipt of a mutually agreed upon purchase order, a fully conformed design specification and following completion of the post award Order Definition Meeting (ODM). ODM to take place a minumum of 10 weeks prior to first set (Group 1) of drawing due dates. 6 A drawing is considered submitted when uploaded to the www.projectnet.com site. 7 Vendor Supplied Drawing

000072

Page 168: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 25

Drawing Title2 Drawing

Type3 Group

Submittal Date (weeks prior to

RTS)4,5,6

Schematic Diagram, DC Power Distribution CI 3 34 Schematic Diagram, Critical Path Shutdown CI 3 34 Schematic Diagram, Miscellaneous CI 5 30 Schematic Diagram, Turbine Room DC Lighting CI 5 30 Schematic Diagram, 125V DC Motor Starter CI 5 30 Interconnect Plan, Electrical System CI 2 36 Interconnection Wiring Diagram, Customer CI 4 32 Schedule, Motor Control Center CI 2 36 Instrument Loop Diagram, Hydraulic Start System CI 5 30 Instrument Loop Diagram, Ventilation & Combustion Air System CI 5 30 Instrument Loop Diagram, Turbine Lube Oil System CI 5 30 Instrument Loop Diagram, Generator Lube Oil System CI 5 30 Instrument Loop Diagram, Gas Fuel System SAC CI 5 30 Instrument Loop Diagram, Liquid Fuel System CI 5 30 Instrument Loop Diagram, DLE Fuel System CI 5 30 Instrument Loop Diagram, NOx Water Injection System CI 5 30 Instrument Loop Diagram, Water Wash System CI 5 30 Instrument Loop Diagram, Vibration System CI 5 30 Instrument Loop Diagram, Auxiliary System CI 5 30 Instrument Loop Diagram, Cabinet Heat Exchangers CI 5 30 Instrument Loop Diagram, DC Power Distribution CI 5 30 Instrument Loop Diagram, Critical Shutdown Path CI 5 30 Instrument Loop Diagram, Miscellaneous CI 5 30 Instrument Loop Diagram, Generator CI 5 30 Instrument Loop Diagram, Generator Gearbox (Only G4 50Hz units) CI 5 30 Interconnect Cable Schedule CI 4 32 Plan & Elevation, 24V DC Control Power CI 1 38 Plan & Elevation, 125 VDC Battery System CI 1 38 Plan & Elevation, Turbine Control Panel CI 3 34 Plan & Elevation, Lineside Cubicle CI 1 38 Plan & Elevation, Neutral Cubicle CI 1 38 Schematic, Diagram, Circuit Breaker Control CI 3 34 Schematic, Lighting & Distribution CI 3 34 Schematic, Communication CI 3 34 Generator Protective Relay Settings CI 5 30 Digital Multi-function Meter Settings CI 5 30 Digital Synchronizer Settings CI 5 30 AVR Settings CI 5 30 Area Classification Drawing CI 3 34 Area Classification Report CI 3 34 Wiring Diagram, Lineside Cubicle M Wiring Diagram, Neutral Cubicle M Wiring Diagram, Turbine Control Panel, Control Cubicle M Wiring Diagram, Turbine Control Panel, Termination Cubicle M Wiring Diagram, Auxiliary Skid M Wiring Diagram, Generator Skid M Wiring Diagram, Generator Lube Oil M Wiring Diagram, Main Turbine Terminal Box (MTTB) M Wiring Diagram, Turbine Skid M Wiring Diagram, Air Filter M

000073

Page 169: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 26

Drawing Title2 Drawing

Type3 Group

Submittal Date (weeks prior to

RTS)4,5,6

Wiring Diagram, Fire & Gas Protection System* M Wiring Diagram, Generator Gearbox M Nameplate List, Engraving Schedule and Switch Development M Worksheet, Fuel Control M Worksheet Sequencer M Worksheet, Cause & Effects M

000074

Page 170: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

LM2X Gas Turbine Generator Set

LM2500+G4 Stanley Consultants/University of Iowa CMS-707173 Jul 7, 2009 Rev. #2 Page 27

3.3 Typical Performance

"University of Iowa LM2500+G4 Chilled Performance.pdf"

3.4 Codes & Standards

To follow

3.5 Rate Sheet

Field_Services%2B_RoW_09[1].pdf

3.6 Gas Pressure Requirements

SAC Fuel Pressure (psig)

DLE Fuel Pressure (psig)

Min Nominal Max Min Nominal Max

LM2000 365 385 405 430 450 470

LM2500 365 385 405 430 450 470

LM2500+ 500 520 540 500 520 540

LM2500+ G4 500 520 540 500 520 540

3.7 Standard Terms & Conditions

GE Energy Standard Terms and Conditions of Sale shall apply.

"University of Iowa LM2500+G4 Predicted Performance.pdf"

000075

Page 171: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Budgetary Estimate for Combustion Gas Turbine Packaged Power PlantTable of Contents

Project Information

Plant Location

Site Information

Site Electrical Summary(Rated)

Equipment Summary

Scope of Supply Summary

Gas Fuel Information

Equipment List

Term Sheet

Energy Product Links

Environment, Health & Safety

GE Aero Energy Products

GE Distributed Power

GE Hydro

GE Nuclear Energy

GE Oil and Gas

GE Power.com

GE Water Technologies

GE Wind Energy

Reuter-Stokes, Inc.

Substation Automation Solutions

Turbine Blading, Ltd.

GE Response to Energy Products Configurator Request

CMS ID Number: 709706Configuration Number: 3118 (Rev: 3)Budgetary Estimate No: 4297Date: 03-09-2009 12:20:06Customer Contact: Doug EinckCompany Name: Stanley Consultants Inc.Equipment Configured: MS6001B Gas Turbine-GeneratorNumber of Units: 1Projected first unit ship: 2010 - 4th QuarterRequested first unit ship: 2010 - 4th Quarter* Estimated Price: Euro 17,461,000

* Estimated price for budgetary purposes only

Includes: Standard Warranty, Continental/Domestic Freight, Export Box, TechnicalDirection of Installation (TDI), Training, Performance Testing

This estimated price is based on the equipment configuration developed inyour visit to GE's Energy Products Configurator web site. It assumes thatyou and the appropriate GE company will develop a mutually agreeablecontract which incorporates the principles set forth in the attached TermSheet.

This budgetary estimate does not constitute an offer to sell. It is providedfor preliminary planning purposes only.

General Electric would be pleased to work closely with you to develop afirm price proposal for this project. Please contact GE via email ortelephone with any questions. If you wish to change the configuration,request a firm proposal or explore related GE products, please revisit theGEPower.com web site.

Patel, Vijay C

10550 Barkley St

Overland Park, KS 66212-1824

+1-913-967-6274

[email protected]

This document was prepared by GE and provided to the recipient for the sole purpose of evaluating the useof GE products in a potential power generation project. Disclosure of this information to any third party,other than a party assisting the recipient in such evaluation, is strictly forbidden.

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 1000076

Page 172: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Project InformationProject Name: University of IowaCustomer Contact: Doug EinckCompany Name: Stanley Consultants Inc.Address: 225 Iowa Avenue

Muscatine/IA/ 52761

Project Type: Equipment OnlyGenerator Frequency: 60 Hz

Back to Table of Contents

Plant LocationSite Name:

City: Iowa CityCountry: USAState/Province: Iowa

Back to Table of Contents

Site InformationElevation: 0 ft / 0 m 14,7 psi / 1013

mbarDes Ambient Temp: 59 F / 15 CMin Ambient Temp: 5 F / -15 CMax Ambient Temp: 104 F / 40 CDes Relative Humidity: 60%Min Relative Humidity: 40%Max Relative Humidity: 80%

Wind Speed: 0 to 100 mph / 0 to 160 km/hApplicable Code: UBC 1997Salt Classification: Inland, Low rainfall, No fogDust: Light < 200 ppmSnow Load: No SnowSeismic Code: UBC 1997Seismic Zone: 2A

Back to Table of Contents

Site Electrical Summary(Rated)Frequency: 60 HzPF Selected: 0.85PF at Rated Base Load: 0.8Distribution Grid Type: Grid/IslandLow Single Phase Voltage: 120 Volts

Terminal/High Voltage: 13500 VoltsMedium Voltage: 6600 VoltsLow Three Phase Voltage: 480 VoltsDC Voltage: 125 Volts

Back to Table of Contents

Equipment SummaryTurbine: PG6001B 60HzGenerator: Open Ventilated/BrushlessNumber of Units: 1

Combustor Type: DLNFuel: Natural Gas OnlyDuty Cycle: Base Load

Back to Table of Contents

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 2000077

Page 173: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Scope of Supply SummaryGE Supplied Equipment

Equipment Comments

Turbine

Generator/Excitation Open Ventilated/Brushless

Fire Protection

Inlet System Self cleaning

Starting Means Diesel Engine ( black start)

Compressor Washing OFF Line

Accessory Base

Electrical Systems / Equipment

Auxiliary Transformer

52G Gen Breaker

Bus Bar to MV Cell

Battery

Turbine Control

Generator Protection Panel

PEECC

Turbine Equipment MCC

Customer Supplied Equipment

Equipment Comments

Exhaust System

Exhaust Expansion Joint

Closed Cooling Water System

Gas Meter

Final Scrubber

Interconnecting pipings

Electrical Systems / Equipment

Interconnecting Cables

Main Transformer

Back to Table of Contents

Gas Fuel InformationNote: If multiple fuel sources are to be used, fuel data is required for each. Refer to gas fuel specification GEI - 41040F for further detail on fuel

properties and effects on turbine operation.

Gas Fuel AnalysisConstituents Mole %

Hydrogen: 0Nitrogen: 0Carbon Monoxide: 0Carbon Dioxide: 0Methane: 100Ethane: 0Propane: 0n-Butane: 0n-Pentane: 0n-Hexane: 0Total Mole %: 100

Supply ConditionsTemperatureNom (°F/°C) 60/16Min (°F/°C) 0/-18Max (°F/°C) 140/60PressureNom (psig/ kg/cm²) 309/22Min (psig/ kg/cm²) 309/22Max (psig/kg/cm²) 350/26

Back to Table of Contents

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 3000078

Page 174: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Equipment List

EQUIPMENT SUPPLIED BY GE:

Generator

General Information· Open ventilated air-cooled generator

· Outdoor installation

· 60 Hz generator frequency

· Generator voltage 13.8 kV

· 0.85 power factor (lagging)

· Capability to 1.00 power factor (leading)

· Class "F" armature and rotor insulation

· Class "B" temperature rise, armature and rotor winding

· Self-cleaning inlet filters

· Generator bearings

·– Pedestal bearing support

·– Tilting pad bearings

·– Roll out bearing capability without removing rotor

·– Insulated collector end bearing

·– Offline bearing insulation check with isolated rotor

· Monitoring Devices

·– Provisions for key phasor-generator

·– Provisions for permanent flux probe

·– Proximity vibration probes

·– Two probes per bearing at 45° angle

· Generator Field

·– Direct cooled field

·– Two-pole field

·– Finger type amortissuers

Generator Lube Oil Systems and Equipment· Bearing lube oil system

·– Generator lube oil system integral with turbine

·– Sight flow indicator

· Lube oil system piping materials

·– Stainless steel lube oil feed pipe

·– Stainless steel lube oil drain pipe

·– Welded oil piping

Generator Temperature Devices

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 4000079

Page 175: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

· Stator winding temperature devices

·– 100 ohm platinum RTDs (resistance temperature detector)

·– Single element RTDs

·– Grounded RTDs

·– Six (6) stator slot RTDs

· Gas path temperature devices

·– 100 ohm platinum gas path RTDs

·– Single element temperature sensors

·– Two (2) cold gas

·– One (1) hot gas

· Bearing temperature devices

·– Chromel alumel (type K) thermocouples

·– Dual element temperature sensors

·– Two (2) bearing metal temperature sensors per bearing

· Lube oil system temperature devices

·– Chromel alumel (type K) thermocouples

·– Dual element temperature sensors

·– One (1) bearing drain temperature sensor per drain

Generator Packaging, Enclosures, and Compartments·– Neutral tie

·– Exciter enclosure for brushless exciter

· Foundation hardware

·– Generator shims

·– Generator alignment key(s) - collector end

Generator Excitation Systems, Static Components· EX2000BR brushless field excitation regulator

Generator Protection

· Generator electrical protection equipment

·– Ground brush rigging

· Transportation

·– Generator shipped with rotor installed

·– English language service manuals including Operation, Maintenance and Reference Drawing volumes

·– On-line Operation and Maintenance Manuals for Generator

· Generator maintenance tools (1 set per site)

·– Rotor lifting slings

·– Rotor removal equipment including shoes, pans, pulling devices

· Installation equipment

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 5000080

Page 176: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

·– Trunions for generator

·– On permanent basis

The Gas Turbine Package Consisting Of:

The Gas Turbine Compartment:· Multi-stages, axial flow compressor

· Modulated inlet guide vanes

· Three-stages turbine

· Multi-chambers combustion system

· Single gas combustion system with DLN combustors

· Ignition system with spark plugs and U.V. flame detectors

· Borescope openings for maintenance inspection

· Seismic type vibration sensors on bearing caps for protection

· Proximity type sensors for shaftline displacement monitoring

· Thermocouples for measuring exhaust temperature

· Thermocouples on bearing drains

· Inlet and exhaust plenums

· Exhaust frame blowers

· Off line compressor and off line turbine wet washing system

The Auxiliary Systems:· Lubricating oil system with:

·– Duplex lube oil filters

·– Single lube oil to water heat exchanger

·– Shaft driven main lube oil pump

·– Full flow AC motor-driven auxiliary lube oil pump

·– One (1) partial flow DC motor driven emergency lube oil pump

·– Lube oil tank

·– Lube oil mist eliminator with single extraction Fan

·– Lube oil heater

· Hydraulic oil system with:

·– Shaft driven hydraulic oil pump

·– AC motor driven auxiliary hydraulic oil pump

·– Duplex hydraulic oil filters

· Gas fuel system with:

·– One (1 x 100%) fuel gas filter

·– Gas fuel stop and control valves

Couplings:· Flexible auxiliary coupling

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 6000081

Page 177: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

· Auxiliary gear box

· Gas turbine dry flexible type load coupling

· Load gear box, mounted between the gas turbine and the generator:

·– Separate base

·– Lubricating system integral with gas turbine

·– Seismic type vibration sensors on bearing caps for protection

·– Thermocouples on bearing drains

·– Connected to generator with rigid coupling

Gas Turbine Packaging· Lagging and enclosures

·– Enlarged acoustical enclosure around gas turbine and accessory compartments

·– Load gear compartment acoustical enclosure

·– On-base enclosure for gas fuel module

· Compartment ventilation and heating

·– Dual vent fans and heating system for turbine and accessory compartments

·– Dual vent fans and heating system for load gear compartment

·– Dual vent fans and heating system for gas fuel compartment

· Hazardous area classification (NEC Class1, Group D, Division 2)

·– Turbine compartment

·– Gas fuel compartment

· Gas detection system

·– Turbine compartment

·– Gas fuel compartment

· Fire detection and protection system with:

·– Thermic detectors

The Gas Turbine Generator Control Equipment:

Located into an air conditioned Turbine Control Compartment (TCC) designed for outdoor installation andconsisting of:· SPEEDTRONIC Mark VI turbine control panel

· ETHERNET interface to the plant DCS via <HMI>, GSM-TCP/IP protocol (local)

· Generator control, excitation, regulation and protection panel with:

·– Power system stabilizer (PSS)

· Unit AC/DC Motor Control Center, withdrawable type

· Unit AC/DC sub-distribution panel, non- withdrawable

·– Gas detection rack

Off-Base Unit Mechanical Auxiliaries Including:

The Inlet Air System, For Each Unit, with:

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 7000082

Page 178: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

· Up & forward orientation

· Self cleaning type air filter

· Bleed heating system

· Bleed heating interconnecting piping

· Ducting and inlet silencer

· Supporting steel structure

The Gas Fuel Off-Base System Including For Each Unit:· One (1) safety shut off valve + one (1) vent valve

Fire Protection For Gas Turbine Unit Including For Each Unit:· One (1) H.P. CO2 bottles rack.

·– Under shelter

· Unit fire detection and protection panel

Washing Skid(s) Including:

Note: For several units project, the washing skid may be common to several gas turbine units.· Compressor Off-Line washing skid with:

·– Water tank 6m3 - stainless steel

·– Pump skid with:

·– One (1 x 100%) AC motor driven water pump

·– One (1) detergent storage tank

·– One (1) Venturi ejector for detergent

Connection Between Generator Package And Medium Voltage Compartment By:· Metal enclosed air insulated non segregated phase bus bars

One (1) Medium Voltage Compartment, Per Unit, Designed For Outdoor Installation, Consisting Of:· Unit circuit breaker (52 G) withdrawable

· 400 kVA unit auxiliary power transformer

· VTs for synchronization and bus bar ground protection

Remote Control & Monitoring

· One (1) complete remote commercial grade operator interface <HMI>

Miscellaneous

· The following consumables:

·– First charge of lubricating oil

· Anchoring, base plates and positioning blocks

· Template for anchor bolts positioning (for several units project, we do supply one single template for eachblock of three gas turbine units)

· Painting products (for touch up on external surfaces of equipment, to be applied on site)

· Special tools for the gas turbine including:

·– Special tools list A

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 8000083

Page 179: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

· No load gas turbine factory tests according to Manufacturer's standard

Services

· One (1) set of civil work guide drawings for the supplied equipment

· Quality plan including:

· Operation and maintenance manuals, according GE Energy Products - Europe standard form, in Englishlanguage on the following support:

·– CD-ROM

· Technical Advisory service during installation of the supplied equipment

· Technical Advisory service during commissioning of the supplied equipment

· On site performance testing of the supplied equipment

· Mechanical training in factory (limited to 16 trainees) according to GE Energy Products Europe's program

· Electrical and regulation training in factory (limited to 8 trainees) according to GE Energy Products Europe'sprogram

· Training on site according to GE Energy Products Europe's program

TERMINAL POINTS

Mechanical

· Air

·– Inlet face of the gas turbine air filter

·– Inlet face of the generator air filter

· Exhaust gas

·– Outlet flange of exhaust plenum

· Gas fuel

·– Inlet flange on the gas turbine base

·– Vent connections

·– Inlet flange on the gas turbine base

· Cooling Water (Open Circuit)

·– Inlet and outlet connecting flanges 0.5 m outside of the GTG enclosures

· Washing Water (OFF Line)

·– Filling connection on washing water tank

·– Outlet flange of washing skid

·– Inlet flange on the gas turbine base

· Lube Oil

·– Inlet and outlet connection on lube oil tank for filling and emptying

· Compressed Air (Instrument / Service)

·– Inlet connection on the bleed heating control valve

· Drains

·– Various outlet connections on the Gas Turbine Generator and auxiliary bases

·– Inlet flanges of the sump pump

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 9000084

Page 180: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

· Ventilation

·– Inlet and outlet openings on the acoustical enclosures

Electrical

· Low Voltage (460 VAC)

·– Incoming circuit breaker terminals on GT MCC

·– Terminals on GTG unit(s) package(s) and various skid(s)

·– Terminals of the washing skid cubicle

· Medium Voltage

·– Outgoing terminals of the medium voltage compartment

· Control and instrumentation

·– Terminals at the GTG unit(s) package(s) and various skid(s)

·– Terminals at control panels

· Earthing

·– Terminal points on GTG base frame and various auxiliaries

SUPPLY BY OTHERS

Mechanical

· Exhaust system

·– Exhaust duct

·– Exhaust stack

·– Exhaust emission measurement instrumentation

· Gas fuel system

·– Gas fuel flow meter for performance tests (this flow meter shall be in accordance with ISO 5167)

·– Final gas filter and / or separator

·– Gas fuel treatment station including: primary filter and / or separator, pressure boosters, pressurereducing valve, heater, tariff metering, condensate tank, vent stack, flare (if any)

·– Gas fuel density or calorific value measurements

· Off-base cooling loop

· Fire fighting system

·– Site fire protection and detection system

· Piping

·– Gas fuel piping

·– Liquid fuel piping

·– Cooling water piping

·– CO2 piping

·– Washing water piping

·– Draining system piping

·– Piping beyond terminal points

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 10000085

Page 181: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

· Compressed air system (service and control) (if any)

· Washing water (if any) and oily water drain system including water recovery pit, piping from connecting flangenear the GT base, water treatment before discharge in sewage system (if any)

· Any crane and / or lifting facilities

· Machine shop equipment (if any)

· Laboratory equipment (if any)

· Turbine hall ventilation (if any)

· Various vents to be piped outside the turbine hall (if any)

Electrical

· All control, power and instrumentation cables with raceways and accessories between the suppliedequipment

· All MV and HV cables

· Any MV and / or LV site switchboard

· Emergency diesel generating set and black start equipment

· Grounding grid and connections to the grounding cable

· Lightning protection

· Site lighting, fencing

· Cathodic protection

Miscellaneous & Services

· Any generator type test

· All consumable, chemicals during erection, commissioning, testing and running of the unit(s)

·– Including first charge of:

·– Detergent for compressor off-line washing

· Soil investigation, analysis and factual report

· Any civil work, concrete structure, road, including design studies (except guide drawings for the suppliedequipment)

· Grouting compound for GT unit(s)

· Complete erection of the supplied equipment

· Complete commissioning of the supplied equipment

· All environmental permits and / or approvals such as (but not limited to) air, waste, fluids, coastal zone, noise,hydrology study

· All governmental permits and / or approvals such as (but not limited to) construction permit, environmentalimpact statements, licenses, exemptions

· Any other equipment or service not clearly indicated in our Scope of supply

Back to Table of Contents

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 11000086

Page 182: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Term Sheet for Equipment SalesA final equipment sale contract between Seller and Buyer for the Project would have to incorporate a set ofcommercial terms and conditions to the mutual satisfaction of Seller and Buyer. Seller's proposals for equipmentsales to extended scope project contractors are based upon the contract principles summarized below:

1. Final notice to proceed must follow satisfaction of certain conditions precedent, including but not limited to: (i)that all necessary permits and approvals to be obtained by the Buyer have been obtained; (ii) that paymenthas been made or committed to Seller for any resulting work and commitments, regardless of the Buyer'sbanking agreements or the status of any financing arrangements; (iii) the contract has been executed. If thenotice to proceed is delayed for any reason, Seller shall be entitled to reasonable Adjustments (as defined).Interim notices to proceed may be issued subject to mutual agreement regarding payment for work performedduring such interim period.

2. Decisions and determinations of compliance under the contract shall be based upon objective compliance withcontract specifications rather than subjective standards. Consents, approvals, waivers, cancellations,changes, acceptances, and other actions shall be fairly made or taken and not unreasonably withheld ordelayed, so that the parties will not be unfairly hindered in efficiently completing their obligations under theprime contract.

3. Buyer shall have the right to witness tests and inspections at Seller's factory. These tests and inspections shallbe held on the date scheduled by Seller and shall be conducted by Seller's personnel.

4. Seller shall be entitled to appropriate Adjustments for any changes requested by Buyer from contractspecifications, including changes resulting from changes in laws impacting the project after the date of Seller'sproposal and changes needed to accommodate the work being performed by any of the Buyer's othercontractors. Seller shall not be required to comply with any requested change order until Buyer and Sellerhave reached written agreement on appropriate Adjustments.

5. For equipment manufactured or shipped from the United States by Seller, title shall be transferred to Buyerwhen such equipment is available for shipment from the factory of manufacture directly to Buyer or totemporary storage. Title to equipment procured by Seller outside the US which shall be shipped directly toBuyer shall pass to Buyer after clearing customs at the port of export in the country of manufacture. Title toother work in progress and construction support services and all other services shall pass to Buyer as suchwork or services are performed.

6. Responsibility for obtaining licenses and permits shall be allocated by mutual agreement between Buyer andSeller.

7. Force Majeure shall be defined to include events beyond Seller's reasonable control including but not limitedto acts of God, civil unrest, war, earthquake, acts of governments, acts of other Sellers, unavailability ofrequired materials and services, strikes and other labor disturbances, archaeological finds and unusualsurface or subsurface conditions. Seller shall be entitled to reasonable Adjustments in the event of a ForceMajeure.

8. The contract shall include a mutually agreed payment schedule to apply in the event the Buyer elects toterminate any part of the contract for convenience. Seller shall be entitled to reasonable Adjustments in theevent Buyer suspends work at the Site. Seller shall be entitled to continue the manufacture of equipment andreceive contract payments during a site suspension and shall store the equipment at Buyer's expense uponcompletion of manufacture.

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 12000087

Page 183: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

9. Buyer shall be entitled to terminate the contract in the event Seller fails to commence reasonable cure within30 days after notice from Buyer specifying the material default. Seller's liability for material default shall belimited to the additional amount Buyer must pay a third party to complete the work over what Buyer agreed topay Seller.

10. Performance tests of guaranteed values will be based only upon the entire plant, i.e. station instrumentationtesting. Performance and reliability test procedures and criteria, dead bands, tolerances and test duration mustbe established in conformity with general industry practices and set forth in the contract. The Buyer shallprovide operating personnel and all required water, fuel and consumables during the start-up, commissioning,testing and commercial operation. Seller shall have the right to elect to pay liquidated damages or undertakecorrective action for any performance test failures and an opportunity for a performance retest within one yearof the first test.

11. Assessment of performance related liquidated damages shall be based on the price of the nonperforming unit,provided that bonuses for exceeding guaranteed values on units shall be used to offset failure to achieveguaranteed values on other units. Liquidated damages for delay shall be assessed on the basis of the greaterof the value of the delayed equipment or the value of the delayed unit in which the equipment will be used.Liquidated damages shall be reasonable in amount and shall be Buyer's sole and exclusive remedy for delayor performance failure.

12. The warranty period shall commence upon initial synchronization for a duration of one year but in no eventexpiring later than two years after unit shipment. Seller's work shall be warranted to conform to the contractspecifications, to be free from defects in materials, workmanship and title, to be designed and fit for thepurpose of generating electric power in accordance with operating instructions and to be free from anyinfringement of US. patents or trademarks.

13. In the event of any warranty deficiencies, Seller shall, at its option, repair or replace the defective work andre-perform any associated servicesassociated therewith. The repaired or replaced component shall bewarranted for one year, but in no event shall any warranty obligations extend beyond three years after unitshipment. Seller shall not be responsible for normal wear and tear and deficiencies caused by improperoperation or maintenance. The warranties and the warranty remedies set forth in the contract shall be Buyer'ssole and exclusive remedy for defects occurring during the warranty period.

14. Indemnification obligations shall only apply to claims by third parties for damage to property or personal injuryand shall be limited to the extent of each party's degree of negligence or fault.

15. Seller's and its subcontractors' aggregate liability under the contract for direct damages, indemnification,liquidated damages, guarantees, warranties and/or otherwise shall be limited to claims which arose prior to theexpiration of the warranty period and shall not exceed an agreed to percentage of the contract price forperforming the work, and must specifically exclude consequential, special, indirect, exemplary and incidentaldamages.

16. The contract shall be subject to mutually agreed international arbitration conducted in accordance withinternationally recognized neutral procedural rules by a neutral arbitration panel appointed by aninternationally recognized neutral authority.

17. The contract shall provide for payment security satisfactory to Seller established at Buyer's expense. Latepayments shall bear interest at a mutually agreed upon rate.

18. Upon Buyer's request, the Contract shall provide Buyer with mutually agreed performance and advancepayment security bonds, provided that Seller's price shall be increased by the cost of providing such bonds.Buyer shall have the right to draw such bonds thirty (30) days after notifying Seller in writing of Seller's defaultand Buyer's decision to draw such bonds.

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 13000088

Page 184: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

19. Seller shall be responsible for corporate and personal taxes measured on net income or profit. Buyer shall beresponsible for all other taxes including ad valorem, consumption, excise, franchise, gross receipts, import,license, property, sales, stamp, storage, transfer, turnover, use or value added taxes, etc.

20. Seller shall have the right to assign or novate performance of work to be performed outside of the UnitedStates and its training obligations to a wholly owned affiliate. Buyer shall accept performance from suchaffiliates and shall make payment directly to the affiliate. The contract shall provide for separate paymentstreams for imported and in-country work.

21. The contract shall provide for mutually agreed obligations to obtain appropriate insurance. Transfer of risk ofloss shall be coordinated with the allocation of insurance obligations.

22. Seller's proposal, price, guarantees and scope of supply do not take into consideration agreements betweenthe Buyer and third parties which Seller has not reviewed and incorporated into its proposal. Additionally, priorto the execution of the contract, any exhibits thereto must be reduced to such provisions as are specificallyapplicable to Seller's contract, and can be accepted after the review and approval by Seller and afterappropriate Adjustments are made.

23. Contract provisions that apply generally must be equally applicable to both parties. Terms shall be drafted toeliminate ambiguities and otherwise conform to the foregoing requirements and to the technical and othercomments contained in Seller's proposal and subsequently mutually agreed by the parties. Other lessimportant provisions will need to be revised or developed during the final contract negotiations. All applicablerights and obligations of either party must be specifically set forth in the contract.

24. The terms "Adjustments" as used in this Appendix shall mean, as the context may require, appropriateequitable adjustments in price, project schedule, project warranties, performance guarantees and projectscope of supply

Back to Table of Contents

Budgetary Estimate No: 4297Configuration No: 3118 (Rev: 3) GEPS Budgetary Estimate Page 14000089

Page 185: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Proposal No: 24925-DS Date: 07-25-2008 Prepared By: Daniel Skiles

TO:

Stanley Group

Coralville, IA

FOR:

University of Iowa

Iowa City, IA

000090

Page 186: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 2 07-25-2008

TABLE OF CONTENTS

1.0 INTRODUCTION .......................................................................................................................3 2.0 SCOPE OF SUPPLY ...................................................................................................................4 3.0 BOILER DESIGN DATA............................................................................................................ 10 4.0 BOILER PERFORMANCE DATA................................................................................................. 11 5.0 BOILER DESIGN FEATURES .................................................................................................... 12

5.1 D-TYPE BOILER .................................................................................................................. 12 5.2 DESIGN STANDARDS .......................................................................................................... 12 5.3 FACTORY TESTS ................................................................................................................. 12 5.4 DATA REPORTS & BOILER REGISTRATION........................................................................... 13 5.5 BOILER DRUMS .................................................................................................................. 13 5.6 LOWER DRUM BLOW OFF .................................................................................................... 13 5.7 STEAM BAFFLE SYSTEM ...................................................................................................... 13 5.8 BOILER TUBES ................................................................................................................... 14 5.9 BOILER WELDED WALLS ..................................................................................................... 14 5.10 BOILER FRONT & REAR WALLS............................................................................................ 14 5.11 BOILER CASING ................................................................................................................. 14 5.12 BURNER THROAT................................................................................................................ 14 5.13 BOILER BASE ..................................................................................................................... 14 5.14 BOILER PAINT FINISH........................................................................................................ 15 5.15 OBSERVATION PORTS ........................................................................................................ 15 5.16 SUPERHEATERS.................................................................................................................. 15 5.17 ECONOMIZERS ................................................................................................................... 16

6.0 START-UP & FREIGHT ............................................................................................................ 17 6.1 START-UP SERVICE ............................................................................................................ 17 6.2 FREIGHT ............................................................................................................................ 17

7.0 PRICING................................................................................................................................ 18 7.1 PROPOSAL TYPE: ................................................................................................................... 18 7.2 BID VALIDITY: ...................................................................................................................... 18 7.3 SHIPPING TERMS: ................................................................................................................. 18 7.4 PAYMENT TERMS: .................................................................................................................. 18 7.5 CANCELLATION SCHEDULE: ................................................................................................... 18 7.6 GUARANTEES:........................................................................................................................ 19 7.7 PRODUCTION TIME:............................................................................................................... 19 7.8 GENERAL TERMS OF SALE: ..................................................................................................... 19 8.0 FIELD SERVICE RATES ........................................................................................................... 20 9.0 ENGINEERING SUBMITTAL PACKAGE ..................................................................................... 21 10.0 ASME WATER QUALITY .......................................................................................................... 22 11.0 STANDARD VENDOR/MANUFACTURER LIST ........................................................................... 24 12.0 COMMENTS ............................................................................................................................ 25

12.1 TECHNICAL CLARIFICATIONS............................................................................................. 25 12.2 COMMERCIAL CLARIFICATIONS.......................................................................................... 25

13.0 TERMS & CONDITIONS........................................................................................................... 26

000091

Page 187: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 3 07-25-2008

1.0 INTRODUCTION CB Nebraska Boiler & CB Natcom form the engineered boiler/burner division of the Cleaver-Brooks family of companies. We are committed to offering integrated boiler/burner solutions to the industry. This group of companies has been in this business for more than 80 years and continues to enjoy a large percentage of the market share. We maintain our leadership in the industrial watertube market by offering innovative solutions and a true single-source responsibility to our customers for boilers, burners, controls & auxiliary equipment. This commitment to overall system design ensures that your equipment operates efficiently and lasts for years to come. For your unique application, we are offering a packaged solution with the following design features:

1.1 OUTLET STEAM CONDITIONS:

Capacity: 100,000 LB/HR ¤ Operating Pressure: 155 PSIG (at exit of non-return valve) ¤ Steam Temperature: Saturated Steam Quality: 99.5% dry steam

1.2 BOILER DESIGN: Type: D-Type Industrial Watertube Model: NB-400D-75 Vessel Design Pressure: 250 psig

1.3 BURNER DESIGN: Type: Low-NOx Register Main Fuel: Natural Gas Backup Fuel: NA

1.4 ECONOMIZER DESIGN:

Type: Rectangular Finned-Tube Arrangement: Vertical Gas Flow; Counter-Current Water Flow

Design Pressure: 300 psig Inlet Feedwater Temp: 228°F 1.5 STACK DESIGN:

Type: Stub Stack Diameter (at exit): 42” Height (from grade): 50 ft

000092

Page 188: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 4 07-25-2008

2.0 SCOPE OF SUPPLY The following equipment is included for each steam generator system proposed: *Note that items marked ‘NO’ may not be required and/or may not be specified: Shipped Included Loose ITEM Size Qty YES NO ALT

X Model NB-400D-75 industrial watertube boiler 1 X - Fully membrane (watercooled) pressure vessel that

is 100% welded gas-tight with no refractory corner seals

X

- Tubes will be SA178A X - Tubes will be SA192 (seamless) X - Tubes seal-welded to drum (for high-pressure or

heavy cycling service) X

- Steam separators to provide dry steam quality of 99.5% based on water supply meeting attached limits.

X

- Boiler shall be painted SSPC - SP3 X - Membrane front wall X - Membrane rear wall X - Factory hydrostatic pressure test X - Factory air casing pressure test X - Corrugated aluminum outer casing X - Welded steel outer casing – primed & painted X - Lower-drum steam heating coil 1 X - Furnace access door 1 X - Convection inspection door 1 X - Furnace observation ports (three 1 ½” on rear wall) 3 X - 12x16” elliptical manways 4 X - 14x18” elliptical manways (steam drum only) 2 X - Hinged manways 4 X Boiler Steam Trim: - Water column 1 X - Water column drain valve 0.75 in. 1 X - Water column probe 1 X - Water column gage glass 1 X - Water column gage 1 X - Water column gage drain valve 0.75 in. 1 X - Auxiliary Low water cutout 1 X - Auxiliary Low water cutout drain valve 0.5 in. 1 X - Low water cutouts bypass 1 X - Continuous (surface) blowdown stop valve 1.5 in. 1 X - Continuous (surface) blowdown control valve 1.5 in. 1 X X - Bottom (intermittent) blowdown stop valve 1.5 in. 2 X X - Bottom (intermittent) blowdown control valve 1.5 in. 2 X - Chemical feed stop valve 0.75 in. 1 X - Chemical feed check valve 0.75 in. 1 X

000093

Page 189: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 5 07-25-2008

Shipped Included Loose ITEM Size Qty YES NO ALT

X - Drum vent valve 0.75 in. 1 X - Drum vent stack 1 X - Steam pressure gage 8.5 in. 1 X - Steam gage drain valve 0.5 in. 1 X - Steam gage test valve 0.25 in. 1 X - Drum Level Transmitter Isolation Valve 1.5 in. 2 X - Drum Level Transmitter Isolation Drain Valve 0.5 in. 2 X X - Main steam non-return valve 8.0 in. 1 X X - Main steam stop valve 8.0 in. 1 X X - Spool piece – 3 ft 8.0 in. 1 X X - Spool piece drain valve 0.5 in. 1 X X - Safety valves - set at: 250 PSIG 250 psig 1 X X - Safety valves - set at: 245 PSIG 245 psig 1 X - Safety valve silencers 2 X - Safety valve vent stacks 2 X - Safety valve silencer/stack support 2 X - Safety valve drip pan elbow 2 X - Steam sample cooler 1 X - Lower-drum steam heating coil trim including

isolation valves, drain valves & steam trap temperature regulator

1.5 in. 1 X

Boiler Feedwater Trim: X - Feed control valve 3.0 in. 1 X X - Feed stop valve 3.0 in. 1 X X - Feed check valve 3.0 in. 1 X X - Feed control system drain valve 0.5 in. 2 X X - Feedwater bypass valves – globe 3.0 in. 1 X X - Feedwater bypass valves – gate 3.0 in. 2 X X - Feedwater piping 3.0 in. 1 X Boiler Sootblowers: - Boiler wall boxes & bearings 2 X - Sootblower manual assembly 2 X - Sootblower electric assembly 2 X - Sootblower element (calorized/dialoy) 2 X - Sootblower steam piping from boiler 1 X - Sootblower shutoff valve 2.0 in. 2 X - Sootblower drain valve 0.5 in. 2 X Economizer: X - Rectangular finned-tube economizer with corrugated

outer lagging 1 X

- Economizer sootblower wall boxes & bearings 1 X - Economizer sootblower assembly 1 X - Steam supply pipe and steam stop and drain valves

for economizer sootblower assembly 1 X

Economizer Trim: - Economizer feedwater bypass 3.0 in. 2 X - Economizer safety relief valve 1 X - Economizer safety relief valve vent stack 1 X

000094

Page 190: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 6 07-25-2008

Shipped Included Loose ITEM Size Qty YES NO ALT

- Economizer safety relief valve drip pan elbow 1 X X - Header vent valve 1.0 in. 1 X X - Header drain valve 1.0 in. 2 X X - Temperature gauges – feedwater inlet/outlet 2 X - Temperature thermowell - feedwater inlet/outlet 2 X X - Temperature gauges – flue gas inlet/outlet 2 X - Temperature thermowell - fluegas inlet/outlet 2 X Low-NOx Burner: - Natcom NXT burner register 1 X - Burner windbox with fresh air inlet 1 X - Natural gas pilot fuel train 1 X - Natural gas main fuel train 1 X - Natural gas fuel control valve 1 X - Fuel oil main fuel train 1 X - Fuel oil control valve 1 X - Windbox-mounted fuel trains 1 X - Rack-mounted fuel trains X X - PLC BMS flame safeguard panel 1 X - BMS flame scanner 1 X - BMS limit switches Lot X - Gas strainers 1 X - Oil strainers 1 X - Main gas PRV’s 1 X - Oil PRV’s 1 X - Oil pumps and heater equipment 1 X X - FGR mixing box 1 X X - FGR ducting 1 X X - FGR flow control damper 1 X X - FGR flow control damper actuator 1 X Combustion/Feedwater Controls: X - Combustion/feedwater control panel - Allen Bradley

Compact Logix 1 X

X - HMI Interface - Panel View 1 X - Single-point (jackshaft) combustion control strategy 1 X - Fully-metered, cross-limited combustion control

strategy 1 X

- O2 trim 1 X - Draft control - including damper & actuator 1 X - 3 element feedwater control strategy 1 X - Blowdown conductivity control 1 X - SCR Control 1 X Boiler Instrumentation: X - Steam flow element 1 X X - Feed water flow element 1 X X - Combustion Air flow element 1 X X - Natural Gas flow element 1 X - #2 Oil Flow element 1 X - FGR flow element 1 X

000095

Page 191: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 7 07-25-2008

Shipped Included Loose ITEM Size Qty YES NO ALT

- Flue gas oxygen analyzer 1 X Boiler Transmitters: - all transmitters include valve

manifolds as required

X - Steam flow transmitter 1 X X - Feedwater flow transmitter 1 X X - Combustion air flow transmitter 1 X X - Natural gas flow transmitter 1 X - #2 fuel oil flow transmitter 1 X - FGR flow transmitter 1 X X - Steam outlet pressure transmitter 1 X - Furnace pressure transmitter for draft control 1 X - Drum level transmitter 1 X - Eyehye remote drum level transmitter 1 X - Economizer feedwater inlet temperature transmitter

- including RTD 1 X

- Economizer feedwater outlet temperature transmitter - including RTD

1 X

- Economizer flue gas inlet temperature transmitter - including RTD

1 X

- Economizer flue gas outlet temperature transmitter - including RTD

1 X

Forced Draft Fan: - Windbox-mounted Arrangement 4 1 X X - Grade-mounted Arrangement 7 forced draft fan 1 X X - Ductwork from grade mounted fan to windbox 1 X X - Inlet air silencer 1 X - Fresh air inlet damper 1 X - Fresh air inlet damper actuator 1 X X - Inlet vane control (IVC) damper 1 X X - Inlet vane control (IVC) damper actuator 1 X - Fan outlet damper (mounted on burner windbox) 1 X - Fan outlet damper actuator 1 X X - 200 HP TEFC direct drive electric motor, 480V, 3

phase, 60 Hertz with coupling and coupling guard 1 X

- Variable-frequency drive NEMA 1 1 X - Packaged variable-frequency drive with enclosure &

line reactor (NEMA 4X) 1 X

- Steam turbine drive with reduction gearbox 1 X - Lube oil system 1 X - Concrete foundation bearing pedestals X - Common steel base pedestal for fan/motor 1 X - External insulation & lagging for fan duct 1 X Stack: X - Stub stack 42 inch diameter (at the exit) and 50 ft

in height (from grade) with sampling ports as required. Made from 0.25 inch carbon steel.

1 X

X – Ladders to access sampling ports 45 ft 1 X X - Platforms to access EPA ports 1 X

000096

Page 192: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 8 07-25-2008

Shipped Included Loose ITEM Size Qty YES NO ALT

- 1/16” corrosion allowance on stack wall. 1 X - Rub plates and all hardware for guiding the stack at

the roof 1 X

- Rain hood 1 X X - Personnel protection - from grade: 8 ft 1 X - External insulation & lagging for stack 1 X - FAA warning lights 1 X Boiler Platforms & Ladders: X - Platforms & ladders to access boiler drum length 1 X X - Platforms & ladders to access boiler drum ends 1 X - Platforms & ladders to access economizer 1 X X - Platform construction: Angle Iron handrails, Exp

flooring 1 X

X - Platform & ladder finish: primed & painted 1 X Miscellaneous: - P.E. stamp (structural only) 1 X - Blowdown tank 1 X - Blowdown conductivity control system 1 X - Chemical feed system 3 X - C.E.M.S. (continuous emissions monitoring system) 1 X - Motor starters 1 X - Spreader bars for rigging X - Oil fuel atomizing steam stop and drain valves and

supply piping from steam header/drum to entrance to atomizing steam train

1 X

- Superheater piping field welds X - Piping insulation X - Piping supports X - Field cuts/welds for field alignment, between major

pieces of equipment. (Ducting flanges are tack welded. Prefab piping is completed for hydrotest at factory)

X

- Design & supply of interconnecting piping, wiring, conduit, tubing, and fittings, between boiler/boiler controls and auxiliary equipment e.g. D.A., blowdown, chem. feed, drains, vents, field mounted electronics, etc…

X

- Unloading and installation of equipment X - Interconnecting large-bore (> 2”) piping between

skids. Small-bore piping (< 2”) by others X

- Disposal of boil-out chemicals X - Required chemicals and fuels for boil-out, start-up,

and testing X

- Foundation and anchor bolts X - Export packing/crating X - Bonding or LOC X X - O&M manuals - submitted electronically 6 X Ductwork: X - Boiler-to-economizer transition duct 1 X

000097

Page 193: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 9 07-25-2008

Shipped Included Loose ITEM Size Qty YES NO ALT

X - Economizer outlet transition duct with FGR port 1 X X - Expansion Joint 1 X - Misc. Duct 1 X Structural Support: X - Economizer support steel structure 1 X - Misc. Support 1 X Service: - Including: 15 Days 4 Trips X - 5 days and 1 trip of installation supervision X - 2 8-hour training sessions X - Materials for training sessions (manuals,

presentations, cut sheets, etc…) X

Freight: - Equipment is offered Ex-Works (Incoterms 2000) X - Freight, via truck/rail, is included FCA jobsite

(Incoterms 2000) X

- Rigging & offloading at designated point of delivery X - Transport from point of delivery to jobsite X

END OF SCOPE OF SUPPLY

000098

Page 194: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 10 07-25-2008

3.0 BOILER DESIGN DATA Boiler Dimensions: Units Height to Main Steam Outlet 15 Ft 1 In FT Overall Width of Unit 11 Ft 7.5 In FT Overall Length of Unit* 27 Ft. FT *Add approximately 6-8 ft length for burner. Weight of Unit (Dry) 89,015 LBS Weight of Unit (Wet) 115,180 LBS Surface Area / Volume: Units Furnace Volume 1,491 FT3 Furnace Projected Area 876 FT2 Evaporator Area 4,456 FT2 Total Area 5,331 FT2 Economizer Area 10,252 FT2 Superheater Area - FT2 Tubing Data: Units Tube OD 2.0 IN Tube Wall Thickness – Furnace Section 0.105 IN Tube Wall Thickness – Convection Section 0.105 IN Tube Material SA178A Corrosion Allowance NA IN Steam Drum: Units Inside Drum Diameter: 48 In IN Drum Length 27 Ft. Seam/Seam FT Drum Material: SA516 Grade 70 Corrosion Allowance: NA IN Water Drum: Units Drum Diameter: 24 In IN Drum Length 27 Ft. Seam/Seam FT Drum Material: SA106 Grade B Corrosion Allowance: NA IN Standard Drum Connections: Quantity Type Main Steam Outlet: One Flanged Safety Valves: Per ASME Code Flanged Feedwater Inlet: One Flanged Bottom Drum Blowoff: Two Flanged Water Column: Two Threaded

(NPT) Feedwater Regulator: Two Flanged Vent: One NPT Continuous Blowdown: One NPT Chemical Feed: One NPT Sootblower: Two Flanged Auxiliary L.W. Cutouts: One NPT

*The above information is preliminary and shall be confirmed at time of engineering submittal.

000099

Page 195: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 11 07-25-2008

4.0 BOILER PERFORMANCE DATA Fuel: Natural Gas

Boiler load - % 100% 75% 50% 25% Units Steam Flow - ¤ 100,000 75,000 50,000 25,000 Lb/Hr Steam Pressure – Operating - ¤ 155.0 155.0 155.0 155.0 PSIG Steam Temperature - ¤ 368.0 368.0 368.0 368.0 °F Fuel Input (HHV) 119.5 89.3 59.5 30.0 MMBTU/Hr Ambient Air Temperature 80.0 80.0 80.0 80.0 °F Relative Humidity 60 60 60 60 % Excess Air 15 15 15 15 % Flue Gas Recirculation 15 15 15 15 % Steam Output Duty 100 75 50 25 MMBTU/hr Heat Release Rate 80,127 59,879 39,870 20,082 BTU/FT3-Hr Heat Release Rate 136,472 101,986 67,906 34,204 BTU/FT2-Hr Deaerator Pegging Steam - - - - Lb/Hr Feed Water Temperature 228 228 228 228 °F Water Temp. Leaving Economizer 310 298 285 275 ±10°F Blow Down 3.0 3.0 3.0 3.0 % Boiler Gas Exit Temperature 558 504 447 398 ±10°F Economizer Gas Exit Temp. 305 285 266 250 ±10°F Air Flow 100,446 75,063 49,980 25,175 Lb/Hr Flue Gas to Stack 105,924 79,157 52,706 26,548 Lb/Hr Flue Gas Including FGR 121,813 91,031 60,612 30,530 Lb/Hr Fuel Flow 5,478 4,093 2,725 1,373 Lb/Hr Flue Gas Losses/Efficiency-% Dry Gas Loss 4.2 3.9 3.5 3.2 % Air Moisture Loss 0.1 0.1 0.1 0.1 % Fuel Moisture Loss 10.7 10.6 10.5 10.4 % Casing Loss 0.5 0.7 1.0 2.0 % Margin 0.5 0.5 0.5 0.5 % Efficiency - LHV 93.1 93.4 93.5 92.8 % Efficiency – HHV - ¤ 84.0 84.3 84.4 83.8 % Total Pressure Drop Including Economizer 9.87 5.52 2.44 0.63

IN WC

Products of Combustion - CO2 8.3 8.3 8.3 8.3 % - H2O 18.1 18.1 18.1 18.1 % -N2 71.2 71.2 71.2 71.2 % -O2 2.5 2.5 2.5 2.5 % -SO2 - - - - % GAS- % volume NG methane 90.00 ethane 5.00 nitrogen 5.00 LHV-Btu/lb 19,687 HHV-Btu/lb 21,815

*The above information is preliminary and shall be confirmed at time of engineering submittal.

000100

Page 196: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 12 07-25-2008

5.0 BOILER DESIGN FEATURES 5.1 D-TYPE BOILER CB-Nebraska Boiler’s proven D-Type boiler series is an ideal solution to almost any steam need. Our unique design incorporates a 100% membrane watercooled furnace with minimal refractory. This feature greatly eliminates the costly & time consuming annual maintenance associated with older refractory boiler designs. In fact, the membrane front & rear walls (including all of the corner gas seals) are completely refractory-free, including the burner throat (when paired with our exclusive CB-Natcom burner). 5.2 DESIGN STANDARDS The design, material, and workmanship of all pressure parts is in strict conformance with the rules and regulations in effect at the date of contract as required by:

1. THE ASME BOILER AND PRESSURE VESSEL CODE.

2. The Laws of the State in which the equipment is to be installed (as applicable).

3. Requirements of the Hartford Steam Boiler Inspection and Insurance Company, under whose inspection the pressure parts of each unit shall be constructed.

4. Structural components supplied with the boiler package will be designed in accordance with the following codes:

INTERNATIONAL BUILDING CODE (2000) AISC – LRFD (Latest Edition) ASME STS-1 STEEL STACKS 2001

5.3 FACTORY TESTS A hydrostatic test at one and one-half times the design pressure is applied to the pressure parts in accordance with the ASME Code. For some applications, a casing pressure test is also performed to ensure gas-tight design.

Cross-section view

Plan view showing gas flow

000101

Page 197: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 13 07-25-2008

5.4 DATA REPORTS & BOILER REGISTRATION Two(2) copies of the Manufacturer's Data Report are provided. Each boiler is registered with the National Board of Boiler & Pressure Vessel Inspectors and with the State Boiler Inspection Department in the State in which the boiler will be installed (as applicable). 5.5 BOILER DRUMS Boiler drums are fusion welded in accordance with the latest ASME Boiler and Pressure Vessel Code Section I covering power boilers, including x-raying and stress-relieving as required and under the inspection of Hartford Steam Boiler Inspection and Insurance Company. All tubes holes are drilled true and radially, to afford full parallel bearing of tubes through the drum plate. Each tube hole is serrated with single or multiple grooves, as required by the design pressure. This insures a seal that is tight when expanded and stays leak-free when in operation. For some severe-duty applications, the tube-to-drum connections are also seal-welded. All drums have an elliptical manway with cover in each head. Lifting lugs are provided on the drums to facilitate rigging. 5.6 LOWER DRUM BLOW OFF The lower drum is provided with one or two connections at the lowest point for draining and discharge of precipitates. A slotted collector angle of proper proportion is provided for blowing the unit down. These blow-off valves also serve as boiler drains. 5.7 STEAM BAFFLE SYSTEM All boiler tubes shall discharge into the upper steam drum inside a baffled compartment designed to act as a primary steam-water separator system. Steam discharge from the baffle outlet shall be horizontal above the normal water level. Secondary steam separation shall be effected by use of a chevron or labyrinth steam drier from which dry steam is delivered to the steam outlet connection. The steam after the boiler outlet shall contain not more than 0.5% moisture if saturated steam or 1 ppm TDS if superheated steam. The solids concentration of the boiler water shall not exceed the recommended values as recommended by ASME. Higher steam purity is available for certain applications.

Serrated and rolled tube-to-drum connection

Steam drum cross-section showing typical internals

Factory drum construction

000102

Page 198: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 14 07-25-2008

5.8 BOILER TUBES Tube bends shall be made on an 8" radius with mandrel inserted during bending to prevent distortion at the bend. Tube arrangement shall be in line. Tubes shall be in proper alignment with tube holes and shall be exact length for proper expanding and flaring. All tubes shall be 2” O.D. on 4” centers. All tubes in the furnace shall be membrane (watercooled) tubes except those where the gases leave the furnace and enter the convection section. The last row in the convection section shall be membrane (watercooled) tubes except in the area where the flue gases leave the boiler. Membrane fins shall be ¼” by 1" steel, fused continuously to opposite sides of the tubes by electric welding. All tubes in both the furnace and convection section shall be 2" O.D. electric resistance-welded carbon steel boiler tubes. 5.9 BOILER WELDED WALLS The adjacent membrane fins of each outboard furnace and convection tube shall be continuously seal-welded together, forming a water-cooled, gas tight inner seal. The inboard row of membrane tubes between the furnace and convection zone shall also be seal-welded together to prevent short-circuiting of flue gas from the furnace to the boiler flue gas outlet. Super plastic refractory shall be installed to protect the entire length of water and steam drums from radiant heat where exposed to the furnace between the two rows of furnace tubes. 5.10 BOILER FRONT & REAR WALLS

The front & rear walls of the boilers are of membrane tube construction. The watercooled burner throat shall be of the ring header design. The walls will be backed with mineral wool and ceramic fiber blanket. Corner gas seals are welded and refractory-free. 5.11 BOILER CASING CB-Nebraska Boilers are available with 2 types of outer casings. The aluminum casing uses 0.04” pebble grain lagging. The welded steel outer casing is constructed of 12-gauge SA36 steel that is primed & painted. Our standard offering guarantees an average casing surface temperature of 140°F in an ambient temperature of 90°F and a surface wind velocity of two(2) feet per second while the boiler is operated continuously at full load. 5.12 BURNER THROAT CB-NATCOM burners do not require a traditional refractory burner throat. Instead, a cylindrical stainless steel sleeve is installed into the watercooled furnace frontwall in an effort to reduce the costly & time-consuming maintenance and repair associated with refractory burner throats. The burner unit is then inserted into this sleeve as part of a fully integrated boiler/burner package. The burner throat is refractory-free.

5.13 BOILER BASE The boiler base is constructed of heavy I-beams or welded heavy beams & channels. The boiler weight shall be uniformly distributed over the entire area of the boiler base. Material is SA-36.

Membrane wall construction

000103

Page 199: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 15 07-25-2008

5.14 BOILER PAINT FINISH All non-aluminum portions of the outer casing shall be finished as follows: Surface Preparation: SSPC-SP3 or as specified Casings: One (1) coat primer

One (1) coat of industrial enamel, color: Boiler Blue or equal. Drum Heads: One (1) coat high-temp paint, color: Boiler Black, Silver or equal.

5.15 OBSERVATION PORTS Each boiler includes three(3), air-cooled observation port assemblies, located in the furnace target wall. Additional observation ports are included in the windbox register area.

5.16 SUPERHEATERS If applicable, an integral inverted-loop convection-type superheater system will be provided. Nebraska Boiler offers both single and dual stage superheater systems with feedwater spray attemperation to maintain steam temperature over turndown. Superheater elements consist of seamless steel tubes arranged in multiple passes where necessary to obtain the desired mass flow and pressure drop. All necessary braces, spacers, hangers and supports of carbon or alloy steel corresponding to temperature requirements shall be furnished for spacing and supporting of elements and headers. Saturated steam piping from the steam drum to the superheater inlet is provided along with the outlet piping with safety valve & start-up vent system. Superheater piping shall be shipped loose. Superheater piping is to be field welded by others. The steam connection to the drum on superheater units shall be a welded connection. Cross-section showing integral

superheater arrangement

000104

Page 200: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 16 07-25-2008

5.17 ECONOMIZERS CB-Nebraska Boiler furnishes rectangular finned-tube economizers to increase the thermal efficiency of the system by recovering heat from the flue gas to heat the incoming feedwater. These assemblies come complete with structural steel supports (some field assembly and welding is required), interconnecting single-cased duct with fabric type expansion joint from boiler gas outlet to economizer gas inlet and interconnecting feedwater piping from the economizer feedwater outlet to the boiler feedwater inlet. Economizers are double-cased and insulated. The internal casing is carbon steel, seal-welded and gas-tight. It is externally insulated with 2" heavy duty blanket insulation and externally lagged with corrugated lagging. Economizers are designed so that access for tube inspection can be achieved by either access doors in the economizer or from adjacent ductwork incorporating access doors. The gas side connections on the economizer are plate flange-type with drilling for bolt holes for aligning to adjacent components. The water side connections are flanged. The economizer unit shall include vent and drain connections, and appropriate closures. Lifting lugs are provided to facilitate loading and unloading. The design, fabrication and construction of economizers shall be in accordance with ASME Code Section I.

Finned tube with extended surface

000105

Page 201: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 17 07-25-2008

6.0 Start-Up & Freight 6.1 START-UP SERVICE CB-Nebraska Boiler offers the services of our qualified service technicians, trained in all aspects of boiler room equipment, to supervise boil-out, start-up, and/or operator instruction for equipment furnished. Additional services, beyond those stated in the scope of supply above, are available at our per diem rate in effect at time of start-up (see attached for current rates). Note that the emissions guarantee is contingent upon our trained field service engineer(s) being present at time of start-up to fine tune the burner as required, and observe the operation of auxiliary equipment to assure that performance guarantees will be met prior to final testing. Approximate time required for setup is twenty(20) days per unit, however, this will vary depending upon the size of the equipment, number of fuels, site readiness, controls system complexity, emission levels required, etc. 6.2 FREIGHT CB-Nebraska Boiler can offer freight for the equipment in our scope of supply per INCOTERMS 2000. Shipment is via either truck or railcar, depending on the size of the equipment and shipping clearances. Any freight pricing offered is subject to clearance availability at the time of shipment. Rigging & offloading at the designated point of delivery is by others.

000106

Page 202: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 18 07-25-2008

7.0 Pricing Alternate Item Unit Price Qty Total Price

Base Bid

CB-Nebraska Boiler model NB-400D-75, including equipment and accessories as described herein and as noted in the scope above.

$1,275,000.00 1 $1,275,000.00

Option Adders

All pricing is in US dollars 7.1 Proposal Type: This proposal is a BUDGET proposal.

- A FIRM proposal is priced and designed such that CB-Nebraska Boiler would be willing to enter into a contract based off the proposal.

- A BUDGET proposal is priced and designed to give the Buyer a reasonable estimate of the cost and design of the equipment. CB-Nebraska Boiler is not obligated to enter into a contract based on a budget proposal.

7.2 Bid Validity: Due to fluctuating steel prices, bid validity is 30 days. 7.3 Shipping Terms: Equipment is offered Ex-Works (INCOTERMS 2000). All shipments are subject to clearance availability. 7.4 Payment Terms:

Payment terms, subject to credit approval, are as follows: Upon Receipt of Order ..............................................................10% Upon Drawing Submittal #1 ......................................................30% (Net 30 days) Upon Completion of Hydrostatic Test ..........................................35% (Net 30 days) Upon date of shipment or date equipment is ready to ship. ..........25% (Net 30 days)

7.5 Cancellation Schedule:

Up to14 days after receipt of purchase order ...............................0% 14 days after receipt of purchase order to drawing approval .........25% Up to 30 days after drawing approval .........................................45% 31-60 days after drawing approval .............................................55% 61-90 days after drawing approval .............................................75% Over 90 days after drawing approval ..........................................100%

000107

Page 203: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 19 07-25-2008

7.6 Guarantees: All data in the proposal marked with an ¤ is considered a guaranteed point. All other data provided is predicted only and will be finalized at time of submittal. Guarantees are based on the unit being operated per the requirements of the operation and maintenance manual. Guarantee points are also based on the unit operating at 100% MCR, unless otherwise stated. It is the Buyer’s responsibility to have the equipment tested during the stated warranty period. If equipment passes such tests or the tests are not performed before the end of the warranty period, it will be assumed that the equipment is accepted. The cost of all tests is the responsibility of the Buyer. 7.7 Production Time:

Item Start Finish Order Entry 0 1 Submittal of Nebraska Boiler Standard Drawings (see table below) 1 12 Review of submittals by buyer* 12 14 Manufacturing/Procurement of equipment described herein 14 38 Total – All time is in calendar weeks 0 38 *If review of submittals lasts longer than 2 weeks, the shipment of the equipment may be delayed. Any changes to design made after PO date may affect delivery.

The above schedule is an estimate and may be subject to change +/- based on new order input between the date of this proposal and the date of project award. 7.8 General Terms of Sale: Equipment warranty and other conditions of sale shall be as per our standard "Terms and Conditions of Sale," a copy of which is attached to this proposal. Any Purchase Order issued must reference this proposal (or subsequent revisions provided prior to award) and must include a tax exemption certificate, direct pay permit or a statement to the effect that Purchaser will be responsible for the payment of taxes. The prices quoted do not include any use, excise, sales, custom fees, port of exit fees, or other like taxes, which may be applicable to this transaction. We trust that the above meets with your favorable consideration and ask that you do not hesitate to contact our office if you have any questions. Best Regards, Daniel Skiles Application Engineer Pre-Engineered Products

000108

Page 204: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 20 07-25-2008

8.0 FIELD SERVICE RATES United States Other Start-Up, Troubleshooting, Field Inspection Service, Service Technician, Boilermaker*

$1,250.00/day

$1,550.00/day

Combustion/Control Technician $1,250.00/day $1,550.00/day Combustion Engineer $1,550.00/day $2,000.00/day

Regular time hours: Monday to Friday 8:00 a.m. 4:30 p.m. Over-time hours (x 1.5): Monday to Friday 4:30 p.m. 8:30 p.m. Saturday 8:00 a.m. 4:30 p.m. Double-time hours (x 2.0): Monday to Friday 8:30 p.m. 8:00 a.m. Saturday 4:30 p.m. 8:00 a.m. Sunday 0:00 a.m. 12:00 p.m. Statutory/Legal Holidays 0:00 a.m. 12:00 p.m. *Holiday pay for Union Boilermakers is x 3.0 Stand-By/Waiting time: At rates shown above Travel time: Travel time is chargeable at rates shown above. Transportation other than service vehicle (taxi, airline, rental vehicle, welding rig, etc., are charged at cost + 10% for administration) Company and private automobile use will be billed at a rate of $.55 per mile/km Accommodations & Travel: Chargeable at cost + 10% for administration Meals: $60.00/day minimum Miscellaneous Expenses: Shipping charges, rental of any special tools, miscellaneous

expenses such as securing passports or visas, inoculations, entry and exit fees and all other expenses incurred in making required travel arrangements in connection with the work will be invoiced at cost + 10% for administration

Minimum charge of two (2) days per call

Terms: Pre-payment through pro-forma invoicing

Prices quoted in U.S. Funds

Service rates are subject to change without notice

000109

Page 205: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 21 07-25-2008

9.0 ENGINEERING SUBMITTAL PACKAGE CB-Nebraska Boiler utilizes a 3-stage submittal process as described below:

The first stage, or "Submittal #1", consists of the general arrangement & foundation drawings for the boiler pressure vessel. This initial submittal allows the customer to begin foundation design & piping layout as quickly as possible without waiting for the full mechanical submittal. It also keeps the project moving forward by allowing the customer to approve and/or mark-up the boiler connection locations and return the drawings to CB-Nebraska Boiler (within 2 weeks) with a release to purchase/manufacture. This process ensures an on-time delivery date by not delaying the longest-lead item, which is the boiler itself. The second stage, or "Submittal #2", contains the full mechanical package including general arrangements, foundation drawings, cut sheets & other data for all equipment (burner, fan, economizer, controls, P&IDs, ductwork, etc…). The third stage, or “Submittal #3”, contains the full electrical package including control panel arrangements, wiring diagrams, instrumentation details, logic diagrams, field wiring schematics, etc…

Unless agreed otherwise, CB-Nebraska Boiler shall submit its standard submittal package as follows: ITEM DESCRIPTION SUBMITTAL

NUMBER DUE DATE

1 TRIM LIST OF BOILER ONLY 1 8 WKS ARO 2 GENERAL ARRANGEMENT OF BOILER ONLY 1 8 WKS ARO 3 BASE LOADING OF BOILER ONLY 1 8 WKS ARO 4 BOILER TRIM LIST [EQUIPMENT LIST] 2 10 WKS ARO 5 GENERAL ARRANGEMENT 2 10 WKS ARO 6 BASE-LOADING [FOUNDATION PLAN] 2 10 WKS ARO 7 PREDICTED PERFORMANCE 2 10 WKS ARO 8 P&ID* 2 10 WKS ARO 9 ECONOMIZER ARRANGEMENT* 2 10 WKS ARO 10 BURNER BILL OF MATERIALS* 2 10 WKS ARO 11 BURNER ARRANGEMENT* 2 10 WKS ARO 12 BURNER FUEL TRAIN SCHEMATICS* 2 10 WKS ARO 13 BURNER PANEL ARRANGEMENT* 3 12 WKS ARO 14 BURNER WIRING DIAGRAMS* 3 12 WKS ARO 15 BURNER SEQUENCE OF OPERATION* 3 12 WKS ARO 16 CONTROL PANEL ARRANGEMENT* 3 12 WKS ARO 17 CONTROL PANEL WIRING DIAGRAM* 3 12 WKS ARO 18 CONTROL PANEL SAMA LOGIC* 3 12 WKS ARO

*If applicable. Drawings must be returned within 2 weeks of submittal. Delivery may be delayed day-per-day or week-per-week upon late return of submittals. Any deviation from the above standard submittal package may result in additional cost and/or delay in final shipment.

000110

Page 206: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 22 07-25-2008

10.0 ASME WATER QUALITY

Suggested Water Chemistry Limits Industrial Watertube, High Duty, Primary Fuel Fired, Drum Type

Makeup water percentage: Up to 100% of feedwater Conditions: Includes superheater, turbine drives, or process restriction on steam purity Saturated steam purity target: See tabulated values below.

* as CaCO3 NS = not specified ND = not detectable VAM = Use only volatile alkaline materials upstream of attemperation water source. (10)

Notes to Table:

(1) With local heat fluxes >1.5 x 105 Btu/hr/ft2 (>473.2 kW/m2), use values for at least the next higher pressure range. (2) Minimum hydroxide alkalinity concentrations in boilers below 900 psig (6.21 MPa) must be individually specified by a

qualified water treatment consultant with regard to silica solubility and other components of internal treatment. See section 6.6 of this document.

(3) Maximum total alkalinity consistent with acceptable steam purity. If necessary, should override conductance as blowdown control parameter. If makeup is demineralized quality water and boiler operates at less that 1000 psig (6.89 MPa) drum pressure, the boiler water conductance should be that in table for 100-1500 psig (6.9-10.34 MPa) range. In this case, the necessary continuous blowdown will usually keep these parameters below the tabulated maximum values. Alkalinity values in excess of 10% of specific conductance values may cause foaming.

(4) Not detectable in these cases refers to free sodium or potassium hydroxide alkalinity. Some small variable amount of total alkalinity will be present and measurable with the assumed congruent or coordinated phosphate-pH control or volatile treatment employed at these high pressure ranges.

(5) Maximum values are often not achievable without exceeding maximum total alkalinity values, especially in boilers below 900 psig (6.21 MPa) with >20% makeup of water whose total alkalinity is >20% of TDS naturally or after pretreatment by lime-soda, or sodium cycle ion exchange softening. Actual permissible conductance values to achieve any desired steam purity must be established for each case by careful steam purity measurements. Relationship between conductance and steam purity is affected by too many variables to allow its reduction to a simple list of tabulated values.

(6) Nonvolatile TOC is that organic carbon not intentionally added as part of the water treatment regime. See Section 6.4 of this document.

Drum Operating Pressure (1) (11)

Psig 0-300 (MPa) (0-2.07)

301-450 (2.08-3.10)

451-600 (3.11-4.14)

601-750 (4.15-5.17)

751-900 (5.18-6.21)

901-1000 (6.22-6.89)

1001-1500 (6.90-10.34)

1501-2000 (10.35-13.79)

Feedwater (7) Dissolved oxygen ppm (mg/l)O2 - measured before chemical oxygen scavenger addition (8)

< 0.007 < 0.007 < 0.007 < 0.007 < 0.007 < 0.007 < 0.007 < 0.007

Total iron ppm (mg/l) Fe < 0.1 < 0.05 < 0.03 < 0.025 < 0.02 < 0.02 < 0.01 < 0.01 Total copper ppm (mg/l) Cu < 0.05 < 0.025 < 0.02 < 0.02 < 0.015 < 0.01 < 0.01 < 0.01 Total hardness ppm (mg/l)* < 0.3 < 0.3 < 0.2 < 0.2 < 0.1 < 0.05 ND ND pH @ 250C 8.3-10.0 8.3-10.0 8.3-10.0 8.3-10.0 8.3-10.0 8.8-9.6 8.8-9.6 8.8-9.6 Chemicals for preboiler system protection

NS NS NS NS NS VAM VAM VAM

Nonvolatile TOC ppm (mg/l) C (6) < 1 < 1 < 0.5 < 0.5 < 0.5 < 0.2 < 0.2 < 0.2 Oily matter ppm (mg/l) < 1 < 1 < 0.5 < 0.5 < 0.5 < 0.2 < 0.2 < 0.2 Boiler Water Silica ppm (mg/l) < 150 < 90 < 40 < 30 < 20 < 8 < 2 < 1 Total alkalinity ppm (mg/l)* < 700(3) < 600(3) < 500(3) < 200(3) < 150(3) < 100(3) < NS(4) < NS(4) Free OH alkalinity ppm (mg/l)* (2) NS NS NS NS NS NS ND(4) ND(4) Specific conductance (12) µmhos/cm (µS/cm) 250C without neutralization

5400-1100(5)

4600-900(5) 3800-800(5) 1500-300(5) 1200-200(5) 100-200(5)

< 150 < 80

Total Dissolved Solids in Steam (9)

TDS (maximum) ppm (mg/l) 1.0-0.2 1.0-0.2 1.0 0.2 0.5-0.1 0.5-0.1 0.1 0.1

000111

Page 207: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 23 07-25-2008

(7) Boilers below 900 psig (6.21 MPa) with large furnaces, large steam release space, and internal chelant, polymer, and/or antifoam treatment can sometimes tolerate higher levels of feedwater impurities than those in the table and still achieve adequate deposition control and steam purity. Removal of these impurities by external pretreatment is always a more positive solution. Alternatives must be evaluated as to practicality and economics in each individual case.

(8) Values in the table assume existence of a deaerator. (9) Achievable steam purity depends on many variables, including boiler water total alkalinity and specific and specific

conductance as well as design of boiler steam drum internals and operating conditions [(Note 5)]. Since boilers in this category require a relatively high degree of steam purity for protection of the superheaters and turbines, more stringent steam purity requirements such as process steam restrictions on individual chemical species or restrictions more stringent than 0.1 ppm (mg/l) TDS turbine steam purity must be addressed specifically.

(10) As a general rule, the requirements for attemperation spray water quality are the same as those for steam purity. In some cases boiler feedwater is suitable; however, frequently additional purification is required. In all cases the spray water should be obtained from a source that is free of deposit forming and corrosive chemicals such as sodium hydroxide, sodium sulfite, sodium phosphate, iron, and copper. The suggested limits for spray water quality are < 30 ppb (µg/l) TDS maximum, < 10 ppb (µg/l) Na maximum, < 20 ppb (µg/l) SiO2 maximum, and it should be essentially oxygen free.

(11) Low pressure boilers frequently use feedwater that is suitable for use in higher pressure boilers. In these cases the boiler water chemistry limits should be based on the pressure range that is mose consistent with the feedwater quality. See Sections 1 and 6.2 of this document regarding blowdown.

(12) Conversion from ppm (mg/l) TDS values in the ABMA standards [12] used a factor of 0.65. See Section 6.7 of this document.

000112

Page 208: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 24 07-25-2008

11.0 STANDARD VENDOR/MANUFACTURER LIST Unless otherwise specified by the customer, CB-Nebraska Boiler shall utilize the following vendors for major components:

Item Size / Rating

Standard Vendor / Manufacturer

Alternate Vendors / manufacturer

Water Column <900# NBC Clark-Reliance, Yarway

Water Column >900# Clark-Reliance Yarway Water Gage Clark-Reliance Yarway

Water Column Trycocks Clark-Reliance Yarway Water Gage Valves Vogt Crane, Velan

Gate and Globe valves < 2” Vogt Crane, Velan Gate and Globe valves >2” Velan Edward, Powell

Steam Gage Ashcroft Steam Gage Valve Marsh Steam Gage Valve Marsh Main Steam NRV Edward Powell

Main Steam Stop Valve Crane Edward, Velan Check valves < 3” Vogt Crane, Edward Check valves > 3” Crane Edward, Powell

Flow control valves < 300# Flow control valves > 300# Fisher Safety relief valves <300# Kunkle Crosby,

Consolidated Safety relief valves > 300# Crosby Consolidated,

Kunkle Drip pan elbows Kunkle

Low water cut outs Clark-Reliance Low water cut-out by-pass switch Allen-Bradley Square-D

Transmitters Rosemount Foxboro, Siemens, ABB

PLC’s/Controller Allen-Bradley Moore NOTE:

The standard vendor/manufacturer list is generated by CB-Nebraska Boiler based on our stringent quality requirements and vendor performance over the years. In principle, we have no objection to using vendors/manufacturers on the alternate list. However the cost and delivery impact in using the alternate vendors has to evaluated and agreed upon. We reserve the right to provide items of equal or better quality from vendor/manufacturers listed above based on project execution needs.

000113

Page 209: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 25 07-25-2008

12.0 Comments 12.1 TECHNICAL CLARIFICATIONS Equipment as offered is per CB-Nebraska Boiler’s standard design & construction. No specifications have been bid to at this time. The addition of specifications may require modification to our design and may result in increased cost and/or schedule. General Notes: As an OEM, CB-Nebraska Boiler is providing equipment only. Any references in the specifications to field work (including erection, installation, etc…) shall not apply to our scope of supply and shall be provided by others. We are offering our standard welding & NDE procedures at this time. Details can be provided upon request. The steam & feedwater piping in our scope of supply is not hydrostatically tested at the factory. CB-Nebraska Boiler will not be responsible for any leaks that might be found at the time of final field hydrostatic testing of the unit, due to the fact that some or all of this piping is removed for shipping purposes and reinstalled outside of our control. Piping that was not removed may have been subject to vibration during shipment and piping leaks could occur for that reason. Boiler safety valves shall be set at the design pressure of the boiler. Lower set pressures can be provided for a price adder available upon request. FGR ductwork, if applicable, shall be supported by others. Recommended operational spare parts list with pricing shall be provided after award during detailed engineering. CB-Nebraska Boiler is certified ISO 9001:2000. 12.2 COMMERCIAL CLARIFICATIONS Equipment and warranty and other conditions of sale shall be as per our standard “Terms and Conditions of Sale” a copy of which is attached to this proposal. This Proposal expressly limits acceptance to our standard “Terms and Conditions of Sale”.

END OF COMMENTS SECTION

000114

Page 210: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 26 07-25-2008

13.0 Terms & Conditions CB Nebraska Boiler (the "Company") agrees to sell the Equipment described herein upon the following terms and conditions of sale which, accordingly, supersede any of Purchaser's additional or inconsistent terms and conditions of purchase. 1. TERMS AND PRICES (a) All orders are subject to the approval of the Company's home office and shall not be binding upon the Company unless signed by a duly elected and acting officer of the Company. Unless otherwise stated, terms of payment shall be as proposed in the Company's firm proposal. If partial shipments are made, payment shall become due upon the earlier of date of shipment or date of invoice. (b) The prices agreed upon herein are exclusive of any present or future Federal, State, Municipal or other excise, sales or use tax with respect to the Equipment or services covered hereby. If the Company is required by applicable law or regulation to pay or collect any such tax or taxes on account of this transaction or the Equipment or services covered hereby, then such amount of tax shall be paid by the Purchaser in addition to the prices provided herein. (c) Prepaid freight, if applicable, will be added to the purchase price and invoiced separately. Where the price includes transportation or other shipping charges, any increases in transportation rates, any demurrage, special detention charges or other shipping charges shall be for the account of and paid by Purchaser. (d) If Purchaser requests changes in the Equipment or delays progress of the manufacture or shipment of the Equipment, the contract price shall be adjusted to reflect increases in selling price caused thereby. (e) Prices are subject to revision because of increases in material and labor cost during the period of manufacture if a price adjustment schedule is part of the proposal. Typographical errors are subject to correction (f) The Company shall not be called upon to make any allowance to Purchaser for material, labor, repairs or alterations made for its account unless authorized in writing by a duly elected and acting officer of the Company. (g) The Purchaser shall furnish the Company with all information, instructions and drawings requisite to the execution of the work. (h) The Company shall not furnish any drawings other than general arrangement drawings as are necessary for the work. The Company shall furnish its drawings promptly and the Purchaser shall check, approve and return one set without delay. 2. WITHDRAWAL OR CANCELLATION OF PROPOSAL (a) The price and terms quoted herein are subject to acceptance by the Purchaser within a period of 30 days from the date hereof, except that the Company shall have the right to withdraw this Proposal at any time before formal acceptance by the Purchaser and written acknowledgment by a duly elected and acting officer of the Company. (b) Orders accepted by the Company are not subject to cancellation except by mutual agreement and at cancellation charges as determined by the Company. Changes in specifications after acceptance of Purchaser's order are subject to a charge to be determined by the Company. 3. SHIPMENT Shipment is F.O.B. Company's plant or point of shipment, unless otherwise specified. Risk of loss of or damage to the Equipment shall pass to the Purchaser upon delivery of the Equipment or any portion thereof by the Company to a common carrier at Company's plant or point of shipment, in the case of shipments F.O.B. point of destination, risk of loss or damage to the Equipment shall pass to the Purchaser when the Equipment arrives at the nearest rail siding to point of destination, subject to clearance availability. However, when the Equipment is ready for shipment and shipment is delayed or postponed through any causes beyond the control of the Company, the Purchaser shall arrange for storage of the Equipment covered by this Proposal other than at the works of the Company, unless by separate written agreement Company shall agree to store the Equipment. After shipment and when the Equipment is ready for erection, if erection is delayed or postponed through any causes beyond the control of the Company, the Purchaser shall protect the Equipment against damage from the weather or other causes, and in any case the Purchaser shall assume the risk of loss or damage to the Equipment and shall be responsible for any charges in connection with storage or reconditioning.

000115

Page 211: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 27 07-25-2008

4. DELIVERY (a) The Company will endeavor to make shipment of orders as scheduled. However, all shipment dates are approximate only, and the Company reserves the right to readjust shipment schedules. (b) UNDER NO CIRCUMSTANCES WILL THE COMPANY BE RESPONSIBLE OR INCUR ANY LIABILITY FOR COSTS OR DAMAGES OF ANY NATURE (WHETHER GENERAL, CONSEQUENTIAL, AS A PENALTY OR LIQUIDATED DAMAGES, OR OTHERWISE) ARISING OUT OF OR OWING TO (i) ANY DELAYS IN DELIVERY OR (ii) FAILURE TO MAKE DELIVERY AT AGREED OR SPECIFIED TIMES DUE TO CIRCUMSTANCES BEYOND ITS REASONABLE CONTROL. (c) If shipment is delayed or suspended by Purchaser, Purchaser shall pay (i) Company's invoice for the Equipment as per payment terms, (ii) Company's handling and storage charges then in effect, and (iii) demurrage, special detention, and any related charges if loaded on rail cars. 5. LIMITED WARRANTY; WARRANTY ADJUSTMENT; EXCLUSIONS; LIMITATION OF LIABILITY (a) Limited Warranty The Company warrants that at the time of shipment, the Equipment manufactured by it shall be merchantable, free from defects in material and workmanship and shall possess the characteristics represented in writing by the Company. The Company's warranty is conditioned upon the Equipment being properly installed and maintained and operated within the Equipment's capacity under normal load conditions with competent supervised operators and with proper water conditioning. Equipment, accessories and other parts and components not manufactured by the Company are warranted only to the extent of and by the original manufacturer's warranty to the Company, and in no event shall such other manufacturer's warranty create any more extensive warranty obligations of the Company to the Purchaser than the Company's warranty covering Equipment manufactured by the Company. Refractories installed in Equipment manufactured by the Company are excluded from this Limited Warranty for the reason that Company has no control over the conditions to which the refractories are subjected in service. (b) Exclusions from Warranty (i) THE FOREGOING IS IN LIEU OF ALL OTHER WARRANTIES, ORAL OR EXPRESSED OR IMPLIED, INCLUDING ANY WARRANTIES THAT EXTEND BEYOND THE DESCRIPTION OF THE EQUIPMENT. THERE ARE NO EXPRESS WARRANTIES OTHER THAN THOSE CONTAINED IN THIS PARAGRAPH 5 AND TO THE EXTENT PERMITTED BY LAW THERE ARE NO IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE. THE PROVISIONS OF THIS PARAGRAPH 5 AS TO DURATION, WARRANTY ADJUSTMENT AND LIMITATION OF LIABILITY SHALL BE THE SAME FOR BOTH IMPLIED WARRANTIES (IF ANY) AND EXPRESS WARRANTIES. (ii) The Company's warranty is solely as stated in (a) above and does not apply or extend, for example, to expendable items, ordinary wear and tear, altered units, units repaired by persons not expressly approved by the Company, materials not of the Company's manufacture, or damage caused by accident, the elements, abuse, misuse, temporary heat overloading, or by erosive or corrosive substances. The treatment of feedwater and the conditioning of boiler water are beyond the control of the Company. Therefore, the Company shall not be held responsible for any damage, direct or consequential, due to the presence of oil, grease, scale or deposits on the internal surfaces of the Equipment, or for damage resulting from foaming caused by chemical conditions of the water; or for damage resulting from corrosion or caustic embrittlement, or from any other cause which results because of improper or inadequate treatment of feedwater or conditioning of boiler water. (c) Warranty Adjustment The Company shall repair or shall replace F.O.B. point of shipment, any parts of the Equipment within one (1) year from the date of initial firing, but not to exceed eighteen (18) months after date of shipment or date of invoice, whichever is earlier, found to be defective in design, workmanship, or material, provided the Equipment is operated by the Purchaser in accordance with generally approved practice and in accordance with the conditions of service, if any, herein specified, and provided the Purchaser notifies the Company in writing within thirty (30) days of discovery of any alleged defect. Any warranty adjustments made by the Company shall not extend the initial warranty period set forth above. The warranty period for replacements to the Equipment made by the Company shall terminate upon the termination of the initial warranty period set forth above. Expenses incurred by Purchaser for labor to replace or repair or expenses to return the Equipment or any part or parts to Company will not be reimbursed by the Company.

000116

Page 212: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 28 07-25-2008

(d) Spare and Replacement Parts Warranty Adjustment The Company sells spare and replacement parts. This subparagraph (d) sets forth the Warranty Adjustment for such parts. Purchaser must make claim of any breach of any spare or replacement parts warranty by written notice to the Company's home office within thirty (30) days of discovery of any alleged defect for all such parts manufactured by the Company. The Company agrees at its option to repair or replace, but not install, F.O.B. Company's plant, any part or parts it manufactures which, within one (1) year from the date of shipment shall prove to the Company's satisfaction (including return to the Company's plant, transportation prepaid, for inspection, if required by the Company) to be defective within this Parts Warranty. The Warranty and warranty period for spare and replacement parts not manufactured by the Company (purchased by the Company from third party suppliers) shall be limited to the Warranty and Warranty Adjustments extended to the Company by the original manufacturer of such parts; in no event shall such other manufacturer's warranty create any more extensive warranty obligation of the Company to the Purchaser for such parts than the Company's Warranty Adjustment covering parts manufactured by the Company as set forth in this subparagraph (d). Expenses incurred by the Purchaser for labor to replace or repair or expenses to return the spare or replacement parts will not be reimbursed by the Company. (e) Limitation of Liability The warranty adjustment provision set forth in this paragraph shall be Purchaser's exclusive remedy and the extent of the Company's liability for breach of implied (if any) and express warranties, representations, instructions or defects from any cause in connection with the sale or use of the Equipment. THE COMPANY SHALL NOT BE LIABLE FOR ANY SPECIAL, INDIRECT, INCIDENTAL, OR CONSEQUENTIAL DAMAGES, OR FOR LOSS, DAMAGE OR EXPENSE, DIRECTLY OR INDIRECTLY ARISING FROM THE USE OF THE EQUIPMENT, SPARE OR REPLACEMENT PARTS, OR FROM ANY OTHER CAUSE WHETHER BASED ON WARRANTY (EXPRESSED OR IMPLIED) OR TORT OR CONTRACT, regardless of any advices or recommendations that may have been rendered concerning the purchase, installation or use of the Equipment. 6. PATENTS (a) Patent Indemnity and Conditions The Company shall defend at its own expense and hold Purchaser harmless in the event of any suits instituted against Purchaser based on a claim that the Equipment, or any part thereof, furnished hereunder constitutes an infringement of any claim of any United States Patent covering the Equipment as originally manufactured by the Company per the Company's specifications and without modification by the Purchaser, provided Purchaser shall (i) have given the Company immediate notice in writing of any such claim or institution or threat of such suit; and (ii) have permitted the Company to defend or settle the same, and have given all needed information, assistance and authority to enable the Company to do so. Purchaser shall defend and indemnify the Company against all expenses, costs and loss by reason of any real or alleged infringement by the Company's incorporating a design or modification requested by Purchaser. (b) Limitation of Liability The Company's total liability hereunder is expressly limited to an amount not to exceed the sales price of the Equipment and may be satisfied by the Company's refund to Purchaser, at the Company's option, of the sales price of the Equipment. In the event the Company elects to defend any such suit and the Equipment is held to infringe any such United States Patent and if the Purchaser's use thereof is enjoined, the Company shall, at its expense and at its option: (i) obtain for the Purchaser the right to continue using the Equipment; or (ii) supply non-infringing Equipment for installation by Purchaser; or (iii) modify the Equipment so that it becomes non-infringing; or (iv) refund the then-market value of the Equipment. 7. PRIOR USE (a) If damage to the Equipment or other property or injury to persons is caused by use or operation of the Equipment prior to being placed in initial operation ("Start-up") by the Company where Start-up is included in the purchase price, then Purchaser shall indemnify and hold the Company harmless from all liability, costs, and expenses for all such damage or injury. (b) Inasmuch as representatives of the Company are authorized only to advise and consult with the Purchaser, and no representative of the Company is authorized or licensed to operate the Equipment, all preliminary operations and demonstration of capacity and performance guarantees, if required, prior to final acceptance, shall be performed by the Purchaser. 8. EQUIPMENT CHANGES The Company may, but shall not be obligated to, incorporate in the Equipment any changes in specifications, design, construction, arrangement or components.

000117

Page 213: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 29 07-25-2008

9. SECURITY INTEREST; INSURANCE (a) To secure payment of the purchase price, Purchaser agrees that the Company shall retain a security interest in the Equipment until Purchaser shall have paid in cash the full purchase price when due, interest at the highest lawful contract rate until so paid and the costs of collection, including reasonable attorneys' fees. The Equipment shall at all times be considered and remain personal property and Purchaser shall perform all acts necessary to assure and perfect retention of the Company's security interest against the rights or interests of third persons. In the event Purchaser defaults in payment of any part of the purchase price when due, or fails to comply with any provisions of this contract, the Company shall have the remedies available under the Uniform Commercial Code. (b) From the date that risk of loss of and damage to the Equipment passes to the Purchaser as provided above, and until the Equipment is finally accepted and the Contract Price paid in full, or until all obligations of the Company hereunder have terminated, the Purchaser shall provide and maintain insurance in the names of the Purchaser and the Company as interest may appear to the total value of the Equipment and of all work performed in the erection thereof against risk of fire, lightning, windstorm, aircraft and explosion, including inherent dangers and boiler explosion and the proceeds of such insurance shall be applied to the cost of repairing and replacing the Equipment and work destroyed or damaged. (c) In the event the Purchaser furnishes workmen for the unloading, transportation, loading, handling or erection of the Equipment to be furnished by the Company hereunder, or if the Company or its Erection Supervisor utilizes workmen paid directly by the Purchaser to perform the work covered by this contract, or in the event preliminary operations of the Equipment are performed by the Purchaser prior to final acceptance, then the Purchaser shall indemnify and hold harmless the Company from any and all liability, claims, suits or expenses in connection with bodily injuries, including death, at any time resulting therefrom, and in connection with any damage to or loss of property sustained by any person or persons including such workmen, occurring during the performance of such work or resulting from the operation of such Equipment by the Purchaser prior to final acceptance, except such injury, death, damage or loss as may result from negligent acts or omissions of the Company or its employees. The Purchaser shall at his own expense defend any and all suits brought against the Company alleging any such injury, death, damage or loss, even if such suit or suits are groundless, false or fraudulent. The Company shall not be responsible for damage to or loss of the Equipment furnished or work done by the Company if so caused by employees of the Purchaser or if resulting from such preliminary operations. (d) The Company shall provide and maintain until completion of the work the following forms of insurance in respect of its own employees (but not in respect of any employee paid directly by the Purchaser, but utilized by the Company): Workers' Compensation Insurance including Employer's Liability Insurance in accordance with the laws of the State in

which the Company may be required to pay compensation; and Comprehensive General Liability Insurance, excluding products, with a combined bodily injury and property damage

liability limit of $1,000,000 for each occurrence and $1,000,000 in the aggregate. 10. LOSS, DAMAGE OR DELAY The Company shall not be liable for loss, damage or delay resulting from causes beyond its reasonable control or caused by strikes or labor difficulties, lockouts, acts or omissions of any governmental authority or the Purchaser, insurrection or riot, war, fires, floods, Acts of God, breakdown of essential machinery, accidents, priorities or embargoes, car and material shortages, delays in transportation or inability to obtain labor, materials or parts from usual sources. In the event of any delay from such sources, performance will be postponed by such length of time as may be reasonably necessary to compensate for the delay. In the event performance by the Company of this agreement cannot be accomplished by the Company due to any action of governmental agencies, or any laws, rules or regulations of any governmental agency, the Company (at its option) may cancel this agreement without liability. In no event shall the Company be liable for any loss or damage of any kind, including consequential or special damages of any nature.

000118

Page 214: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Group

6940 Cornhusker Hwy. ◊ Lincoln, NE 68507 ◊ Tel: (402)434-2000 ◊ Fax (402)434-2064 ◊ www.neboiler.com

NO. 24925-DS Page 30 07-25-2008

11. WORK BY OTHERS (a) The Company, being only a supplier of the Equipment, shall have no responsibility for labor or work of any nature relating to the installation or operation or use of the Equipment all of which shall be performed by Purchaser or others. It is the responsibility of Purchaser to furnish such accessory and safety devices as may be desired by it and/or required by law or OSHA standards respecting Purchaser's use of the Equipment. Purchaser shall be responsible for ascertaining that the Equipment is installed and operated in accordance with all code requirements and other applicable laws, rules, regulations and ordinances. (b) The Company shall provide the Purchaser with General Arrangement drawings showing the Equipment with reference to foundations, including loading diagrams and showing location of anchor bolts in the foundations. The Company shall not be responsible for the depth of the footings, size or accuracy of the foundations, or the character of the materials selected for their construction. Adequate foundations, having plan measurements in accordance with such drawings including foundation bolts and plates, concrete work, all grouting, and excavation, shall be furnished in place in due time by the Purchaser. The Company shall not be responsible for any damages, or repairs necessary to the Equipment furnished by it, caused by or resulting from defects in or settlement of the foundations. (c) Unless otherwise stated, any supporting steel to be furnished by the Company as specified in this Proposal will be designed to support the Equipment which the Company proposes to furnish and will be designed in accordance with the latest Rules of the American Institute of Steel Construction. If the Company is required to increase the size or weight of its supporting structures to conform to other than these Rules or because of additional loadings imposed by the Purchaser, the Purchaser shall reimburse the Company for the additional steel required. (d) It is mutually agreed that where State laws or Municipal ordinances require permits to install Equipment covered by this Proposal, or the approval of the plans and specifications for this installation, the Purchaser assumes the responsibility for securing the approval of said plans and specifications from the proper State or Municipal authorities and for any required fees. If any changes are required in the Equipment covered by this Proposal to meet the approval of said State or Municipal authorities, the Purchaser shall inform the Company of such changes and shall reimburse it for changes actually made to comply with the requirements of said authorities. 12. GOVERNING LAW AND RECOVERY OF FEES AND EXPENSES This Agreement is made and entered into in the State of Nebraska, County of Lancaster, and shall be construed in accordance with the laws of the State of Nebraska. With regard to any disputes which arise hereunder, jurisdiction and venue shall be proper in the State or Federal Courts located in Lancaster County. In the event suit is brought or an attorney is retained by Company to enforce these Terms and Conditions or to collect any money hereunder, or to collect any money damages for breach hereof, Company shall be entitled to recover, in addition to other remedy, reimbursement for reasonable attorneys' fees, court costs, costs of investigation and other related expenses incurred in connection therewith. 13. COMPLETE AGREEMENT; NON-WAIVER THE COMPLETE AGREEMENT BETWEEN THE COMPANY AND PURCHASER IS CONTAINED HEREIN AND NO ADDITIONAL OR DIFFERENT TERM OR CONDITION STATED BY PURCHASER SHALL BE BINDING UNLESS AGREED TO BY THE COMPANY IN WRITING, EXECUTED BY A DULY ELECTED AND ACTING OFFICER OF THE COMPANY. No course of prior dealings and no usage of the trade shall be relevant to supplement or explain any terms used in this Agreement. This Agreement may be modified only by a writing signed by both the Company and Purchaser. The failure of the Company to insist upon strict performance of any of the terms and conditions stated herein shall not be considered a waiver of any such term or condition or any of the Company's rights.

END OF STANDARD TERMS & CONDITIONS

000119

Page 215: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

C:\Documents and Settings\6920\Local Settings\Temporary Internet Files\OLK16\U of I Budget Quote - Rentech.doc

August 5, 2008 Stanley Consultants 225 Iowa Avenue Muscatine, IA 52761 Attention: Mr. Doug Einck Subject: University of Iowa

Titan 130 HRSG Dear Doug: Rentech is pleased to offer our budget price quotation for the supply of one (1) fired Heat Recovery Steam Generator system. The HRSG will receive heat from Solar Titan 130 gas turbine and will be designed to generate 100,000 lb/hr of 175 psig saturated steam with duct firing. I. HRSG System Scope of Supply

The HRSG system shall include the following equipment and services: • Transition duct from the turbine to the duct burner.

• Natural gas only duct burner including fuel train and burner management system. • Firing duct

• Single pass evaporator. • Economizer. • Main stack 80’ total elevation. • Field mounted instrumentation to include safety valves, steam drum water columns, pressure

gages, main steam stop and non-return valve, thermocouples with wells and small bore trim. • Platforms and ladders to provide access to instrumentation located on the steam drums,

ammonia injection manifold and main stack EPA ports. • Interconnecting piping between heat transfer sections.

• PLC Based boiler control panel.

000120

Page 216: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

C:\Documents and Settings\6920\Local Settings\Temporary Internet Files\OLK16\U of I Budget Quote - Rentech.doc

II. Customer Supplied Equipment and Services

• External thermal insulation and lagging for piping, and stacks. • Sampling panel for sample coolers. • Start-up, testing and commissioning of the units. • Piping and sampling system for nitrogen blanketing, chemical dosing, alkaline boil-out and

chemical cleaning. Code isolation valves are supplied by Rentech per ASME Section I. • Foundation design and installation, including anchor bolts, nuts and grout. • Heat tracing. • Steam/water analyzers. • Spare parts, beyond start-up spares. • All utilities required during installation and commissioning of the boiler. • Hydrostatic test of the boiler after erection. • Boilout, acid cleaning and steam blow of the HRSG systems. • Feedwater and condensate pumps and motors. • Instrument piping and tubing. • Instrument service air. • All other necessary controls and field instruments, as required to complete the system, not

supplied as part of the Rentech HRSG scope of supply and system. • All electrical wiring, conduit and cable trays, etc. required to complete the system. • Steam and water piping outside the terminal points. • Motor starters and disconnects for all motors, including power wiring to motors. • Chemical feed system. • Final field paint.

000121

Page 217: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

C:\Documents and Settings\6920\Local Settings\Temporary Internet Files\OLK16\U of I Budget Quote - Rentech.doc

II. HRSG Pricing Summary

Base Offering The budget pricing for the supply of one (1) HRSG systems, as described within Section I, HRSG System Scope of Supply is: $1,380,000 USD

Option The budget pricing to add a diverter valve and bypass duct connecting into the main stack: $350,000 USD

III. Payment Terms 10% Upon Receipt of Purchase Order. 10% Upon drawing submittal 15% Upon Receipt of the Tubes 15% Upon receipt of the Drum Cylinders 20% Upon stabbing first tube 30% Upon Shipment Typical drawing submittal time would be 8-10 weeks after receipt of a purchase order. Equipment delivery time would be 9 months after receipt of a purchase order. We would like to thank you for allowing us to offer our service, and we look forward to the opportunity of working with you. Should you have any questions concerning this budget proposal as submitted, please do not hesitate to call me. Very truly yours, RENTECH BOILER SYSTEMS, INC. Kevin Slepicka Senior Sales Engineer cc: Jim Lopata

000122

Page 218: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 1 of 3

April 21, 2009 Stanley Consultants, Inc. 225 Iowa Avenue Muscatine, IA 62761 Attention: Mr. Doug Einck Subject: Rentech Budget Proposal No. GTB-KS-3809 University of Iowa Dear Mr. Einck: Rentech is pleased to offer our budget price quotation for the supply of one (1) Heat Recovery Steam Generator systems for the referenced project. I. HRSG System Scope of Supply

The HRSG system shall include the following equipment and services: • Inlet transition from the turbine exhaust flange to the HRSG inlet • Evaporator #1 Module

• High pressure steam drum with shop installed steam purification equipment.

• SCR system including ammonia injection grid and flow control skid, reactor housing and catalyst bed.

• CO Catalyst

• Evaporator #2 Module

• Economizer assembly • Main stack to a total elevation of 80’ above grade. • Field mounted instrumentation to include safety valves, steam drum water columns, pressure

gages, main steam stop and non-return valves, thermocouples with wells and small bore trim. • Platforms and ladders to provide access to instrumentation located on the steam drums and

main stack EPA ports. • Interconnecting piping between heat transfer sections.

.

000123

Page 219: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 2 of 3

II. Customer Supplied Equipment and Services

• Expansion joints at turbine exhaust outlet. • CEMS System.

• External thermal insulation and lagging for piping. • Sampling panel for sample coolers. • Start-up, testing and commissioning of the units. • Piping and sampling system for nitrogen blanketing, chemical dosing, alkaline boil-out and

chemical cleaning. Code isolation valves are supplied by Rentech per ASME Section I. • Foundation design and installation, including anchor bolts, nuts and grout. • Heat tracing. • Steam/water analyzers. • Lightning system. • Spare parts, beyond start-up spares. • All utilities required during installation and commissioning of the boiler. • Hydrostatic test of the boiler after erection. • Boilout, acid cleaning and steam blow of the HRSG systems. • Feedwater and condensate pumps and motors (Feedwater pumps price option provided). • Cooling water distribution piping. • Instrument piping and tubing. • Instrument service air. • All other necessary controls and field instruments, as required to complete the system, not

supplied as part of the Rentech HRSG scope of supply and system. • All electrical wiring, conduit and cable trays, etc. required to complete the system. • Steam and water piping outside the terminal points. • Motor starters and disconnects for all motors, including power wiring to motors. • Chemical feed system. • Final field paint.

000124

Page 220: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 3 of 3

III. HRSG Pricing Summary

The budget pricing for the supply of one (1) HRSG systems, as described within Section I, HRSG System Scope of Supply is: $2,950,000 USD Basis: FOB Abilene, TX. The above pricing does not include local, state, sales or federal taxes, or taxes of similar nature.

IV. Options To remove all the SCR & CO equipment included in the base offering. Note: a SCR spool duct would remain the scope of supply: <$800,000> To provide a diverter valve, bypass stack and silencer to the scope of supply: $590,000

V. Payment Terms 10% Upon Receipt of Purchase Order 25% Upon Receipt of the Tubes 15% Upon receipt of the Drum Cylinders 20% Upon stabbing first tube 30% Upon Shipment We would like to thank you for allowing us to offer our service, and we look forward to the opportunity of working with you. Should you have any questions concerning this budget proposal as submitted, please do not hesitate to call me. Very truly yours, RENTECH BOILER SYSTEMS, INC. Kevin Slepicka Senior Sales Engineer Cc: Jim Lopata

000125

Page 221: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

BUDGET PROPOSAL #11-10-2008a-1-1800-250/900

OAT HULL FIRED STEAM GENERATION PLANT

One (1) 1800 BHP Boiler System / 60,000 PPH 60,000 PPH Total System Capacity @ 250 PSIG DESIGN & 850 PSIG Alternate #1 Design

Prepared For

University of Iowa – Main Campus Boiler House

Stanley Consultants – Muscatine, Iowa 225 Iowa Drive

Muscatine, Iowa 52761 USA

REFERENCE: HBC011-10-2008a

ATTN: Douglas Einck

Phone: (563) 264-6554 Email: [email protected]

November 10, 2008 (REVISED)

Prepared By

Page 1 of 22 11/10/08 (REVISED)

Global Energy Solutions, Inc.—Agent for Hurst Boiler & Welding Co., Inc.

000126

Page 222: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

EQUIPMENT — GENERAL SPECIFICATIONS 1.0 BOILER EQUIPMENT (Hurst Boiler & Welding Co., Inc.)

1. Scope of Equipment One (1) substoichiometric hardwood waste fuel gasifier, combustor and heat recovery system fed from metering bin.

2. Gasifier Fuel Requirements 1-1/2" x 2-1/2" x 5/8" or less in size, 50% or less in moisture content and a BTU content of 4,347 BTU/lb (minimum). Oat Hulls approximately 10% Moisture Content.

3. Approximate Fuel Usage at Maximum Firing Rate One (1) @ 10,285 lbs. per hour @ 10% moisture content (75,560,800 BTU/Hr input).

4. Boiler Rating One (1) @ 1800 Boiler horsepower, 60,000 PPH output steam output each from and @ 212oF.

5. Boiler Pressure BASE: 250 PSI design pressure. Maximum recommended operating pressure is 225 PSI. ALTERNATE: 850 PSI design pressure. Maximum recommended operating pressure is 890 PSI.

6. Boiler Design BASE: High Pressure Hybrid Model #HY-10200-250-CG (Fire Tube/Water tube design). Built in accordance with the ASME Code. We will be using Chain Grate Stoker for Oat Hulls. ALTERNATE: E-Tech, Inc. SWB-50 Shotgun D-Frame (Water tube design) with Superheater. Built in accordance with the ASME Code. We will be using Chain Grate Stoker for Oat Hulls.

1.1 ENGINEERING SERVICES FOR BOILER SYSTEM Hurst Boiler & Welding Co., Inc. will supply all required design and specifications for the proposed boiler system equipment. Engineering will include:

1. Boiler room layout drawings for locating new equipment. 2. Foundation details for proposed waste fired boiler based on 2500 PSF soil conditions. 3. Assistance in completing and filing of boiler's environmental emission permit. 4. Electrical wiring prints and specifications required to install the proposed electrical

equipment 5. All drawings listed above shall be provided in hard copy and digital (AutoCAD 14 or earlier)

formats.

Page 2 of 22 11/10/08 (REVISED)

6. Two (2) sets of operating and maintenance manuals.

000127

Page 223: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

1.2 INSTALLATION SERVICES FOR BOILER SYSTEM (Crane, Lifts, and Services by OTHERS) Hurst Boiler and Welding Co., Inc. will furnish experienced, highly trained and certified supervisors and laborers employed by Hurst Boiler and Welding Co., Inc. to supervise the confirmation of receipt of materials and to set the main system components to include: casing, boiler vessel, feedwater system and soot blowers. All work will be completed in a workman-like manner according to standard practices. The installation will be executed as outlined below:

1. Furnish all materials, tools, equipment and labor necessary to complete the equipment

installation to include:

• Setting and anchoring major components; combustion chamber, combustion air fans and ductwork, pressure vessel, breeching, multicyclone collector(s), flue gas ductwork, induced draft fan and transition to additional pollution control systems, as may be necessary. Concrete anchors, nuts, bolts, gaskets and other materials required for the assembly of the major components are supplied as part of the installation.

• Installation of minor equipment components (stoker drive assembly, rotary

valves, soot blower compressed air accumulator, etc.) including necessary nuts, bolts, washers, gaskets and other materials to complete installation.

2. Furnish all pipe, fittings, gaskets, tools, equipment, and labor necessary to complete the

mounting and plumbing of boiler trim and controls to include:

• Water columns and water column blow down piping • Relief valves and venting to building exterior • Blow down valving and piping to blow down separator • Blow down separator to include fabricating and erecting vent stack • Surface blow down valving and piping to blow down separator • Main steam valving • Pressure gauge • Limit controls • Feed water valving.

Page 3 of 22 11/10/08 (REVISED)

3. Provided by Others - all rigid conduit, wire and other materials necessary for the interconnection of all motors, electrical components provided by Hurst Boiler and Welding Co., Inc. All necessary labor will be furnished and installation will be completed in accordance with applicable NEMA standards. Termination of wiring is a part of the electrical installation.

000128

Page 224: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

4. Furnish insulation/refractory materials, tools and labor required to install the internal

gasification/combustion chamber insulation and refractory with hanger clips and hanger bricks.

5. Provided by Others – installation and materials to fabricate and install access

platforms, ladders and one set of stairs to access: Front smoke box tube access doors and soot blowers Water column and feed water valve train Main steam and relief valving Multicyclone collector bin(s) and rotary air lock valves.

6. Painting of field fabricated components and touch-up of all equipment is included as part

of the installation. Piping will be color coded and OSHA yellow will be used as required on platforms and drive guards.

7. Hurst Boiler and Welding Co., Inc. will keep its work area clean of all debris resulting

from our work and place it in a receptacle provided and removed by the purchaser. 1.3 SYSTEM START-UP FOR BOILER SYSTEM When installation of the boiler equipment supplied is completed, Hurst Boiler & Welding Co., Inc. will provide one start up technician to assist in the curing of the refractory system, start the equipment and train personnel on the proper maintenance and operation of the system to include:

1. Check out of all system components to assure proper rotation, alignment, sequencing, function, etc.

2. Application of steam to the system to test operation of valving, controls and other related equipment.

3. Adjustment of controls to provide efficient operation of all boiler functions.

4. Start-up of the equipment with mill personnel to familiarize them with proper operation and maintenance procedures.

5. Maximum duration of this service is ten (10) days total on the job site, not including travel

time. Additional time will require a change order (purchase order) from the purchaser. Additional time will be billed at $1,200 / day, plus expenses and travel costs.

6. HBC may provide, upon receipt of change order ADD, one start-up technician on-site for a

duration of three days (two days prior to emission testing) to assist in tuning and operating the boiler system prior to and during emission testing. Scheduling requires two (2) weeks prior notice to HBC of the testing date.

Page 4 of 22 11/10/08 (REVISED)

000129

Page 225: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

2.1 BIOMASS FUEL GASIFIER Substoichiometric biomass fuel gasifier to include a heavy duty combustion chamber, refractory and insulation shipped loose, will be furnished to combust the solid fuel as specified. The unit will be complete with the following:

1. Three (3) dual screw metering bins complete with AC-type variable speed controller and bin level indicator (Sonac) to control owner’s fuel conveyor.

2. One (1) sloped, reciprocating grate type stoker to include:

• Heavy duty, sloped reciprocating conveyor to be mechanically driven by timer

based controls allowing for the ultimate flexibility in handling fuels of different qualities and consistencies.

• Fuel feed conveyor housing with flanged end opening for easy screw removal and thermocouple with quenching system to prevent burn back.

• Reciprocating grates cast of heavy duty iron and high chrome content alloy.

• One (1) heavy-duty ash removal drag chain conveyor (wet) with trough,

3. Substoichiometric combustion air system to include:

• One (1) belt driven blower with TEFC motor and OSHA belt guard. • Prefabricated combustion air ductwork for interconnection of blower to under

grate zone and gasifier air preheater (see Section 2.5, Item #2). • Zoned, under grate plenum. • One (1) combustion air blower incorporates welded steel housing, flanged outlet,

flanged inlet, high efficiency impeller wheel and variable frequency AC drive for improved control of combustion airflow. This fan is designed to modulate with steam demand.

4. Gasification chamber casing to include:

• Furnace front of 1/2" steel plate. • Furnace sides and rear of 1/4" reinforced steel plate.

• Chamber lining (to be field installed) of:

Page 5 of 22 11/10/08 (REVISED)

9" refractory wall and radiant arch with a service temperature of: 3000° F. The refractory walls are constructed using a proprietary refractory compound.

000130

Page 226: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A very high density, low clay, high alumna content ram-able refractory, Hurst Mud is the only refractory available on the world market designed specifically for its high resistance to aerosol attacks which may occur during the gasification and combustion of some solid fuels. 2" "M" block, service temperature of: 1900° F. 2" mineral wool, service temperature: 1200° F. Refractory anchor brick that includes a two-part clipping system of stainless steel. This allows the refractory and the casing to independently expand and contract thereby greatly reducing refractory maintenance.

5. Two (2) air-cooled observation ports with heat shields and site glasses.

6. Cast iron over fire access doors with heat shields and lockable handles. 7. Under grate access doors. 8. Skids and support assembly.

2.2 BURNER UNIT (FOR BIOMASS GAS) Combustion air system to include:

1. One (1) prefabricated zoned over fire combustion air plenum encircling the entire

combustion casing with nozzles that penetrate the casing interior and manually adjustable dampers.

2. Prefabricated combustion air ductwork for interconnection of blower to zoned air plenum

and combustion air preheater (see Section 2.5, Item #2).

Page 6 of 22 11/10/08 (REVISED)

3. One (1) combustion air blower incorporates welded steel housing, flanged outlet, flanged inlet, high efficiency impeller wheel and variable frequency AC drive for improved control of combustion airflow. This fan is designed to automatically modulate in response to the O2 sensor system mounted in the rear smoke box of the boiler vessel.

000131

Page 227: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

4. Combustion chamber casing to include:

• Furnace front of 1/2" steel plate.

• Furnace sides and rear of 1/4" reinforced steel plate.

• Chamber lining (to be field installed) of:

9" refractory wall and radiant arch with a service temperature of: 3000° F. The refractory walls are constructed using a proprietary refractory compound. A very high density, low clay, high alumna content ram-able refractory, Hurst Mud is the only refractory available on the world market designed specifically for its high resistance to aerosol attacks which may occur during the gasification and combustion of some solid fuels. 2" "M" block, service temperature of: 1900° F. 2" mineral wool, service temperature: 1200° F. Refractory anchor brick that include a two-part clipping system of stainless steel. This allows the refractory and the casing to independently expand and contract thereby greatly reducing refractory maintenance.

5. Over fire inspection/access doors with lockable handles.

2.3 BACK-UP BURNER UNIT (FIRED BY NATURAL GAS) – Optional ADD Price Only Combustion air system to include:

1. The boiler is equipped with a Low NOx burner; with induced flue gas recirculation for NOx emissions reduction to 30 PPM.

2. Low NOx IFGR burner capable of 30 PPM NOx emissions when firing natural gas

3. Forced draft fan with TEFC motor and pre-wired motor starter, mounted and wired in a separate starter panel (note: blower is shipped loose for field mounting)

4. Burner Management System with Fireye E100 Series Programmer OR EQUAL with remote display and first-out annunciation, relays, limit switches, alarm and indicating lights

Page 7 of 22 11/10/08 (REVISED)

000132

Page 228: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

5. Combustion control system, electro-pneumatic positioning consisting of an microprocessor based controller with full metering capability, automatic and manual firing rate control

6. NEMA 4 and 12 electrical enclosures and sealtite conduit.

7. Fuel valving, trim and controls meeting FM insurance standards NFPA-8501 Safety Code requirements.

2.4 BOILER PRESSURE VESSEL Hurst Hybrid boiler with water wall radiant section designed for efficient heat recovery from wet biomass fuel combustion, and support structure. The unit shall be built in strict accordance with the ASME Code and stamps and be rated at no less than 6.5 square feet of heating surface per boiler horsepower output. The generator (fire tube) section includes:

1. Front and rear smoke boxes complete with twin hinged airtight doors. The doors on the

Hurst boiler are internally insulated and incorporate an abrasion resistant shield on the interior of the doors.

2. The fire tubes are designed to maximize heat recovery from biomass fuel fired

combustion. 3. Steam, water inspection and drain openings. 4. Support assembly for attaching to combustion chamber casing.

The radiant (water tube) section includes: 1. 1/2" front plate and rear plate. 2. The water tubes are 2-1/2” in diameter providing superior water flow and eliminating “hot

spots” found in other designs. 3. Support assembly for attaching to combustion chamber casing. 4. Blow down openings on each lower drum. 5. Flanged inspection openings on the end of each drum.

Page 8 of 22 11/10/08 (REVISED)

000133

Page 229: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Both the generator and radiant sections of the Hybrid boiler are insulated with 2" of high-density mineral wool and clad with 22 gauge "Paint-Grip" zinc coated steel jacket material and galvanized screws for attachment and joining. Overall thermal design of the Hybrid boiler vessel is computed and analyzed to insure that the highest possible efficiency is maintained throughout the system’s operating range. The boiler system shall be designed to provide 4:1 turndown rate. 2.5 BOILER TRIM AND LIMIT CONTROLS

1. Relief valves per ASME Code. 2. Boiler bottom blow down valves:

-Two (2) in generator section, quick-opening. -Two (2) in radiant section, quick-opening. -One (1) slow opening.

3. Surface blow down valves consisting of one (1) needle and one (1) gate. 4. Main steam valves, one (1) gate, “PP” spool piece and one (1) non-return.

5. Chemical feed valves consisting of one (1) gate and two (2) check valves.

6. Steam pressure gauge with pigtail and gauge cock.

7. Boiler feed water valves (manual) to include: one (1) globe valve and two (2) check

valves.

8. Quick fill valves consisting of one (1) check and one (1) gate.

9. Low water limit: • Primary: Probe type with tricocks, gauge glass and pump controller. • Secondary: Probe type, manual reset.

10. Pressure limits include:

• Operating limit. • High-pressure limit, manual rest. • Low-pressure limit. • 4-20 milliamp pressure sensor for fuel feed / combination air modulation.

11. Boiler fire tube soot Blowers, fixed zone with necessary ASME Code compressed air

tank, piping, compressed air header, and timer actuated compressed air valves and drain valve. Note: Dry compressed air is provided by others. The unit will require approximately 10 SCFM of dry compressed air at 100 psi minimum.

Page 9 of 22 11/10/08 (REVISED)

000134

Page 230: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

12. One (1) steam flow meter with totalizer and transmitter.

13. Provided by Others - Installation and materials for access platforms, ladders and one set of stairs to access:

• Rear smoke box • Induced draft fan • Water column • Feed water valve train • Main steam valves

14. One (1) blow down separator built in accordance with ASME Code to include:

• Blow down inlet • Drain • Vent • Exhaust stack to vent above building roofline

15. One (1) steam header, common to both boilers, to include:

• 10 foot long by 8” diameter Header, Schedule 40, A106b • Two (2) inlets • Four (4) outlets (sizing to be determined) • One (1) outlet for Instrument/Gauge tap, ½” • One (1) outlet for condensate drip leg • One (1) steam trap • All header valves (inlet and outlet) BY OTHERS

16. Necessary pipe and fittings for the installation of the above trim.

2.6 POLLUTION CONTROL AND INDUCED DRAFT EQUIPMENT HURST BOILER & WELDING CO., INC. GUARANTEES THIS PLANT NOT TO EXCEED THE EMISSION RATE OF 0.3 LBS PARTICULATE PER MILLION BTU INPUT OR STATE ALLOWABLE, WHICHEVER IS GREATER. Pollution control and induced draft system for each unit consisting of:

1. Flanged flue gas ducting, prefabricated of angle iron reinforced 3/16" steel plate, designed to prevent pulsation and vibration cracking, for routing flue gas from boiler to gasification/combustion air preheater.

2. One (1) Gasifier/Combustion air preheater, tubular air-air, operation.

Page 10 of 22 11/10/08 (REVISED)

3. Flanged flue gas ducting, prefabricated of angle iron reinforced 3/16" steel plate, designed to prevent pulsation and vibration cracking, for routing flue gas from combustion air preheater to Primary Flyash Collector.

000135

Page 231: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

4. One (1) primary dry mechanical multiple cyclone flyash arrestor with cyclones, 9”

diameter, each mounted on ¼” steel tube sheets. The body of the collector will be fabricated of 3/16” steel plate, reinforced with angle iron and flat bar. The unit will have flanged inlet, outlet and hopper connections. The collection hopper will be fabricated of 3/16” steel plate with flanged bottom outlet for connection of the rotary air lock valve, hopper vibrator and access door. Provide one (1) mechanical rotary air lock discharge valves with discharge chute to main ash conveyor. Receptacle by OTHERS.

5. Flanged flue gas ducting, prefabricated of angle iron reinforced 3/16" steel plate,

designed to prevent pulsation and vibration cracking, for routing flue gas from primary multi cyclone to optional feedwater economizer.

6. Flanged flue gas ducting, prefabricated of angle iron reinforced 3/16" steel plate,

designed to prevent pulsation and vibration cracking, for routing flue gas from optional economizer to induced draft fan.

7. Centrifugal type induced draft fan designed for combustion air service complete with

high efficiency radial tip wheel to reduce required motor horsepower and remain as clean as possible. The fan will be fabricated of heavy gauge steel plate with pillow block roller bearings (located outside hot gas stream), heavy-duty shaft with heat slinger, TEFC drive motor, variable frequency drive, belt drive and OSHA belt guard. This fan will be floor mounted.

Note: HBC shall design the control for the draft fan motor variable frequency drive to assure the

boiler remains negatively pressurized (Low Draft Limit). 8. One (1) Flue Gas Recirculation system to include:

-Centrifugal type fan with fabricated of heavy gauge steel plate with pillow block roller bearings (located outside hot gas stream), -Heavy-duty shaft with heat slinger, -TEFC drive motor, -Variable frequency drive, belt drive and OSHA belt guard. This fan will be floor mounted. -Ducting from fan to gasifier/combustion air fan intake manifold.

9. Duct work from ID fan to secondary pollution controls, secondary pollution controls,

exhaust stack, etc. are by others.

Note: HBC shall design the control for the draft fan motor variable frequency drive to assure the boiler remains negatively pressurized (Low Draft Limit).

10. Secondary pollution controls (if required) related ductwork and exhaust monitoring is BY

OTHERS

Page 11 of 22 11/10/08 (REVISED)

The entire exhaust gas system will be designed to minimize vibration and noise. The use of inlet boxes with properly designed dampers and radial tip wheel fans insure that noise levels will not exceed acceptable standards.

000136

Page 232: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

2.7 ELECTRICAL CONTROL SYSTEM – ALL WIRING BY OTHERS An integrated, control system housed in a freestanding, pre-wired panel for automatic operation to include:

1. Control panel fabricated of 10 gauge steel plate (NEMA 12 enclosure), primed and painted

interior and exterior with main disconnect, cooling, as required, with air-air exchanger and lock-out / tag-out compliance.

2. One (1) programmable logic controller with power supply, rack, communication modules

and input/output modules.

3. One (1) cabinet-mounted, touch screen computer with network and modem remote annunciation capabilities and operator interface software for automatic control of operating steam pressure, temperatures, fuel flow and combustion airflow.

The control system incorporates a 4-20 milliamp steam pressure transmitter to sense changes in steam flow by measuring variations in boiler pressure and regulates the fuel feed and combustion air flow accordingly by adjusting the frequency of the metering bin and the combustion air fans’ variable frequency drives.

An oxygen-sensing device will be located in the boiler's rear smoke box and will measure variations in the percentage of excess oxygen in the combustion gases. The system’s target is +/- 6% O2 for optimized combustion characteristics. As changes in the percentage occur due to inconsistent moisture content, fuel density, fuel BTU content or consistency of the fuel quality, the device measures these changes in millisecond increments and signal the control’s ladder logic to bias the fuel/combustion air (over fire) ratio by adjusting the variable frequency drive of the forced draft blower motor thus providing the most efficient combustion.

4. Variable frequency drives for the stoker drive, under fire air fan, over fire air fan and

induced draft fan motors with input line reactors and communication to the processor.

5. Circuit breakers for all motors furnished by Hurst Boiler & Welding Co., Inc.

6. Motor starters for all motors furnished by Hurst Boiler & Welding Co., Inc.

7. Local motor disconnects are provided at each motor.

8. Furnace draft consistency will be maintained by constantly monitoring the draft and regulating the induced draft fan motor’s variable frequency drive as required by the draft controller.

9. Instrumentation with 4-20 milliamp transmitters to indicate and control the following will be

furnished:

Page 12 of 22 11/10/08 (REVISED)

• Steam pressure (PSIG above or below set point).

000137

Page 233: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

• Steam flow (pounds per hour above and below set point). • Water level. • Furnace draft (+ water column inches).

10. Thermocouple with high temperature limit to monitor gasifier temperature. 11. Limits will be provided to shut down the steam plant in the event of a system failure as

follows: • Primary low water limit (automatic reset). • Secondary low water limit (manual reset). • Primary high water limit (automatic reset) • High boiler steam pressure (automatic reset). • Low boiler steam pressure (automatic reset). • High furnace temperature (automatic reset). • Low draft (automatic reset).

The master control panel is factory wired, tested and equipped with incoming control voltage overload protection, interlocking circuit devices and terminal strip termination of all control circuits. All VFD controlled motors shall be of the Inverter type. 2.8 BOILER FEEDWATER DEAERATOR SYSTEM (Optional Price) Included as an option in this proposal is one (1) HBC OXY-MISER model OM-120, duplex Feedwater Deaerator system. This is a complete stand mounted tank with all required internals, pumps, motors and controls. Unit will contain approximately 15 minutes of water storage measured at the overflow level. Boiler Feed Water System to include:

1. One (1) welded steel tank, with steel stand.

2. Deaerating section with spray valves

3. Tank drain opening and valve.

4. One feed water pre-heater, steam injector.

5. Inlet controller, one each, external type.

6. Inlet valve, one each, lever type.

7. By-pass, manual inlet valve.

8. Gauge glass, one each, full coverage.

9. Thermometer, one each.

Page 13 of 22 11/10/08 (REVISED)

10. Pumps, two each, electric driven feed water.

000138

Page 234: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

11. Pump motors, two each with VFD to provide modulating Feedwater control.

11. Water pressure gauge, two each.

12. Pump isolating valves, two each (suction and discharge of each pump), gate

13. Tank pump discharge openings shall be either mounted on the tank end plate 6” above the

bottom of the tank or shall be internally extended from the bottom of the steel tank by 6”

nipples.

Pumps to be mounted on structural steel deaerator tank base; pump suction piping plumbed at factory and dismantled for shipping. Feed water tank trim mounted at factory (some components may be removed for shipping). Hurst Boiler and Welding Co., Inc. will provide a Nema 1 control cabinet enclosure fabricated from 10 gauge mild steel, primed and painted on interior and exterior, with hinged door, magnetic across the line motor starters, pump selector switch, running lights and circuit breakers. To be mounted on the tank's structural steel base.

It is recommended that arrangements be made to provide a diesel generator or alternate to power the feed water pumps in the case of a power outage. 3.1 RESPONSIBILITIES OF PURCHASER

1. Obtain all necessary building and applicable permits, fees, bonds, taxes and or testing.

2. Provide P.E. stamp, if necessary.

3. Return approved final plan view and elevation layout drawings within ten (10) days of

receipt.

4. Provide all site preparation to assure a minimum soil bearing capacity of 2500 PSF.

5. Install boiler foundation per Hurst Boiler & Welding Co., Inc. drawings and specifications.

6. Provide freight from Coolidge, GA to the job site.

7. Provide all crane, lifting and man lift services, supervisors, laborers, tools, materials etc

required to unload, set and install the equipment proposed above.

Page 14 of 22 11/10/08 (REVISED)

8. Building necessary to house boiler and associated equipment with lighting and electrical

service.

000139

Page 235: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

9. Furnish interconnecting steam, condensate and water piping between new boiler, and all

associated auxiliary equipment, as required.

10. Piping from HBC supplied blow down separator discharge to approved drain.

11. Provide treated water supply, water softeners and chemical feed equipment, to each

boiler Feedwater system.

12. Chemical treatment and disposal of waste water used in boiling out of boiler.

13. Provide one (1) telephone line and one (1) high speed internet portal to the boiler control

room. The telephone line shall be for use with a telephone and the portal shall be for the

computer modems. These lines shall be operational prior to start up.

14. Dried compressed air piped to the soot blowers’ compressed air accumulator tank.

15. Ductwork from ID Fan to All Secondary Pollution Control equipment, Secondary Pollution

Control equipment and installation as may be required to meet emission regulations.

(Quoted as Option)

16. Exhaust stack from boiler or secondary pollution control device, as applicable.

17. Inspect, receive and protect materials prior to the start of construction.

18. Provide main disconnect and wiring to main lugs located in master control panel,

boiler feed water control panel (and optional fuel storage control cabinet).

19. Provide unrestricted access to the job site.

20. Insulation on hot service piping and exhaust air-handling equipment, if required.

21. Furnish fuel receiving, handling and storage system to include delivery of fuel to metering

bin.

22. Provide enough fuel, quality as specified, of a consistent type for three days of operation

at full firing rate prior to start-up and prior to emission testing.

Page 15 of 22 11/10/08 (REVISED)

000140

Page 236: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

4.1 BUDGET PRICE The BUDGET pricing, FOB Factory in Georgia, Freight is NOT INCLUDED, for the basic boiler system is as follows:

Page 16 of 22 11/10/08 (REVISED)

BASE Budget Proposal – Low Pressure One (1) Model #S1600, 1800 BHP, 250 PSI design, 60,000 PPH steam output from and @ 212oF, wood biomass fuel @ 10% M.C. $3,687,500.00

Budget Proposal Includes:, Standard steel metering bins & feed screws, Boiler & Component Erection, Controls, Piping at Boiler and Steam Supply Pipe to Steam Header & Steam Header, Boiler Wet and Dry Ash System, Auto-De-Ash System on Boiler, and other items specifically included in Proposal above. Excluded from Budget Proposal above: Cranes, lifts, freight, Boiler Breeching from Boiler to APC Equipment, APC Equipment (Bag House – As Alternate Price), Stack, APC Monitoring Equipment, Wet APC or Boiler Blow-down Dryer (APC design Information Required for this), Conveyors or Feed System up to Metering Bins except as Alternate, Control or Power Wiring, Economizers, 2-Pump DA System with each pump @ 60,000 pph pump capacity, Fuel Feed and Storage System for Dry Fuel, Ash Removal Conveyors or Storage System, Boiler Wiring, and other items excluded in Proposal Section #3.1 above.

Excluded from Price Above

Option BUDGET Price Additions to Base Proposal as Follows:

Add # 1 – Backup Natural Gas Burner as described in Section 2.3. +$154,000.00

Add # 2 – One HBC 250 PSI Oxymizer Deaerator, Standard Duplex Pumps, VFD’s, Control Panel. (BUDGET ONLY – Use Existing Feedwater System)

+$240,000.00

Add # 3 – One (1) Economizer. +$Included in Base Price

Add # 4 – One (1) Bag House System to serve the total system capacity. +$725,000.00

Add # 4A – One (1) Dry Electrostatic Precipitator (ESP) to serve the total system capacity. (BUDGET ONLY) +$950,000.00

Add # 5 – One (1) Oxygen Catalyst System, if Required NOT REQUIRED

Add # 6 – One SNCR, if Required (Required for Extra 10% Control) (BUDGET ONLY) +$150,000.00

Add # 7 – APC or CEMS Monitoring Equipment is Dependant Upon Final Design and State Requirements. We Will Submit Pricing Upon Final Design Requirements by Stanley Group. (BUDGET ONLY)

+$188,100.00

Add # 8 – One (1) 100-Foot Tall Flue Stack. Height and Requirements to be Determined by OTHERS. (BUDGET ONLY) +$160,000.00

000141

Page 237: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Alternate #1 Budget Design Proposal – High Pressure One (1) Model #S1600, 1800 BHP, 900 PSI & 850 F design, 60,000 PPH steam output from and @ 212oF, wood biomass fuel @ 10% M.C. $4,700,000.00

Budget Proposal Includes:, Standard steel metering bins & feed screws, Boiler & Component Erection, Controls, Piping at Boiler and Steam Supply Pipe to Steam Header & Steam Header, Boiler Wet and Dry Ash System, Auto-De-Ash System on Boiler, and other items specifically included in Proposal above. Excluded from Budget Proposal above: Cranes, lifts, freight, Boiler Breeching from Boiler to APC Equipment, APC Equipment (Bag House – As Alternate Price), Stack, APC Monitoring Equipment, Wet APC or Boiler Blow-down Dryer (APC design Information Required for this), Conveyors or Feed System up to Metering Bins except as Alternate, Control or Power Wiring, Economizers, 2-Pump DA System with each pump @ 60,000 pph pump capacity, Fuel Feed and Storage System for Dry Fuel, Ash Removal Conveyors or Storage System, Boiler Wiring, and other items excluded in Proposal Section #3.1 above.

Excluded from Price Above

Option BUDGET Price Additions to Base Proposal as Follows:

Add # 1 – Backup Natural Gas Burner as described in Section 2.3. +$154,000.00

Add # 2 – One HBC 850 PSI Oxymizer Deaerator, Standard Duplex Pumps, VFD’s, Control Panel (BUDGET ONLY – Use Existing Feedwater System)

+$430,000.00

Add # 3 – One (1) Economizer. +$Included in Base Price

Add # 4 – One (1) Bag House System to serve the total system capacity. +$725,000.00

Add # 4A – One (1) Dry Electrostatic Precipitator (ESP) to serve the total system capacity. (BUDGET ONLY) +$950,000.00

Add # 5 – One (1) Oxygen Catalyst System, if Required NOT REQUIRED

Add # 6 – One SCR or SNCR, if Required (Required for Extra 10% Control) (BUDGET ONLY) +$150,000.00

Add # 7 – APC or CEMS Monitoring Equipment is Dependant Upon Final Design and State Requirements. We Will Submit Pricing Upon Final Design Requirements by Stanley Group. (BUDGET ONLY)

+$188,100.00

Add # 8 – One (1) 100-Foot Tall Flue Stack. Height and Requirements to be Determined by OTHERS. (BUDGET ONLY) +$160,000.00

Page 17 of 22 11/10/08 (REVISED)

000142

Page 238: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

4.1A EXCLUSIONS Taxes, Freight, Permits, Fees, Bonds, General Contracting Work, Items listed In Section 3.1, Items not specifically listed as included in this proposal. It is our understanding that Secondary Air Pollution Control Equipment and respective Monitoring Equipment will be required for this project. We have NOT INCLUDED APC Equipment or respective Monitoring Equipment in Our BASE BID PROPOSAL. Our proposal includes only the boiler and the mechanical collector. If additional equipment is provided by HBC for this project, there will be an additional cost commensurate with the requirement as determined By OTHERS. As a convenience to you, we have provided recommended budget prices for various APC systems in Section 4.1 above.

The above prices remain firm for 30 days from date hereof. Due to the volatility of materials pricing, adjustments (beyond 30 days) are inevitable and will be passed on, if necessary, after receipt of order. 4.2 DELIVERY Hurst Boiler & Welding Co., Inc. will have the steam plant complete and ready for shipment within seven (7) months of the receipt of client-approved layout drawings. 4.3 TERMS 35% upon receipt of order.

20% upon final approval of layout drawings

30% upon notification equipment is ready for shipment.

5% upon setting of Main Components

10% upon satisfactory completion, not to exceed 90 days from notification equipment is ready for

shipment.

Thank you for the opportunity to submit this proposal. If I may be of further assistance, please call on me.

Page 18 of 22 11/10/08 (REVISED)

000143

Page 239: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Gregory W. Smith MEM, BSIE Global Energy Solutions, Inc. Agent for Hurst Boiler & Welding Co., Inc.

GENERAL TERMS AND CONDITIONS 1. You will sign or have signed our proposal of which the general terms and conditions are a part. For and in consideration of one dollar in hand paid by you, the purchaser and by us, the seller, to each other and other good and valuable considerations, the receipt and adequacy of which are hereby acknowledge by each of us, you and we agree to the following as a part of our contract. If there exists a conflict between the rest of our contract and, then the General Terms and Conditions, then the General Terms and Conditions will take precedence.. 2. Security Interest and Title. Hurst Boiler and Welding Co., Inc.(“Hurst” and sometimes “we,” “us” and “seller”) is hereby granted and will retain a purchase money security interest in, and to the extent allowed by applicable law, equitable title to, the equipment described in our proposal to you, and all products and proceeds thereof, until Hurst is paid in full. In order to perfect that interest, we ask that you execute one or more financing statements. Purchaser agrees to sign and deliver to seller all UCC-1s, UCC-2s and other documents required to perfect such security interest, and to do so immediately upon signing of the contract. This will be recorded and will be public notice that we retain a purchase money security interest in the equipment and all products and proceeds thereof. You and our company agree and it is our mutual intention that the equipment proposed and described in our quote is now and shall remain personal property and shall not become a fixture or part of a fixture until we have been paid in full. 3. Price, Terms and Payment. Hurst’s price to you is stated in the contract. Our price is a cash price and you agree to pay us in cash. You agree to pay us 35% of the cash price at the time of acceptance of the contract and another 60% thereof upon notification by Hurst to you that the equipment is ready for shipment, which payment must be received by us before shipment. The final 5% is due upon completion of our work, but in no event later than 90 days after notification to you that the equipment is ready for shipment. Your payment to us will not be dependent or contingent upon receipt of payment by you from any other party. Any balance of the remaining cash price unpaid 31 days after the invoice date will be subjected to a 1 ½ per cent monthly service fee until the invoice is completely paid in full. In the event that we have to engage an attorney to collect the balance due us, including the service fee, you agree to reimburse us for all collection costs including reasonable attorney’s fees. 3.a Steel Price Escalation. Recent market conditions have resulted in exceptionally volatile prices for both stainless and carbon steels. Supply conditions are such that producers have instituted surcharges, which they apply at the time of actual shipment of the steel. This means that the cost for steel used for developing the prices in this quotation are not firm. As a result of this policy, it has become necessary for Hurst Boiler & Welding Co., Inc. to pass along any escalation in the cost of carbon and stainless steels. The price escalation will be calculated by indexing the cost of the steel based on the London Metals Exchange from the date that this proposal is issued to the date that the steel is actually received. The prices could change if you should require changes such as a change in the design of the product or changes in the components we have quoted. We will issue the necessary change orders to either decrease or increase the price and/or time of completion, and said change orders will be deemed accepted and assented to by you if within a reasonable time the terms of the change order have not been objected to in writing to us by you, it being agreed upon that a reasonable time for objection is 20 days from the date of issuance of any said change order. We, of course, reserve the right to correct typing and clerical errors in our price or specifications. 4. Storage of Equipment. You will be notified of a tentative shipment date. Once the equipment is ready to be shipped, we may at our option, agree to store the equipment should you not be ready for delivery. This will not relieve your duty to pay all invoices as they become due according to the payment terms of the contract. Should we invoke our option to store the equipment for said reason you hereby agree to pay a storage fee to us at the rate of 1% of the contract price per month in addition to your duty to pay the cash price and service fees.

Page 19 of 22 11/10/08 (REVISED)

000144

Page 240: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

5. Inspection by Purchaser. All or much of the equipment work will be manufactured or fabricated at our factory near Coolidge, Georgia. Inspection by you during manufacturing or fabrication must be made at our factory at your expense prior to shipment there from, with 5 days’ advance notice to seller. 6. Taxes, Permits and Licenses. Purchaser agrees to pay all sales, use and excise taxes due, payable or imposed by virtue of this sale, whether imposed on purchaser or seller. Purchaser agrees to pay the cost of all licenses and permits and environmental protection testing imposed on or incurred by purchaser or seller in connection with this sale by seller to purchaser. All such taxes, licenses, permits and testing paid by seller, together with all costs, expenses and charges incurred by seller defending against or resisting payment thereof, shall be reimbursed by purchaser to seller promptly upon receipt of an invoice therefor. If you are tax exempt on this job, you will need to provide us with your exemption certificate. 7. Freight, Transportation and Risk of Loss. All Freight, transportation or other charges and costs of delivery to purchaser of all equipment and work shall be assumed by the seller and is included in the contract price, and shall be F.O.B. destination or other point of shipment to Purchaser, if not shipped in our truck(s). Hurst is not responsible for shipment then the purchaser shall be held responsible for all necessary permits, escorts, and all other details for delivery of the equipment. In order for you to obtain proper delivery, it is agreed by you and by Hurst that you will provide the carrier with an access road to and from the job site which is capable of supporting trucks loaded to 75,000 pounds and with a 14 foot height clearance. Should the job site or such road not be suitable for such use and purposes, you will reimburse the carrier and us if we are responsible for the erection of the equipment , for any delays at the hourly labor rate and demurrage rate current at that time. You will also be responsible for unloading the equipment, unless we are responsible for the erection of the equipment. 8. Delays in Performance. We will not be liable for any damages sustained by you resulting from our company’s or any supplier’s failure to perform or delay in performing any obligation , if such failure(s) or delay(s) is/are caused directly or indirectly by circumstances or events beyond Hurst’s control. Some examples are invasion, fire, floods, strikes, thefts, interference or restraint by civil or military authority, etc. You agree to hereby waive any right you have to incidental or consequential damages as a result of any delay, as stated in our warranty. You also agree that we will not be responsible for any “back charges” or costs unless you first obtain our company’s written approval before you sustain any “back charges” or costs. You must obtain this approval in writing in advance from our authorized officer. 9. Limited Warranty. All material and equipment supplied by and or erected and or started up by us under the contract is warranted to you against defects in materials and workmanship and/or design for a period of one (1) year from the date of fire-up/start-up. This warranty applies only in the event of normal use, service and conditions. Assemblies, subassemblies, parts, and/or accessories manufactured by others and incorporated into goods of our manufacture are warranted by Hurst only to the extent of the warranty of the original manufacturer. All claims for breach of warranty must be made in writing to Seller at the Seller’s address as soon as any defect becomes apparent. IT IS EXPRESSLY AGREED THAT THE FOLLOWING IS BUYER’S/YOUR EXCLUSIVE REMEDY FOR BREACH OF THESE WARRANTIES: THE SOLE OBLIGATION OF HURST AND YOUR SOLE REMEDY UNDER THESE WARRANTIES IS LIMITED TO THE REPAIR OR, AT OUR OPTION, REPLACEMENT OF ANY COMPONENT PART MANUFACTURED BY HURST WHICH PROVES , UPON EXAMINATION BY HURST, TO HAVE BEEN DEFECTIVE ORIGINALLY. DEFECTIVE PARTS MUST BE RETURNED BY THE PURCHASER OR OWNER TO US. In no event shall we bear any responsibility for the failure on your behalf to operate the equipment in accordance with our manuals, instructions, training, or service procedures. If you or anyone you authorize, other than Hurst, repairs the equipment without prior written consent of an authorized officer of Hurst, then this limited warranty will no longer be valid. HURST WILL NOT BE RESPONSIBLE FOR ANY INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES OF WHATSOEVER NATURE OR KIND. IN NO EVENT WILL HURST’S LIABILITY TO PURCHASER EXCEED THE CASH PRICE OF THE DEFECTIVE EQUIPMENT. IT IS MUTUALLY AGREED THAT THE PRICE STATED FOR THE EQUIPMENT HEREIN DESCRIBED IS A CONSIDERATION IN LIMITING HURST’S LIABILITY.

Page 20 of 22 11/10/08 (REVISED)

THIS LIMITED WARRANTY IS IN SUBSTITUTION FOR AND IN LIEU OF ANY AND ALL OTHER WARRANTIES, WHETHER EXPRESS, IMPLIED OR STATUTORY, INCLUDING WITHOUT LIMITATION IMPLIED WARRANTIES OF MERCHANTABILITY AND SUITABILITY AND FITNESS FOR ANY PARTICULAR PURPOSE WHATSOEVER.

000145

Page 241: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

10. CANCELLATION. This contract may be canceled by you upon notice to us in writing, but only on the following terms: (a) payment by you in advance of cancellation date in full of the purchase price in effect on the day of cancellation for all equipment completed and all work performed, and (b)payment in full of all material and labor costs incurred, plus material handling, manufacturing, sales, engineering, and administrative overhead, plus 8% overall anticipated profit on all incomplete equipment and to- be- performed work. In addition to such cancellation charges, Purchaser also shall pay immediately and before the cancellation date the full cost of all special or specially fabricated tools and equipment considered a part of the contract and specifically enumerated therein which are on hand or for which the seller is obligated, together with all labor and other out-of-pocket expenses connected therewith. All cancellation costs are due and payable prior to the effective date of cancellation. Our company may cancel the order and contract at any time before receiving the final approved drawings, if Hurst deems itself insecure, or determines that it is commercially unreasonable for us to proceed. In this event you will be refunded any and all deposits you have made with us. Purchaser, after receipt by seller of all cancellation costs referenced above, shall be permitted free access to the seller’s premises, or other premises where the equipment may be found, and may remove same therefrom, all at purchaser’s own and sole cost and expense. If such cancellation arises from the insolvency or bankruptcy of the seller, the purchaser may, at its own option and subject to its obligation and rights herein contained, obtain from the seller or its trustee, as the case may be, a full and complete set of drawings and specifications, and purchaser shall be entitled to have others complete the fabrication and erection of the equipment, all at its sole cost and expense. 11. Events of default. Purchaser is in default upon the happening of any one or more of the following: (a) a failure to make any payment when due, (b) a negative change here after in the present financial condition, creditworthiness or responsibility of Purchaser materially affecting Purchaser’s ability to pay Seller, (c) a refusal by Purchaser to accept any delivery, (d) failure to perform any obligation hereunder when and as required, or (e) a breach by Purchaser of any representation, promise or warranty herein contained. 12. Remedies on Default. If, in seller’s reasonable opinion, the purchaser has defaulted under one or more of the provisions of this contract, seller may so notify the purchaser in writing of the happening of such event(s) of default, and then seller may immediately at its option (a) cease performance of any other obligation under this contract, or (b) exercise any remedy under the Uniform Commercial Code of Georgia or any other state where the remedy is sought to be exercised, or (c) take possession of all equipment and/or work wherever located and remove it from the premises where located, or (d) void all warranties and refuse service and fire-up/start-up, or (e) declare all sums owed, or to be payable to seller immediately payable, or (f) as attorney- in- fact for Purchaser to take possession of the property wherever located and sell the same at the best price obtainable at public or private sale, with or without notice, in the sole opinion of seller, and execute and deliver all documents necessary therefor with the right of the subsequent purchaser thereof to remove same from the premises where located, or any number of such remedies. The seller shall, upon exercise of one or more of its remedies of default, be entitled to receive all sums owed, or to be payable to seller by purchaser, to date of sale, plus such additional charges as may be specifically set forth herein for the cancellation hereof. If any net positive sale proceeds shall remain after completion of such sale and payment of all of seller’s costs and charges, the net proceeds, so called, shall be remitted to purchaser forthwith. All remedies exercised by seller shall be free and clear to any liability therefor to purchaser, and the exercise of one or more of said remedies by seller shall not eliminate or waive its right to exercise any other legal or equitable remedy it may have. 13. Attorney’s Fees and Costs. In the event of purchaser’s default, purchaser agrees to pay to seller a reasonable attorney’s fee for all sums collected by or through an attorney at law, along with any other costs incurred by seller in litigating such collection or otherwise exercising such remedies. 14. Entire Agreement. You and Hurst both agree that this contract, including but not limited to these Terms and Conditions, contains the complete and final agreement between you and Hurst and may not be modified, supplemented, explained or waived by parole evidence, your purchase order, course of dealing, or in any other way, except where made in writing and signed by you and our company’s authorized officer.

Page 21 of 22 11/10/08 (REVISED)

000146

Page 242: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 22 of 22 11/10/08 (REVISED)

15. Other Documents. Purchaser and seller agree to execute and deliver to each other any and all other documents necessary or useful in the discretion of seller to secure or exercise any power or remedy hereunder, including without limitation, financing statements, powers of attorney, bills of sale or additional security agreements. 16. Laws Governing. This is a Georgia Contract. The laws of the State of Georgia shall govern all the terms of this contract. ACCEPTANCE OF PROPOSAL The proceeding prices, specifications and conditions are satisfactory and hereby accepted. You are authorized to do the work as specified. Payment will be made as outline in the proposal. Signature ___________________________________Date ______________________ Signature ___________________________________Date ______________________

000147

Page 243: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

BUDGET PROPOSAL #12-15-2008a-2-1800-650/750

BIOMASS FIRED STEAM GENERATION PLANT

Two (2) 1800 BHP Boiler System / 60,000 PPH 120,000 PPH Total System Capacity @ 750 PSIG DESIGN & 750 F Superheated Steam

Prepared For

University of Iowa – Main Campus Boiler House

Stanley Consultants – Muscatine, Iowa 225 Iowa Drive

Muscatine, Iowa 52761 USA

REFERENCE: HBC012-08-2008a

ATTN: Russ Price

Phone: (563) 264-6554 Email: [email protected]

December 15, 2008 (REVISED)

Prepared By

Page 1 of 20 12/15/08 (REVISED)

Global Energy Solutions, Inc.—Agent for Hurst Boiler & Welding Co., Inc.

000148

Page 244: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 2 of 20 12/15/08 (REVISED)

EQUIPMENT — GENERAL SPECIFICATIONS 1.0 BOILER EQUIPMENT (Hurst Boiler & Welding Co., Inc.)

1. Scope of Equipment Two (2) substoichiometric hardwood waste fuel gasifier, combustor and heat recovery systems fed from metering bin.

2. Gasifier Fuel Requirements 1-1/2" x 2-1/2" x 5/8" or less in size, 50% or less in moisture content and a BTU content of 4,347 BTU/lb (minimum). Biomass approximately 50% Moisture Content or Less.

3. Approximate Fuel Usage at Maximum Firing Rate (Each Boiler) One (1) @ 19,802 lbs. per hour @ 50% moisture content (86,077,800 BTU/Hr input).

4. Boiler Rating One (1) @ 1800 Boiler horsepower, 60,000 PPH output steam output each from and @ 212oF.

5. Boiler Pressure BASE: 750 PSI design pressure. Maximum recommended operating pressure is 675 PSI.

6. Boiler Design BASE: High Pressure Hybrid Model #SHD-10400-750-RG (Shotgun/Water tube design). Built in accordance with the ASME Code. We will be using Reciprocating Grate Stoker for Biomass Fuel. ALTERNATE: E-Tech, Inc. SWB-50 Shotgun D-Frame (Water tube design) with Superheater. Built in accordance with the ASME Code. We will be using Reciprocating Grate Stoker for Biomass Fuel.

1.1 ENGINEERING SERVICES FOR BOILER SYSTEM Hurst Boiler & Welding Co., Inc. will supply all required design and specifications for the proposed boiler system equipment. Engineering will include:

1. Boiler room layout drawings for locating new equipment. 2. Foundation details for proposed waste fired boiler based on 2500 PSF soil conditions. 3. Assistance in completing and filing of boiler's environmental emission permit. 4. Electrical wiring prints and specifications required to install the proposed electrical

equipment 5. All drawings listed above shall be provided in hard copy and digital (AutoCAD 14 or earlier)

formats. 6. Two (2) sets of operating and maintenance manuals.

000149

Page 245: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 3 of 20 12/15/08 (REVISED)

1.2 INSTALLATION SERVICES FOR BOILER SYSTEM (Crane, Lifts, and Services by OTHERS)

Hurst Boiler and Welding Co., Inc. will furnish experienced, highly trained and certified supervisors and laborers employed by Hurst Boiler and Welding Co., Inc. to supervise the confirmation of receipt of materials and to set the main system components to include: casing, boiler vessel, feedwater system and soot blowers. All work will be completed in a workman-like manner according to standard practices. The installation will be executed as outlined below:

1. Furnish all materials, tools, equipment and labor necessary to complete the equipment

installation to include:

• Setting and anchoring major components; combustion chamber, combustion air fans and ductwork, pressure vessel, breeching, multicyclone collector(s), flue gas ductwork, induced draft fan and transition to additional pollution control systems, as may be necessary. Concrete anchors, nuts, bolts, gaskets and other materials required for the assembly of the major components are supplied as part of the installation.

• Installation of minor equipment components (stoker drive assembly, rotary

valves, soot blower compressed air accumulator, etc.) including necessary nuts, bolts, washers, gaskets and other materials to complete installation.

2. Furnish all pipe, fittings, gaskets, tools, equipment, and labor necessary to complete the

mounting and plumbing of boiler trim and controls to include:

• Water columns and water column blow down piping • Relief valves and venting to building exterior • Blow down valving and piping to blow down separator • Blow down separator to include fabricating and erecting vent stack • Surface blow down valving and piping to blow down separator • Main steam valving • Pressure gauge • Limit controls • Feed water valving.

3. Provided by Others - all rigid conduit, wire and other materials necessary for the

interconnection of all motors, electrical components provided by Hurst Boiler and Welding Co., Inc. All necessary labor will be furnished and installation will be completed in accordance with applicable NEMA standards. Termination of wiring is a part of the electrical installation.

4. Furnish insulation/refractory materials, tools and labor required to install the internal gasification/combustion chamber insulation and refractory with hanger clips and hanger bricks.

5. Provided by Others – installation and materials to fabricate and install access platforms, ladders and one set of stairs to access:

Front smoke box tube access doors and soot blowers

000150

Page 246: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 4 of 20 12/15/08 (REVISED)

Water column and feed water valve train Main steam and relief valving Multicyclone collector bin(s) and rotary air lock valves.

6. Painting of field fabricated components and touch-up of all equipment is included as part

of the installation. Piping will be color coded and OSHA yellow will be used as required on platforms and drive guards.

7. Hurst Boiler and Welding Co., Inc. will keep its work area clean of all debris resulting

from our work and place it in a receptacle provided and removed by the purchaser. 1.3 SYSTEM START-UP FOR BOILER SYSTEM When installation of the boiler equipment supplied is completed, Hurst Boiler & Welding Co., Inc. will provide one start up technician to assist in the curing of the refractory system, start the equipment and train personnel on the proper maintenance and operation of the system to include:

1. Check out of all system components to assure proper rotation, alignment, sequencing, function, etc.

2. Application of steam to the system to test operation of valving, controls and other related equipment.

3. Adjustment of controls to provide efficient operation of all boiler functions.

4. Start-up of the equipment with mill personnel to familiarize them with proper operation and maintenance procedures.

5. Maximum duration of this service is ten (10) days total on the job site, not including travel

time. Additional time will require a change order (purchase order) from the purchaser. Additional time will be billed at $1,200 / day, plus expenses and travel costs.

6. HBC may provide, upon receipt of change order ADD, one start-up technician on-site for a

duration of three days (two days prior to emission testing) to assist in tuning and operating the boiler system prior to and during emission testing. Scheduling requires two (2) weeks prior notice to HBC of the testing date.

2.1 BIOMASS FUEL GASIFIER Substoichiometric biomass fuel gasifier to include a heavy duty combustion chamber, refractory and insulation shipped loose, will be furnished to combust the solid fuel as specified. The unit will be complete with the following:

1. Three (3) dual screw metering bins complete with AC-type variable speed controller and bin level indicator (Sonac) to control owner’s fuel conveyor.

2. One (1) sloped, reciprocating grate type stoker to include:

000151

Page 247: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 5 of 20 12/15/08 (REVISED)

• Heavy duty, sloped reciprocating conveyor to be mechanically driven by timer based controls allowing for the ultimate flexibility in handling fuels of different qualities and consistencies.

• Fuel feed conveyor housing with flanged end opening for easy screw removal and thermocouple with quenching system to prevent burn back.

• Reciprocating grates cast of heavy duty iron and high chrome content alloy.

• One (1) heavy-duty ash removal drag chain conveyor (wet) with trough,

3. Substoichiometric combustion air system to include:

• One (1) belt driven blower with TEFC motor and OSHA belt guard. • Prefabricated combustion air ductwork for interconnection of blower to under

grate zone and gasifier air preheater (see Section 2.5, Item #2). • Zoned, under grate plenum. • One (1) combustion air blower incorporates welded steel housing, flanged outlet,

flanged inlet, high efficiency impeller wheel and variable frequency AC drive for improved control of combustion airflow. This fan is designed to modulate with steam demand.

4. Gasification chamber casing to include:

• Furnace front of 1/2" steel plate. • Furnace sides and rear of 1/4" reinforced steel plate.

• Chamber lining (to be field installed) of:

9" refractory wall and radiant arch with a service temperature of: 3000° F. The refractory walls are constructed using a proprietary refractory compound. A very high density, low clay, high alumna content ram-able refractory, Hurst Mud is the only refractory available on the world market designed specifically for its high resistance to aerosol attacks which may occur during the gasification and combustion of some solid fuels. 2" "M" block, service temperature of: 1900° F. 2" mineral wool, service temperature: 1200° F. Refractory anchor brick that includes a two-part clipping system of stainless steel. This allows the refractory and the casing to independently expand and contract thereby greatly reducing refractory maintenance.

5. Two (2) air-cooled observation ports with heat shields and site glasses.

000152

Page 248: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 6 of 20 12/15/08 (REVISED)

6. Cast iron over fire access doors with heat shields and lockable handles. 7. Under grate access doors. 8. Skids and support assembly.

2.2 BURNER UNIT (FOR BIOMASS GAS) Combustion air system to include:

1. One (1) prefabricated zoned over fire combustion air plenum encircling the entire

combustion casing with nozzles that penetrate the casing interior and manually adjustable dampers.

2. Prefabricated combustion air ductwork for interconnection of blower to zoned air plenum

and combustion air preheater (see Section 2.5, Item #2).

3. One (1) combustion air blower incorporates welded steel housing, flanged outlet, flanged inlet, high efficiency impeller wheel and variable frequency AC drive for improved control of combustion airflow. This fan is designed to automatically modulate in response to the O2 sensor system mounted in the rear smoke box of the boiler vessel.

4. Combustion chamber casing to include:

• Furnace front of 1/2" steel plate.

• Furnace sides and rear of 1/4" reinforced steel plate.

• Chamber lining (to be field installed) of: 9" refractory wall and radiant arch with a service temperature of: 3000° F. The refractory walls are constructed using a proprietary refractory compound. A very high density, low clay, high alumna content ram-able refractory, Hurst Mud is the only refractory available on the world market designed specifically for its high resistance to aerosol attacks which may occur during the gasification and combustion of some solid fuels. 2" "M" block, service temperature of: 1900° F. 2" mineral wool, service temperature: 1200° F. Refractory anchor brick that include a two-part clipping system of stainless steel. This allows the refractory and the casing to independently expand and contract thereby greatly reducing refractory maintenance.

5. Over fire inspection/access doors with lockable handles.

000153

Page 249: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 7 of 20 12/15/08 (REVISED)

2.3 BACK-UP BURNER UNIT (FIRED BY NATURAL GAS) – Optional ADD Price Only Combustion air system to include:

1. The boiler is equipped with a Low NOx burner; with induced flue gas recirculation for NOx emissions reduction to 30 PPM.

2. Low NOx IFGR burner capable of 30 PPM NOx emissions when firing natural gas

3. Forced draft fan with TEFC motor and pre-wired motor starter, mounted and wired in a separate starter panel (note: blower is shipped loose for field mounting)

4. Burner Management System with Fireye E100 Series Programmer OR EQUAL with remote display and first-out annunciation, relays, limit switches, alarm and indicating lights

5. Combustion control system, electro-pneumatic positioning consisting of an microprocessor based controller with full metering capability, automatic and manual firing rate control

6. NEMA 4 and 12 electrical enclosures and sealtite conduit.

7. Fuel valving, trim and controls meeting FM insurance standards NFPA-8501 Safety Code requirements.

2.4 BOILER PRESSURE VESSEL Hurst Hybrid boiler with water wall radiant section designed for efficient heat recovery from wet biomass fuel combustion, and support structure. The unit shall be built in strict accordance with the ASME Code and stamps and be rated at no less than 6.5 square feet of heating surface per boiler horsepower output. The generator (fire tube) section includes:

1. Front and rear smoke boxes complete with twin hinged airtight doors. The doors on the

Hurst boiler are internally insulated and incorporate an abrasion resistant shield on the interior of the doors.

2. The fire tubes are designed to maximize heat recovery from biomass fuel fired

combustion. 3. Steam, water inspection and drain openings. 4. Support assembly for attaching to combustion chamber casing.

The radiant (water tube) section includes:

000154

Page 250: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 8 of 20 12/15/08 (REVISED)

1. 1/2" front plate and rear plate. 2. The water tubes are 2-1/2” in diameter providing superior water flow and eliminating “hot

spots” found in other designs. 3. Support assembly for attaching to combustion chamber casing. 4. Blow down openings on each lower drum. 5. Flanged inspection openings on the end of each drum.

Both the generator and radiant sections of the Hybrid boiler are insulated with 2" of high-density mineral wool and clad with 22 gauge "Paint-Grip" zinc coated steel jacket material and galvanized screws for attachment and joining. Overall thermal design of the Hybrid boiler vessel is computed and analyzed to insure that the highest possible efficiency is maintained throughout the system’s operating range. The boiler system shall be designed to provide 4:1 turndown rate. 2.5 BOILER TRIM AND LIMIT CONTROLS

1. Relief valves per ASME Code. 2. Boiler bottom blow down valves:

-Two (2) in generator section, quick-opening. -Two (2) in radiant section, quick-opening. -One (1) slow opening.

3. Surface blow down valves consisting of one (1) needle and one (1) gate. 4. Main steam valves, one (1) gate, “PP” spool piece and one (1) non-return.

5. Chemical feed valves consisting of one (1) gate and two (2) check valves.

6. Steam pressure gauge with pigtail and gauge cock.

7. Boiler feed water valves (manual) to include: one (1) globe valve and two (2) check

valves.

8. Quick fill valves consisting of one (1) check and one (1) gate.

9. Low water limit: • Primary: Probe type with tricocks, gauge glass and pump controller. • Secondary: Probe type, manual reset.

10. Pressure limits include:

000155

Page 251: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 9 of 20 12/15/08 (REVISED)

• Operating limit. • High-pressure limit, manual rest. • Low-pressure limit. • 4-20 milliamp pressure sensor for fuel feed / combination air modulation.

11. Boiler fire tube soot Blowers, fixed zone with necessary ASME Code compressed air

tank, piping, compressed air header, and timer actuated compressed air valves and drain valve. Note: Dry compressed air is provided by others. The unit will require approximately 10 SCFM of dry compressed air at 100 psi minimum.

12. One (1) steam flow meter with totalizer and transmitter.

13. Provided by Others - Installation and materials for access platforms, ladders and one

set of stairs to access: • Rear smoke box • Induced draft fan • Water column • Feed water valve train • Main steam valves

14. One (1) blow down separator built in accordance with ASME Code to include:

• Blow down inlet • Drain • Vent • Exhaust stack to vent above building roofline

15. One (1) steam header, common to both boilers, to include:

• 10 foot long by 8” diameter Header, Schedule 40, A106b • Two (2) inlets • Four (4) outlets (sizing to be determined) • One (1) outlet for Instrument/Gauge tap, ½” • One (1) outlet for condensate drip leg • One (1) steam trap • All header valves (inlet and outlet) BY OTHERS

16. Necessary pipe and fittings for the installation of the above trim.

2.6 POLLUTION CONTROL AND INDUCED DRAFT EQUIPMENT HURST BOILER & WELDING CO., INC. GUARANTEES THIS PLANT NOT TO EXCEED THE EMISSION RATE OF 0.3 LBS PARTICULATE PER MILLION BTU INPUT OR STATE ALLOWABLE, WHICHEVER IS GREATER. Pollution control and induced draft system for each unit consisting of:

000156

Page 252: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 10 of 20 12/15/08 (REVISED)

1. Flanged flue gas ducting, prefabricated of angle iron reinforced 3/16" steel plate, designed to prevent pulsation and vibration cracking, for routing flue gas from boiler to gasification/combustion air preheater.

2. One (1) Gasifier/Combustion air preheater, tubular air-air, operation.

3. Flanged flue gas ducting, prefabricated of angle iron reinforced 3/16" steel plate,

designed to prevent pulsation and vibration cracking, for routing flue gas from combustion air preheater to Primary Flyash Collector.

4. One (1) primary dry mechanical multiple cyclone flyash arrestor with cyclones, 9”

diameter, each mounted on ¼” steel tube sheets. The body of the collector will be fabricated of 3/16” steel plate, reinforced with angle iron and flat bar. The unit will have flanged inlet, outlet and hopper connections. The collection hopper will be fabricated of 3/16” steel plate with flanged bottom outlet for connection of the rotary air lock valve, hopper vibrator and access door. Provide one (1) mechanical rotary air lock discharge valves with discharge chute to main ash conveyor. Receptacle by OTHERS.

5. Flanged flue gas ducting, prefabricated of angle iron reinforced 3/16" steel plate,

designed to prevent pulsation and vibration cracking, for routing flue gas from primary multi cyclone to optional feedwater economizer.

6. Flanged flue gas ducting, prefabricated of angle iron reinforced 3/16" steel plate,

designed to prevent pulsation and vibration cracking, for routing flue gas from optional economizer to induced draft fan.

7. Centrifugal type induced draft fan designed for combustion air service complete with

high efficiency radial tip wheel to reduce required motor horsepower and remain as clean as possible. The fan will be fabricated of heavy gauge steel plate with pillow block roller bearings (located outside hot gas stream), heavy-duty shaft with heat slinger, TEFC drive motor, variable frequency drive, belt drive and OSHA belt guard. This fan will be floor mounted.

Note: HBC shall design the control for the draft fan motor variable frequency drive to assure the

boiler remains negatively pressurized (Low Draft Limit). 8. One (1) Flue Gas Recirculation system to include:

-Centrifugal type fan with fabricated of heavy gauge steel plate with pillow block roller bearings (located outside hot gas stream), -Heavy-duty shaft with heat slinger, -TEFC drive motor, -Variable frequency drive, belt drive and OSHA belt guard. This fan will be floor mounted. -Ducting from fan to gasifier/combustion air fan intake manifold.

9. Duct work from ID fan to secondary pollution controls, secondary pollution controls,

exhaust stack, etc. are by others.

Note: HBC shall design the control for the draft fan motor variable frequency drive to assure the boiler remains negatively pressurized (Low Draft Limit).

000157

Page 253: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 11 of 20 12/15/08 (REVISED)

10. Secondary pollution controls (if required) related ductwork and exhaust monitoring is BY OTHERS

The entire exhaust gas system will be designed to minimize vibration and noise. The use of inlet boxes with properly designed dampers and radial tip wheel fans insure that noise levels will not exceed acceptable standards. 2.7 ELECTRICAL CONTROL SYSTEM – ALL WIRING BY OTHERS An integrated, control system housed in a freestanding, pre-wired panel for automatic operation to include:

1. Control panel fabricated of 10 gauge steel plate (NEMA 12 enclosure), primed and painted

interior and exterior with main disconnect, cooling, as required, with air-air exchanger and lock-out / tag-out compliance.

2. One (1) programmable logic controller with power supply, rack, communication modules

and input/output modules.

3. One (1) cabinet-mounted, touch screen computer with network and modem remote annunciation capabilities and operator interface software for automatic control of operating steam pressure, temperatures, fuel flow and combustion airflow.

The control system incorporates a 4-20 milliamp steam pressure transmitter to sense changes in steam flow by measuring variations in boiler pressure and regulates the fuel feed and combustion air flow accordingly by adjusting the frequency of the metering bin and the combustion air fans’ variable frequency drives.

An oxygen-sensing device will be located in the boiler's rear smoke box and will measure variations in the percentage of excess oxygen in the combustion gases. The system’s target is +/- 6% O2 for optimized combustion characteristics. As changes in the percentage occur due to inconsistent moisture content, fuel density, fuel BTU content or consistency of the fuel quality, the device measures these changes in millisecond increments and signal the control’s ladder logic to bias the fuel/combustion air (over fire) ratio by adjusting the variable frequency drive of the forced draft blower motor thus providing the most efficient combustion.

4. Variable frequency drives for the stoker drive, under fire air fan, over fire air fan and

induced draft fan motors with input line reactors and communication to the processor.

5. Circuit breakers for all motors furnished by Hurst Boiler & Welding Co., Inc.

6. Motor starters for all motors furnished by Hurst Boiler & Welding Co., Inc.

7. Local motor disconnects are provided at each motor.

8. Furnace draft consistency will be maintained by constantly monitoring the draft and regulating the induced draft fan motor’s variable frequency drive as required by the draft controller.

000158

Page 254: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 12 of 20 12/15/08 (REVISED)

9. Instrumentation with 4-20 milliamp transmitters to indicate and control the following will be furnished:

• Steam pressure (PSIG above or below set point). • Steam flow (pounds per hour above and below set point). • Water level. • Furnace draft (+ water column inches).

10. Thermocouple with high temperature limit to monitor gasifier temperature. 11. Limits will be provided to shut down the steam plant in the event of a system failure as

follows: • Primary low water limit (automatic reset). • Secondary low water limit (manual reset). • Primary high water limit (automatic reset) • High boiler steam pressure (automatic reset). • Low boiler steam pressure (automatic reset). • High furnace temperature (automatic reset). • Low draft (automatic reset).

The master control panel is factory wired, tested and equipped with incoming control voltage overload protection, interlocking circuit devices and terminal strip termination of all control circuits. All VFD controlled motors shall be of the Inverter type. 2.8 BOILER FEEDWATER DEAERATOR SYSTEM (Optional Price) Included as an option in this proposal is one (1) HBC OXY-MISER model OM-120, duplex Feedwater Deaerator system. This is a complete stand mounted tank with all required internals, pumps, motors and controls. Unit will contain approximately 15 minutes of water storage measured at the overflow level. Boiler Feed Water System to include:

1. One (1) welded steel tank, with steel stand.

2. Deaerating section with spray valves

3. Tank drain opening and valve.

4. One feed water pre-heater, steam injector.

5. Inlet controller, one each, external type.

6. Inlet valve, one each, lever type.

7. By-pass, manual inlet valve.

8. Gauge glass, one each, full coverage.

9. Thermometer, one each.

10. Pumps, two each, electric driven feed water.

000159

Page 255: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 13 of 20 12/15/08 (REVISED)

11. Pump motors, two each with VFD to provide modulating Feedwater control.

11. Water pressure gauge, two each.

12. Pump isolating valves, two each (suction and discharge of each pump), gate

13. Tank pump discharge openings shall be either mounted on the tank end plate 6” above the

bottom of the tank or shall be internally extended from the bottom of the steel tank by 6”

nipples.

Pumps to be mounted on structural steel deaerator tank base; pump suction piping plumbed at factory and dismantled for shipping. Feed water tank trim mounted at factory (some components may be removed for shipping). Hurst Boiler and Welding Co., Inc. will provide a Nema 1 control cabinet enclosure fabricated from 10 gauge mild steel, primed and painted on interior and exterior, with hinged door, magnetic across the line motor starters, pump selector switch, running lights and circuit breakers. To be mounted on the tank's structural steel base.

It is recommended that arrangements be made to provide a diesel generator or alternate to power the feed water pumps in the case of a power outage. 3.1 RESPONSIBILITIES OF PURCHASER

1. Obtain all necessary building and applicable permits, fees, bonds, taxes and or testing.

2. Provide P.E. stamp, if necessary.

3. Return approved final plan view and elevation layout drawings within ten (10) days of

receipt.

4. Provide all site preparation to assure a minimum soil bearing capacity of 2500 PSF.

5. Install boiler foundation per Hurst Boiler & Welding Co., Inc. drawings and specifications.

6. Provide freight from Coolidge, GA to the job site.

7. Provide all crane, lifting and man lift services, supervisors, laborers, tools, materials etc

required to unload, set and install the equipment proposed above.

8. Building necessary to house boiler and associated equipment with lighting and electrical

service.

9. Furnish interconnecting steam, condensate and water piping between new boiler, and all

associated auxiliary equipment, as required.

10. Piping from HBC supplied blow down separator discharge to approved drain.

000160

Page 256: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 14 of 20 12/15/08 (REVISED)

11. Provide treated water supply, water softeners and chemical feed equipment, to each

boiler Feedwater system.

12. Chemical treatment and disposal of waste water used in boiling out of boiler.

13. Provide one (1) telephone line and one (1) high speed internet portal to the boiler control

room. The telephone line shall be for use with a telephone and the portal shall be for the

computer modems. These lines shall be operational prior to start up.

14. Dried compressed air piped to the soot blowers’ compressed air accumulator tank.

15. Ductwork from ID Fan to All Secondary Pollution Control equipment, Secondary Pollution

Control equipment and installation as may be required to meet emission regulations.

(Quoted as Option)

16. Exhaust stack from boiler or secondary pollution control device, as applicable.

17. Inspect, receive and protect materials prior to the start of construction.

18. Provide main disconnect and wiring to main lugs located in master control panel,

boiler feed water control panel (and optional fuel storage control cabinet).

19. Provide unrestricted access to the job site.

20. Insulation on hot service piping and exhaust air-handling equipment, if required.

21. Furnish fuel receiving, handling and storage system to include delivery of fuel to metering

bin.

22. Provide enough fuel, quality as specified, of a consistent type for three days of operation

at full firing rate prior to start-up and prior to emission testing.

000161

Page 257: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 15 of 20 12/15/08 (REVISED)

4.1 BUDGET PRICE The BUDGET pricing, FOB Factory in Georgia, Freight is NOT INCLUDED, for the basic boiler system is as follows: Base Budget Design Proposal – High Pressure Two (2) Model #S1600, 1800 BHP, 750 PSI & 750 F design, 60,000 PPH steam output from and @ 212oF, wood biomass fuel @ 50% M.C. $10,150,000.00

Budget Proposal Includes:, Standard steel metering bins & feed screws, Boiler & Component Erection, Controls, Piping at Boiler and Steam Supply Pipe to Steam Header & Steam Header, Boiler Wet and Dry Ash System, Auto-De-Ash System on Boiler, and other items specifically included in Proposal above. Excluded from Budget Proposal above: Cranes, lifts, freight, Boiler Breeching from Boiler to APC Equipment, APC Equipment (Bag House – As Alternate Price), Stack, APC Monitoring Equipment, Wet APC or Boiler Blow-down Dryer (APC design Information Required for this), Conveyors or Feed System up to Metering Bins except as Alternate, Control or Power Wiring, Economizers, 2-Pump DA System with each pump @ 60,000 pph pump capacity, Fuel Feed and Storage System for Dry Fuel, Ash Removal Conveyors or Storage System, Boiler Wiring, and other items excluded in Proposal Section #3.1 above.

Excluded from Price Above

Option BUDGET Price Additions to Base Proposal as Follows:

Add # 1 – Add for Two (2) Backup Natural Gas Burner as described in Section 2.3. +$330,000.00

Add # 2 – Add for Two (2) Sets Water Tube Boiler Plattens. Note: Use of Plattens will Reduce Boiler Steam Output by Amount of Energy Consumed in Plattens

+$400,000.00

Add # 3 – Two (2) Dry Electrostatic Precipitators (ESP) to serve the total system capacity. (Includes Erection Labor and Freight) +$2,025,600.00

Add # 3A – One (1) 200-Foot Tall Corten Steel Flue Stack for Item #3 +$250,000.00Add # 3B – One (1) 200-Foot Tall Galvanized Steel Flue Stack for Item #3 ONLY, Used in Lieu of Item #3A Above. +$335,000.00

Add #4 – Two (2) Wet ESP Systems (No Labor or Freight) +$3,725,000.00

Add #4A – Labor & Material for Two (2) Wet ESP Systems (No Freight) +$400,000.00

Add # 4B – One (1) 200-Foot Tall Stainless Steel Flue Stack for Item #4 ONLY. Wet ESP Requires Stainless Steel Stack. +$520,000.00

Add # 5 – One SCR System for 73% NOx Control & One Oxygen Catalyst System for 41% CO Control for Two (2) Boilers Above. (Based Upon Most Stringent Case Information)

+$750,000.00

Add # 6 – One APC or CEMS Monitoring System for Above. (Budget depending upon final design requirements) +$190,000.00

Total for Two (2) Boiler System Above w/ Dry ESP System (with #3A) $14,095,600.00Total for Two (2) Boiler System Above w/ Wet ESP System (with #4B) $16,465,000.00Hurst Recommended Fuel Feed & Storage System (Separate Proposal) Add to Either System Above +$2,200,000.00

000162

Page 258: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

4.1A EXCLUSIONS Taxes, Freight, Permits, Fees, Bonds, General Contracting Work, Items listed In Section 3.1, Items not specifically listed as included in this proposal. It is our understanding that Secondary Air Pollution Control Equipment and respective Monitoring Equipment will be required for this project. We have NOT INCLUDED APC Equipment or respective Monitoring Equipment in Our BASE BID PROPOSAL. Our proposal includes only the boiler and the mechanical collector. If additional equipment is provided by HBC for this project, there will be an additional cost commensurate with the requirement as determined By OTHERS. As a convenience to you, we have provided recommended budget prices for various APC systems in Section 4.1 above. Note: Proposal above includes Add #5 Above for NOx & CO Reduction. This system would include both a CO and a SCR catalyst. The SCR catalyst we are recommending is not Vanadium based and is not particularly hazardous. The CO catalyst also is not very hazardous and works to convert CO into CO2. Additional details provided with detailed NOx & CO Reduction System proposal under separate cover.

The above prices remain firm for 30 days from date hereof. Due to the volatility of materials pricing, adjustments (beyond 30 days) are inevitable and will be passed on, if necessary, after receipt of order. 4.2 DELIVERY Hurst Boiler & Welding Co., Inc. will have the steam plant complete and ready for shipment within seven (7) months of the receipt of client-approved layout drawings. 4.3 TERMS 35% upon receipt of order.

20% upon final approval of layout drawings

30% upon notification equipment is ready for shipment.

5% upon setting of Main Components

10% upon satisfactory completion, not to exceed 90 days from notification equipment is ready for

shipment.

Thank you for the opportunity to submit this proposal. If I may be of further assistance, please call on me.

Gregory W. Smith MEM, BSIE Global Energy Solutions, Inc. Agent for Hurst Boiler & Welding Co., Inc.

Page 16 of 20 12/15/08 (REVISED)

Terms and Conditions on Following Pages

000163

Page 259: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 17 of 20 12/15/08 (REVISED)

GENERAL TERMS AND CONDITIONS

1. You will sign or have signed our proposal of which the general terms and conditions are a part. For and in consideration of one dollar in hand paid by you, the purchaser and by us, the seller, to each other and other good and valuable considerations, the receipt and adequacy of which are hereby acknowledge by each of us, you and we agree to the following as a part of our contract. If there exists a conflict between the rest of our contract and, then the General Terms and Conditions, then the General Terms and Conditions will take precedence.. 2. Security Interest and Title. Hurst Boiler and Welding Co., Inc.(“Hurst” and sometimes “we,” “us” and “seller”) is hereby granted and will retain a purchase money security interest in, and to the extent allowed by applicable law, equitable title to, the equipment described in our proposal to you, and all products and proceeds thereof, until Hurst is paid in full. In order to perfect that interest, we ask that you execute one or more financing statements. Purchaser agrees to sign and deliver to seller all UCC-1s, UCC-2s and other documents required to perfect such security interest, and to do so immediately upon signing of the contract. This will be recorded and will be public notice that we retain a purchase money security interest in the equipment and all products and proceeds thereof. You and our company agree and it is our mutual intention that the equipment proposed and described in our quote is now and shall remain personal property and shall not become a fixture or part of a fixture until we have been paid in full. 3. Price, Terms and Payment. Hurst’s price to you is stated in the contract. Our price is a cash price and you agree to pay us in cash. You agree to pay us 35% of the cash price at the time of acceptance of the contract and another 60% thereof upon notification by Hurst to you that the equipment is ready for shipment, which payment must be received by us before shipment. The final 5% is due upon completion of our work, but in no event later than 90 days after notification to you that the equipment is ready for shipment. Your payment to us will not be dependent or contingent upon receipt of payment by you from any other party. Any balance of the remaining cash price unpaid 31 days after the invoice date will be subjected to a 1 ½ per cent monthly service fee until the invoice is completely paid in full. In the event that we have to engage an attorney to collect the balance due us, including the service fee, you agree to reimburse us for all collection costs including reasonable attorney’s fees. 3.a Steel Price Escalation. Recent market conditions have resulted in exceptionally volatile prices for both stainless and carbon steels. Supply conditions are such that producers have instituted surcharges, which they apply at the time of actual shipment of the steel. This means that the cost for steel used for developing the prices in this quotation are not firm. As a result of this policy, it has become necessary for Hurst Boiler & Welding Co., Inc. to pass along any escalation in the cost of carbon and stainless steels. The price escalation will be calculated by indexing the cost of the steel based on the London Metals Exchange from the date that this proposal is issued to the date that the steel is actually received. The prices could change if you should require changes such as a change in the design of the product or changes in the components we have quoted. We will issue the necessary change orders to either decrease or increase the price and/or time of completion, and said change orders will be deemed accepted and assented to by you if within a reasonable time the terms of the change order have not been objected to in writing to us by you, it being agreed upon that a reasonable time for objection is 20 days from the date of issuance of any said change order. We, of course, reserve the right to correct typing and clerical errors in our price or specifications. 4. Storage of Equipment. You will be notified of a tentative shipment date. Once the equipment is ready to be shipped, we may at our option, agree to store the equipment should you not be ready for delivery. This will not relieve your duty to pay all invoices as they become due according to the payment terms of the contract. Should we invoke our option to store the equipment for said reason you hereby agree to pay a storage fee to us at the rate of 1% of the contract price per month in addition to your duty to pay the cash price and service fees. 5. Inspection by Purchaser. All or much of the equipment work will be manufactured or fabricated at our factory near Coolidge, Georgia. Inspection by you during manufacturing or fabrication must be made at our factory at your expense prior to shipment there from, with 5 days’ advance notice to seller. 6. Taxes, Permits and Licenses. Purchaser agrees to pay all sales, use and excise taxes due, payable or imposed by virtue of this sale, whether imposed on purchaser or seller. Purchaser agrees to pay the cost of all licenses and permits and environmental protection testing imposed on or incurred by purchaser or seller in connection with this sale by seller to purchaser. All such taxes, licenses, permits and testing paid by seller, together with all costs, expenses and charges incurred by seller defending against or resisting payment thereof, shall be reimbursed by purchaser to seller promptly upon receipt of an invoice therefore. If you are tax exempt on this job, you will need to provide us with your exemption certificate.

000164

Page 260: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 18 of 20 12/15/08 (REVISED)

7. Freight, Transportation and Risk of Loss. All Freight, transportation or other charges and costs of delivery to purchaser of all equipment and work shall be assumed by the seller and is included in the contract price, and shall be F.O.B. destination or other point of shipment to Purchaser, if not shipped in our truck(s). Hurst is not responsible for shipment then the purchaser shall be held responsible for all necessary permits, escorts, and all other details for delivery of the equipment. In order for you to obtain proper delivery, it is agreed by you and by Hurst that you will provide the carrier with an access road to and from the job site which is capable of supporting trucks loaded to 75,000 pounds and with a 14 foot height clearance. Should the job site or such road not be suitable for such use and purposes, you will reimburse the carrier and us if we are responsible for the erection of the equipment, for any delays at the hourly labor rate and demurrage rate current at that time. You will also be responsible for unloading the equipment, unless we are responsible for the erection of the equipment. 8. Delays in Performance. We will not be liable for any damages sustained by you resulting from our company’s or any supplier’s failure to perform or delay in performing any obligation , if such failure(s) or delay(s) is/are caused directly or indirectly by circumstances or events beyond Hurst’s control. Some examples are invasion, fire, floods, strikes, thefts, interference or restraint by civil or military authority, etc. You agree to hereby waive any right you have to incidental or consequential damages as a result of any delay, as stated in our warranty. You also agree that we will not be responsible for any “back charges” or costs unless you first obtain our company’s written approval before you sustain any “back charges” or costs. You must obtain this approval in writing in advance from our authorized officer. 9. Limited Warranty. All material and equipment supplied by and or erected and or started up by us under the contract is warranted to you against defects in materials and workmanship and/or design for a period of one (1) year from the date of fire-up/start-up. This warranty applies only in the event of normal use, service and conditions. Assemblies, subassemblies, parts, and/or accessories manufactured by others and incorporated into goods of our manufacture are warranted by Hurst only to the extent of the warranty of the original manufacturer. All claims for breach of warranty must be made in writing to Seller at the Seller’s address as soon as any defect becomes apparent. IT IS EXPRESSLY AGREED THAT THE FOLLOWING IS BUYER’S/YOUR EXCLUSIVE REMEDY FOR BREACH OF THESE WARRANTIES: THE SOLE OBLIGATION OF HURST AND YOUR SOLE REMEDY UNDER THESE WARRANTIES IS LIMITED TO THE REPAIR OR, AT OUR OPTION, REPLACEMENT OF ANY COMPONENT PART MANUFACTURED BY HURST WHICH PROVES , UPON EXAMINATION BY HURST, TO HAVE BEEN DEFECTIVE ORIGINALLY. DEFECTIVE PARTS MUST BE RETURNED BY THE PURCHASER OR OWNER TO US. In no event shall we bear any responsibility for the failure on your behalf to operate the equipment in accordance with our manuals, instructions, training, or service procedures. If you or anyone you authorize, other than Hurst, repairs the equipment without prior written consent of an authorized officer of Hurst, then this limited warranty will no longer be valid. HURST WILL NOT BE RESPONSIBLE FOR ANY INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES OF WHATSOEVER NATURE OR KIND. IN NO EVENT WILL HURST’S LIABILITY TO PURCHASER EXCEED THE CASH PRICE OF THE DEFECTIVE EQUIPMENT. IT IS MUTUALLY AGREED THAT THE PRICE STATED FOR THE EQUIPMENT HEREIN DESCRIBED IS A CONSIDERATION IN LIMITING HURST’S LIABILITY. THIS LIMITED WARRANTY IS IN SUBSTITUTION FOR AND IN LIEU OF ANY AND ALL OTHER WARRANTIES, WHETHER EXPRESS, IMPLIED OR STATUTORY, INCLUDING WITHOUT LIMITATION IMPLIED WARRANTIES OF MERCHANTABILITY AND SUITABILITY AND FITNESS FOR ANY PARTICULAR PURPOSE WHATSOEVER. 10. CANCELLATION. This contract may be canceled by you upon notice to us in writing, but only on the following terms: (a) payment by you in advance of cancellation date in full of the purchase price in effect on the day of cancellation for all equipment completed and all work performed, and (b)payment in full of all material and labor costs incurred, plus material handling, manufacturing, sales, engineering, and administrative overhead, plus 8% overall anticipated profit on all incomplete equipment and to- be- performed work. In addition to such cancellation charges, Purchaser also shall pay immediately and before the cancellation date the full cost of all special or specially fabricated tools and equipment considered a part of the contract and specifically enumerated therein which are on hand or for which the seller is obligated, together with all labor and other out-of-pocket expenses connected therewith. All cancellation costs are due and payable prior to the effective date of cancellation. Our company may cancel the order and contract at any time before receiving the final approved drawings, if Hurst deems itself insecure, or determines that it is commercially unreasonable for us to proceed. In this event you will be refunded any and all deposits you have made with us.

000165

Page 261: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 19 of 20 12/15/08 (REVISED)

Purchaser, after receipt by seller of all cancellation costs referenced above, shall be permitted free access to the seller’s premises, or other premises where the equipment may be found, and may remove same therefrom, all at purchaser’s own and sole cost and expense. If such cancellation arises from the insolvency or bankruptcy of the seller, the purchaser may, at its own option and subject to its obligation and rights herein contained, obtain from the seller or its trustee, as the case may be, a full and complete set of drawings and specifications, and purchaser shall be entitled to have others complete the fabrication and erection of the equipment, all at its sole cost and expense. 11. Events of default. Purchaser is in default upon the happening of any one or more of the following: (a) a failure to make any payment when due, (b) a negative change here after in the present financial condition, creditworthiness or responsibility of Purchaser materially affecting Purchaser’s ability to pay Seller, (c) a refusal by Purchaser to accept any delivery, (d) failure to perform any obligation hereunder when and as required, or (e) a breach by Purchaser of any representation, promise or warranty herein contained. 12. Remedies on Default. If, in seller’s reasonable opinion, the purchaser has defaulted under one or more of the provisions of this contract, seller may so notify the purchaser in writing of the happening of such event(s) of default, and then seller may immediately at its option (a) cease performance of any other obligation under this contract, or (b) exercise any remedy under the Uniform Commercial Code of Georgia or any other state where the remedy is sought to be exercised, or (c) take possession of all equipment and/or work wherever located and remove it from the premises where located, or (d) void all warranties and refuse service and fire-up/start-up, or (e) declare all sums owed, or to be payable to seller immediately payable, or (f) as attorney- in- fact for Purchaser to take possession of the property wherever located and sell the same at the best price obtainable at public or private sale, with or without notice, in the sole opinion of seller, and execute and deliver all documents necessary therefore with the right of the subsequent purchaser thereof to remove same from the premises where located, or any number of such remedies. The seller shall, upon exercise of one or more of its remedies of default, be entitled to receive all sums owed, or to be payable to seller by purchaser, to date of sale, plus such additional charges as may be specifically set forth herein for the cancellation hereof. If any net positive sale proceeds shall remain after completion of such sale and payment of all of seller’s costs and charges, the net proceeds, so called, shall be remitted to purchaser forthwith. All remedies exercised by seller shall be free and clear to any liability therefore to purchaser, and the exercise of one or more of said remedies by seller shall not eliminate or waive its right to exercise any other legal or equitable remedy it may have. 13. Attorney’s Fees and Costs. In the event of purchaser’s default, purchaser agrees to pay to seller a reasonable attorney’s fee for all sums collected by or through an attorney at law, along with any other costs incurred by seller in litigating such collection or otherwise exercising such remedies. 14. Entire Agreement. You and Hurst both agree that this contract, including but not limited to these Terms and Conditions, contains the complete and final agreement between you and Hurst and may not be modified, supplemented, explained or waived by parole evidence, your purchase order, course of dealing, or in any other way, except where made in writing and signed by you and our company’s authorized officer. 15. Other Documents. Purchaser and seller agree to execute and deliver to each other any and all other documents necessary or useful in the discretion of seller to secure or exercise any power or remedy hereunder, including without limitation, financing statements, powers of attorney, bills of sale or additional security agreements. 16. Laws Governing. This is a Georgia Contract. The laws of the State of Georgia shall govern all the terms of this contract.

000166

Page 262: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 20 of 20 12/15/08 (REVISED)

ACCEPTANCE OF PROPOSAL The proceeding prices, specifications and conditions are satisfactory and hereby accepted. You are authorized to do the work as specified. Payment will be made as outline in the proposal. Signature ___________________________________Date ______________________ Signature ___________________________________Date ______________________

000167

Page 263: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Einck, Douglas

From: Nickey, Michael D [[email protected]]

Sent: Thursday, September 25, 2008 5:26 PM

To: Einck, Douglas

Cc: Price, Alyssa; Price, Russell; Biehl, Greg W

Subject: RE: University of Iowa: West Campus Generation Plant

Attachments: BFB Two Drum Preliminary Scope.pdf; BR-1802.pdf; BFB - E1013161.pdf

Page 1 of 3RE: University of Iowa: West Campus Generation Plant

10/30/2008

Doug –

In response to your request for preliminary budget information for a 120,000 lbs/hr “biomass” boiler, I have attached a preliminary scope for reference based on a Bubbling Fluidized Bed Boiler. The BFB was used as the “reference” or “go-by” as the basis of the preliminary budget estimate. Please note that B&W did not perform any engineering analysis or develop equipment sizing to develop the budget estimate.

As we discussed by telephone yesterday, B&W views oathulls as a problematic fuel for several reasons, particularly if used as the primary fuel, for either a stoker or BFB technology. More detailed discussions would be recommended to evaluate fuel sources and fuel/ash analyses and boiler/combustion technology with Stanley and the Customer prior to making a technology selection.

The preliminary budget estimate for a 120,000 lbs/hr “biomass” fired BFB Boiler, based on the attached preliminary material (only) scope is: $ 12,500,000 in current day dollars without escalation. A stoker fired boiler would be somewhat less capital cost.

A rough estimate of the boiler plot plan, arrangement as depicted in the attached brochure on page 7, is: 33’wide, 78’ long (excluding baghouse), and 90’ high (top of boiler).

The information provided is for preliminary budget and planning purposes only, and does not represent an offer to sell.

I have included the following attachments for additional information and reference:

Preliminary Scope Technical Paper BFB Brochure

BFB vs Stoker

<<BFB Two Drum Preliminary Scope.pdf>> <<BR-1802.pdf>> <<BFB - E1013161.pdf>>

Let us know if you have any questions or desire additional information.

Regards,

����

000168

Page 264: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Michael D. Nickey

General Sales Manager

Babcock & Wilcox Power Generation Group

363 North Sam Houston Parkway East, Suite 600

Houston, TX 77060

Phone: 281-405-6804 (direct)

713-898-5609 (cell)

Website: www.babcock.com

-----Original Message----- From: Einck, Douglas [mailto:[email protected]] Sent: Friday, September 19, 2008 4:09 PM To: Nickey, Michael D Cc: Price, Alyssa; Price, Russell; Liegois, Bill Subject: University of Iowa: West Campus Generation Plant

Mike-

Followup to our earlier conversation, we'd like rough budgetary

information for a 120 kpph boiler (stoker or BFB) that burns oat hulls

(see attached analysis) and produces steam at 1500 psi and 750F

including;

A) pricing and

B) approximate envelope dimensions

Currently, we do not have information on project specific environmental

emissions limits. Please assume emission values based on expectations of

current market conditions.

We will be meeting with the University of Iowa in the morning on

Thursday, 9/25/08. We'd appreciate your response by end of the day

Page 2 of 3RE: University of Iowa: West Campus Generation Plant

10/30/2008

000169

Page 265: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Wednesday, if possible.

Regards,

Doug Einck

Senior Mechanical Engineer

Stanley Consultants, Inc.

225 Iowa Avenue

Muscatine, IA 52761

Phone: 563-264-6554

www.StanleyConsultants.com

This message is intended only for the individual or entity to which it is addressed and contains information that is proprietary to The Babcock & Wilcox Company and/or its affiliates, or may be otherwise confidential. If the reader of this message is not the intended recipient, or the employee agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately by return e-mail and delete this message from your computer. Thank you.

Page 3 of 3RE: University of Iowa: West Campus Generation Plant

10/30/2008

000170

Page 266: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Steam Turbine Business Unit 3800 West Avenue

Burlington, Iowa 52601 Phone: (319) 753-5431 Fax: (319) 752-1616

1

STEAM TURBINE-GENERATOR BUDGET PROPOSAL TO Stanley Consultants, inc. ATTN: Alyssa Price EMAIL ADDRESS [email protected] DATE: November 7, 2008 SUBJECT: University of Iowa / D-R Ref: D26656 SHEET: 1 of 3 INCLUDING THIS SHEET SIGNED: Dick Perry [email protected]

TURBINE DATA Selection “B” TURBINE FRAME RG4 NUMBER OF STAGES 4 INLET VALVES Single INLET SIZE/ RATING 6” / 900# Either Side EXHAUST SIZE/ RATING 10” / 300# Either Side TURBINE SPEED (RPM) 7,500 PERFORMANCE DATA OPERATION NORMAL INLET PRESSURE (PSIA) 914.7 INLET TEMPERATURE (DEG F) 850 EXHAUST PRESSURE (PSIA) 170 EXHAUST TEMPERATURE (DEG F) 531 EXHAUST ENTHALPY (BTU/LB) 1,288 INLET FLOW (LBS/HR) 111,000 ESTIMATED POWER OUTPUT FROM GEN. (KW*) * at generator terminals 4,162 COMMERCIAL DATA SHIPMENT (WEEKS) 52 TG package estimated price each (US$) $1,900,000.00 Please advise when you need our best firm price and full blown proposal.

SYNCHRONOUS GENERATOR 3 PH, 60 HZ, 13,800 V, .80 PF

1800 RPM, TEWAC

EXHAUST

INLET 1.3 S.F. GEAR

000171

Page 267: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Steam Turbine Business Unit 3800 West Avenue

Burlington, Iowa 52601 Phone: (319) 753-5431 Fax: (319) 752-1616

2

000172

Page 268: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Steam Turbine Business Unit 3800 West Avenue

Burlington, Iowa 52601 Phone: (319) 753-5431 Fax: (319) 752-1616

3

Package includes:

Single valve, non-condensing steam turbine

Speed reduction gear (Lufkin)

Synchronous generator (Ideal)

Base-plate for turbine, gear and generator

Gimpel combined trip and throttle valve

Woodward DG505 electronic governor

Stainless steel supply and carbon steel oil piping, ANSI flanges

Sight flow indicators and bearing drain line temperature thermometers

Separate console lube system (standard commercial)

HS & LS couplings with guards

Removable blanket insulation

Gauge-board & tachometer

Gland condenser and steam ejector

Turbine casing sentinel warning valve

RTD and vibration probes and monitoring system

Generator main terminal box

Turbine-generator instrument panel with automatic synchronizing, generator

protection relay

No load mechanical run test for turbine and gear

12 month, not to exceed 18 months from shipment guarantee

Price FOB ex-works factory (Burlington, Iowa)

Items NOT included:

Expansion joints, steam piping, circuit breaker, site service.

000173

Page 269: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

3800 West Avenue Burlington, Iowa 52601

Steam Turbine Business Unit Phone: (319) 753-5431 Fax: (319) 752-1616

STEAM TURBINE-GENERATOR BUDGET PROPOSAL

TO Stanley Consultants, Muscatine, Iowa ATTN: Alyssa Price ADDRESS: [email protected] DATE: February 12, 2009 SUBJECT: University of Iowa SHEET: 1 of 2 INCLUDING THIS SHEET SIGNED: JOHN GRAHAM [email protected] D-R REF : D26656 Sel. E TURBINE DATA SELECTION E TURBINE FRAME R NUMBER OF STAGES 10 INLET VALVES MULTIPLE INLET SIZE/RATING 6” / 900# EITHER SIDE BLEED SIZE/RATING NONE EXTRACTION SIZE/RATING 8” / 300# EITHER SIDE OR DOWN EXHAUST SIZE/RATING 72” RECTANGULAR, UP OR DOWN GENERATOR TEMP RISE 80 DEG C GENERATOR POWER FACTOR 0.80 PERFORMANCE DATA INLET PRESSURE (PSIG) 900 900 900 900 INLET TEMPERATURE (DEG F) 850 850 850 850 EXTRACTION PRESSURE (PSIG) 170 170 170 170 EXTRACTION ENTHALPY (BTU/LB) 1,304 1,306 1,304 1,304 EXHAUST PRESSURE (IN HgA) 2.5 2.5 2.5 2.5 EXHAUST ENTHALPY (BTU/LB) 1,021 1,025 1,025 1,070 INLET STEAM FLOW (LB/HR) 120,000 113,225 120,000 120,000 EXTRACTION FLOW (LB/HR) ZERO ZER0 17,000 80,750 EXHAUST FLOW (LB/HR) 120,000 113,225 103,000 39,250 TURBINE SPEED (RPM) 4,500 4,500 4,500 4,500 GENERATOR OUTPUT (KW) 13,912 13,000 12,378 6,624 COMMERCIAL DATA SHIPMENT (WEEKS) 52 TURBINE GENERATOR PRICE (USD) $ 5,500,000 PRICE DOES NOT INCLUDE EXPANSION JOINTS, STEAM PIPING, NOR SURFACE CONDENSER.

1.3 S.F.

SYNCHRONOUS GENERATOR 3 PH, 60 HZ, 4160 V 1800 RPM, TEWAC

EXHAUST

INLET

BLEED EXTRACTION

000174

Page 270: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Turbine generator price includes:

• Multi-stage steam turbine • Dresser-Rand or equal T&T valve • Overspeed trip, solenoid trip, low oil pressure trip • Woodward DG-505 or equal governor • Blanket insulation without sheet metal jacket • Gland condenser and ejector • Gland seal pressure regulator • Vacuum breaker • Condensate drain pump (if turbine is specified with TOP exhaust) • Vibration probes and transmitters for turbine, gear, and generator • Bearing RTD's for turbine, gear, and generator • Vibration probes and RTD’s monitored by PLC in generator control panel • HS and LS couplings • Reduction gear • Turning gear driven by AC motor • Generator with voltage regulator • Common baseplate for turbine/gear • Separate soleplates for generator • Separate lube console for turbine/gear/generator • Generator control and switchgear panels • Main circuit breaker sized for generator output • Synchronizing equipment • Protective relays • Instrumentation • Suitability for either parallel or solo operation • PLC for monitoring and control functions • Neutral grounding resistor

000175

Page 271: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PPRROOPPOOSSAALL NNOO.. 0099--BB--114477

NNOOxxOOUUTT UULLTTRRAA

UUrreeaa CCoonnvveerrssiioonn SSyysstteemm

SSTTAANNLLEEYY CCOONNSSUULLTTAANNTTSS

ffoorr

TThhee UUnniivveerrssiittyy ooff IIoowwaa UURREEAA--BBaasseedd SSCCRR RReeaaggeenntt SSuuppppllyy SSyysstteemm

JJuunnee 1155,, 22000099

000176

Page 272: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 1

CONFIDENTIAL Do Not Duplicate

TABLE OF CONTENTS

Proposal Summary ............................................................................................................. 2

NOxOUT® ULTRA Process Description.............................................................................. 2-4 - NOxOUT ULTRA Schematic. .................................................................................. 4

NOxOUT® ULTRA Process Design Table

- Electric Heater Urea Decomposition ....................................................................... 5 NOxOUT® ULTRA Scope of Supply Summary ................................................................... 6

Fuel Tech, Inc. Equipment Scope of Supply....................................................................... 7-9

Fuel Tech, Inc. Engineering Scope of Supply..................................................................... 10

Scope of Supply by Others ................................................................................................. 11

Typical Spare Parts – Electrical and Mechanical................................................................ 12

Expected NOxOUT ULTRA Utilities.................................................................................... 13

NOxOUT ULTRA Typical Schedule .................................................................................... 14

Pricing and Payment Schedule .......................................................................................... 15

FTI Terms and Conditions, Exhibit C3 ............................................................................... 16-20

Attachments and Supporting Documentation - NOxOUT ULTRA Marketing Bulletin FT9200AP (2 pp) - Marketing Drawings Identified in Body of Proposal (3 pp) - Exhibit C1 – Fuel Tech Service Pricing Schedule (2 pp)

000177

Page 273: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 2

CONFIDENTIAL Do Not Duplicate

PROPOSAL SUMMARY

In support of efforts underway at Stanley Consultants to evaluate the SCR reagent supply system alternatives that are available for risk-averse clients, Fuel Tech, Inc. (FTI) is pleased to submit our budgetary proposal covering the engineering, supply, start-up and optimization for one (1) NOxOUT ULTRA urea conversion system for the HRSG and SCR project at The University of Iowa. The ULTRA system would deliver reagent to an Ammonia Injection Grid (AIG) based on a demand signal, both provided by others. The proposed ULTRA systems would be designed to satisfy the expected NH3 demand of approximately 11 lb/hr during normal operation – further information regarding the design cases that have been evaluated can be found in the Process Design Table on Page 5. NOxOUT ULTRA® PROCESS DESCRIPTION The NOxOUT ULTRA® Process utilizes an aqueous urea solution to supply the reagent to Selective Catalytic Reduction (SCR) systems that control NOx emissions from fossil fuel-fired and waste fuel-fired boilers, furnaces, incinerators, or heaters to meet NOx emission requirements. The ULTRA Process relies on the thermal decomposition of urea to ammonia and isocyanic acid (HNCO) and delivers these reagents to a traditional ammonia injection grid or static mixing device located upstream of SCR catalyst reactor. The NOxOUT ULTRA® process design is based on FTI experience with urea-based SCR systems installed and operating on a number of industrial NOx sources. The ULTRA process provides reagent to an SCR system by controlling the injection of high quality, liquid urea solution into a compactly and specifically designed duct where the required decomposition temperature, ranging from 600F to 1200F is maintained. The reactions of the ULTRA Process are described as: NH2CONH2 + H2O NH3 + HNCO Urea + Water Ammonia + Isocyanic Acid HCNO + H2O NH3 + CO2 Isocyanic Acid + Water Ammonia + Carbon Dioxide

Urea, which is unstable at temperatures greater than 300F, decomposes to NH3 and HNCO when injected in the appropriate temperature environment. HNCO can also convert to NH3 and CO2 by reacting with water – no CO is produced. The resultant reagent from this process follows the typical post-combustion SCR process to produce nitrogen and water vapor. The dominant SCR reactions are described as follows: 4NO + 4NH3 + O2 4N2 + 6H2O NO + NO2 + 2NH3 2N2 + 3H2O (dominant)

Nitrogen Oxide(s) + Ammonia + Oxygen Nitrogen + Water 4NO + 4HNCO + O2 4N2 + 4 CO2 + 2H2O Nitrogen Oxide + Isocyanic Acid + Oxygen Nitrogen + Carbon Dioxide + Water

000178

Page 274: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 3

CONFIDENTIAL Do Not Duplicate

NOxOUT ULTRA® PROCESS DESCRIPTION

(CONTINUED…)

By incorporating the commercially proven features of our urea-based NOxOUT® SNCR and SCR systems, the NOxOUT ULTRA® process provides efficient conversion of liquid urea to gaseous ammonia while eliminating the need to store and handle anhydrous NH3 or aqueous ammonia solutions. The Industrial grade urea reagent is readily available for delivery in solution, or in a dry form for on-site solutionizing, and may be stored in FRP tanks that are vented to atmosphere. Quality control of urea solution has been established over many years with the assistance of licensed suppliers and Fuel Tech is working with these and other companies to improve quality controls for the supply of dry urea. Using Fuel Tech’s proprietary chemical injection system, the aqueous urea solution is injected into the hot air flowing through the Decomposition Chamber. By controlling the urea flow, air pressure and droplet size, these chemical injectors facilitate effective distribution of the reagent to ensure that the urea is fully decomposed before leaving the Decomposition Chamber. The air flow through the Decomposition Chamber and the urea injection and reagent distribution are modeled using computational fluid dynamics and a proprietary analysis of chemical kinetics. This process ensures proper evaporation, mixing, and decomposition of injected urea reagent within the heated air stream. The goal of the NOxOUT ULTRA® System is to decompose the urea reagent into the hot air stream. The Decomposition Chamber is designed with the appropriate residence time within the decomposition temperature window to ensure complete conversion of the urea solution to the SCR reagents. The gas stream containing the SCR reagent is then routed to the ammonia injection grid or injected upstream of the static mixing device. The pressure, flow, and temperature are monitored to conform to the requirements of the SCR system design and to maintain proper ULTRA® operation. The NOxOUT ULTRA® Process incorporates on-site liquid reagent atmospheric storage tanks. The ULTRA system covered by this proposal would be configured to provide reagent feed for the specified SCR reagent demand. The ammonia injection grid (AIG) and/or static mixing device will be provided by others. The control system for the proposed ULTRA® system would be similar to what is used to control the SNCR process on a majority of our installations – in this case, the Allen Bradley CompactLogix PLC system. The control of urea injection will be based on a hard-wired reagent demand signal from the Owner’s DCS. A short residence time in the Decomposition Chamber facilitates a rapid response time for SCR reagent demand, capable of following quick boiler ramp rates with turndowns as high as 10:1. The Decomposition Chamber requires 2 to 4 hours to be fully operational following a “cold start” to allow for proper heating of system components. Shutdown of the system and clearing of the system piping can be accomplished almost instantaneously.

000179

Page 275: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 4

CONFIDENTIAL Do Not Duplicate

STACKNOx

Air

UreaStorage

Tank

AirElectricHeater

DecompositionChamber

AIG

SCR

NH3HNCO

MeteringPumps

APH

NOxOUT® ULTRA Process Schematic

NOxOUT ULTRA® PROCESS DESCRIPTION

(CONTINUED…)

The NOxOUT ULTRA® Process will decompose the urea at approximately 800F. The NOxOUT ULTRA® Process does not involve hydrolysis. Fuel Tech had completed an evaluation of the hydrolysis process early in our company’s history and realized that it was a difficult process to control and it carried with it uncertainty as to which by-products might be formed. The NOxOUT ULTRA® design and process is simple to operate and has no disposal requirements for by-products during operation, start-up, and shutdown. The added benefits include the system’s ability to be brought off-line quickly, with very responsive tracking of boiler load and control of NOx emissions. The features of the NOxOUT ULTRA® system include:

Safe Reagent Supply – Transportation, Handling, and Storage Skid-mounted system components for easy installation Simplified process and controls compared to other systems Designed for maximum system availability and minimum maintenance Load following controls for safe operation and easy system shutdown Low pressure operation Fuel Tech's proven experience with urea-based systems Experience with proven system components System supported by Fuel Tech's field personnel with startup, optimization and service

experience.

000180

Page 276: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 5

CONFIDENTIAL Do Not Duplicate

Design Case Design, Predicted 101 Predicted 109 Predicted 100 Chilled 101 Chilled

Fuel Fired Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas

Flue Gas Flow, Wet (lb/hr) 719763 769243 614129 675079 675058

Flue Gas Flow, Wet (mol/hr) 25368 27032 21788 23926 23932

Operating O2, Dry (%) 14.5% 14.7% 14.5% 14.4% 14.4%

Moisture (%) 7.2% 6.3% 8.8% 8.6% 8.7%

Flue Gas Flow, Dry at 15% O2 (mol/hr) 25702 26405 21502 23962 23971

Baseline NOx, Dry at 15% O2 (ppmd) 25 25 25 25 25

Baseline NOx (lb/hr) 29.6 30.4 24.7 27.6 27.6

SCR NOx Reduction (%) 90% 90% 90% 90% 90%

Target NOx, Dry at 15% O2 (ppmd) 2.5 2.5 2.5 2.5 2.5

Target NOx (lb/hr) 2.96 3.04 2.47 2.76 2.76

SCR NOx Removed (mol/hr) 0.58 0.59 0.48 0.54 0.54

NH3 Slip, Dry at 15% O2 (ppmd) 3 3 3 3 3

NH3 Demand (mol/hr) 0.66 0.67 0.55 0.61 0.61

SCR NH3 Demand (lb/hr) 11.1 11.4 9.3 10.4 10.4

Air Temperature (°F) 46 5 95 85 95

Total Reagent/Air Flow Rate @ Decomposition Chamber Outlet (scfm) 291 291 291 291 291

Total Reagent/Air Flow Rate @ Decomposition Chamber Outlet (lb/hr) 1,286 1,286 1,289 1,287 1,287

Dilution Air Flow Rate to Decomposition Chamber/Burner Inlet (scfm) 261 260 263 262 262

Dilution Air Flow Rate to Decomposition Chamber/Burner Inlet (lb/hr) 1,167 1,165 1,178 1,172 1,172

Pre-Injection Temperature (°F) 794 800 757 779 779

Expected Liquid Urea Flow Rate (gph) 5.5 5.7 4.6 5.2 5.2

Injected Reagent Concentration – Dilution Required (Wt %) 40 40 40 40 40

Urea Density (lb/gal) 9.26 9.26 9.26 9.26 9.26

Solid Urea Requirement - On-site Solutionizing (lb/hr) 25.5 26.4 21.3 24.1 24.1

Ammonia-to-Air Ratio (Vol %) 1.44 1.48 1.21 1.35 1.35

Gross Heat Input -Electric Heater (kW) 70.3 74.6 62.8 65.5 64.6

Pressure @ AIG Tie-in Point (in WC) TBD TBD TBD TBD TBD

Temperature @ AIG Tie-in Point (°F) 550 550 550 550 550

Number of Injectors required per Reactor 1 1 1 1 1

Atomization Air Required per Reactor (scfm) 15 15 15 15 15

An electric heater will be used t heat the ambient air up to the pre-injection temperature.

PROCESS DESIGN TABLE – NOxOUT ULTRA® SCR

Stanley Consultants for The University of Iowa

Process Design Comments

000181

Page 277: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 6

CONFIDENTIAL Do Not Duplicate

FTI EQUIPMENT – ULTRA SCOPE OF SUPPLY SUMMARY

NOxOUT ULTRA Capacity 11 lb-NH3/hr Urea Storage, Circulation and Distribution System

Urea Storage Tank 6,000 gallon FRP

Metering and Distribution Module (MDM) 1

ULTRA Injector 1

CompactLogix PLC-based Control System 1

ULTRA Decomposition Components

Dilution Air Blower 2

Electric Heater and Panel 1

Decomposition Chamber 1

Additional Equipment and Services Process Indication and Controls for Ammonia/Gas Flow, Pressure, & Temp As Required

Process Design Modeling As Required

Project Engineering and CAD Drawings As Required

PLC Controls & Interface Support As Required

Startup, Optimization, and Training 20 Man-days (total)

000182

Page 278: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 7

CONFIDENTIAL Do Not Duplicate

FUEL TECH EQUIPMENT DESCRIPTION

FRP UREA STORAGE TANK The Urea Storage Tanks are made from Fiberglass Reinforced Plastic (FRP) with a Premium Grade Vinylester Resin. The tanks are fabricated per ASTM D3299, NEC, IEEE, and all applicable OSHA regulations. Site specific conditions such as low and high ambient temperature, maximum wind load, maximum snow load, and seismic conditions are used to customize the design for a specific geographic location. The tank is designed to contain a urea based liquid up to a 1.5 specific gravity. The tank heating package consists of an array of 500 watt, 240 VAC heating pads arranged in multiple levels at a quantity sufficient to maintain a 45F liquid temperature at the low ambient temperature condition. The pads are covered by polyisocyanurate (PIR or ISO) insulation and the insulation is covered by a second layer of fiberglass and a gel coat for weather protection. The tanks come standard with flanged connections for pump supply, pump return, tank level, tank temperature, and tank fill. A gooseneck vent is included on the top of the tank and a side manway is installed near the bottom of the tank for maintenance purposes. Other items supplied include a NEC and IEEE compliant NEMA 4X fiberglass tank heating control panel, a differential pressure level transmitter, multiple isolation valves, tank hold down lugs, brackets to hold the tank to the pad and a J-type Tank Thermocouple. Bolts to embed into the concrete pad along with nuts and washers are not included. 6,000 Gallon Capacity: 10' OD × 10’-3” Shell Height; Approx. Empty Weight: 2,700 lb. Reference FTI Drawing C-1 REAGENT METERING AND DISTRIBUTION MODULE (MDM-1) The function of the Metering and Distribution Module is to precisely meter and independently control the flow of urea reagent to the NOxOUT ULTRA® injection system. Chemical flow to the ULTRA injector mounted on the Decomposition Chamber This module, through the use of a chemical flow control valve, provides an increased level of process control needed for injection into the Decomposition Chamber. The MDM module is designed to interface with and respond to a reagent demand signal provided by Owner’s DCS. An integrated metering pump will be provided to ensure constant pressure for the control valve. The control cabinet will be NEMA 4X rated and would be mounted to the MDM Module. The control cabinet would contain an Allen Bradley CompactLogix PLC with Ethernet communications to Owner’s DCS with local interface provided by an A-B PanelView 1500 Plus.

000183

Page 279: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 8

CONFIDENTIAL Do Not Duplicate

FUEL TECH EQUIPMENT DESCRIPTION

(Continued…)

The module includes complete assembly and testing, one (1) local control panel with Allen Bradley PLC (NEMA 4X) and operator interface, one (1) stainless steel metering pump, stainless steel skid with basin, flow meter, motor starter, actuated valve for chemical inlet and flush water, simplex strainer, injector flow control valve and flow meter, air pressure switch, distribution flow and pressure indication with regulators for chemical and atomizing air, and all necessary components, piping (SS, Schedule 40 socket-welded), tubing (SS, butt-welded), and fittings. Reference FTI Drawing J-18 (information only) Typical Size: 4’ W × 7’ L × 6’ H; Weight: 3,500 lbs DILUTION AIR BLOWER MODULE The ambient air blower(s) provides ambient air to the Decomposition Chamber (DC) for the NOxOUT ULTRA® process. The blower is designed to provide constant flow of air to the DC and AIG tie-in point. The blowers shall be floor mounted (by others) with one being a 100% redundant spare blower. The blower comes supplied with the following:

Outlet damper and inlet silencer Inlet filter Low leakage Outlet Damper for isolating fan Flexible motor coupling, shaft and coupling guards

The basic fan includes a bolted access door (not available for smaller sizes where housing width is too narrow); drain unplugged; flanged and drilled inlet and outlet; industrial enamel coat; ceramic felt shaft seal; and 150°F maximum design temperature. The blowers will be shipped loose with the inlet filter and outlet damper mounted, and require installation by others. Motor starter panels will be shipped loose and will need to be wired to the blower motors as well as the 480 VAC power supply. Control wiring will need to be wired to the Decomposition Chamber Control Panel. The factory mounted motor is a 2.5 hp, 3600 rpm, 480 VAC, 3, 60 Hz, TEFC mill and chemical duty motor. Typical Size: Overall Envelope/Blower = Total Estimated Wt with Damper: 360 lb ea DECOMPOSITION CHAMBER The decomposition chamber for the NOxOUT ULTRA® design will utilize ambient air from the blowers and an electric heater as the heat source to fully decompose the urea being delivered to the ammonia injection system. The decomposition chamber is a reinforced duct designed to provide adequate residence at the required temperature to ensure maximum conversion of the urea to ammonia. A short residence time (<10 seconds) in the decomposition chamber will allow a rapid response time for SCR reagent production.

000184

Page 280: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 9

CONFIDENTIAL Do Not Duplicate

FUEL TECH EQUIPMENT DESCRIPTION

(Continued…)

The inlet piping to the decomposition chamber will transition from 6” to 10” to the appropriate size for urea decomposition as determined by FTI. Ambient air will forced through the DC and heated to maintain the proper urea decomposition temperature. The urea will be added to the hot air via injectors that provide adequate reagent distribution. The amount of urea being injected will be determined by a feed forward SCR reagent demand signal (by others) and controls located on the Metering and Distribution Module. The system is able to respond quickly and adjust the urea flow rate as needed to meet practically any change in reagent demand. A mixture of heated air and SCR reagent is delivered to the AIG inlet piping at a predetermined pressure and temperature. The Decomposition Chamber (DC) and electric heater will be pre-fabricated and delivered on a steel skid to be set in place by the installation contractor. The DC comes complete with inlet and outlet transition duct flanged connection, internal insulation, electric heater, process indication and controls for ammonia/air pressure and temperature. External insulation of the Decomposition Chamber is by others. Typical size: Exact Size and Weight to be Determined. ULTRA INJECTOR ASSEMBLY The NOxOUT ULTRA® Injector will be designed and installed on the Decomposition Chamber. The injector is appropriately sized and characterized for proper flows and pressures that are required to achieve the necessary urea atomization and distribution within the Chamber. The injector fitting will be designed to withstand any hot gas back flow to the atmosphere and will be supplied with aspirating air ports.

The injectors are made completely of 316L stainless steel and the nozzle tip and cooling shield is typically 3/4” tubing (.750” OD & .083” wall thickness). The inner atomization tube is typically 3/8” tubing, standard length is 1.5’. The injector is piped to the distribution panel, which will control the chemical flow rate and airflows. Each injector assembly includes adapter for insertion adjustment, quick-connects and 6’ long steel-braided flex hoses for both the mixed chemical and air connections. Reference FTI Drawing G-24

000185

Page 281: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 10

CONFIDENTIAL Do Not Duplicate

FUEL TECH SCOPE OF SUPPLY

ENGINEERING Fuel Tech will provide Project and Process Engineering and the following drawings and information:

- P&IDs - Mechanical Drawings and Bill of Materials - Skid Arrangements - Foundation Dead Loads - Tank Arrangement - Blower Arrangement - Electrical Drawings including:

Schematics Internal Wiring Diagrams External Connection Diagrams (Field Terminations) Electrical Bill of Materials

- Pump Performance Curves - O&M Manuals

ENGINEERING SERVICES

- Process and Project Engineering - Twenty (20) Man-days total for Start Up, Optimization, and Training - Five (5) Operation and Maintenance Manuals

000186

Page 282: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 11

CONFIDENTIAL Do Not Duplicate

SCOPE OF SUPPLY BY OTHERS

1. Receiving, Offloading, Storage of Equipment at Jobsite. 2. Foundations/Grout/Anchor Bolts for Storage Tanks, Decomposition Chamber,

Metering/Distribution Module, Blowers, and all other FTI-supplied Equipment. 3. Freeze Protection. 4. Storage Tank Containment as Required. 5. Structural Steel modifications for Support of FTI-supplied Equipment. 6. Installation and Construction Management. 7. Interconnecting Piping, Ductwork, and Wiring of FTI-supplied Equipment. 8. Flexible pipe connections to FTI-supplied equipment for earthquake

protection. 9. Ammonia Injection Grid, AIG Manifold, and Design. 10. External Insulation for Decomposition Chamber. 11. Insulation for Temperature Control of Dilution Air Piping after Decomposition

Chamber to maintain reagent design temperature. 12. Motor starters, breakers, and overload protection (480 VAC Power to all

Motors). 13. Utility Requirements as Provided in Tables 1.1 – 1.3 on the following page. 14. Permissive Control Logic Schemes from Plant DCS. 15. Ammonia Demand Signal from Plant DCS. 16. Construction Permits and All Other Applicable Permits. 17. Granular, Prilled, or Liquid Urea Supply and Metering Module Flush Water. 18. Performance Testing. 19. Spare Parts.

000187

Page 283: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 12

CONFIDENTIAL Do Not Duplicate

TYPICAL SPARE PARTS

Typical One Year Minimum – Electric

Qty Description Manufacturer Part Number Unit Price Total Price Six Month Lead Time1 Breaker, Circuit, 1 Pole, 2 Amp ABB S271-K2 $31.92 $31.92 1 WEEK1 Breaker, Circuit, 1 Pole, 4 Amp ABB S271-K4 $31.92 $31.92 1 WEEK1 Breaker, Circuit, 1 Pole, 6 Amp ABB S271-K6 $31.92 $31.92 1 WEEK1 Breaker, Circuit, 1 Pole, 20 Amp ABB S271-K20 $31.92 $31.92 1 WEEK1 Breaker, Circuit, 2 Pole, 10 Amp ABB S282-K10 $97.28 $97.28 1 WEEK1 Module, Digital, Input Allen Bradley 1746-IA16 $375.62 $375.62 2 WEEKS1 Module, Digital,Output Allen Bradley 1746-OA16 $527.20 $527.20 2 WEEKS0 Module, Analog, Input Allen Bradley 1746-NI4 $803.98 $0.00 2 WEEKS1 Module, Analog, Input Allen Bradley 1746-NO4I $1,238.92 $1,238.92 2 WEEKS2 Bulbs, Indicator, Replacement, Package Allen Bradley 800T-N65 $4.30 $8.60 * 1 WEEK1 Relay, 120 VAC, Control, 3PDT Allen Bradley 700-HK32A1 $21.90 $21.90 1 WEEK1 Contactor Allen Bradley 100-A09ND3 $129.42 $129.42 * 1 WEEK1 Contact, Auxillary Allen Bradley 140-A10 $15.82 $15.82 * 1 WEEK1 Protector, Motor, 0.5 HP Allen Bradley 140-MN-0160 $158.18 $158.18 1 WEEK2 Fuse, 3 Amp, Package Bussman LPJ-3SP $14.16 $28.32 * 1 WEEK2 Fuse, 0.2 Amp, Package Bussman AGC-0.2 $2.20 $4.40 * 1 WEEK0 Element, Electric, Heater Warren Electric 1-WF-3-4-131C-LT-YY $1,500.00 $0.00 6 WEEKS

TOTAL $2,733

ULTRA System – PLC Design

Qty Description Manufacturer Part Number Unit Price Total Price Six Month Lead Time20 Tips, Standard Wall Injector, Ceramic Coated Lechler TBD $45.00 $900.00 * 3 Week4 Quick Disconnects, Parker, 1/2",Air Parker 8M-Q8CY-SSP $79.44 $317.76 2 Week4 Quick Disconnects, Parker, 1/2",Air Parker 8Z-Q8VY-SS $65.10 $260.40 2 Week4 Quick Disconnects, Parker, 1/2", Mixed Chem Parker 8M-Q8VY-SS $60.88 $243.52 2 Week4 Quick Disconnects, Parker, 1/2", Mixed Chem Parker 8Z-Q8CY-SSP $84.42 $337.68 2 Week

20 Shield, Cooling, 10" Ceramic Coated SPF CS-750-30 $124.50 $2,490.00 * 3 Week10 Assembly, Inner Tube, SPF IT-375-30 $187.50 $1,875.00 * 3 Week1 Kit, Swing Out, Valve, Gemini, 1" Gemini 1" 89-6-RTV $168.78 $168.78 1 Week1 Kit, Swing Out, Valve, Gemini, 3/4" Gemini 3/4" 89-6-RTV $123.42 $123.42 1 Week1 Kit, Swing Out, Valve, Gemini, 1/2" Gemini 1/2" 89-6-RTV $105.36 $105.36 1 Week1 Operator, Gemini/Bettis Valve Gemini/Bettis EM212-04 $420.64 $420.64 1 Week1 Kit, Mechanical Seal Rebuild for Water Pumps Grundfos $92.00 $92.00 * 2 Week1 Kit, Mechanical Seal Rebuild for Circ Pumps Grundfos $300.00 $300.00 * 2 Week5 Rotometer, 1/2", Glass Tube, Fischer Porter Fischer-Porter 10A45SXAHCHBX 0-1GPM-KIT $300.00 $1,500.00 * 2 Week1 Gauge, Pressure, Ashcroft, Water Ashcroft 35-1009AWL-02L 0-100 PSI $80.00 $80.00 * 2 Week1 Gauge, Pressure, Ashcroft, Mixed Chem Ashcroft 35-1009SWL-02L 0-300 PSI $98.00 $98.00 * 2 Week2 Kit, Rebuild, Control Valve, Kammer Kammer $820.00 $1,640.00 2 Week1 Regulator, Cash Acme Cash Acme E41 Series $268.00 $268.00 * 2 Week5 Regulator, Air, Watts, Watts R10-04 $46.22 $231.10 * 2 Week6 Gauge, Pressure, Ashcroft, Air Ashcroft 35-1009AWL-02B-100 PSI XFF $110.00 $660.00 * 2 Week6 Gauge, Pressure, Ashcroft, Chem Ashcroft 35-1009SWL-02B-100 PSI XFF $128.00 $768.00 * 2 Week

TOTAL $12,880

Typical Spare parts list. Actual spare parts developed after design.* - Denotes possible Six (6) month replacement frequency.

Typical One Year Minimum – Mechanical

000188

Page 284: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 13

CONFIDENTIAL Do Not Duplicate

FUEL TECH EQUIPMENT

Expected ULTRA System Utilities Table 1.1 Expected Air Requirements

Atomizing Air/Plant Air Flow Required Parameters

Injection Atomizing Air 15 scfm 80 psig Minimum @ Metering/Distribution Module – Station Air

Injector Seal Air 20 scfm 20 psig Min @ Injector Seal Port on

Decomposition Chamber – Station Air (Intermittent)

Metering Module 3 scfm 80 psig Min @ Metering Module – Control Air

Table 1.2 Expected Power Requirements

Equipment Group Equipment Identification Power Requirement Load (AMPS) HP / KW

Blower No. 1 480 VAC -3 Ø 2.5 Hp Dilution Air Blowers

Blower No. 2 480 VAC -3 Ø 7 2.5 Hp

Metering/Distribution

Module Control Panel 120 VAC, UPS ~ (TBD)

Electric Heater 70 nom.Decomposition Chamber

Control Panel ~ (TBD) Table 1.3 Expected Flush Water Requirements

Flush Water Flow Required Parameters

Potable Flush Water 3 gpm 60 psig Min @ Metering/Distribution Module, Clean Water

Notes: Values shown above are preliminary. Actual values will be determined during the design phase of the project.

000189

Page 285: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 14

CONFIDENTIAL Do Not Duplicate

TYPICAL PROJECT SCHEDULE

INDUSTRIAL NOxOUT ULTRA® SYSTEM

EVENT RESPONSIBILITY WEEKS FROM ORDER DATE

Receipt of Order CUSTOMER 0

Begin Equipment Design FUEL TECH 2

Submit P&IDs for Review FUEL TECH 8

Customer P&ID Comments 1 CUSTOMER 10

Submit Equipment Drawings for Review FUEL TECH 10

Customer Equipment Drawing Comments 1 CUSTOMER 12

Submit Electrical Drawings for Review FUEL TECH 10

Customer Electrical Drawing Comments 1 CUSTOMER 12

Certified P&IDs and Equipment Drawings Issued CUSTOMER 12

Certified Electrical Drawings Issued CUSTOMER 14

Begin Equipment Fabrication FUEL TECH 14

Begin Electrical Panel Fabrication FUEL TECH 16

Equipment Shipment FUEL TECH 32

Equipment Delivery FUEL TECH 34

Complete Equipment Installation CUSTOMER TBD

Begin Start-Up and Testing FUEL TECH 2 weeks for testing, beginning one week after completion of

installation

Begin Optimization FUEL TECH 1-3 weeks

Compliance Testing CUSTOMER After Optimization

1 Actual time requirement to be determined if the Customer utilizes an outside engineering firm.

Schedule is typical for the system proposed, and is based on Customer having provided Fuel Tech all relevant design information. Some flexibility may be available based on customer needs.

000190

Page 286: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 15

CONFIDENTIAL Do Not Duplicate

PRICING AND PAYMENT SCHEDULE

NOXOUT ULTRA® SYSTEM For the Engineering, Equipment, Testing, Startup, Optimization, and Training as defined herein, Fuel Tech quotes the following budgetary price, FOB Jobsite: NOxOUT® ULTRA SIX HUNDRED AND THIRTY THOUSAND DOLLARS $630,000.00

Price includes the stated number of start-up and optimization services man-days, with travel and living expenses included. Please see our Field Service Pricing Schedule, Exhibit C1, dated January 2009, for per diem service rates. TERMS OF PAYMENT 10% Upon receipt of Letter of Intent, Purchase Order, or Contract 20% Upon submittal of Drawings to the Buyer for Approval 20% Upon Buyer’s release for equipment fabrication 10% Upon submittal of Certified Drawings to the Buyer 30% Upon date of shipment of equipment, or thirty days after notification to buyer that

equipment is ready to ship, whichever occurs first. 10% After successful completion of acceptance test or six (6) months after receipt of

equipment, whichever occurs first.

000191

Page 287: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 16

CONFIDENTIAL Do Not Duplicate

EXHIBIT C3

FUEL TECH, INC. STANDARD TERMS AND CONDITIONS

These terms and conditions shall be part of the attached proposal and shall become part of the contract entered into between FUEL TECH, INC. (Fuel Tech), and the Buyer. Deviations from these terms and conditions must be agreed to in a writing signed by Fuel Tech and the Buyer. Fuel Tech hereby gives notice of its objection to any different or additional terms or conditions unless such different or additional terms or conditions are agreed to in a writing signed by Fuel Tech and Buyer.

1. TERMS OF PAYMENT

All invoices are payable net thirty (30) days from date of invoice. Buyer shall pay interest at the rate of ten percent (10%) per annum on all overdue amounts. Buyer shall pay all sales tax, use tax, excise tax, or other similar taxes.

2. DELAYS

If shipments are delayed by Buyer, payment shall be due on and warranty coverage shall begin to run from thirty days after the original shipment date specified in the contract or thirty (30) days after notification to Buyer that equipment is ready to ship, whichever is earlier. Risk of loss shall pass to Buyer at the time that equipment is identified, and any costs caused by such delay shall be borne by Buyer. If shipments are delayed by Buyer, Fuel Tech will ship the equipment no later than sixty (60) days after initial notification to the Buyer that the equipment is ready for shipment. Buyer agrees either (1) to provide Fuel Tech an appropriate “ship to” address and to accept delivery or (2) pay reasonable storage charges for the equipment beginning sixty (60) days after initial notification to Buyer that equipment is ready to ship.

3. PERFORMANCE GUARANTEE

Buyer warrants that the operating conditions of the Unit are those specified in the Process Design Table. Buyer is solely responsible for the accuracy of that operating condition information, and all performance guarantees and equipment warranties granted by Fuel Tech shall be void if that operating condition information is inaccurate or is not met. All performance guarantees and equipment warranties are conditioned on Buyer timely providing all of the equipment, materials, chemicals, utilities, and services that it has agreed to provide, on operating the Unit within the operating conditions specified in the Process Design Table, and on using reagent of license grade quality in the operation of the Unit.

000192

Page 288: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 17

CONFIDENTIAL Do Not Duplicate

EXHIBIT C3

FUEL TECH, INC. STANDARD TERMS AND CONDITIONS

4. EQUIPMENT WARRANTY Fuel Tech warrants that the equipment it provides shall be free from defects in design, workmanship, and material at the time the equipment is delivered and for a period of twelve (12) months after initial operation, or eighteen (18) months from shipment of equipment, whichever occurs first. Fuel Tech does not warrant wear parts such as injection tips, cooling shields, pump diaphragms, check valves, solenoids, pump impellers, pump wear rings, pump seals, valve packing, and valve seats. All warranties made by the manufacturer of the equipment (if that manufacturer is any entity other than Fuel Tech) shall be assigned by Fuel Tech to the Buyer, if such assignment is permissible by law and contract. Warranty coverage starts at shipment of equipment or thirty (30) days after notification to Buyer that equipment is ready to ship.

5. DISCLAIMER OF WARRANTIES

Fuel Tech warrants its equipment and the performance of its equipment solely in accordance with the equipment warranty and performance guarantee contained in this proposal and makes no other representations or warranties of any other kind, express or implied, by fact or by law. All warranties other than those specifically set forth in this proposal are expressly disclaimed. FUEL TECH SPECIFICALLY DISCLAIMS ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, AND DISLCAIMS THE IMPLIED WARRANTY OF MERCHANTABILITY, THE IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE, AND ANY OTHER IMPLIED WARRANTIES OF DESIGN, CAPACITY, OR PERFORMANCE RELATING TO THE EQUIPMENT.

6. LIMITATION OF LIABILITY

Buyer’s sole remedy under the equipment warranty and the performance guarantee shall be to allow Fuel Tech, at Fuel Tech’s option, either to repair, replace, or supplement the equipment to meet the performance guarantee, or, in the event that those options are not feasible, to remove the Equipment and refund the contract price to Buyer. NOTWITHSTANDING ANYTHING TO THE CONTRARY, FUEL TECH’S TOTAL LIMIT OF LIABILITY ON ANY CLAIM, WHETHER FOR BREACH OF CONTRACT, BREACH OF WARRANTY, TORT, NEGLIGENCE, STRICT LIABILITY, OR ANY OTHER LEGAL THEORY, FOR ANY LOSS OR DAMAGE ARISING OUT OF, OR CONNECTED TO, OR RESULTING FROM THIS AGREEMENT, INCLUDING WITHOUT LIMITATION AMOUNTS INCURRED BY FUEL TECH OR BUYER IN ATTEMPTING TO REPAIR, REPLACE, OR SUPPLEMENT THE EQUIPMENT OR MEET THE PERFORMANCE GUARANTEE, SHALL BE LIMITED TO THE CONTRACT PRICE TO BE PAID BY BUYER PURSUANT TO THE CONTRACT.

000193

Page 289: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 18

CONFIDENTIAL Do Not Duplicate

EXHIBIT C3

FUEL TECH, INC. STANDARD TERMS AND CONDITIONS

7. EXCLUSION OF CONSEQUENTIAL DAMAGES NOTWITHSTANDING ANYTHING TO THE CONTRARY, IN NO EVENT SHALL FUEL TECH BE LIABLE FOR ANY INDIRECT, CONSEQUENTIAL, INCIDENTAL, SPECIAL, OR PUNITIVE DAMAGES, INCLUDING BUT NOT LIMITED TO LOSS OF CAPITAL, LOSS OF REVENUES, LOSS OF PROFITS, LOSS OF ANTICIPATORY PROFITS, LOSS OF BUSINESS OPPORTUNITY, DAMAGE TO EQUIPMENT OR FACILITIES, COST OF SUBSTITUTE NOx REDUCTION SYSTEMS, DOWNTIME COSTS, GOVERNMENT FINES, OR CLAIMS OF CUSTOMERS, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.

8. RESPONSIBILITY FOR THIRD PARTIES

Buyer shall at all times be responsible for the acts and omissions of its subcontractors and of any other third parties hired or retained or contracted by Buyer to perform work or provide equipment related to the system provided by Fuel Tech, including but not limited to third party design, systems integration, equipment tie-in, or process design changes. Fuel Tech shall have no responsibility for ensuring the accuracy of any such work or the performance of any equipment provided by subcontractors or third parties hired or retained or contracted by Buyer, and Buyer assumes all liability for any such work or equipment and for any failures in Fuel Tech’s equipment caused by any such subcontractors or third parties hired or retained or contracted by Buyer. Buyer agrees to indemnify, hold harmless, and defend Fuel Tech from any claims, losses, damages, injuries, or failures caused by any such subcontractors or third parties.

9. CONFIDENTIALITY

Buyer agrees that it shall hold Confidential Information received from Fuel Tech in the strictest confidence, shall not use the Confidential Information for its own benefit except as necessary to fulfill the terms of the agreement between the parties, shall disclose the Confidential Information only to employees, agents, or representatives who have a need to know the Confidential Information, shall not disclose the Confidential Information to any third party, shall not copy the Confidential Information, shall not disassemble, decompile, or otherwise reverse engineer the Confidential Information and any inventions, processes, or products disclosed by Fuel Tech, and, in preventing disclosure of Confidential Information to third parties, shall use the same degree of care as for its own information of similar importance, but no less than reasonable care.

10. LICENSE AGREEMENT AND OTHER TERMS

Sale is subject to agreement on other terms and conditions, including a Sale of Equipment with License Agreement.

000194

Page 290: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 19

CONFIDENTIAL Do Not Duplicate

EXHIBIT C3

FUEL TECH, INC. STANDARD TERMS AND CONDITIONS

11. INDEMNIFICATION Each Party shall defend, indemnify, and hold harmless the other Party and its employees, agents, and representatives from any claims, liabilities, lawsuits, costs, losses, or damages that arise out of or result from any negligent or willful acts or omissions of the indemnifying Party’s employees, agents, or representatives. Where such claims, liabilities, lawsuits, costs, losses, or damages are the result of the joint or concurrent negligence or willful misconduct of the Parties or their respective agents, employees, representatives, subcontractors, or any third party, each Party’s duty of indemnification shall be in the same proportion that the negligence or willful misconduct of such Party, its agents, employees, representatives, or subcontractors contributed thereto. The Party entitled to indemnity under this Agreement shall promptly notify the indemnifying Party of any indemnifiable claim, liability, lawsuit, cost, loss, or damage. The Party responsible for indemnification under this Agreement shall conduct and control the defense of the indemnified claim, liability, lawsuit, cost, loss, or damage. The Parties shall use their best efforts to cooperate in all aspects of the defense of any such claim, liability, lawsuit, cost, loss, or damage. The indemnifying Party shall not be bound by any compromise or settlement made without its prior written consent.

12. FORCE MAJEURE

The Parties shall be excused from liability for delays in manufacture, delivery, or performance due to any events beyond the reasonable control of the Parties, including but not limited to acts of God, war, national defense requirements, riot, sabotage, governmental law, ordinance, rule, or regulation (whether valid or invalid), orders of injunction, explosion, strikes, concerted acts of workers, fire, flood, storm, failure of or accidents involving either Party’s plant, or shortage of or inability to obtain necessary labor, raw materials, or transportation (“Force Majeure”). Any delay in the performance by either party under this Agreement shall be excused if and to the extent the delay is caused by the occurrence of a Force Majeure, provided that the affected party shall promptly give written notice to the other party of the occurrence of a Force Majeure, specifying the nature of the delay, and the probable extent of the delay, if determinable.

Following the receipt of any written notice of the occurrence of a Force Majeure, the parties shall immediately attempt to determine what fair and reasonable extension for the time of performance may be necessary. The parties agree to use reasonable commercial efforts to mitigate the effects of events of Force Majeure. No liabilities of any party that arose before the occurrence of the Force Majeure event shall be excused except to the extent affected by such subsequent Force Majeure.

000195

Page 291: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Stanley Consultants – Muscatine, IA June 15, 2009

The University of Iowa Proposal 09-B-147 NOxOUT ULTRA® Urea Conversion System Page 20

CONFIDENTIAL Do Not Duplicate

EXHIBIT C3

FUEL TECH, INC. STANDARD TERMS AND CONDITIONS

13. GOVERNING LAW This Agreement shall be governed by and interpreted in accordance with the laws of the State of Illinois, excluding its choice of laws rules. The parties shall attempt to settle any disputes, controversies, or claims arising out of this Agreement through consultation and negotiation in good faith and in a spirit of mutual cooperation. If those attempts fail, then any dispute, controversy or claim shall be submitted first to a mutually acceptable neutral advisor for mediation. Neither party may unreasonably withhold acceptance of a neutral advisor. The selection of the neutral advisor must be made within forty-five (45) days after written notice by one party demanding mediation, and the mediation must be held within six months after the initial demand for it. By mutual agreement, however, the parties may postpone mediation until they have each completed some specified but limited discovery about the dispute, controversy, or claim. The cost of mediation shall be equally shared between the parties. Any dispute that the parties cannot resolve through mediation within six (6) months after the initial demand for it may then be submitted to a state or federal court of competent jurisdiction within the State of Illinois for resolution. The use of mediation shall not be construed (under such doctrines as laches, waiver, or estoppel) to have adversely affected any party’s ability to pursue its legal remedies, and nothing in this provision shall prevent any party from resorting to judicial proceedings if good faith efforts to resolve a dispute under these procedures have been unsuccessful or interim resort to a court is necessary to prevent serious and irreparable injury to any party or others.

14. ENTIRE AGREEMENT

This Exhibit C3 and the Fuel Tech Proposal attached to it constitute the entire agreement between the parties and can be modified only in writing signed by authorized representatives of each of the parties.

000196

Page 292: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Smart and simple... the NOxOUT ULTRA® process providesammonia for SCR systems without the risks of dangerous chemical handling.

Ammonia Generation Process

NOxOUTULTRA®

Safety Benefits

• No DOT or DHS restrictionson the transportation or handling of urea–Avoid tight regulations on

ammonia transportation fromDOT and Rail Safety Act

–Ammonia has been cited by DHSas a chemical of interest underAnti-Terrorism Standards

• Low pressure operation

• Process controls follow load with minimal time lag and facilitate rapid system shutdown

Economic Benefits

• Worldwide availability of urea maximizes flexibility and economics

• Lower annualized costs vs. aqueous ammonia systems

• No requirement for specialized urea quality

• Dry urea system option tominimize operating costs

Ammonia

Urea

Selective catalytic reduction (SCR)has become the standard for attainingthe most stringent NOx reductionrequirements for power generatingfacilities. Until recently, NOx reductionusing SCR employed anhydrousammonia (NH3) as the reducing agent,requiring owners of these systems tocontend with transportation, safety,and costs associated with handlinghazardous ammonia.Fuel Tech’s patented NOxOUT ULTRAprocess is an innovative alternative for ammonia generation from urea.Available for new and retrofit SCRsystems, the NOxOUT ULTRAsystemis a safer, cost-effective solution thatsimplifies SCR operation.

Anhydrous ammonia is classified as ahazardous chemical per the Clean AirAct (CAA) Section 112(r). As such,ammonia requires additional proce-dures to protect personnel, neighboringcommunities, and the environmentfrom potential chemical release.Reporting, record keeping, permitting,and emergency preparedness planningare needed with ammonia transportation,unloading and on-site ammonia storage. The U.S. Department of HomelandSecurity (DHS) and the Department ofTransportation (DOT) are restricting thetransport and handling of anhydrousammonia through the Rail Security Act.DHS has labeled anhydrous ammonia

Ammonia: Hazardous and Complexas a chemical of interest for its Anti-Terrorism Standards. In addition, theUS EPA has determined the toxic radiusof a spill to be between 5 to 7 miles.Aqueous ammonia systems use lessconcentrated ammonia, but are stillconsidered hazardous under Section112(r). These systems require five times the amount of transportationand handling, increasing the potentialfor spills and releases. The EPA toxicradius for aqueous ammonia is 1 to 2miles. In contrast, urea products arenon-hazardous sources of ammonia, so transport, handling and storageconcerns are minimized.

The facts are clear: urea is asafer alternative to dangerousanhydrous ammonia.

000197

Page 293: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

How it WorksThe NOxOUT ULTRAprocess generateslow pressure, dilute ammonia for SCRsystems by thermally decomposingurea. The diluted ammonia is fedthrough the ammonia injection grid(AIG) to the SCR. The ULTRA processcontrols ammonia generation bymetering urea into a decompositionchamber. The generation rate respondsrapidly based on urea flow rate. TheNOxOUT ULTRA system is simple,consisting of a blower, heat source,decomposition chamber, urea storage,urea metering and process controls.Filtered ambient air is fed into thechamber through the use of a blowerwith automatic dampers to control discharge flow and pressure.A burner is fired downstream of the dampers, and an aqueous ureasolution supplied by the metering systemis sprayed into the decompositionchamber through the injectors. The ureais efficiently decomposed to ammoniato reduce NOx through the SCR. The outlet stream of decompositionchamber feeds the AIG for a traditionalSCR system.

Other urea-to-ammonia conversionsystems on the market work byhydrolyzing urea.These processesoften requirehigher priced

Ammonia Generation Process

NOxOUTULTRA®

© 2008 Fuel Tech, Inc. FT-9200-APNOxOUT ULTRA is a registered trademark of Fuel Tech, Inc.

Fuel Tech, Inc., 27601 Bella Vista Pkwy., Warrenville, IL 60555Toll Free 800.666.9688 www.ftek.com

Fuel Tech provides fully integratedsystems with guaranteed performance,including capital equipment and installation services. Visit our website at www.ftek.com.

Experience

• Backed by Fuel Tech’s provenstart-up, optimization, andservice experience

• Twenty systems operating on over 4000 MW combinedexperience

• Installations in the US, Europe and China

• Coal-fired boiler applications

• Gas turbine/heat recoverysteam generator applications

specialty solutions and are complex systems that operate under high pressures and significant steam consumption. NOxOUT ULTRA is aneconomical and easy method to generate ammonia at low pressure.

System OptionsThe NOxOUT ULTRA system can be customized for each application. In addition to natural gas, heat sourcesinclude electric heaters for small systemsand fuel oil, or propane, for larger systems.Where energy efficiency is critical, we can use pre-heated combustion air directly or a heat exchanger to preheatambient air. Aqueous urea can be delivered to the site or created on-sitefrom solid or concentrated urea solutionsby adding condensate or demineralizedwater. Water purity is essential for SCRcatalyst performance.

Proven TechnologiesThe NOxOUT ULTRA system incorporatesproven features of Fuel Tech’s other NOxreduction products on over 500 commercialinstallations. Urea storage, metering andinjection are all standard to the NOxOUTproduct line, first introduced in 1990.The NOxOUT ULTRA system has all thebenefits of ammonia generation for SCRwithout the cost, safety and environmentalconcerns associated with ammonia handling. More cost-effective than urea-hydrolyzing processes, it is a smartchoice for simplifying SCR operation witha urea-to-ammonia conversion process.

Urea solution storage tank

Fuel Tech SrL, Centro Direzionale "Le Torri" Via Marsala, 34/A, 21013 Gallarate (Varese) ItalyTel. 39.0331.701110 Fax 39.0331.701099

Beijing Fuel Tech, Peking Times SquareTel. 86.10.8487.1472 Fax 86.10.8487.1470000198

Page 294: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

000199

Page 295: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

000200

Page 296: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

000201

Page 297: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

April 2009 1

EXHIBIT C1 FUEL TECH SERVICE PRICING SCHEDULE

RATES

Billing will be based on rates in effect at time service is rendered. Rates apply within the USA, but excluding the States of Alaska and Hawaii. The per diem rates listed below are for an 8-hour man-day, during normal working hours. Travel time is working time. Parts and expenses are additional. Daily Rate Hourly Rate

Technician $1,350.00 $170.00

Project Engineer $1,500.00 $190.00

Process/Test Engineer $1,600.00 $200.00

Project Manager $1,600.00 $200.00

Engineering Manager/Director $2,000.00 $250.00

VP Technology $2,200.00 $275.00

The rates quoted are valid through January 31, 2010. The per diem rate for specialist service and services performed outside the Continental United States will be quoted upon request. NORMAL WORKING HOURS AND DAYS

8:00 AM to 5:00 PM, including sufficient time for lunch, Monday through Friday, except legal holidays, at location of customer’s plant. OVERTIME

Overtime will be billed at 1.5 times the prevailing hourly rate. Overtime is defined as all hours worked under twelve (12) on the employee’s first scheduled off day (Saturday), and all hours worked under twelve (12) and over eight (8) hours for a day on the job (Standard hourly rate × 1.5). DOUBLE TIME

Double time will be billed at two (2) times the prevailing hourly rate. Double time is defined as all hours worked over twelve (12) on any day, all hours worked on the employee’s second scheduled off day (Sunday) and all hours on observed holidays.

000202

Page 298: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

April 2009 2

EXHIBIT C1 FUEL TECH SERVICE PRICING SCHEDULE

(CONTINUED…) EXPENSES

1. TRAVEL a) Automobile travel at the rate of $0.55 per mile

b) Travel expenditures will be charged per round-trip from the Fuel Tech personnel’s point of origin, plus local travel.

c) Expenses for travel will be at cost, which will be by airplane, rail or auto, whichever is the most expeditious under given circumstances. Air travel will be at prevailing available rates; Tourist Class within the Continental United States and Business Class for International flights. 2. LIVING a) Actual expenses for lodging, meals and incidental costs.

b) Telephone calls and wires as required in connection with details of the job will be charged at cost.

GENERAL CONDITIONS

Fuel Tech representatives are authorized to act in a consulting capacity only. Operation and control of all equipment shall rest with others. Fuel Tech shall not be held responsible for any damage through any misoperation or misunderstanding.

Customer shall render all reasonable assistance to Fuel Tech representative. Necessary working and storage space, including field office, if required, shall be furnished by the customer. Customer shall be responsible for insuring the Fuel Tech representative has full access to the equipment to be serviced and the scheduling of the required boiler load.

It will be the responsibility of the customer to furnish qualified tradesmen when required, to work with our representative.

In the event of any labor disputes, it shall be left to the judgment of the Fuel Tech representative on the jobsite as to their course of action. Fuel Tech’s representative will in no way become involved in labor disputes.

Terms are Net thirty days (30) from receipt of invoice. Fuel Tech reserves the right to enforce a 1-1/2% carrying charge per month for any invoice in excess of fifteen (15) days overdue.

000203

Page 299: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

April 2009 3

EXHIBIT C1 FUEL TECH SERVICE PRICING SCHEDULE

(CONTINUED…) SPARE PARTS

Spare parts are available through our Warrenville, IL office. An inventory of critical parts is kept on-site for injectors. Fuel Tech works with key local suppliers to provide a quick turnaround time for spare parts orders. Parts and expenses are additional. RENTAL EQUIPMENT

Customer shall, at its own cost and expense, keep the Equipment in good repair, condition, and working order and shall furnish any and all parts, mechanisms, and devices required to keep the Equipment in good working order. Customer hereby assumes and shall bear the entire risk of loss or damage to the Equipment from any and every cause whatsoever. In the event of loss or damage of any kind whatever to the Equipment, Customer shall, at Fuel Tech's option: (a) Place the Equipment in good repair, condition, and working order; or

(b) Replace the Equipment with identical Equipment in good repair, condition and working order; or

(c) Pay Fuel Tech the replacement cost of the Equipment.

DISCLAIMER OF WARRANTIES

FOR THE PRODUCTS AND SERVICES PROVIDED BY FUEL TECH UNDER THIS AGREEMENT, FUEL TECH SPECIFICALLY DISCLAIMS ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, OR STATUTORY AND DISLCAIMS THE IMPLIED WARRANTY OF MERCHANTABILITY, THE IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE. LIMITATION OF LIABILITY

To the fullest extent allowed by applicable law whether under the Contract, any contract theory, any warranty theory, strict liability, negligence or other theory: (1) Fuel Tech shall not be liable for any indirect, consequential, incidental, special, or punitive damages, including but not limited to loss of capital, loss of revenues, loss of profits, loss of anticipatory profits, loss of business opportunity, damage to equipment or facilities, cost of substitute programs, downtime costs, government fines, or claims of customers, even if advised of the possibility of such damages, and (2) in no event shall Fuel Tech’s liability exceed the total contract price.

000204

Page 300: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 1 of 2

BBRRAADDEENN MMAANNUUFFAACCTTUURRIINNGG,, 55119999 NNOORRTTHH MMIINNGGOO RROOAADD,, PPOO BBOOXX 11222299,, TTUULLSSAA,, OOKK 7744110011,, TTEELL.. ((991188)) 227722--55337711,, FFaaxx ((991188)) 227722--77441144

BUDGETARY PROPOSAL SP 31419/31420R0

Attention: Mr. Doug Einck, Stanley Consultants, Inc.

From: Nick Kristobak, Sales Engineer

CC: J. Trost, VP Sales, Braden

Date: Thursday, June 4, 2009

Reference:

RFQ Email Dated 5/20/09

Revision: 0. Original proposal sent 6/4/09

Dear Mr. Einck,

Braden Manufacturing wishes to extend the following quotation for one (1) Simple Cycle Exhaust Stack to be in service behind one (1) GE LM2500+G4 gas turbine unit and one (1) Simple Cycle SCR Exhaust System to be in service behind one (1) GE LM2500+G4 gas turbine unit.

I. Price:

Base ; MEXICO FABRICATION

DESCRIPTION QTY FREIGHT TOTAL PRICE

SP31419 - Simple Cycle Exhaust System 60ft Tall (Braden Standard) Ex Works Mexico Facility 1 Not Included $ 270,700 USD

SP31419 - Simple Cycle Exhaust System 45ft Tall (Braden Standard) Ex Works Mexico Facility 1 Not Included $ 241,900 USD

SP 31420 - Simple Cycle SCR Exhaust System (Braden Standard) Ex Works Mexico Facility 1 Not Included $1,870,000 USD

This quotation does not include permits, sales taxes, duties, VAT, other export / import fees and jobsite unloading.

II. System Features:

1. The exhaust system consists of large shipping components which minimize field assembly labor.

2. Shell will be A36 Carbon Steel; liner will be 409 Stainless Steel.

3. Stack insulation is high temperature basalt wool.

4. All external carbon steel surfaces (and internal surfaces to first liner stud row) shall be sand blasted to SSPC

SP6 and painted with inorganic zinc primer, 2-3 mils DFT per Braden Standard practice.

5. All support steel, ladders, platforms, grating and handrails shall be galvanized per ASTM A123.

6. Acoustic dampening shall achieve 85 dBA at 3ft from duct wall and 65 dBA at 400ft using Braden Standard

000205

Page 301: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 2 of 3

BBRRAADDEENN MMAANNUUFFAACCTTUURRIINNGG,, 55119999 NNOORRTTHH MMIINNGGOO RROOAADD,, PPOO BBOOXX 11222299,, TTUULLSSAA,, OOKK 7744110011,, TTEELL.. ((991188)) 227722--55337711,, FFaaxx ((991188)) 227722--77441144

manufacturing practices.

7. All external stiffeners shall be seal welded to prevent corrosion stains.

III. Scope of Supply:

SP31419 – Exhaust Stack1. One (1) Expansion Joint 2. One (1) Horizontal Transition Duct 3. One (1) Breech Duct 4. One (1) Vertical Transition Duct

5. One (1) Stack Section 6. Lifting Lugs

SP31420 – SCR Exhaust Stack 1. One (1) Expansion Joint 2. Horizontal Transition Ducting 3. Horizontal Ducting 4. One (1) Breech Duct 5. One (1) Vertical Stack 6. Ammonia Injection System 7. Catalyst System 8. Lifting Lugs

9. Tempering Air System (if required) 10. CO Catalyst 11. SCR Catalyst 12. Perferated Plate for Flow Distribution 13. CFD Analysis 14. Access Ladders/Platforms

IV. Other Conditions:

a. Prices quoted or stated do not include Duties, VAT, Customs expenses, sales, use, excise or other taxes measured, in whole or in part, by gross receipts. Any such taxes applicable to the sale, processing, assembling, installing, use or consumption of any goods or materials and/or any services or labor shall be an obligation of the customer and will be invoiced to the customer.

b. This proposal is based on Braden’s standard Terms and Conditions.

c. Delivery to be 26 weeks ARO ex-works, based on the following key project milestones:

Milestone Event Weeks ARO Receipt of Buyer design specifications (Final revs., applicable codes) 0 Submittal of arrangement dwgs. to Buyer 3 Arrangement dwg. review and approval by Buyer 4 GA configuration and interface freeze 5 QA and Mfg. plan to Buyer 5 QA and Mfg. plan review and approval by Buyer 6 Ready to ship 26 Delays in meeting the above milestones may impact the delivery date. The SCR Exhaust system will have a delivery schedule of 32 weeks ARO.

d. Progress payments shall be as follows: 20% ARO, 30% at 10 weeks and 50% ready to ship (RTS). Braden will require 100% payment by letter of credit prior to product shipment. Progress payments shall be due upon receipt of invoice.

e. The equipment offered will be warranted for 12 months from the start of commercial operation to a maximum

of 18 months from the date of delivery, whichever occurs first.

f. Braden standard packaging is included.

g. The pricing enclosed is budgetary only, please contact us if firm pricing is required.

000206

Page 302: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 3 of 3

BBRRAADDEENN MMAANNUUFFAACCTTUURRIINNGG,, 55119999 NNOORRTTHH MMIINNGGOO RROOAADD,, PPOO BBOOXX 11222299,, TTUULLSSAA,, OOKK 7744110011,, TTEELL.. ((991188)) 227722--55337711,, FFaaxx ((991188)) 227722--77441144

V. Attachments:

1. Braden Sales Proposal Drawing SP31419 2. Braden Standard Terms and Conditions.

We trust the above information meets with your approval. Should you have any questions or need further information, please contact the undersigned at your convenience. Sincerely,

Nicholas A. Kristobak Sales Engineer Braden Manufacturing

000207

Page 303: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

000208

Page 304: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

000209

Page 305: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Form 179 October 1, 2004

BRADEN TERMS AND CONDITIONS OF SALE

These terms and conditions of sale, together with any quote, purchase order, scope of work, plans, specifications or other documents listed therein or herein and any other attachments, exhibits and/or documents attached hereto or thereto (collectively, the “Agreement”) shall govern any purchase of products or services by any person or entity (“Customer”) from Braden Manufacturing, L.L.C. (“Braden”).

A. CREDIT RESERVATIONS. Unless otherwise agreed to in writing by Braden, all shipments, deliveries and performance of work shall at all times be subject to the approval of Braden’s credit department. Notwithstanding any standard terms of payment or other arrangements, Braden may, without breaching this Agreement, delay or suspend any delivery or performance until Braden shall receive from Customer commercially reasonable and adequate assurances of payment.

B. INTEREST CHARGES AND LEGAL FEES. Customer shall pay to Braden all amounts due within 30 days after the date of invoice. All amounts not paid when due shall bear interest at the rate of 1 ½% per month or the maximum allowed by law until paid. Braden shall also be entitled to recover all costs of collection with respect to any unpaid amounts, including, but not limited to, reasonable attorneys’ fees.

C. SALES, USE, EXCISE TAXES. Unless specifically stated otherwise, prices quoted or stated do not include any federal, state or local sales, use, excise or other taxes measured, in whole or in part, by gross receipts. Any such taxes applicable to the sale, processing, assembling, installing, use or consumption of any goods or materials and/or any services or labor provided by Braden under this Agreement shall be payable by Customer and may be collected from Customer at any time.

D. SECURITY INTEREST – LIENS. Until Braden receives full payment therefore, it reserves a security interest in and to all materials delivered by Braden. Such security interest shall be superior to the rights of any and all creditors of Customer. Customer hereby grants such security interest to Braden and authorizes Braden, its employees, attorneys and agents, to file records reflecting such security interest, including financing statements, amendments and continuations, and to send notices to prior secured parties related to the security interest granted herein. Such security interest shall not preclude the enforcement of materialmen’s and/or mechanics’ liens by Braden and such liens and rights shall constitute alternate and additional security. Braden may proceed concurrently to enforce its security interest and its lien rights.

E. SHIPMENT AND DELIVERY DATES – FORCE MAJEURE. Statements concerning shipment, delivery or completion dates are only estimates based upon information of Braden at time stated and are not promises, guarantees or representations of Braden. Braden will make reasonable efforts to comply with shipment, delivery and completion schedules quoted, but will not be liable for any delay. Braden shall have no liability to Customer for any loss or damage suffered by Customer, resulting directly or indirectly from, or through, or arising out of any delay in filling an order, shipment or delivery of any materials, or any fabrication, installation or erection under this Agreement, to the extent that Braden’s performance is prevented or delayed due to acts of God, fire, flood, strikes or other labor difficulties, war, riot, embargoes, material shortages, governmental priorities or allocations, shortage or unavailability of transportation by common carriers, acts of civil or military authorities, or other causes of any nature beyond the control of Braden. If delay occurs by virtue of any such event, Braden’s time for performance shall be extended accordingly.

F. WARRANTY. (a) For a period of one year from the date of delivery, Braden warrants that materials manufactured, fabricated or assembled by Braden will be free from defects in materials and workmanship. This warranty does not include products, parts, accessories or attachments not manufactured by Braden. Customer’s sole and exclusive remedy for the breach of this warranty is limited to Braden’s furnishing (but not dismantling or installing) necessary replacement parts, F.O.B. Braden’s plant. (b) If this Agreement requires erection or installation of materials by Braden, the sole responsibility of Braden with respect to such erection or installation shall be to perform such services in a good and workmanlike manner. Following inspection and acceptance of such work by Customer, no claim shall be made, and Braden shall not be liable for, any damage or other claim for or on account of any alleged defect of any nature unless claim therefore is made within one year from and after acceptance of such work by Customer. Braden’s sole responsibility and Customer’s sole remedy shall be correction of any such defective work by Braden within a reasonable time after receipt of notice thereof. (c) THESE WARRANTIES ARE IN LIEU OF ALL OTHER EXPRESS AND IMPLIED WARRANTIES, INCLUDING BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. (d) Braden will, upon written request of Customer, assign to Customer any warranties made to Braden by any vendor or supplier of Braden when permitted by the terms and conditions of such vendor’s or supplier’s warranties to Braden.

G. MODIFICATIONS, CHANGES. Customer’s order is accepted by Braden on the basis that it is complete and can be released for fabrication immediately, unless otherwise noted in such order. No changes to any order will be accepted by Braden unless Customer agrees to additional charges, as applicable. No modification, alteration or changes in specifications, designs, schedules, price or other contract terms (except extras ordered and accepted by Customer) shall be accepted by Braden until confirmed in writing with reasonable identification (number, date, etc.) to this Agreement.

H. EXTRA CHARGES AND REPRICING. Customer shall be liable for any and all extra charges arising from delays initiated or caused by Customer. These charges include, but are not limited to, storage charges, handling charges, demurrage charges on trailers already loaded for shipment at the time of delay, unloading charges, and any and all other direct or indirect charges incurred by Braden in connection with the delay. If a job is held beyond the estimated shipping date as set forth on the face of this Agreement due to delays created by Customer such as delay of approved drawings, failure to furnish

information necessary for processing of order or failure to supply adequate assurances for payment of the order as requested from Braden, Braden reserves the right to reprice the job based on the prices in effect at the time of receipt of approved drawings, information necessary for processing of order, or presentation of adequate assurance for payment as requested by Braden.

I. CANCELLATION CHARGES. No order may be cancelled by the Customer without prior written approval of Braden, which approval may be granted or withheld at the sole discretion of Braden. Should Braden decide to allow cancellation before any fabrication, Customer shall be liable for all direct costs incurred by Braden, including applicable overhead in connection with the job. If cancellation is allowed after fabrication is commenced, Customer shall be liable for all direct costs and overhead attributable to the job, plus all storage, handling, demurrage, and any and all other direct or indirect expenses incurred in connection with the job.

J. QUOTATIONS. Quotations issued by Braden are not binding contracts and may be changed or withdrawn by Braden without notice. No contract shall be deemed to have been entered into until Customer’s order has been accepted by an authorized Braden representative.

K. LIMITATION OF LIABILITY. IN NO EVENT SHALL BRADEN, ITS SUPPLIERS OR SUBCONTRACTORS BE LIABLE TO OR THROUGH CUSTOMER FOR ANY SPECIAL, INCIDENTAL, EXEMPLARY OR CONSEQUENTIAL DAMAGES, INCLUDING, BUT NOT LIMITED TO, LOSS OF PROFITS, WHETHER SUCH CLAIM IS BASED UPON BREACH OF WARRANTY, BREACH OF CONTRACT, NEGLIGENCE, STRICT LIABILITY IN TORT OR ANY OTHER LEGAL THEORY, AND REGARDLESS OF WHETHER BRADEN, ITS SUPPLIERS OR CONTRACTORS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGE OR LOSS.

L. SITE ACCESS. When erection or installation by Braden is required, all prices are based upon Braden having working access close to and completely surrounding the perimeter of the project. Should erection personnel be delayed by virtue of lack of free site access, Braden may charge Customer for costs incurred by Braden due to such delay. Any piping, beams, conduits, etc., passing through roofing or siding materials and not shown on Customer’s drawing will constitute extras and Customer agrees to pay for such extras on a time and materials basis. Customer agrees to provide electrical power within 200’ of the building for use by Braden’s erection crew.

M. COMPLETION AND INSPECTION. On all projects involving erection or installations by Braden, Braden’s field representative shall notify Customer within two (2) working days of completion. Within two (2) working days from date of notification, Customer’s representatives shall perform final inspection and indicate in writing any corrective work required. If no written notice specifying required corrective action is delivered to Braden’s field representative within such period, all materials furnished and work performed by Braden shall be deemed to have been accepted and all contract sums remaining unpaid shall be due and payable in accordance with the terms hereof.

N. ASBESTOS FREE ENVIRONMENT. If this Agreement requires erection or installation of materials by Braden, the parties hereto acknowledge that Braden’s quote assumes an asbestos-free working environment and Customer agrees to hold Braden and its employees harmless from any effect of asbestos on the job site. In the event that asbestos is discovered on the job site, then: 1. If Braden has not started work or purchased materials, then any quote and this

Agreement are deemed null and void, or 2. If Braden has started work, and/or purchased materials then: (a) All work shall stop immediately, and Braden shall be paid, within 15 days for all

materials purchased and work performed at a reasonable value thereof proportionate to the value of the entire contract; and

(b) Customer shall have a reasonable time to remove all asbestos, not to exceed three (3) months, and provide an asbestos-free environment, whereupon Braden agrees to re-schedule the project for completion, provided that Customer shall be responsible for all additional costs or expenses incurred by Braden in completing the job because of the delay.

O. GOVERNING LAW. This Agreement is deemed made and shall be construed and enforced by the laws of the State of Oklahoma without regard to the choice of law principles thereof. Customer hereby consents to the exclusive jurisdiction and venue of the federal or state courts located in Tulsa, Tulsa County, Oklahoma, with respect to any matter pertaining to this Agreement and hereby waives any defenses it may have with respect to the jurisdiction and venue of such courts.

P. INDEMNIFICATION. Customer agrees to indemnify, defend and hold Braden, its suppliers and subcontractors, and their respective officers, directors, owners and agents (collectively, the “Braden Parties”) harmless from any and all demands, claims, actions or judgments of a third party against any Braden Party, directly or indirectly, relating to injury and/or death of any and all persons and for loss of and/or damage to property arising out of Customer’s use, misuse or operation of materials and/or products and/or Customer’s negligence or willful misconduct.

000210

Page 306: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

5199 NORTH MINGO ROAD, PO BOX 1229, TULSA OK 74101. TEL. (918) 272-5371. FAX (918) 272-7414

Incoterms 2000

Incoterms or international commercial terms are a series of international sales terms widely used throughout the world. They are used to divide transaction costs and responsibilities between buyer and seller and reflect state-of-the-art transportation practices. They closely correspond to the U.N. Convention on Contracts for the International Sale of Goods.

EXW – Ex Works (named place)

the seller makes the goods available at his premises. FCA – Free Carrier (named place)

the seller hands over the goods, cleared for export, into the custody of the first carrier (named by the buyer) at the named place. This term is suitable for all modes of transport, including carriage by air, rail, road, and containerised / multi-modal transport.

FAS – Free Alongside Ship (named loading port) the seller must place the goods alongside the ship at the named port. The seller must clear the goods for export; this changed in the 2000 version of the Incoterms. Suitable for maritime transport only.

FOB – Free On Board (named loading port) the classic maritime trade term, Free On Board: seller must load the goods on board the ship nominated by the buyer, cost and risk being divided at ship's rail. The seller must clear the goods for export. Maritime transport only.

CFR – Cost and Freight (named destination port) seller must pay the costs and freight to bring the goods to the port of destination. However, risk is transferred to the buyer once the goods have crossed the ship's rail. Maritime transport only.

CIF – Cost, Insurance and Freight (named destination port) exactly the same as CFR except that the seller must in addition procure and pay for insurance for the buyer. Maritime transport only.

CPT – Carriage Paid To (named place of destination) the general/containerised/multimodal equivalent of CFR. The seller pays for carriage to the named point of destination, but risk passes when the goods are handed over to the first carrier.

CIP – Carriage and Insurance Paid to (named place of destination) the containerised transport/multimodal equivalent of CIF. Seller pays for carriage and insurance to the named destination point, but risk passes when the goods are handed over to the first carrier.

DDU – Delivered Duty Unpaid (named destination place) It means that the seller delivers the goods to the buyer to the named place of destination in the contract of sale. The goods are not cleared for import or unloaded from any form of transport at the place of destination. The buyer is responsible for the costs and risks for the unloading, duty and any subsequent delivery beyond the place of destination. However, if the buyer wishes the seller to bear cost and risks associated with the import clearance, duty, unloading and subsequent delivery beyond the place of destination, then this all needs to be explicitly agreed upon in the contract of sale.

DDP – Delivered Duty Paid (named destination place) It means that the seller pays for all transportation costs and bears all risk until the goods have been delivered and pays the duty. Also used interchangeably with the term "Free Domicile"

Wikipedia. 19 Feb. 2009, http://en.wikipedia.org/wiki/Incoterm

000211

Page 307: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

5199 North Mingo Road • Tulsa, Oklahoma 74117 •

918.272.5371 phone • 918.272.7414 fax • www.braden.com

Braden Manufacturing, LLC is a unit of Global Power Equipment Group with headquarters in Tulsa, Oklahoma. Originally founded in 1923, Braden Manufacturing specializes in the design and manufacture of gas turbine inlet and exhausts systems. Our products include: inlet air filters, inlet air cooling, inlet ducts and silencing, aftermarket filter elements, exhaust plenums and diffusers, exhaust stacks and silencers (simple and combined cycle), turbine and generator enclosures and diverter dampers. We manufacture our equipment in over 25 countries located in Asia, Europe, South America, the Middle East, and North America. Our extensive base of manufacturing locations allows us to maximize local content and minimize freight costs. Braden’s customer base includes gas turbine manufacturers, EPC contractors, and utilities around the globe. Braden-Europe B.V. is located in Heerlen, The Netherlands and serves our European clients. Braden-Europe is also our technology center for diverter damper design, leading the world in design improvements and reliability. With over 30 years in the gas turbine business, we have developed design standards that are proven, cost-effective and dependable. As an ISO-9001 company, we have implemented a rigorous quality control system. This system assures our customers that products built in Tulsa, Oklahoma; Monterrey, Mexico; or any of our manufacturing sites, will be the finest available.

Turbine manufacturers acknowledge Braden as the company that is best equipped to handle the challenges of GT plants: • Air Filtration • Diverter Dampers • Inlet Cooling • Expansion Joints • Silencing • Bypass Stacks • Exhaust & Inlet • Diffusers & Ductwork Plenums • Installation/Turnkey

000212

Page 308: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

5199 North Mingo Road • Tulsa, Oklahoma 74117 •

918.272.5371 phone • 918.272.7414 fax • www.braden.com

• Filter Houses: Projects range from reconditioning to redesigning. Supplemental air treatments, including: cooling coils, evaporative cooling, and anti-icing. • Ductwork: Projects range from replacement with more appropriate alloys (e.g. stainless steel) to redesign for better airflow/performance. • Silencers: Inlet and exhaust – quieter performance, reduce pressure drops, and reduced maintenance. • Duct Isolation Systems: Design & installation of these isolation systems, including diverters, louvers, flap, and guillotine dampers. • Expansion Joints: can be the “weak link” in ductwork and must be fully engineered to withstand the stress of sudden thermal growth.

From replacement components and efficiency upgrades to complete design, fabrication and installation of Air Treatment Systems, Braden’s Filtration Team offers you experience which maximizes your energy production and insures clean air with reliable operation. • Filter Houses (New & Retrofit) • Prefilters &Coalescers • TriCel Barrier Filters • Excel Pulse Filters • Cooling Coils • Evaporative Cooling • Anti-Icing

Braden is a major supplier of gas turbine exhaust stacks and diffusers for turbine original equipment manufacturers. • Rectangular Stack • Round Stack with Structural Support • Round Stack-Free-Standing • Silencers in Vertical Stack • Silencers in Horizontal Ductwork

Contact: Braden Sales Email: [email protected]

www.braden.com 000213

Page 309: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

STANLEY CONSULTANTS MR. DOUGLAS EINCK

FOR

UNIVERSITY OF IOWA PROJECT

PROJECT REFERENCE: N/A PEERLESS PROPOSAL REFERENCE NUMBER: 13563, Rev. #0

FEBRUARY 11, 2009

Property Rights: The information, figures, and drawings contained in this printed piece are confidential and proprietary to Peerless Mfg. Co., Dallas, Texas. They are provided in confidence with the understanding that they will not be reproduced or copied without the expressed written permission of Peerless Mfg. Co., and that they will not be used adversely to Peerless. All patent rights are reserved.

000214

Page 310: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 2 of 17

I. BUDGETARY PRICE SUMMARY: ONE (1) AQUEOUS ELECTRIC SCR SYSTEM FOR A GE LM2500 COMBUSTION TURBINE (12” H2O)

ITEM QUANTITY DESCRIPTION PRICE

A 1 Expansion Joint at turbine exhaust

B 1 Inlet Transition Ductwork

C 1 Reactor Housing from CO catalyst through SCR catalyst

D 1 Outlet Transition Ductwork

E 1 Expansion joint at Stack

F 1 CO catalyst support structure and seals

G 1 CO catalyst

H 1 SCR Catalyst Support Structure and Seals

I 1 SCR Catalyst (2.5 ppmvd @15% O2 NOX Outlet)

J 1 Equipment design to meet 85 dBA @ 3 feet

K 1 Stack

L 1 Ammonia Flow Control Unit (AFCU)

M 1 Ammonia Injection Manifold

N 1 Ammonia Injection Grid (AIG)

O 1 Tempering / purge air skid with interconnecting ductwork and injection piping (2 x100%)

P 1 Interconnecting piping from AFCU to manifold and from manifold to AIG (< 25 linear feet)

Q 1 Computational Fluid Dynamics Modeling

R Lot Peerless standard PLC, Allen Bradley CompactLogix PLC

TOTAL BUDGETARY PRICE FOR ONE (1) SCR SYSTEM,

EX-WORKS, MANUFACTURING POINT US $2,500,000

O1. OPTION Freight is on a pre-pay and add basis, billed at cost for items quoted in base (only items A-M above)

To be determined

O2. OPTION Freight for optional items listed below To be determined

O3. OPTION ADDER for Urea System in lieu of an Aqueous Electric System (includes FRP Urea storage) Ex Works

US $ 1,000,000

O3. OPTION 10,000 aqueous ammonia gallon storage tank, 2 x 100% pump skid, truck unloading station, and eyewash station (no tempered water)

US $ 300,000

O4. OPTION Field Service / Supervision One trip / five days is recommended per unit

See Section XI

All Purchase Orders based on this Quote, which is not an offer, are subject to acceptance by Seller at its principal office in Dallas, Texas. Unless otherwise expressly provided in Seller's acceptance, the terms and conditions set forth herein shall constitute a part of any agreement resulting from Seller's acceptance of an order for all or part of the goods covered by this Quote. This Quote serves as notice to Buyer of Seller's objection to any terms and conditions of Buyer that in any way conflict with, modify, condition, add to, or differ from the terms and conditions specified herein, unless such terms and conditions of Buyer are expressly included in Seller's acceptance of Buyer's order. Silence on the part of Seller shall not be construed, under any circumstances, as acceptance of Buyer's terms and conditions. If not previously revoked or otherwise provided herein, this Quote shall terminate and cease to exist thirty (30) days from the date of this Quote.

Cc: Tim Shippy, Peerless Mfg. Co. Pam Murphy, Peerless Mfg. Co. Bob Locke, Locke Associates

Connie Rios Application Engineer – Environmental Systems Group [email protected] (P) 972-559-6303 (F) 214-351-0194

000215

Page 311: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 3 of 17

II. COMMERCIAL TERMS A. PROPOSAL PRICE: The price proposed is for the design, materials, or components listed. If specific design conditions

differ from the inquiry, the specifications shall be modified and an equitable adjustment shall be made in the contract price or delivery schedule, or both. Any changes in this quotation will be submitted and approved in writing.

B. DELIVERY: Typical delivery for catalyst and all equipment is within fifty-two (52) weeks from the order date, contingent

upon the timely return of approved drawings/documents. Storage fees will be charged if delivery is delayed beyond the project schedule for delays not caused by Peerless Mfg. Co. (Peerless). These charges will be imposed at the time of the delay.

C. TRANSPORTATION: Shipment of the equipment shall be via Motor Freight, Ex Works, Manufacturing Point. No allowance

has been made for any freight charges, special packaging, or export packaging / crating. D. EXCLUDED ITEMS: The quoted price does not include any custom duties, tariffs, import fees, income tax, nor any other

taxes, duties, levies, etc., imposed by governmental organizations. Equipment delivered to the following states will require a Tax Exemption Certificate to exclude those current state taxes from our invoice: Arizona, California, Georgia, Kentucky, Tennessee, and Texas.

E. VALIDITY: The offered price is valid for thirty (30) days from the proposal date, and thereafter, is subject to our

acceptance. Due to the current fluctuation in steel prices, all pricing in this proposal must be confirmed at time of purchase order.

F. PAYMENT TERMS: Payment shall be made, net 30 days, according to the following schedule:

10% - upon receipt of order 10% - upon submittal of approval drawings 25% - upon Peerless’ release to purchase materials 25% - upon Peerless’ notification to proceed with fabrication 30% - upon Peerless’ notification that equipment is ready for shipment.

G. CHANGES / CANCELLATION SCHEDULE: Any changes to or cancellation of the Agreement, once accepted, are subject

to written approval by Peerless under conditions that shall include, among other things, protection against any loss to Peerless.

Cancellation Schedule: 25% - after receipt of purchase order 50% - after submittal of general arrangement drawings 90% - after release to purchase materials 100% - upon release to fabricate H. WARRANTY:

1. All hardware is under warranty for eighteen (18) months from contracted delivery or twelve (12) months from scheduled start-up, whichever occurs first. The extent of the warranty includes replacement of defective components, and is limited to material only.

2. Peerless is not responsible for any damage resulting from mis-operation or improper maintenance of the unit as

described in the Peerless Operation & Maintenance Manuals for this project.

3. The aqueous ammonia must be reagent grade, diluted with fully de-ionized water to 19% by weight.

4. Peerless’ warranties are fulfilled at the end of the period stated in this proposal if the results of on-site tests indicate that the performance values shown in this proposal are met.

5. If the results of on-site tests during the warranty period indicate that the warranted values are not being met,

Customer will conduct an on-site investigation to determine the cause of non-performance. If the catalyst is suspect, Peerless will conduct laboratory tests, according to the conditions specified in this proposal to verify the catalyst performance.

6. If the results of the laboratory tests indicate that the warranted values are being met, Peerless’ warranties will be

deemed in fulfillment at this time and the Customer will continue their investigation to determine the cause of non-fulfillment. The Customer will compensate Peerless for the cost of laboratory evaluation.

7. If the results of the laboratory tests indicate that the warranty values are not being met, Peerless will, at its option,

repair, replace, or add catalyst at its cost to meet the required performance values. Peerless will absorb the cost of laboratory evaluation.

000216

Page 312: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 4 of 17

CATALYST WARRANTY CRITERIA:

1. Each SCR and CO catalyst bed performance is under warranty for thirty-six (36) months from initial start-up, or thirty-

nine (39) months from contracted delivery, or 24,000 total hours, whichever occurs first. This warranty is contingent on items discussed in the paragraph below and all requirements and contingencies provided by the SCR and CO catalyst vendors.

2. The catalyst must be handled, operated, and maintained according to the catalyst vendor’s instructions. Peerless is

not responsible for any damage due to operation above or below temperatures or pressures other than those design conditions shown on the specification sheet provided by Peerless, nor any damage resulting from mis-operation or improper maintenance of the unit as described in the Peerless Operation & Maintenance Manuals for this project.

3. To prevent premature thermal degradation of the SCR catalyst, the temperature at the catalyst face must not exceed

780 degrees F (416 degrees C).

4. The SCR catalyst face temperature must be a minimum of 450 degrees F (232 degrees C) for natural gas before ammonia injection will be allowed.

5. Unit operating conditions shall be within the limits of design cases provided.

6. The catalyst vendor maintains warranty protection as long as normal system start-up and shut-down procedures are

followed and no moisture other than from the flue gas or ambient air is present. The allowed start-up and shut-down temperature gradient for the catalyst is 10ºC/min below and 100ºC/min above the flue gas dew point.

7. The catalyst vendor is not responsible for catalyst degradation caused by reagent drainage or other liquid contact to

catalyst.

8. The catalyst vendor is not responsible for catalyst degradation caused by catalyst poisons. Design for natural gas applications is based on impurities found in typical United States pipeline quality natural gas applications. Impurities in the natural gas fuel were not available for evaluation. The impact of impurities can significantly impact the proposed design. A fuel specification including trace components must be provided to ensure that the catalyst design is adequate for the application.

a. Fine Particulate (ash) b. Ammonia-Sulfur Compounds c. Alkaline Metals (Family includes sodium, potassium, cesium, lithium, francium, rubidium) d. Alkaline earth metals (Family includes calcium, magnesium, barium, strontium) e. Non-Metals (phosphorus, arsenic, silicas, siloxanes) f. Halogens (fluorine, chlorine ) g. Transition and Other Metals (Family includes iron, antimony, chrome, copper, lead, mercury, nickel, tin,

zinc, vanadium, platinum, rhodium, palladium)

9. The NO/NOx ratio must be greater than 0.80 at the turbine exhaust for optimum performance and NOx reduction warranties to be met. (NO2 speciation must be less than or equal to 20% of the total NOx.)

10. No ammonia oxidizing material, such as platinum group elements, is to be dispersed upstream of the SCR reactor.

11. Peerless will not accept spent catalyst as part of the disposal process. Catalyst disposal is the responsibility of others.

I. PROPRIETARY RIGHTS:

1. All engineering and application information given in Peerless' Proposal is proprietary. Such information is to be used only in the evaluation of this offer. If an order does not result from this Proposal, such proprietary information must be held in confidence, and never used in any manner by the prospective purchaser.

2. If an order results from the Proposal, such proprietary information becomes the property of the Purchaser for use in the design, manufacture, and operation of the specific unit proposed, and cannot be used on any other item or in any other manner without approval from Peerless.

J. STANDARD LIABILITY INSURANCE LIMITS: Peerless is insured for the following limits.

o Commercial General Liability � Each Occurrence: $1,000,000 � Damage to Rented Premises: $100,000 (each occurrence) � Medical Expense: $5,000 (any one person) � Personal & ADV Injury: $1,000,000

000217

Page 313: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 5 of 17

� General Aggregate: $2,000,000 � Products: $2,000,000

o Automobile Liability – any auto, hired autos, non-owned autos � Combined single limit: $1,000,000

o Excess / Umbrella Liability � Each occurrence: $15,000,000 � Aggregate: $15,000,000

K. NON-UNION LABOR: All Peerless labor facilities are non-union. Non-union employees will complete all Peerless

fabrication work. UA labeled pipe can be supplied for an additional cost, if required.

III. GENERAL SCOPE OF SUPPLY

DESCRIPTION Peerless Optional Buyer Out of Scope

BASIC ENGINEERING AND DESIGN

PMC Document Index: X

Control logic: Logic Summary: Logic Diagram:

X

I/O List: X

Packing lists: with shipment X

ISA data sheet index and data sheets: X

Finish Specification: X

Two (2) Operation & Maintenance manuals provided 4 weeks after shipment of the system equipment. Additional manuals are $100.00 each.

X

Inspection Test Plan: X

P & ID Legend and Symbols: X

P & ID: X

Equipment general arrangement drawings: X

Reaction loads X

PE Stamp (can be included for an additional cost) X

Location of anchor bolts X

Design of anchor bolts X

Design of insulation (if applicable) X

Design of heat tracing (if applicable) X

Computation Fluid Dynamics Modeling X

DESCRIPTION Peerless Optional Buyer Out of Scope

AMMONIA SYSTEM

Aqueous Electric Ammonia Flow Control Unit:

1 x 100% U-tube emersion heater 3-Phase, 480V, 60 Hz

X

One (1) Heater power panel X

Ammonia Flow Control Valve X

Pressure Control Valves X

Differential Pressure Gauge X

Shut-off Valves X

Strainers X

Annubar X

Pressure Indicators X

000218

Page 314: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 6 of 17

Coriolis Flow Meter X

Thermocouple X

Temperature Transmitter X

1 x 100% packed tower vaporizer Material: SA-36 Note: Atomizing air is not required. Note: ASME code design is not required.

X

2 X 100% dilution air fans X

Insulation X

Wiring of fan motors X

Motor starters (Main disconnect breaker is not included)

X

PLC Control Panel

Allen Bradley CompactLogix PLC • PLC Controller o Analog Input (4-20mA) o Analog Output (4-20mA) o Analog Thermocouple Input o Digital Input /Output o Serial Data Comm (to HMI) • HMI –10” Color Touchscreen • Enclosure – Painted CS, NEMA 4 • Non-hazardous Electrical Classification • Standard terminals, wire, and accessories. • PLC processor with Ethernet comms and a 5-port industrial Ethernet switch for HMI and DCS comms

X

One (1) junction box – analog/digital Control Power: 120V, 1-Phase, 60 Hz

X

Support of AFCU X

Manifold:

Ammonia injection manifold Orientation: Vertical on one side Material: A-53B carbon steel welded pipe

X

Pressure Gauge X

Orifice plate at each branch take-off X

Branch balancing utilizes Midwest differential pressure indicators X

Valves for branch balancing control X

Insulation X

Supports for manifold X

Ammonia Injection Grid:

AIG: Each branch ammonia injection lances is shipped loose for field installation Material: A-53B carbon steel welded pipe or A500 carbon steel

X

Interconnecting Piping: Supply of interconnecting piping is based on the AFCU being within 25 feet of the ammonia injection location. Supply is based on no site obstructions that would require additional elbows or piping.

Interconnecting pipe (AFCU to manifold) Material: A-53B carbon steel welded pipe

X

Interconnecting pipe (Manifold to AIG) Material: A-53B carbon steel welded pipe

X

Interconnecting pipe (Ductwork to AFCU) Material: A-53B carbon steel welded pipe

X

Insulation X

Support of interconnecting piping X

Common Compressed Air System X

000219

Page 315: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 7 of 17

DESCRIPTION Peerless Optional Buyer Out of Scope

UREA TO AMMONIA CONVERSION SYSTEM

Decomposition chamber – 4.7’W x 4.7’L x 9’H & 12,000 lbs X

Integrated Circulation Pump & Controls X

Injector X

Metering & Distribution Module X

Process indication and controls for ammonia / gas flow, pressure, and temperature

X

Urea solutionizer system X

Wiring of fan motors X

Motor starters (Main disconnect breaker is not included)

X

Freeze protection, if required X

PLC Controls and Interface Support X

Support of UFCU X

UREA STORAGE SYSTEM

Heated and insulated urea storage tank: Fiberglass reinforced plastic (FRP) Capacity: 6,000 gallons 10’ OD x 10’ 3” Height, 2,700 lbs Gravity feed

X

Valves and Instrumentation (shipped loose to be installed in field by others): One (1) level indicator One (1) thermometer

X

Interconnecting piping X

Support of interconnecting piping X

DESCRIPTION Peerless Optional Buyer Out of Scope

CATALYST

SCR catalyst bed X

SCR catalyst test coupons X

CO catalyst bed X

CO catalyst test coupons X

DESCRIPTION Peerless Optional Buyer Out of Scope

DUCTWORK AND STRUCTURE

AIG support structure X

SCR catalyst support structure & sealing mechanism X

Test Ports for Catalyst X

Reactor instrumentation X

Expansion Joint at turbine exhaust X

Reactor housing from CO Catalyst to SCR Catalyst Duct Casing Material: Carbon Steel Casing Thickness: 0.25” minimum Interanl Liner: 409 S/S (14 ga. – walls and ceiling; 12 ga. – floor) Internal Insulation: 8 lb/ft3 ceramic fiber blanket – 4” thickness Casing Design Temperature is < 140°F

X

Inlet Transition Ducting to Reactor Housing X

Outlet ducting from Reactor Housing to Stack X

Flow Distribution Correction Vanes (if required) X

Hoist and monorail: Electric hoist / electric trolley

X

000220

Page 316: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 8 of 17

Includes cable hoist, electric trolley, electrical cable reel, and control pendant Standard electric voltage: 480 VAC, 3 phase

Catalyst installation / access door X

Ductwork platforms and ladder access Material: Galvanized

X

Stack Height: 60’ tall Diameter: TBD Casing Material: Carbon Steel Casing Thickness: 0.25” minimum Internal Liner: 409 S/S (12 ga.) Internal Insulation: 8 lb/ft

3 ceramic fiber blanket – 4” thickness

Casing Design temperature is < 140ºF

X

CEMS test ports X

Stack platforms and ladders X

Sound Attenuation, if required X

DESCRIPTION Peerless Optional Buyer Out of Scope

TEMPERING / PURGE AIR SKID

Tempering / purge air fans (2 x 100%) X

Wiring of fan motors X

Motor starters (Main disconnect breaker is not included)

X

Support of tempering / purge air skid X

Ducting from tempering / purge air skid to injection plenum X

Support of ducting X

DESCRIPTION Peerless Optional Buyer Out of Scope

AQUEOUS AMMONIA STORAGE SYSTEM

Ammonia storage tank: Material: SA516-70 Designed to ASME Code Section VIII, Div. 1 National Board Stamped Orientation: Horizontal Gross water capacity: 10,000 gallons Useable capacity: ~90% by volume of gross capacity Design Pressure: 50 psig Design Temperature: -20ºF / 150ºF Corrosion Allowance: 1/16” Manway: One (1) 24” RF

X

Valves and Instrumentation (shipped loose to be installed in field by others): Two (2) pneumatic valves One (1) level transmitter One (1) level indicator One (1) thermometer One (1) pressure gauge One (1) pressure relief valve (sized for blocked flow) One (1) vacuum breaker valve

X

Instrument Trim / Fittings / Drains X

Ladders and Platforms X

Ammonia Pump Skid (Aqueous Ammonia):

Ammonia Pump Skid: 2 x 100% Mag-drive type forwarding pumps Open loop system

X

Valves and Instrumentation: Two (2) pressure gauges Two (2) pressure safety valves

X

000221

Page 317: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 9 of 17

One (1) pressure relief valves / control valves One (1) back pressure regulator One (1) ammonia outlet pressure transmitter Two (2) Y-type strainers Two (2) swing check valves

Instrument Trim / Fittings / Drains X

Support of ammonia pump skid X

Motor Starters X

Truck Unloading Station:

Truck Unloading Stand: Skid pipe material: SA-106B C/S

X

Valves and Instrumentation: One 2-inch liquid sight flow indicator Two shutoff valves with ACME adapters, dust caps, and local drains One swing check valve for liquid fill line

X

Truck Unloading Pump X

Interconnecting Piping:

Interconnecting piping from truck unloading to tank X

Interconnecting piping from tank to pump skid X

Interconnecting piping from pump skid to AFCU X

Support of interconnecting piping X

Accessories:

Ambient area monitor (4 point system) X

Water fogger system X

Eyewash station X

Tempered water heater for eyewash station X

DESCRIPTION Peerless Optional Buyer Out of Scope

GENERAL

Supply of anchor bolts X

Supply and installation of external insulation X

Supply and installation of heat tracing X

DESCRIPTION Peerless Optional Buyer Out of Scope

SITE WORK

Field Service / Supervision X

Interconnecting wiring, ground frames, and conduits X

Electrical supply and controls for pumps, fans X

Final field and touch-up painting X

Unloading and storage at job site X

Civil/foundation design and work, anchor bolts and frames X Labor, equipment, consumables, and materials for erection of the equipment at the job site

X

IV. PEERLESS STANDARD DESIGN SPECIFICATIONS:

Paint Specifications: Surface Preparation: SSPC SP-6, Commercial Blast Cleaning Primer: Inorganic Zinc Primer, Carboline, Carbo Zinc 11, Gray #0700, 2-3 mils DFT

000222

Page 318: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 10 of 17

Top Coat: Carboline Carbothane 133HB, 2-2.5 mils, 4701 Gray White Color

Piping Specifications: Aqueous Ammonia Systems: ANSI B31.1 Structural Welding Specifications: AWS D1.1 Peerless Standard Weld Procedure: GMAW Electrical Classification: Enclosure Type: NEMA 4 IEC Enclosure Class: IP56 Area Classification: Non-hazardous Drawings: AutoCAD 2000, model space Documents: Microsoft Word, Excel, Adobe Acrobat Peerless Standard Instrument Suppliers:

Device Supplier

Level Indicator (float style) Magnetrol, Rochester, K TEK

Level Transmitter (guided wave radar style) Magnetrol

Flow sight glass (unloading station) Penberthy

Remote level indication (unloading station) Rosemount

Pressure relief valve (vapor ammonia) Crosby, Farris

Hydrostatic relief valve (liquid ammonia) Crosby

Vacuum breaker valve Groth

Thermocouple/Thermowell Rosemount

Temperature indicator Wika

Temperature transmitter Rosemount

Flow control valve (ammonia) Fisher-Baumann

Flowmeter/transmitter (ammonia) – coriolis style Micromotion

Flowmeter/transmitter (air) – annubar style Rosemount

Actuated Butterfly valve

• Actuator

• Solenoid valve

• Limit switch

Keystone, De Zurich, WKM, Fisher Posi Seal Tyco, Rotork, Bettis ASCO Tyco – Avid, Go, Moniteur

Actuated ball valve

• Actuator

• Solenoid valve

• Limit switch

Marwin, Truline, Velan Tyco, Rotork, Bettis ASCO Tyco – Avid, Go, Moniteur

Ball valve (manual) Marwin, Velan, Vogt, Apollo

Pressure gage Wika

Pressure regulator Fisher

Pressure switch S.O.R.

Pressure transmitter Rosemount

Differential pressure indicator Midwest

Differential pressure transmitter Rosemount

Butterfly valve Keystone, DeZurich, WKM

Excess flow check valve MGM

Orifice plates Fluidic Technique

Electric heaters Chromalox/Odgen

Dilution air blowers (ambient air) Chicago Blower, Robinson Fan

Dilution air blower motors Siemens, Reliance, Baldor

Gate Valves Velan, Vogt

Globe Valves Velan, Vogt

Instrument Needle Valves Hex, AGCO

Instrument Valve Manifolds Hex, AGCO

Strainers Armstrong, Spirax/Sarco

000223

Page 319: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL Page 11 of 17

V. DESIGN CRITERIA

A. DESIGN CONDITIONS: The proposed SCR System design is based on the following design conditions; the data is for one (1) unit. Should the actual gas conditions be different from the design data, the performance shall be re-evaluated, based on the corrected design data.

Case: Design 101 102 103 104 105 106 107 108 109

Fuel: NG NG NG NG NG NG NG NG NG NG

Reactor Inlet Conditions:Flue Gas Flow Rate, Wet lb/hr 719,763 769,243 761,149 753,161 741,538 703,637 686,144 665,099 640,196 614,129

Flue Gas Temperature degrees F 978 903 929 955 969 985 992 1001 1013 1025

O2 Vol %, wet 13.42 13.82 13.67 13.52 13.45 13.44 13.40 13.33 13.26 13.23H2O Vol %, wet 7.18 6.32 6.50 6.71 6.88 7.27 7.60 8.07 8.57 8.84N2 Vol %, wet 75.01 75.59 75.50 75.38 75.26 74.93 74.65 74.27 73.88 73.65CO2 Vol %, wet 3.48 3.36 3.43 3.49 3.51 3.47 3.45 3.43 3.41 3.40Ar Vol %, wet 0.89 0.90 0.90 0.90 0.90 0.89 0.89 0.89 0.88 0.88

NOx as NO2 ppmvd 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0NOx as NO2 lb/hr 29.4 30.2 30.5 30.8 30.4 28.6 27.8 26.9 25.8 24.6CO ppmvd 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0

CO lb/hr 17.9 18.4 18.6 18.7 18.5 17.4 16.9 16.4 15.7 15.0

NOx Reduction Percent 90.0 90.0 90.0 90.0 90.0 90.0 90.0 90.0 90.0 90.0CO Reduction Percent 75.0 75.0 75.0 75.0 75.0 75.0 75.0 75.0 75.0 75.0

Dilution Air Required lb/hr 180 185 186 188 186 175 170 164 157 150Dilution Air Required SCFM 37 38 38 39 38 36 35 34 33 31Consumption NH4OH lb/hr 11 11 11 11 11 10 10 10 9 9Consumption NH4OH gal/month N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Total Mass Injected by SCR lb/hr 190 196 197 199 197 185 180 174 167 159

Reactor Outlet Conditions:

Flue Gas Flow Rate, Wet lb/hr 719,953 769,439 761,346 753,360 741,735 703,822 686,324 665,273 640,363 614,288

Performance Warranties:NOx as NO2 ppmvd 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5

NOx as NO2 lb/hr 2.9 3.0 3.0 3.1 3.0 2.9 2.8 2.7 2.6 2.5CO ppmvd 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2

CO lb/hr 4.5 4.6 4.6 4.7 4.6 4.4 4.2 4.1 3.9 3.7NH3 ppmvd 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0

NH3 lb/hr 0.9 0.9 0.9 0.9 0.9 0.8 0.8 0.8 0.7 0.7Total System Pressure Drop " W.C.

"ppmvd" denotes parts per million by volume, dry, referenced to 15 percent oxygen.

< 12

000224

Page 320: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 12 of 17

B. CATALYST DESIGN DETAILS:

SCR CATALYST DATA

Catalyst Manufacturer Cormetech Equal (with Buyer approval)

Catalyst Type Honeycomb Ceramic Vanadium / Titanium

Honeycomb Ceramic Vanadium / Titanium

Gas Flow Horizontal Horizontal

C. UTILITY CONSUMPTION (AQUEOUS ELECTRIC AMMONIA FLOW CONTROL UNIT):

DESCRIPTION QUANTITY UNITS

Design Flow Rate Aqueous Ammonia (19% by Weight)

39 Lbs/Hr/Unit

Ammonia Supply Pressure 40 PSIG

Ammonia Inlet Temperature Ambient F Minimum for NH3

Ammonia Inlet Temperature Ambient F for NH4OH

AFCU Electric Air Heater

Capacity 45 kW

Consumption at Maximum Operating Ammonia Flow Rate (Estimated)

TBD kW

Instrument Air (-20 F Dew Point or Better)

Supply Pressure 80-125 PSIG

Maximum Steady State Air Consumption 1 SCFM

Maximum Instantaneous Air Supply Demand 5 SCFM

AFCU Dilution Air Blowers

Nominal Motor Rating (Estimated Only) 7.5 HP

Operating Power Consumption (Estimate) 75% of rated capacity BHP

Cooling Air Blowers

Nominal Motor Rating (Estimated Only) 250 HP

Operating Power Consumption (Estimate) 75% of rated capacity BHP

VI. LIST OF DOCUMENTS RECEIVED WITH INQUIRY:

Peerless has designed the equipment in accordance with the following specifications with exception to the items listed under Section VI of this proposal. Referenced specifications will be considered only if copies are provided with the proposal inquiry. State and local codes and/or regulations will be considered only if applicable copies are attached to the proposal inquiry. • E-mail from Doug Einck, dated 02-06-2009. • SCR Information Request Form, filled in, dated 02-06-2009, 4 pages. • University of Iowa LM2500+G4 Predicted Performance, dated 01-05-2009, 2 pages. • Typical Drawing 683200 – General Arrangement Main Unit, Rev C, 1 page.

000225

Page 321: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 13 of 17

VII. TECHNICAL CLARIFICATIONS AND EXCEPTIONS, SPECIFICATION 104610-PO-1:

• GENERAL - Modular Design: Peerless has based its design off a modular type construction to save on the total installed cost. The benefits to the modular arrangement include: shorter construction schedule, easier installation management and lower freight cost. o Duct sections are lifted into position on foundations. o Alignment bolts spaced every 4 feet on structural back-to-back channels are installed. o Seal welds are added to the back-to-back channels as shown on the drawing. o Interior insulation, 8# ceramic fiber in strips is placed in interior cut out section. o Floating interior liner plate in 4-foot lengths is lapped under the up stream liner and over the down

stream liner studs. 4” washers are laid over the down stream plate and tightened. Upstream nuts are tightened.

VIII. ADDITIONAL COMMENTS:

None noted. IX. COMMERCIAL CLARIFICATIONS AND EXCEPTIONS:

• Peerless has based this proposal on Peerless standard terms and conditions.

000226

Page 322: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 14 of 17

XI. PEERLESS STANDARD TERMS AND CONDITIONS: 1. PRICE. Unless otherwise specified in this Quotation, prices exclude all taxes (imposed by any state, country or other governmental entity), duties, packing and freight costs (including, without limitation, the cost of loading goods on board a carrier) and related costs and expenses, all of which shall be added to such prices and paid by Buyer. In addition, Buyer shall pay, or reimburse Seller for, reasonable out-of-pocket expenses, including, without limitation, travel and travel-related expenses, incurred by Seller in connection with the performance of its obligations or incurred by Seller at the request or with the approval of Buyer. Should Buyer request any change in goods or services covered by this Quotation, Seller shall not be obligated to proceed with such change until Seller agrees in writing to proceed with such change. If Seller determines that any such change may cause an increase in Seller’s costs or the time required for provision of goods or services, or may raise other issues of concern to Seller, an equitable adjustment shall be made with respect to price, schedule or otherwise in order to address such issues. 2. PAYMENT. Unless otherwise specified in this Quotation, payment for goods and services covered by this Quotation shall be made, in cash, within thirty (30) days from date of Seller's invoice. Unless otherwise specified in this Quotation, U.S. dollars shall be the currency of account, for all purposes, with respect to this Quotation. Amounts not paid when due by Buyer shall bear interest at the highest lawful rate on the unpaid amount from the due date until paid; provided, however, extended payment terms are acceptable only if agreed upon in writing by Seller. 3. SCHEDULES. All dates or schedules specified in this Quotation are approximate and are based upon Buyer’s and other parties’ timely provision of information, and performance of related work and obligations, necessary for Seller to perform its obligations hereunder. Seller shall be excused from any failure to meet such dates or schedules, where such failure is occasioned by any of the circumstances or conditions enumerated in paragraph 13 below. If any failure to meet dates or schedules is occasioned by the fault of Seller, Seller shall make commercially reasonable efforts to remedy such failure as soon as reasonably practicable. Any installation or use of goods or services by Buyer shall constitute a waiver of all claims for delay. Seller has the right to deliver goods at one time or in installments, from time to time, within the period provided for delivery. In the event of partial shipments, Seller may immediately invoice Buyer for the amount(s) due in respect thereof, which amount(s) shall be due and payable in accordance with paragraph 2 above. Delivery of nonconforming goods, or a default of Seller of any nature in relation to one or more installments, shall not substantially impair the value of this transaction, as a whole, and shall not constitute a default hereunder, as a whole. 4. SECURITY INTEREST. Seller shall retain, and Buyer hereby grants to Seller, a security interest in goods covered by this Quotation, now owned or hereafter acquired, wherever located, including all returns, repossessions and parts, and all chattel paper, instruments, documents, accounts, general intangibles, contract rights and security agreements (resulting from the sale or other disposition of such goods) and all cash and non-cash proceeds of any of the foregoing, which shall secure the payment of all amounts due from Buyer to Seller as specified in this Quotation. Buyer shall, at the request of Seller, execute, and hereby grants Seller the right to execute in the name of Buyer, any documents necessary to grant to Seller a security interest in such goods and any filings necessary to perfect such security interest in all jurisdictions where Seller deems such filings to be necessary to protect its interest. 5. INSPECTION. Buyer shall have the right to inspect goods fabricated hereunder prior to acceptance provided (i) such inspection shall occur at the place of fabrication, during the period of fabrication, (ii) such inspection shall be conducted by an authorized and qualified representative of Buyer, during normal working hours after reasonable notice to Seller and without interference with operations, (iii) Buyer shall ensure that all persons involved in such inspection comply with applicable security and other procedures relating to the place of fabrication and (iv) Buyer shall promptly notify Seller, in writing, in the event that any person involved in such inspection shall discover any defects or other problems with respect to the goods. Any inspection at the facilities of a supplier or subcontractor of Seller shall be subject to securing permission from such supplier or subcontractor, and Seller shall make commercially reasonable efforts to obtain such permission. Buyer shall accept goods, or part thereof, as soon as they are reasonably tendered to Buyer, unless during inspection at the place of fabrication Buyer has notified Seller of the unacceptability of such goods and confirms such notice in writing within ten (10) days of such inspection, but not later than the regularly scheduled shipment of such goods. Buyer may not revoke its acceptance. This paragraph 5 in no way modifies or affects Buyer’s remedies or Seller’s warranties set forth elsewhere in this Quotation. 6. INSTALLATION/SERVICE. Unless otherwise specified in this Quotation, all goods shall be installed by and at the expense of Buyer. If so specified in this Quotation, Seller shall furnish technical personnel to assist in installation and start up of goods, in which case Buyer shall pay Seller, at Seller’s then current commercial billing rates, for the resources utilized in connection with such assistance. In the event of service calls, exclusive of service calls necessitated by Seller's beach of the warranties set forth elsewhere in this Quotation, Buyer shall pay Seller, at Seller’s then current commercial billing rates, for the resources utilized in connection with such service calls. 7. SPECIFICATIONS. In the event Buyer is to specify the form, measurement, features or other specifications for goods, or to provide other information with respect to goods or services, Buyer shall deliver and secure Seller’s written acceptance of such information on or before the agreed date or, if no date has been agreed upon, within a reasonable time after receipt of a request from Seller. Seller's quality assurance and other procedures, specifications and drawings, as approved Buyer, shall be deemed for all purposes to comply with any procedures, specifications and drawings of Buyer and to supersede any conflicting terms thereof. 8. COOPERATION. Buyer shall cooperate with Seller in connection with Seller’s performance of its obligations through, among other things, performing its responsibilities set forth in this Quotation, securing performance of related work by other parties and making available, as reasonably requested by Seller, access, management decisions, information, approvals and acceptances in order that Seller may perform its obligations in a timely manner. 9. WARRANTIES. a) General. Seller warrants to Buyer that, under normal use, each item of goods covered by this Quotation shall be free from defects in workmanship and material for a period of twelve (12) months from the date of installation or eighteen (18) months from date of shipment, whichever occurs first. In the event this Quotation specifies a performance warranty or guaranty, Seller warrants to Buyer that, under normal use, each item of goods covered by this Quotation shall perform, in all material respects, in a manner consistent with such performance warranty or guaranty for the period specified in such performance warranty or guaranty or, if no such period is specified, for the period specified in the immediately preceding sentence. “Normal use”, as used herein, includes only such uses under such conditions as have been fully disclosed, in writing, to Seller prior to the date of this Quotation. In addition, Seller warrants to Buyer that Seller shall use reasonable care in providing services covered by this Quotation and that such services shall be provided in a workmanlike manner. In the event there are any nonconformities with these warranties, which nonconformities are reported by Buyer to Seller during the applicable warranty period, Seller shall promptly repair or replace the nonconforming goods and re-perform the nonconforming services.. In the event Buyer claims a nonconformity with these warranties, Seller or its appointee shall have the right to finally approve or disapprove such claim. In each instance of nonconforming goods, Buyer may elect, at its option, to (i) return goods, or part thereof, covered by this Quotation and to which the nonconformity relates, to Seller, at Seller’s fabrication facility, risk of loss en route to Seller’s facility to lie with Buyer, for Seller’s inspection and approval or disapproval or (ii) demand an on-site inspection of such goods. If Seller approves a claim, all transportation costs and other incidental costs incurred in Seller’s inspection of the goods, or part thereof, shall be borne by Seller; otherwise, Buyer shall bear all such costs. b) Exceptions. Notwithstanding anything to the contrary, if any nonconformities with these warranties arise, in whole or part, as a result of work performed by, or the act or omission of, Buyer or any other party, the maintenance or modification of goods other than by Seller, Vendor Items (as hereinafter defined), operation or use of goods or services in a manner inconsistent with any design conditions or other than as anticipated by applicable specifications or other than in accordance with operating instructions provided by Seller, failure to maintain catalyst and other consumables in accordance with manufacturer recommendations or any services, software, equipment or other items provided by Buyer or a third party, such nonconformity shall not constitute a nonconformity with these warranties and Seller shall not be responsible therefor. Notwithstanding anything to the contrary, and except as otherwise specifically agreed in writing by Seller, Seller shall have no responsibility for suggesting, specifying or confirming the appropriateness of Buyer’s specification of any goods, materials or other items used in the fabrication of goods or any other thing and no warranty in respect thereof is made by Seller. No failure which directly or indirectly relates, in whole or part, to such goods, materials or other items shall be, in any respect, the responsibility of Seller or a nonconformity with these warranties. These warranties shall not apply to any goods, materials, items or services supplied to Seller by Buyer. Seller hereby assigns to Buyer any warranties given by Seller's suppliers or subcontractors ("Vendors") in connection with any goods, materials items or services obtained by Seller from such Vendors ("Vendor Items") and included as a part of goods or services covered by this Quotation, to the extent such warranties are so assignable at no additional cost to Seller. To the extent that any such warranties are not assignable, Seller shall, upon the written request of Buyer and at Buyer's expense, take commercially reasonable actions to enforce any applicable warranty which is enforceable by Seller in its own name. However, Seller shall have no obligation to resort to litigation or other formal dispute resolution procedures to enforce any such warranty. With the exception of applicable Vendor's warranties which Seller is able to pass through for Buyer's benefit, Vendor Items are provided on an "AS IS" basis without warranty and, notwithstanding anything to the contrary, Buyer agrees to look solely to the applicable Vendor for any and all warranty claims respecting Vendor Items. c) Disclaimer. THESE WARRANTIES ARE EXPRESSLY IN LIEU OF ALL OTHER EXPRESS OR IMPLIED WARRANTIES, INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY, FITNESS, TITLE OR NONINFRINGEMENT OF ANY PATENT OR OTHER PROPRIETARY RIGHT AND OF ANY OTHER OBLIGATION ON THE PART OF SELLER, except as may be otherwise specified in this Quotation. Other warranties specified in this Quotation, if any, are strictly limited to their respective terms and in no way modify, alter, or waive the general effect of this disclaimer as to all other express or implied warranties. No agent, distributor or representative of Seller has any authority to bind Seller to any affirmation, representation or warranty, either written or oral, concerning goods or services covered by this Quotation or any other matter or thing and, unless an affirmation, representation or warranty made by an agent, distributor or representative is specifically included within this Quotation, it shall not be enforceable by Buyer. The remedies set forth in this paragraph 9 constitute Buyer’s sole and exclusive remedies for any nonconformity with these warranties. d) Suspension. Notwithstanding anything to the contrary, Seller’s may, at its option, suspend performance under this paragraph 9 in the event Buyer is not in full compliance with this Quotation and its obligations hereunder. While, during any such suspension, Seller shall have no obligations under this paragraph 9, such suspension shall not result in any extension of applicable warranty periods or otherwise modify these warranties. 10. BUYER'S REMEDIES. Buyer's exclusive and sole remedies, except as provided in paragraph 9 above, for any default hereunder by Seller, are strictly limited to either, at

000227

Page 323: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 15 of 17

Seller's option, (a) refund of the price paid by Buyer for goods and services in question and return of such goods to Seller or (b) repair and/or replacement of nonconforming goods, or parts thereof, and re-performance of nonconforming services. Notwithstanding anything to the contrary, in the event this Quotation provides for liquidated damages or any other specified amount to be paid, or indemnification or any other specified action to be taken, by Seller, such amount or action shall constitute Buyer’s sole and exclusive remedy for the circumstance or condition upon which such amount or action is based. Under no circumstances shall (i) Buyer have the right to claim or recover any punitive, exemplary, incidental or consequential damages or (ii) Seller be liable, in the aggregate for any and all matters arising out of, under, or in connection with this Quotation, whether based on an action or claim in contract, equity, negligence, intended conduct, tort or otherwise, for more than the amount paid by Buyer for goods and services covered by this Quotation. 11. SELLER'S REMEDIES. All of Seller’s remedies set forth in this Quotation, in the event Buyer fails to comply with this Quotation or any of its obligations hereunder, shall be cumulative and in addition to, and not in lieu of, any other remedies available to Seller at law, in equity or otherwise, and may be enforced concurrently or from time to time and Seller shall additionally be entitled to recover its reasonable attorney's fees and costs incurred by Seller in the enforcement of its rights and remedies. Without limiting the foregoing, in the event Buyer fails to make one or more payments when due, or otherwise defaults in the performance of any of its obligations, Seller may, at its option, suspend performance hereunder until such default is cured or terminate its obligations hereunder, or both. 12. RISK OF LOSS AND PASSAGE OF TITLE. Unless otherwise specified in this Quotation, all goods to be delivered by Seller are sold ex works (as defined in Incoterms 2000, ICC Publication NO. 460) and title to such goods shall pass to Buyer at the earlier of (i) the date when Buyer obtains physical possession of such goods or part thereof or (ii) the date such goods are loaded on a carrier for delivery to Buyer. If no carrier is specified by Buyer sufficiently in advance of the required date(s) of shipment, Seller may select any mode(s) of transportation and any common carrier satisfactory to Seller and such selection shall conclusively be deemed satisfactory to Buyer. In the absence of a written agreement to the contrary, Buyer bears all risks of shipment of any goods sold hereunder. 13. FORCE MAJEURE. Seller shall be excused from performance hereunder for any period, and to the extent, that it is hindered or prevented from performing pursuant hereto, in whole or in part, as a result of delays caused by Buyer or third parties, floods or other acts of God, war, revolution, terrorism or civil disturbance, governmental action, statute, ordinance or regulation, court order, strike or other labor dispute, fire, damage to or destruction in whole or in part of goods or place of fabrication, lack or inability to obtain raw materials, labor, fuel or supplies or any other circumstances or conditions beyond Seller's reasonable control. In the event of nonperformance occasioned by any of the foregoing circumstances or conditions, the time for performance shall be extended to the extent of such delay. Such nonperformance shall not be a default hereunder or a ground for termination hereof and shall not excuse Buyer from its payment obligations hereunder or extend the time for such payment. 14. VERIFICATION OF INFORMATION. This Quotation, including, without limitation, prices, schedules and specifications set forth herein, is based upon information furnished by Buyer to Seller. Buyer believes that such information is accurate and complete. However, if any such information should prove to be inaccurate or incomplete in any material respect, Seller may, at its option and by giving written notice thereof to Buyer, make appropriate adjustments to the provisions hereof including, without limitation, prices, schedules and specifications. 15. OWNERSHIP. Unless otherwise specified in this Quotation, Buyer shall not obtain any rights or interests in any patent, copyright, proprietary right or confidential know-how, trademark or process owned by Seller or any other party. Any and all intellectual property rights, including rights of patent, copyright and trademark, in any reports, drawings, documents, specifications, calculations, confidential know-how, materials, or processes (the “Intellectual Property Rights”) owned or created by Seller and used or embodied in goods or services covered by this Quotation shall remain the sole property of Seller. Any and all Intellectual Property Rights developed by Seller, whether in the provision of goods and services covered by this Quotation or independently thereof, shall belong to Seller. Any and all right, title or interest that Buyer or any other party may have or obtain in or to Seller’s Intellectual Property Rights is hereby assigned to Seller and Buyer shall take, or cause to be taken, all necessary or appropriate actions to vest such Intellectual Property Rights in Seller. 16. CONFIDENTIALITY. Buyer shall handle confidentially all designs and specifications and technical, commercial, financial and other information which Buyer receives from Seller pursuant to this transaction and shall not use, copy or communicate such information to others except in the performance of Buyer’s obligations pursuant to this Quotation or as necessary for operation and use of the goods, without prior written consent of and the payment of fair compensation to Seller. If Buyer discloses such information to any other party, as permitted by this paragraph 16, Buyer shall secure such party’s written agreement to the same confidentiality restrictions as stipulated herein and shall cause such party to comply with such confidentiality restrictions. 17. BUSINESS RELATIONSHIP. Seller, in providing goods and services to Buyer, is acting only as an independent contractor and under no circumstances shall Seller be deemed to be in any relationship with Buyer carrying with it fiduciary or trust responsibilities, whether through partnership or otherwise. Unless otherwise specified in this Quotation, Seller has the sole right and obligation to supervise, manage and direct the provision of all goods and services covered by this Quotation. Seller does not undertake by this Quotation or otherwise to perform any obligation of Buyer, whether regulatory or contractual, or to assume any responsibility for Buyer's business or operations. Buyer shall (i) accurately represent goods and services covered by this Quotation, including, without limitation, as to quality, function, purpose and compatibility, (ii) not attempt or purport to create any obligation of Seller with respect to goods, services or otherwise, (iii) not add, remove, obstruct, conceal, change or deface any notice, legend, logo, designation or other mark on, or affixed to, any goods or any packing or other materials provided with goods, (iv) permit operation, maintenance and use of goods only in accordance with, and in a manner anticipated by, applicable design conditions, specifications and operating instructions and (v) market and distribute goods and services only in the form provided to Buyer by Seller. Buyer shall indemnify, defend and hold Seller harmless from any and all damages, liabilities, costs, and expenses, including without limitation, reasonable attorneys' fees and expenses, arising out of, under or in connection with any claim, demand, charge, action, cause of action or other proceeding relating to the conduct of Buyer's business, including without limitation, the acquisition, transfer, operation and/or use of goods and services covered by this Quotation. This Quotation is not intended to confer any rights or benefits on any third party, including, without limitation, any employee, customer, business associate, creditor or affiliate of Buyer. 18. WAIVER. Waiver or nonenforcement by either Seller or Buyer of a right or privilege with regard to, or of a default by the other of, any term or condition of this Quotation shall not be deemed a waiver of future compliance therewith, and such terms or conditions shall remain in full force and effect. 19. ASSIGNMENT. Buyer shall not assign or transfer its rights or obligations under this Quotation, or any part hereof, without Seller's prior written consent. 20. HEADINGS. The headings contained in this Quotation are for reference purposes only and shall not in any way affect the meanings or interpretations hereof. 21. CHOICE OF LAW AND FORUM. This Quotation shall be governed by and construed in accordance with the laws of the State of Texas, without giving effect to principles of conflict of laws. The United Nations Convention on the International Sale of Goods shall not be applicable to this transaction. Any dispute that may arise out of or in connection with this transaction shall be subject to the exclusive jurisdiction of the courts of the State of Texas and the U.S. federal courts located in such state, and Buyer irrevocably submits to the personal jurisdiction of such courts for purposes of any suit, action or proceeding involving any such dispute. 22. ENTIRE AGREEMENT. The terms and conditions set forth in this Quotation constitute the entire agreement between the parties with respect to the subject matter hereof. This Quotation wholly cancels, terminates and supersedes any and all letters, requests for quotes, quotes, purchase orders, acknowledgments, bills of lading, agreements and understandings, whether oral or written, between Buyer and Seller with respect to the subject matter hereof. Terms and conditions set forth in any letter, request for quote, quote, purchase order, acknowledgment, bill of lading, agreement or other document utilized or exchanged by the parties shall not be incorporated herein or binding unless expressly agreed upon in writing by Seller. This Quotation may not be modified or terminated orally, and no modification, termination or waiver shall be binding on Seller unless accepted and acknowledged by a written instrument signed by a duly authorized representative of Seller. 23. EXPORTS. If all or any portion of the goods to be provided pursuant to this Quotation are to be exported from the United States, Buyer agrees that such exportation is subject in all respects to, and Buyer shall comply in all respects with, United States laws with respect to such export and subsequent re-export of such goods. Seller makes no representation or warranty relative to the export or re-export of such goods. 24. SURVIVAL. All representations, warranties, covenants and indemnities made in this Quotation shall survive the consummation of the transactions contemplated by this Quotation. Termination of all or any part of this Quotation, for any reason, shall not release Buyer from any liabilities or obligations set forth in this Quotation which (i) expressly survive any such termination or (ii) remain to be performed or by their nature would be intended to be applicable following any such termination. 25. SAVINGS CLAUSE. If any provision of this Quotation is declared or found to be illegal, unenforceable or void, then obligations arising under such provision shall be null and void and each provision not so affected shall be enforced to the full extent permitted by law. 26. ARBITRATION. Any controversy arising out of this transaction shall be finally settled by arbitration. The arbitration shall be carried out pursuant to the commercial arbitration Rules of the American Arbitration Association then in force by one or more arbitrators appointed in accordance with such rules. The arbitration shall take place in Dallas, Texas, U.S.A., and the award shall be deemed a State of Texas award. The English language shall be used in the arbitration proceedings. The award shall be made and shall be payable in U.S. dollars free of any tax or other deduction. The award shall include interest from the date of any breach or other violation of this Agreement to the date when the award is paid in full at an appropriate rate of interest fixed by the arbitrators. Judgment upon the award may be entered in any court of appropriate jurisdiction.

000228

Page 324: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 16 of 17

XII. START-UP SUPPORT AND FIELD SERVICE RATES (DOMESTIC):

DOMESTIC FIELD SERVICE RATE SHEET (Effective 6/23/04) FIELD SERVICE includes inspection, direction of installation or repair (labor by others), startup, initial adjustments, readjustment, test and general inspection of plant personnel for the operation and maintenance of Peerless Mfg. Co.'s and related equipment in a plant system. The field service is performed by Peerless Mfg. Co.'s Authorized Service Representative(s) or by representatives from other companies hired by Peerless Mfg. Co. to perform a specific task. This service does not include the supply of any parts. It is performed only on the basis of a bona fide purchase order for field service issued by the ultimate customer or his authorized representative, covering the specific type of service desired. Peerless Mfg. Co.'s service is subject to the Field Service Terms & Conditions shown on the following page.

Service Category Type of Service Daily Rates (8 hours) A Maintenance Service $1200.00 plus expenses B Startup Service $1200.00 plus expenses C Classroom Instruction $1200.00 plus expenses D Engineering Consultation Consult PMC-Dallas E Annual Equipment Inspection $950.00 plus expenses F Construction Supervision $1500.00 plus expenses

Billing will be based on rates in effect at the time service is rendered. Rates apply within the continental United States only. Notes: A) "Time" is based on travel time to the job from the man's regularly assigned office location, on-the-job work hours and return travel to the office location. Travel time will be billed as straight time and will not exceed 8 hours. Travel time from job to job will be a prorated charge. B) “Overtime” applies to all time spent working in excess of 8 hours during a normal working day, any time other than a normal day shift and any time on Saturdays. Overtime will be billed at 1-1/2 times the regular rate. Time on Sundays and holidays recognized by Peerless Mfg. Co. will be billed at 2 times the regular rate. C) A "man day" is considered as 8 hours time per man during a normal day shift working hours. The minimum amount invoiced shall be for one man day (or eight hours). D) “Standby time” is chargeable on-call time during which the service representative is available but unable to proceed with work functions due to jobsite delays. On-site standby time is chargeable at the applicable rate. Off-site standby time is chargeable at full applicable rate. While off-site time on weekdays, beyond 8 hours or weekends and holidays is considered non-chargeable personnel time, the field representative can be made available on an "on-call" basis, if required. This availability, when requested, becomes chargeable at applicable straight time rates. On-site time required becomes chargeable at the applicable overtime rate. E) Peerless Mfg. Co. does not guarantee that the customer's personnel who participate in instruction sessions are sufficiently trained to properly operate the equipment. F) For service visits which extend beyond two weeks, the service representative will be allowed to travel home on the second weekend with time and expenses chargeable at the applicable rate. G) When Peerless Mfg. Co. finds it necessary to hire service representatives from other companies to place major equipment for service, we shall invoice for this service at cost, plus 10% to cover handling charges. H) Field Service may be obtained by contacting Peerless Mfg. Co., SCR Systems Division, Dallas, Texas. I) Two weeks’ advance written notice, including a purchase order referencing this document, is required to guarantee that a site representative will be dispatched to the job site. A US$2,500.00 cancellation fee will apply if the site visit is canceled within three (3) working days of departure. Expenses: A) Travel – Round trip plane tickets, private or rental automobile charges from the point of regularly assigned location of the service representative plus any required local travel. Private automobile charges will be 60 cents per mile. Tolls and parking fees are additional. When our service representative goes from job to job rather than returning to his corporate office, travel charges will be distributed on a prorated basis. B) Living – Lodging, meals, and incidental costs are living expenses. C) Receipts for air travel, automobile rental and lodging will be available upon request. Receipts for meals and incidental costs are not required by Peerless Mfg. Co., but will be supplied upon prior arrangements. D) Special Equipment – If necessary for start-up or is requested by the customer, Peerless Mfg. Co. will furnish any special equipment:

- Portable emissions analyzer – charged at $50.00 per hour - Rented equipment – charged at rental cost plus 10% administration fee.

E) 10% administration fee will be applied to all expenses.

000229

Page 325: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

PEERLESS MFG. CO. 14651 North Dallas Parkway, Suite 500, Dallas, TX 75254 PMC Ref. No.: 13563, Rev. 0

Phone: (214) 357-6181 / Facsimile: (214) 351-0194 PROPRIETARY AND CONFIDENTIAL

Page 17 of 17

XIII. PEERLESS MFG. CO. FIELD SERVICE TERMS & CONDITIONS: The following Terms & Conditions of Sale shall govern all orders and take precedence when Terms & Conditions Between Peerless Mfg. Co. and the Customer differ in substance and/or are in conflict. General Conditions: Peerless is not responsible for the performance of equipment when startup and adjustment is performed by persons who are not Peerless Mfg. Co. Field Authorized Service Representatives. Satisfactory equipment operation is dependent upon proper ammonia, air and/or temperature control; limit devices; operating permissiveness; and sound operating practices. In view of the nature of application and frequent interrelatedness of Peerless Mfg. Co.’s equipment with that of other companies’ equipment, minor resizing of critical parts may become desirable and necessary at startup or during early operation in order to improve the application. Any such changes shall not affect nor change normal warranty or liability or validity of the customer’s purchase order(s) for equipment or services. Any parts required for such modifications are considered a no-charge warranty replacement. However, additional startup service required to make such minor changes at time of startup (e.g. flow meters, spray nozzles, to optimize system operation) is not covered by warranty and is chargeable to the customer. All necessary parts will be supplied on a no charge warranty basis. However, Peerless Mfg. Co.’s service labor will be invoiced separately. Peerless Mfg. Co. maintains the following insurance coverage: Commercial General Liability, Foreign Worldwide Liability, and Employers’ Liability and Business Automobile liability. A Statutory Insurance Certificates is available upon request. Customers who order service without a purchase order will be charged a $75.00 administrative fee to be named as an additional insured. Specific Term: 1. Pricing Purchase orders are subject to review and acceptance by Peerless Mfg. 2. Terms of Payment Invoices are to be in cash, net 15 days from invoice date. All overdue accounts will be subject to a late charge of 1.5% per month from due date until paid. Peerless Mfg. Co. does not hereby agree to give further time for payment, but rather intends to impose a charge for late payment. Peerless Mfg. Co. hereby reserves any right it may have to file a mechanic's lien against the site at which Peerless Mfg. Co. performs service. 3. Limitations of Liability Peerless Mfg. Co. shall not be responsible for the acts and workmanship of the employees, contractors, sub-contractors or agents of the Customer. Peerless Mfg. Co. shall not be liable to the Customer for any loss or injury to persons or property caused by negligence of the Customer, its employees, contractors, suppliers or their employees, agents or sub-contractors. In no event shall Peerless Mfg. Co. be liable, whether arising under contracts, tort (including strict liability and negligence) or otherwise, for loss of anticipated profits, loss by reason of plant shutdown, non-operation or increased expense of operation, service and erection, cost of purchase of replacement power, or for any special, indirect, incidental or consequential loss or damage of any nature arising at time or from any cause whatsoever. 4. Indemnification Peerless Mfg. Co. will defend and indemnify the customer against all damages, liability, claims, losses and expenses (including attorneys' fees) for injury or death to persons or damage to property of other arising out of, or resulting in any way from any defect in the services purchased hereunder or from any negligent act or omission of them, its agents, employees or subcontractors, provided a request is made within 90 days after the services are rendered. In that event, Peerless Mfg. Co. will not be liable for bodily injury or property damage beyond $1,000,000 per occurrence and in the aggregate. 5. Arbitration In the event any dispute arises out of or relating to this Agreement, the parties shall attempt to resolve their differences by negotiation failing which either party may submit the matter to arbitration. The arbitration shall be conducted in accordance with the Commercial Rules of the American Arbitration Association and judgment on the award may be entered in any court having jurisdiction. There shall be one arbitrator, to be selected by mutual agreement of the parties. If the parties cannot agree on such arbitrator within thirty days after commencement of discussions regarding such arbitrator, then either party, on behalf of both may request appointment of the arbitrator by the then presiding judge of the Federal District Court for the State of Texas. Each party shall pay the fees of its own attorneys, and the expenses of its witnesses and all other expenses connected with presenting its case. Other costs of the arbitration, including the costs of any record or transcription of the arbitration, administrative fees and the fee of the arbitrator shall be borne equally by the parties.

000230

Page 326: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

TAS Proprietary Page 1 of 6 Proposal: 0905052-00

TURBINE AIR SYSTEMS 6110 CULLEN BLVD. HOUSTON, TX 77021 (713) 877-8700 P (713) 877-8701 F

May 29, 2009

Budgetary Proposal: 0905052-00 RE: University of Iowa

Stanley Consultants 225 Iowa Avenue Muscatine, IA 52761 RE: University of Iowa To: Mr. Douglas Einck; We thank you for the above referenced enquiry, and take pleasure in submitting the attached budgetary proposal for the supply of a Turbine Inlet Chilling System for the University of Iowa project. The packaged chiller system will consists of a heavy-duty structural steel base and frame with integrated piping, valves, pumps, switchgear and controls. These items are factory installed and pre-wired in TAS’ ISO 9001:2000 certified facility and comprise the bulk of the basic scope of supply items listed in section 1.XX of this offering.

The TAS packaged design ensures that field installation is reduced to the maximum extent possible. Consequently, NON-TAS installation responsibilities consists of only the following:

Setting packages on prepared foundations Connecting utility services Setting the cooling tower cells and piping

Field installation of piping manifold, heat exchanger(s) and insulation if required

Connection of piping, control wiring to the site blow down tank, drains coils etc.

The pricing of this proposal is based on acceptance of TAS standard terms and conditions. This proposal is provided for a budgetary amount and constitutes a binding offer valid for Thirty (30) days from the date above.

Primary Case Gas Turbine TAS Model D-20 Maker GE Capacity, tons 1642 Model LM2500+ Conditions, ºF DB / ºF WB 95/ 81.3 Qty. 1

System Efficiency, kW/ton 0.88 Inlet Air Temperature T2, ºF 44.6 Temperature, leaving water, ºF 38 Quantity of packages 1

Upon receipt of full engineering information, TAS can re-evaluate this proposal and guarantee the performance as noted. We again thank you for the opportunity to submit our proposal for the University of Iowa project, and we look forward to being able to discuss our proposal further in due course. In the meantime should you require anything further please do not hesitate in contacting me at the Houston office. Regards,

Joe Stuparich Director TIC

000231

Page 327: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

TAS

TAS Proprietary Page 2 of 6 Proposal: 0905052-00

1-832-615-6239: Phone 1-713-306-9506: Mobile 1-713-877-8701 : Fax [email protected]: Email

BUDGETARY PROPOSAL PRICING SUMMRY

BUDGET ESTIMATE Case 1 Case 2 Case 3 Primary Case Option Case Option Case

Project Scope, Price $ (EX-Works) Manufacturer’s Facility

1,725,711

EQUIPMENT ONLY Estimated Net Increase in Power, MW 5.5 Unit Price of Additional Power, $ per kW 0.0 Lay-out of Chilling System 1 Chiller Plant Model D-20 Quantity of Chiller plants 1 “ T2” – Inlet Air Temperature, F 44.6

Price schedule and scope of supply as below are based on primary case

Price Schedule 1.0 Price Schedule

Qty. 1– D-20, 60 Hz, Chiller Packages with PLC Based Central Controls consisting of: • Chilled Water Pumps w/ ODP, EPACT Motors............................................................................ Included • Cooling Water Pumps w/ ODP, EPACT Motors........................................................................... Included • Internal Piping, Valves, Instrumentation & Controls..................................................................... Included • ASHRAE Compliant Ventilation System ...................................................................................... Included • Insulated Panel Enc. on Struct. Steel Base - (125 mi/h & Seismic Zn 4 Design) ........................ Included • Internal Lightning and Utility receptacles ..................................................................................... Included • Chiller performance testing (non-witness) ................................................................................... Included • Control valves for chilled water package isolation, turbine bypass (min. flow) and coil flow/temperature

modulation.................................................................................................................................... Included • Cooling Tower Systems (per D-20 package), including............................................................... Included

o Cooling Tower Fans (TEAO) w/ VFD Starters ................................................................ Included o Cooling tower with galvanized basin o Fan Vibration Switches - 1 per Cell................................................................................. Included o Low level switch – 1 per common basin o Condenser water piping design....................................................................................... Included o Condenser large bore piping........................................................................................... Included o Cooling tower support structure & design ....................................................................... Included o 304SS Basin.................................................................................................................... Optional

• TES System with Secondary Chilled Water Pumping Package o Chilled Water Pumps w/ Motors...................................................................................... Optional o Internal Piping, Valves, Instrumentation & Controls........................................................ Optional o ASHRAE Compliant Ventilation System ......................................................................... Optional o Insulated Panel Enc. on Struct. Steel Base - (125 mi/h & Seismic Zn 4 Design) ........... Optional o Internal Lightning and Utility receptacles ........................................................................ Optional

000232

Page 328: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

TAS

TAS Proprietary Page 3 of 6 Proposal: 0905052-00

• GT Lube Oil Pump Skid ............................................................................................................... Optional • Expansion Tank............................................................................................................................ Included • 1 Electric water heater for anti icing, skid system with control panel........................................... Optional • Chemical injection skid, w/ 3 pumps and chemical tote connections .......................................... Optional • First Fill, lubricants and refrigerants ............................................................................................. Included • Coil modules and filter house retrofit kits ..................................................................................... Optional • Gas Turbine Inlet Cooling Coils Sets (one per gas turbine) ........................................................ Optional • Warranty – 2 year parts and labor................................................................................................ Optional • Training, Startup & Commissioning (5 consecutive days) ........................................................... Included

Subtotal Chiller Packages $ 1,725,711 USD

1.1 Shipping Lot (Incoterms 2000) Manufacturer’s Facility ** Please note some key items shipped direct to site

Scope of Supply

TAS packaged Central Chilling Plant(s), complete with the items listed in section 1.XX included in the scope of supply.

2.0 Standard Packaged Central Plant, consisting of following components

2.1 Chiller Selection – Centrifugal (primary) Trane Centrifugal Duplex Model CVHF Chiller, operating in

parallel 2.2 Chiller Motor Starter - Medium Voltage , remote mounted in electrical dry room 2.3 Chiller unit controls - Tracer CH530, with operator interface screen, fully integrated into Central plant

controls system 2.4 Chilled Water Pump Selection- Only Cast Iron, vertically mounted centrifugal pump(s), complete with

top mounted motors, OSHA approved coupling guard, and flexible style grid coupling. 2.5 Condenser Water Pump selection- Only Cast Iron vertically mounted centrifugal pump(s), complete

with top mounted motors, OSHA approved coupling guard, and flexible style grid coupling. 2.6 Cooling tower Qty One (1) cooling tower modules provided per packaged plant, suitable to meet

temperature load requirements 2.6.1 Cooling Tower Structure - Pre-engineered and fabricated structural support for mounting Cooling

Towers to mount above the Chiller Skid(s) 2.6.2 Condenser Water piping loop Qty One (1) lot, large bore (6.00” minimum NPS) cooling tower piping

/header run 2.7 Central Plant Controls System – PLC based digital controls 2.8 Chemical Treatment Equipment – Located outside package interior Qty one (1) Walchem controller

(pH and TDS). Qty three (3) 24 GPD Walchem Chemical feed pumps 2.9 Expansion Tank - Chilled water loop only, to exterior of plant.

2.10 Standard Package Features

2.10.1 Structural steel members - runners, perimeter and intermediate 2.10.2 Lifting trunnions - Qty Four (4) retractable per plant module; ASME B30 2.10.3 Jack bolts - Qty one (1) per anchor bolt hole for each outside skid base member 2.10.4 Side panels- foam core with steel exterior and interior skins, factory-baked enamel finish. 2.10.5 Door -steel exterior min. of 84" high with vandal resistant locks, all keyed alike and lockable 2.10.6 Flooring- 3/16” (4.76 mm) minimum diamond tread plate 2.10.7 Roof - steel exterior and interior, sloped weatherproof and thermally insulated 2.10.8 Maintenance Access - removable end wall or door design for servicing, select areas 2.10.9 Service - Monorail beams with overhead lift device heavy lift sections for maintenance

000233

Page 329: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

TAS

TAS Proprietary Page 4 of 6 Proposal: 0905052-00

2.10.10 Package HVAC Units- Bard Style HVAC units sized for total equipment heat dissipation 2.10.11 Thermostat- 7-day programmable, hardwired, large backlit LCD display 2.10.12 Refrigerant monitor Low-level leak detection 2.10.13 Audible and/or visual alarms – User-set Acceptable Exposure Level (AEL) of the refrigerant 2.10.14 Package Exhaust fan- Ventilation System, integral to alarm 2.10.15 Fire Extinguisher- Multi-Purpose, ABC Dry Chemical, Wall hooks included, 20 lb 2.10.16 Interior Lighting- Industrial T-8 lighting fixtures for main chiller and controls room 2.10.17 Controls dry room for Low and Medium voltage MCC/electrical equipment, operator interface via

control panel

2.11 Filter House retrofit system, complete with cooling coils

• A-36 Carbon steel, inorganic primer and epoxy top coat • Polyurethane moister separators • A-54 Carbon steel external drain piping and isolation valves • A-123 Galvanized Structural Steel • Coil modules, complete with factory installed cooling coils

2.12 Cooling Coils • 304 SS headers, w/ victualic couplings • 304 SS Nozzles • 304 SS casings • Copper tube walls, .024” Thk • GE Quality approved

2.13 Coil condensate return system • Qty Two (2) redundant sump pumps • Stainless Steel storage tank • Controls, gages and strainers

2.14 Thermal Energy Storage Tank System • Tank Volume (gal): 0.0 • Tank Height (ft): 0.0 • Tank Diameter: 0.0 • Secondary pump package, with redundant standby pump VFD drives mounted on a structural steel

base. The secondary chilled water pumps, associated valves, and piping will be unenclosed while the MCC is in a weatherproof enclosure

2.15 Testing & Documentation / Commissioning Services

The following non-witnessed testing on is included with packages: 2.15.1 Qty two Installation, Operating and Maintenance manuals, electronic copies, indexed PDF CD’s 2.15.2 Chiller only standard air-run/vibration test at Trane’s Facility in Lacrosse, Wisconsin 2.15.3 Chiller Package electrical functions check at TAS Facility in Houston, Texas 2.15.4 Motor control center inspection test report at TAS Facility in Houston, Texas 2.15.5 Package piping hydrostatic test ASME B31.1. at TAS Facility in Houston, Texas 2.15.6 Centrifugal Pump only hand turn test at manufacturer’s facility. Any Testing or documentation above and beyond what is included above will be to the buyers account, no exceptions.

2.16 Excluded Items

2.16.1 Chilled water piping outside the battery limits of the proposed packages. 2.16.2 Coil condensate handling equipment and piping 2.16.3 Installation of proposed scope of supply 2.16.4 Cooling tower and chilled water treatment equipment and chemicals 2.16.5 Small bore (<4” nominal O.D.) cooling tower piping. 2.16.6 Fill, flush, draining and disposal of flushing media

000234

Page 330: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

TAS

TAS Proprietary Page 5 of 6 Proposal: 0905052-00

2.16.7 Evacuation of refrigerant loop (high pressure refrigerant systems only) 2.16.8 Freight to site 2.16.9 Performance or payment bonds, letters of credit 2.16.10 Performance testing

3.0 Supplemental Commercial details All Prices quoted are in United States Dollars [USD], not subject to escalation/decrease based on local currency

exchange. Import/Export Customs Duties other than during manufacturing, not included in pricing. All taxes are excluded from the pricing. Currency Exchange Responsibility – USD proposal only, not subject to escalation/decrease based on local currency

exchange. Validity: The prices quoted would remain valid and open for acceptance, for a period of Thirty (30) days from the

date of this quotation. Delivery: The equipment offered in this proposal would be available within twenty six (26) weeks Ex-Works (EXW)

Manufacturer’s Facility, and / or return of submitted engineering drawings (if required) and / or acceptable Letter of Credit. Expedited delivery schedules per TAS approval in writing.

Payment terms: This payment schedule is for an equipment supply scope of work. These payment terms are not subject to retention. All progress payments due via wire transfer net 30 days after date of invoice.

Final of payment to be received no later than 120 days from shipment. A. Progress Payments 10% Upon receipt of order 15% on TAS submission of engineering drawings 20% on commencement of fabrication

30% on commencement of assembly 20% on ready to ship 5% on O&M documentation submission

B. Irrevocable Documentary Letter of Credit in favor of: TAS, Ltd. (TAS)

4300 Dixie Drive Houston TX 77021 Attn: Mike Brady, President

Opened in the English Language confirmed and payable at the counters of a U.S.A bank acceptable to TAS in U.S. Dollars for the amount of contract representing 100% of contract value. Cancellation: In the event of the buyer terminates for convenience and without cause, all or any part of the order, the compensation to TAS shall be as follows: Order Placement to 3 wks after order 10% of P.O. amount. 3 wks after order through 6 wks after order 35% of P.O. amount. 6 wks after order through 9 wks after order 70% of P.O. amount. 9 wks after order through time to deliver 100% of P.O. amount.

4.0 Confidentiality Statement Confidentiality, Restricted Use Of Information PROPRIETARY AND CONFIDENTIAL DATA: The Company’s Proposal contains information that is proprietary and confidential to the Company and others. By accepting this Proposal for consideration, the Customer acknowledges that: (a) information in the Company’s Proposal is confidential, (b) disclosure of confidential information is prohibited, (c) disclosure of confidential information will result in irreparable harm to the Company, and may result in legal liability to the Customer, and (d) the Customer will maintain the confidentiality of the records, use them for the limited purpose for which it has been provided, and comply with the following requirements. USER RESPONSIBILITY FOR MAINTAINING CONFIDENTIALITY: The Customer agrees that the Customer is solely responsible for maintaining the confidentiality of this Proposal and that disclosure is prohibited, except as provided herein. The Customer must handle such information with the same degree of care with which it would treat its own confidential information and must use reasonable efforts to safeguard the information from unauthorized disclosure. LIMITED USE OF RECORDS: The Customer must use the information only for the specific project identified in the Proposal Letter and may not use electronic files of this Proposal and information for any other purpose. No part of this Proposal document may be reproduced in any form or used in any data retrieval system other than for the User’s limited business use defined herein. LIMITED DISCLOSURE ALLOWED; INDEMNITY FOR DISCLOSURE: Disclosure is prohibited, except to those individuals employed by the Customer who are directly involved in the specified Project for which this Proposal has been provided and have a technical or business related need to know the information. However, before disclosing information to such recipient, the Customer must inform him or her that: (a) the information is confidential, and

000235

Page 331: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

TAS

TAS Proprietary Page 6 of 6 Proposal: 0905052-00

(b) disclosure and use of the information is restricted as set forth in herein and under the law. If the Proposal information is disclosed, then the Customer is solely responsible for any damages arising out of the disclosure and will fully indemnify the Company and hold it harmless for such damages. This provision will survive Customer’s notification to Company that it is no longer considering Company’s Proposal for the Project specified in the Proposal Letter. EXCEPTIONS TO CONFIDENTIALITY: There is no requirement to maintain the confidentiality of information that was known to the User before soliciting this Proposal; that was publicly available at the time it was accessed by or transmitted to the Customer; that was properly provided to the Customer by a third party without restriction; that the Customer developed independently; or that is required to be disclosed by law. However, if the User is legally required to disclose confidential information, it will promptly notify the Company and permit the Company to seek an appropriate protective order at the Company’s expense. Standard Terms and Conditions TAS Terms and Conditions can be found here: Domestic: http://www.tas.com/documents/Terms%20and%20Conditions-Domestic%20070131.pdf International: http://www.tas.com/documents/Terms%20and%20Conditions-International%20070131.pdf

000236

Page 332: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Units No-TIC FOG/EVAP CH-Case

GE GE GELM2500+ LM2500+ LM2500+

DLE DLE DLEGas Gas Gas

Simple Simple SimpleNo No No60 60 601 1 1

ft 730 730 730F 95 95 95F 81.3 81.3 81.3% 56.3 56.3 56.3F 95 88.3 44.6

MW 25.4 26.4 32.4MW 25.4 26.4 32.4MW -0.1 -0.1 -0.1MW 25.3 26.3 32.2MW - 1 6.9% - 3.8 27.3

MW 0 0 00 0 00 0 0

MW 0 0 0MW 0 0 0MW - 0 0% - 0 0

MW 25.3 26.3 32.2MW 0 0 1.4MW 0 0 30.8MW - 0 5.5% - 0 21.6

- - TAS CT- - Mechanical- - On-line- - N/A

hours - - 0hours - - 0tons - - 1642tons - - 1642tons - - 1642tons - - 1642

ton-hours - - 0tons - - 1642

ton-hours - - 0ton-hours - - 0

- - D-20- - 1

tons - - 1977kW/ton - - 0.88

kW - - 1444.96kW - - 1444.96

- - 1F - - 38F - - 56

- - Parallel

CF - - -ft - - -H - - -

- - -gpm - - -gpm - - -

mmBTU/hr 237.3 243.5 284.9mmBTU/hr - 6.2 47.6BTU/kW-Hr 9367.1 9261.6 8836.2BTU/kW-Hr - -105.5 -530.9BTU/kW-Hr - 0 414.6BTU/kW-Hr - 0 6865.8mmBTU/hr 0 0 0mmBTU/hr - 0 0BTU/kW-Hr 0 0 0mmBTU/hr 237.3 243.5 284.9mmBTU/hr - 6.2 47.6BTU/kW-Hr 0 0 9250.8BTU/kW-Hr - 0 -116.3

% - 0 -1.2576BTU/kW-Hr - 0 8711.6

Turbine Inlet Cooling System Design Performance Report

Gas Turbine General InformationGas Turbine OEMGas Turbine ModelCombustion / CommentsFuelCycleDuct-FiredFrequency# of GT'sDesign InformationElevation, MSLDesign Ambient Dry Bulb (T1)Design Ambient Wet BulbDesign Ambient RHT2 TemperatureSimple Cycle AnalysisCapacity GT, eachCapacity GT total, grossGT Aux LoadsGT Capacity total, netGT Total Net Power, incremental to No-TIC% change, compared to No-TICCombined Cycle AnalysisCapacity STG Unfired-All CasesDuct Firing CapacityTotal STG CapacityCC BOP Aux Loads (steam island) - All CasesCC BOP CapacityBOP Total Net Power, incremental to No-TIC% change, compared to No-TICTotal Plant CapcityTotal Power Output before netting-out chiller loadsParasitic power from chillers (on-peak only)Net Plant OutputTotal Net Power, incremental to No-TIC% change, compared to No-TICAugmentation Technology AppliedAir or Water CooledMechanical or AbsorptionType of System (On-line or TES)Type of TES SystemHours per day of GT inlet chilling for TESHours per day available for chiler operationCoil load per GT, netCoil load total, netCoil load total, grossTotal System DemandCoil Ton-HoursChiller LoadChiller Ton-HoursTES Ton-HoursTIC System Performance - Chilling PlantTAS Chilling Plant ModelQty of PackageCapacity of PackagePackage EfficiencyPower, Per PackagePower, TotalNumber of Chillers Per PackageChilled Water Supply TempChilled Water Return TempChiller Configuration Configuration (Series/Parallel)TIC System Performance - TESTES Tank VolumeTES Tank HeightTES Tank DiameterTES Tank D/H AspectPrimary CHW Flow RateSecondary CHW Flow RateHeat Rate ReportGT Fuel UsageGT Fuel Usage ChangeGT Heat RateDelta GT HRParasitic HR increaseIncremental HR of Inlet CoolingDuct Burner Fuel UsageDuct Burner Fuel Usage Change

Net Plant to Plant HrHR change in percentageIncremental HR

Incremental HR of FiringTotal Plant Fuel UsageTotal Plant Fuel Usage ChangeNet Plant HR

5/29/2009 8:06:00 AM - TAS\\jstuparich TAS - Confidential 1 of 2 000237

Page 333: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

EQUIPMENT SHIPPING WEIGHT, LB (KG.) SHIPPING DIMENSIONS, FT. [MM] EST. FOUNDATION WEIGHTS, LB (KG.)

ITEM QTY. UNIT WT. WIDTH HEIGHT OPERATING WEIGHTITEM

CHILLER SECTION

PUMP SECTION

CT LOWER SECTION

CT UPPER SECTION

CT STRUCTURE

CT EXT. PIPING LOT

LOT

2

2

1

1 100,000 (45,455)

38,000 (17,237)

30,000 (13,636)

8,000 (3,636)

30'-0" [9144]

34'-0" [10363]

24'-0" [7315]

13'-6" [4113]

14'-0" [4267]

PALLETIZED AND SHIPPED IN ONE 40-FT TRAILER

CHILLER/PUMP SKID

CT, STRUCT. & PIPING

165,000 (75,000)

119,000 (53,972)38,000 (17,237)

26,840 (12,174)

11,440 (5,188)

11'-8" [3558]

8'-3" [2515]

13'-6" [4113]

PALLETIZED AND SHIPPED IN ONE 40-FT TRAILER

LENGTH

100,000 (45,455)

13'-6" [4113] 13'-6" [4113]

30,000 (13,636)

8,000 (3,636)

13,420 (6,087)

5,720 (2,594) 24'-0" [7315] 14'-0" [4267]

NOTES:1. WEIGHTS SHOWN ARE ESTIMATED ONLY.2. THIS DWG. NOT TO BE USED FOR CONSTRUCTION.3. DIMENSIONS SHOWN IN [ ] ARE IN MILLIMETERS.

TOTAL WEIGHT

Water-Cooled Duplex Centrifugal Compressor SystemAvailable in 50 and 60 Hz 4,000 gpm (252 L/s)Maximum Flow Rate:

0.743 kw/ton (COP: 4.73)Nominal Parasitics:

1,725 to 3,000 Tons (6066 to 10550 KWth)Nominal Capacity:MODELS D-20C & D-25C

t a s . c o m ( 7 1 3 ) 8 7 7 - 8 7 00

13'-6

" [41

15]

72'-0" [21946]

000238

Page 334: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

4/15/2009 Stanley Consultants, Inc. 225 Iowa Avenue Muscatine, IA 52761 Ph: 563.264.6554 E-mail: [email protected] Reference: LM2500+G4 FGC Proposal Number: 5422-09KM, Budget Attention: Mr. Doug Einck In response to your inquiry A G Equipment Company is pleased to provide the following commercial and technical budget proposal for your consideration. Major equipment included in this compressor package is an Ariel JGJ/4-2 natural gas compressor and a TECO, or equal, 1100HP, WPII, 1800RPM, 4160/3/60 electric motor. If you have questions regarding the proposal, please phone me at 918-250-7386. Thank you for the opportunity to quote your compressor needs. Sincerely, Keith M. Miller

000239

Page 335: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A G Equipment Company Reference: LM2500 +G4 FGC Proposal Number: 5422-09KM, Budget

1.0 COMPRESSOR: Manufacturer Ariel Model Ariel JGJ/4-2 Type Horizontal balanced opposed Operating RPM 1800 Maximum RPM 1800 Minimum RPM 900 Maximum Rod Load Tension, Pounds 21000 Maximum Rod Load Compression, Pounds 23000 Maximum Rod Load Combined, Pounds 42000 Number of Throws 4 Stroke, Inches 3.5 Cylinders: Stage 1 2 Number 2 2 Cylinder Size Inches 11 7 Cylinder RDP PSI 455 768 Cylinder MAWP PSI 500 845 Included VVCP Yes Yes Crank End Rod Inches 1.5 1.5 Cylinder Class 11-1/2RJ 7-3/8RJ Performance: Suction------------------ Discharge--------------- Case PSIG Temp F PSIG SCFM Horsepower 1 90.00 80 550.00 6175 973 Start Up 90.00 130 550.00 5667 942 The compressor cylinders are unlinered. The compressor cylinders are non-cooled. Compressor performance may be adjusted for actual pressure drops from orifice plates, cooler pressure drops or other flow restrictions after final engineering. An electric motor driven compressor prelube pump is included, est. 5 HP, 460/3/60. A compressor sump heater is included, est. 1250w, 120v. If a pulsation study is executed, any extra costs required by changes to the process system are for the customers account. 2.0 COUPLING: A Rexnord flexible disk coupling is included. If, as a result of the torsional analysis, any extra costs required by changes to the drive system the extra cost are for the customers account. The coupling is covered with a carbon steel safety guard.

000240

Page 336: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A G Equipment Company Reference: LM2500 +G4 FGC Proposal Number: 5422-09KM, Budget

3.0 MOTOR: (a) Motor General Information: Manufacturer TECO, or equal Power(Horsepower) 1100 @ 1800 RPM Enclosure WPII Approximate Full Load Efficiency 96.3 Voltage 4160/3/60 Service Factor 1.15 RTDs For Windings Yes, 100 ohm platinum RTDs For Bearings No Motor Speed 1800 Space Heaters Yes Frame 4509 Rotation Facing Shaft CCW Shaft Material 1040, estimated Starters included No Insulation Class F Bearings Ball Estimated Dry Weight 7756

000241

Page 337: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A G Equipment Company Reference: LM2500 +G4 FGC Proposal Number: 5422-09KM, Budget

4.0 COOLER: (a) The cooler is mounted on top of the main skid. (b) The cooler fan is electric motor driven, est. 20HP, 460/3/60. (c) The cooler gas sections are ASME code stamped. Utility sections are not code stamped. (d) The cooler type is ACE, or equal, model estimated to be E72-10. (e) Materials. Cooler tube material is SA-214 carbon steel. The header material is carbon steel. (f) Shutters. One manual shutter over all gas sections is included. (g) Miscellaneous Cooler Information. Specification basis API11P. Ambient Design F 100 at 50 Feet Elevation Above Sea Level Gas fouling factor 0.002 (h) Cooler Coating. The paint system is the standard ACE system. (i) Cooler Performance. Section 1 2 Outlet Temp F 130 130 Pressure Drop[PSI] 4 4 Design Pressure[PSI] 635 1270 Design Temperature F 350 350

000242

Page 338: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A G Equipment Company Reference: LM2500 +G4 FGC Proposal Number: 5422-09KM, Budget

5.0 CONTROLS: (a) The panel power source is 110/1/60Hz. (b) Annunciation is by an Allen Bradley PLC c/w Panelview touch screen. (c) The panel is mounted on-skid. (d) The panel is designed to meet Class 1, Group D, Division 2. (e) The panel construction is weatherproof carbon steel. (f) Tubing is 304SS with Swagelok plated carbon steel fittings. (g) The control cable is 16 gauge minimum. (h) No Motor Speed Control is Included. (i) The switch action is normal closed during normal operation. (j) Miscellaneous panel components Front Opening Door Yes Compressor Oil Pressure Gauge Yes Compressor Pre-lube Pump Yes (o) Monitored Functions I S N H D A U I V U R T A C I D P E P L D L A S I A M A O O A T U B N O N C W R O A L E T E A N M R L E L E L L Action Annunciation Device Driver Vibration X X X X Compressor Vibration X X X X Cooler Vibration X X X X Lubricator No-Flow X X X X Suction Scrubber High Level X X X X Interstage Scrubber High Level X X X X Discharge Scrubber High Level X X X X Compressor Oil Low Level X X X X Gas Discharge Temperature X X X X Compressor Oil Temperature X X X X Unit Suction Low Pressure X X X X X Interstage Suction Low Pressure X X X X X Unit Suction High Pressure X X X X X Interstage Suction High Pressure X X X X X Interstage Discharge Low Pressure X X X X X Unit Discharge High Pressure X X X X X Interstage Discharge High Pressure X X X X X Compressor Oil Pressure X X X X X

000243

Page 339: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A G Equipment Company Reference: LM2500 +G4 FGC Proposal Number: 5422-09KM, Budget

6.0 PROCESS (a) Process Sizing. The compressor gas scrubber cannot be used for primary liquid/gas separation. A customer supplied separator may be required upstream of the compressor package as a slug catcher. All process system sizing is subject to final engineering. Stage 1 2 Suction: Design Pressure PSI 235 635 Design Temperature F 200 200 ANSI Flange Rating 150 300 Discharge: Design Pressure PSI 635 1270 Design Temperature F 350 350 ANSI Flange Rating 300 600 Suction Scrubber: Type MESH MESH Outside Diameter inches 28.00 24.00 Scrubber K Value 0.30 0.30 Suction Bottle: Include Bottle YES YES Outside Diameter Inches 18.00 12.75 S/S Length Inches 52.00 52.00 Discharge Bottle: Include Bottle YES YES Outside Diameter Inches 18.00 12.75 S/S Length Inches 52.00 52.00 Suction Piping: Pipe Outside Diameter In 10.75 6.63 Gas Velocity FPM 1633 2195 Discharge Piping: Pipe Outside Diameter In 8.63 6.63 Gas Velocity FPM 1370 1186 (b) Relief Valves:

The PSVs are Mercer Flanged Pilot type. Discharge PSVs are included for all stages. PSV trim is carbon steel.

Set Pressures PSI Stage 1 2 Discharge PSV 455 768

000244

Page 340: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A G Equipment Company Reference: LM2500 +G4 FGC Proposal Number: 5422-09KM, Budget

(c) Valves. Manual Bypass Valve Flanged Floating Ball Full Port Carbon Steel Trim Manual Blowdown Valve Flanged Floating Ball Full Port Carbon Steel Trim Scrubber Drain Valves Threaded Ball Valve Automatic Bypass Control Valve Fisher Backpressure Valve Controlling Discharge Pressure Utility Valves Threaded Ball Valve (d) Scrubber Trim Level Controller: Kenco Level Control Valve Kenco Drain Size 1 inch NPT Drain Check Valve Threaded Level Gauge Kenco sight plugs 7.0 SKID: Main Beam Size W 12” @ 53# Number of Main Beams 4 Concrete is installed under the compressor frame portion of the skid. Skid Width Feet 12 Skid Length Feet 30 (a)The compressor end of the skid is lifted by a lifting eye. (b)The driver end of the skid is lifted by a lifting eye. (c)The skid design is for full grouting on a concrete pad. 8.0 ESTIMATED WEIGHTS AND SIZE: Main Unit Weight including the cooler 81,588 pounds. Width at cooler, 12 feet. Height at cooler, 12 feet. Length including cooler base, 38 feet. Cooler Weight Pounds 10,212 The skid dimensions and weights are subject to final engineering. 9.0 AG STANDARDS: TIG Welding processes are used for pressure vessel fabrication for very clean, high quality welding. State of the art blasting facility is used for commercial basting of skids and vessels. Mil scale is blasted from the inside of vessels as a standard. Electrostatic paint processes cause the paint to "wrap" the equipment for superior coverage. Peddinghaus beam cutter. Beams are cut from Autocad drawings for precise bolt hole locations and field fit-up. Deck plate installed in between the beams instead of on top of them for reduced vibration. Heavy duty straps for process piping, not u-bolts. High quality 3D Autocad drawing accurate enough to generate pipe spools. Positioning equipment for vessel nozzle cuttouts for precise weld gaps reduce cracking in vibratory services. CD manuals with the PID and Bill of Material linked for quick location of equipment data and service information.

000245

Page 341: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A G Equipment Company Reference: LM2500 +G4 FGC Proposal Number: 5422-09KM, Budget

10.0 PAINT The paint system is the standard PPG. (a) SSPC-SP3 Surface Preparation and/or Steam Clean and, Red Oxide Primer, 1.5 mils Finish Coat PPG Acrylic Polyurethane, Halliburton Gray, 1.5 mils (b) SSPC-SP3 Insulated[If insulated] Piping and Vessels. Finish Coat high temperature aluminum (c) Flange bolts and nuts are zinc plated. (d) Hoses, name plates, non-metalic products, rotating parts of machinery, finned tubes, v-belts wire end terminals, or sheave grooves are unpainted. 11.0 TESTING: (a) Radiography: Process Piping: To comply with B31.3 piping code. Pressure Vessels: To comply with the ASME code. Cooler Gas Sections: To comply with the ASME code. Oil Piping: None (b) Hydrotest: Process Piping: Hydrotest @ 1.5 times MAWP Pressure Vessels: Hydrotest @ 1.3 times MAWP Cooler Gas Sections: Hydrotest @ 1.3 times MAWP Oil Piping: Test By Running (c) Skid Ultrasonic Testing: None (d) Driver Manufacturer Testing: Testing of the motor is the motor manufacturers standard. (e) Compressor Manufacturer Testing: A non-witnessed no load run test of the compressor is included. (f) Panel Manufacturer Testing: A non-witnessed continuity check of the panel by the panel manufacturer is included. A non-witnessed functional check of the panel by the panel manufacturer is included. (g) Assembled Package Testing: A witnessed functional test of the package end devices is included. A witnessed panel sequence check is included. No-Load run testing of the completed package is not included.

000246

Page 342: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A G Equipment Company Reference: LM2500 +G4 FGC Proposal Number: 5422-09KM, Budget

12.0 DOCUMENTATION A = Approval Required C = Certificates Required H = Hold Point W = Witness by Customer B = Inspection by A G Equipment Company V = Inspection by Sub-Vendor Activity A C H W B V P&ID Drawing X X Bill Of Material X X General Arrangement X X Skid X Vessels X Vessel Calculations X Compressor Inspection X Assembly Torque X Run Test X Final Inspection X Balance Report X Driver Load Test X Cooler HydroTest X Vessel Hydro Test X Piping Hydro Test X Assembly X Run Test X Final Paint X Shipping X

000247

Page 343: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A G Equipment Company Reference: LM2500 +G4 FGC Proposal Number: 5422-09KM, Budget

13.0 COMMERCIAL 13.01 PRICE Budget price of each package, Ex Works Broken Arrow, OK: $495,000.00 The budge tolerance is + - 10%. 13.02 PAYMENT TERMS - NET DUE UPON RECEIPT OF INVOICE AS FOLLOWS 25 % Due upon receipt of the order 50 % Due upon receipt of the compressor 25 % Due upon completion of the package 13.03 DELIVERY The estimated completion date of the package, Ex Works Broken Arrow, OK., is 25 weeks ARO. 13.04 FREIGHT None 13.05 SPARES None 13.06 STARTUP SERVICES No startup services are included. Startup services are available in accordance with paragraph 13.08 of this proposal at extra expense. 13.07 LITERATURE The instruction manual is provided on a CD Rom disk and it is included in the above listed price.

000248

Page 344: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A G Equipment Company Reference: LM2500 +G4 FGC Proposal Number: 5422-09KM, Budget

13.08 SERVICE

A G Equipment Company(hereinafter called the Company) proposes to furnish a service Supervisor to consult with and advise the Purchaser in the installation, starting up and/or overhaul or maintenance of equipment supplied by the Company. Such Supervisor shall not be responsible for the procurement of labor or mechanical work performed by others. The Supervisor services shall be furnished under the following conditions: I. The Purchaser shall pay the Company for the services of said Supervisor as follows beginning with the day he leaves the Company premises or equivalent starting point, until his return thereto, at the following rates: SERVICE RATES: Domestic International Weekday $780/day $1250/day Weekend $1170/day $1875/day Holiday $1560/day $2500/day PROGRAMER RATES: Weekday: $1100/Day Weekend: $1650/Day Holiday: $2200/Day ENGINEERING RATES: Weekday: $1500/Day: Weekend: $2250/Day: Holiday: $3000/Day: ALL DISCIPLINES: Per Diem $185/day All Expenses @ Cash Value Mileage $0.85/mile II. The Company shall be reimbursed by the Purchaser for:

(a) The Supervisor transportation expenses enroute from the Company premises or equivalent starting point to the jobsite and return thereto. (b) Living expenses from the time the Supervisor leaves his starting point until he returns, for quarters and subsistence, shall be billed at the per diem rate. Expenses incurred on an international job will be billed at actual cash value based on the exchange rate at the time of invoicing. (c) Expenses for airfare, auto rental expenses and/or local transportation to and from the jobsite will be billed separately. For international flights, business class travel will be utilized. Use of a Company vehicle will be billed at our mileage rate. (d) Transportation costs for any required special tools or equipment.

III. All necessary workmen(common, semi-skilled or skilled), together with proper labor supervision shall be furnished by Purchaser at his expense. IV. The Purchaser shall provide all tools and equipment required for installation. The Company Supervisor may bring with him, or ship to the jobsite, special tools which are and shall remain Company property. V. The Supervisor shall be properly covered with insurance in the areas of workers compensation, public liability and property damage. This also includes automobile insurance where the use of a vehicle is required. Certificates confirming this insurance coverage are obtainable upon request. VI. The Company accepts no responsibility for material or the acts of men furnished by the Purchaser. The Company is not responsible for the rate of progress or the date of completion of the erection work nor incorrect operation or damage incurred due to improper storage or handling. VII. The Company, or any of its vendors or agents, shall in no event be liable to the Purchaser, any successors in interest or any beneficiary of this service order for any consequential, incidental, indirect, special or punitive damages arising out of this contract of any breach thereof, or any defect in, or failure of, or malfunction of equipment or machinery, whether based upon lost goodwill, lost profits or revenue, interest, work stoppage, impairment of other goods, loss by reason of shutdown or non-operation, increased expenses of operation of equipment or machinery, loss of use of power system, cost of purchase of replacement power or claims of Purchaser of customers of Purchaser for service interruption whether or not such loss or damage of the Company under this contract shall be limited to the Purchaser price of the services furnished hereunder.

000249

Page 345: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

A G Equipment Company Reference: LM2500 +G4 FGC Proposal Number: 5422-09KM, Budget

14.0 Standard Conditions of Sale

I. Terms of Payment. Standard terms are net due upon receipt, from date of invoice unless otherwise noted. Amounts past due are subject to a service charge of 1-1/2% per month. Each shipment shall be considered a separate and independent transaction and payment therefore shall be made accordingly. If delivery is delayed by Purchaser, readiness for delivery shall be deemed date of delivery for payment purposes.

II. Taxes. Any sales, use or other similar type taxes imposed on this sale or on this transaction are not included in the price. Such taxes shall be separately to the Purchaser. Seller will accept a valid exemption certificate from the Purchaser if applicable, however, if an exemption certificate accepted is not recognized by the government taxing authority involved and the Seller is required to pay the tax covered by such exemption certificate, Purchaser agrees to promptly reimburse Seller for the taxes paid.

III. Warranty

(1) The Seller warrants that the equipment manufactured by it and delivered hereunder will be free from defects in material and workmanship for a period of twelve(12) months from the data of initial startup or eighteen(18) months from the date of shipment, whichever shall first occur. The Purchaser shall be obligated to promptly report any claimed defect in writing to the Seller immediately upon discovery and, in any event within the above period. After notice from Purchaser and substantiation of the claim, Seller shall, at its option, correct such defect by suitable repair to such equipment or part, or by furnishing replacement equipment of part(s), as necessary, to the original F.O.B. point of shipment. (2) THE SELLER MAKES NO OTHER WARRANTY OR REPRESENTATION OF ANY KIND. ALL OTHER WARRANTIES,EXPRESSED OR IMPLIED,INCLUDING BUT NOT LIMITED TO,THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE HEREBY DISCLAIMED. (3) With respect to equipment, parts and work not manufactured by Seller, the Sellers only obligation shall be to assign to Buyer whatever warranty Seller receives from the manufacturer. (4) The Seller shall not be liable for the cost of any repair, replacement, or adjustment to the equipment or parts made by the Purchaser for labor performed by the Purchaser or by others, without the Sellers prior written approval. (5) No equipment or part furnished by Seller shall be deemed to be defective by reason of normal wear and tear, failure to resist erosive or corrosive action of any fluid or gas, or Purchasers failure to properly store, install, operate or maintain the equipment in accordance with good industry practices or specific recommendations of Seller. (6) The Purchaser shall not operate equipment which is considered to be defective without first notifying the Seller in writing of its intention to do so. Any such use of the equipment will be at the Purchasers sole risk and expense. (7) The repair or replacement of the equipment, spare or replacement part(s) by the Purchaser under this Warranty provision, shall constitute Sellers sole and exclusive remedy for all claims of defects regarding the equipment and parts furnished hereunder.

IV. Shipping Dates. The time for shipment given herein is approximate and is estimated from the date of receipt of order with complete manufacturing information and approval of drawings as may be necessary. The manufacturer or AG Equipment Company shall not be liable for any loss or damage for delay or non-delivery due to the acts of civil or military authority, acts of the Purchaser or by reason of "force majeure", which shall be deemed to mean all other causes whatsoever not reasonably within the control of the manufacturer including, but not limited to acts of God, war, riot or insurrection, blockades, embargoes, sabotage, epidemics, fires, strikes, lockouts or other industrial disturbances, delays of carriers,and inability to secure materials, labor or manufacturing facilities. Any delay resulting from any such cause shall extend shipping dates corresponding. The manufacturer or AG Equipment Company shall not in any event be liable for any special, indirect or consequential damages arising from delay irrespective of the reason thereof, and receipt by the Purchaser shall constitute acceptance of delivery and waiver of any claims due to delay. V. Cancellation. The Purchaser may cancel his order only upon written notice and payment to AG Equipment Company Company of reasonable and proper cancellation charges. VI. Freight. If delivery specified is F.O.B. point of destination or F.O.B plant (or where made) with freight allowed, the Purchaser shall pay to AG Equipment Company, in addition to the purchase price, any amount by which transportation charges may be increased, by reason of increased transportation rates, between the dates of this proposal and the time of shipment. VII. Acceptance. The proposal is subject to acceptance by the Purchaser within thirty(30) days and in the meantime may be changed or withdrawn upon written notice.

VIII. The Company, or any of its vendors or agents, shall in no event be liable to the Purchaser, any successors in interest or any beneficiary of this order for any consequential, incidental, indirect, special or punitive damages arising out of this contract of any breach thereof, or any defect in, or failure of, or malfunction of equipment or machinery, whether based upon lost goodwill, lost profits or revenue, interest, work stoppage, impairment of other goods, loss by reason of shutdown or non-operation, increased expenses of operation of equipment or machinery, loss of use of power system, cost of purchase of replacement power or claims of Purchaser of customers of Purchaser for service interruption whether or not such loss or damage of the Company under this contract shall be limited to the Purchaser price of the services furnished hereunder. 000250

Page 346: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

____________________________________________________________________________________ BARTONVILLE ⋅ CEDAR RAPIDS ⋅ DAVENPORT ⋅ E. PEORIA ⋅ HANNIBAL ⋅ MOBERLY ⋅ ROCK FALLS ⋅ SPRINGFIELD ⋅ URBANA Quote#: 09DH-0151-01 Page 1 of 1

Altorfer Inc. • 2550 6th St. S.W., Cedar Rapids, IA 52404-3504 • P.O. Box 2184, Zip 52406-2184 Phone: 319/365-6500 • Fax: 319/365-5493

BUDGET PROPOSAL Customer: Stanley Consultants Date: 5-20-09 Attention: Doug Einck Project Name: Black Start Generator Proposal ================================================================================ Altorfer Power Systems appreciates your interest in Caterpillar power generation equipment and the opportunity to work with you on this project. We propose the following equipment to meet your needs: ITEM I – Natural Gas Option One (1) new Caterpillar Olympian model G3516 LE natural gas engine generator set rated at 1000 kW standby, 480Volt, 3-Phase, 60 Hz, 1800 RPM, Two year standard warranty (100% parts, labor, and travel), testing, startup, and training included. Remote radiator, shipped loose. Does not include enclosure, building, piping, miscellaneous electrical. Exhaust system muffler and flex shipped loose. Requires placement within a building – not included.

TOTAL PRICE (ITEM I): $475,000.00

(Plus applicable taxes) ITEM II – Diesel Option One (1) new Caterpillar model C27, diesel engine generator set rated at 750 kW standby, 277/480Volt, 3-Phase, 60 Hz, 1800 RPM, with weatherproof sound attenuated enclosure, 24 hour fuel tank base equipped per attached bill of materials. Two year standard warranty (100% parts, labor, and travel), testing, startup, and training included.

TOTAL PRICE (ITEM II): $150,000.00 (Plus applicable taxes) NOTES:

1. Freight included to jobsite, curbside. No offloading included. 2. Terms are NET 10 days on approved account, Price valid for 30 days. 3. The above bill of material does not include installation, labor, fuel, fuel piping, air ducting, exhaust silencer installation, exhaust piping or

electrical wiring between loose items such as engine, control gear, transfer switches, day tanks, battery charger, etc. 4. The prices quoted are current and subject to change to those in effect at the time of shipment. 5. This equipment carries the manufacturer's warranty, which supersedes all other verbal or written statements of any sort whatsoever. 6. The purchaser agrees to pay any and all taxes, assessments, licenses, and governmental charges of any kind whatsoever upon said

equipment which, may be imposed or assessed or resulting to the seller on account of the possession or use of said equipment by purchaser.

7. All agreements are contingent upon government restrictions, strikes, accidents, delay of carrier, and other delays unavoidable. 8. Permitting not included.

Thank you for the opportunity to quote this project. Please feel free to contact us if you would like any additional information or assistance. Sincerely, Accepted By: _______________________________________ _____________________________________ Dave A Harris Print Name: Phone: 319-365-6500 x208 Mobile: 319-361-9321 E-Mail: [email protected] Date: ____________________________

000251

Page 347: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Einck, Douglas

From: Milster, P F [[email protected]]

Sent: Wednesday, December 31, 2008 11:11 AM

To: Einck, Douglas

Subject: FW: MEC 12 31 08 letter

Attachments: MEC 12 31 08 letter.one

Page 1 of 4

1/5/2009

� � ����������� ��������� � �������������������������� ���������������� ����� ����������� �� ���!�!��" ������������������

������� ��� �������������������������������������������� !�"�#���$#�%%�&���'#�(!������ )�����!�"�#������* ��� ��

��� �����*(���������������� Folks, Jeff stopped by today and delivered the attached letter. We discussed gross up tax and we should plan for about 30% in our estimates. I asked Jeff to get us a proposal for MEC to proceed with a detailed project plan and estimate on option 2. Ferman

� ��������������� � ��������������� �� �������� ��������

+������ �%�����,%����--(�./����.'�������.���0��'.�*(��(�����1�������������������2' %3

000252

Page 348: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 2 of 4

1/5/2009

000253

Page 349: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine

Page 3 of 4

1/5/2009

000254

Page 350: West Campus Power Plant - University of Iowa · 4 MW Backpressure Steam Turbine ... The West Campus Power Plant (WCPP) will be located in the southeast corner of the existing Finkbine