WE Wee Perio Wea Man Subc Sche EST PARK ekly Progress od ending Se ather Average Min Low Average n Power Number contractors Basin Plast edule Upco o o K HOSPI s Report 010 eptember 19 Daily High T Temp Wind Speed or Workers on Site n Mechanica ter, Rapid Fi oming Meetin o Sub Coord o Safety Ori ITAL PHA 0 9, 2014 Temp 68 51 d 12 on Site: 32 al/ NorPac S ire Protectio ngs local ti dination Me ientation Me ASE III F F mph Sheet Metal, on, Yellowsto ime eeting, 9am M eeting, 7am , Big Horn En one Electric. MST Septem MST Daily negery, Cow . mber 16 Co Conference wan Construc onference Of e Office ction, Empire ffice 1 e Lath and 1

Upload: lamlien

Post on 03-Feb-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: WEST PARK HOSPITAL PHASE III · PDF fileWEST PARK HOSPITAL PHASE III Weekly Progress Report 0 ... Progress Photos Cable tray and J hooks are complete on the West ... Sheet

WEST PARK HOSPITAL PHASE IIIWeekly Progress Report 0

Period ending September

Weather

Man Power

Subcontractors on Site

Schedule

WEST PARK HOSPITAL PHASE IIIWeekly Progress Report 0

Period ending September

Weather

Average Daily High Temp

Min Low Temp

Average Wind Speed

Man Power

Number or Workers on Site:

Subcontractors on Site

• Basin Mechanical/ NorPac Sheet Metal,

Plaster, Rapid Fire Protection, Yellowstone Electric.

Schedule

•••• Upcoming Meetings

oo

WEST PARK HOSPITAL PHASE IIIWeekly Progress Report 010

Period ending September 19

Average Daily High Temp

Min Low Temp

Average Wind Speed

Number or Workers on Site:

Subcontractors on Site

Basin Mechanical/ NorPac Sheet Metal,

Plaster, Rapid Fire Protection, Yellowstone Electric.

Upcoming Meetings

o Sub Coordination M

o Safety Orientation Meeting, 7am MST Daily

WEST PARK HOSPITAL PHASE III10

9, 2014

Average Daily High Temp 68

51

Average Wind Speed 12

Number or Workers on Site: 32

Basin Mechanical/ NorPac Sheet Metal,

Plaster, Rapid Fire Protection, Yellowstone Electric.

Upcoming Meetings – local time

Sub Coordination Me

Safety Orientation Meeting, 7am MST Daily

WEST PARK HOSPITAL PHASE III

F

F

mph

Basin Mechanical/ NorPac Sheet Metal,

Plaster, Rapid Fire Protection, Yellowstone Electric.

local time

eeting, 9am MST

Safety Orientation Meeting, 7am MST Daily

Basin Mechanical/ NorPac Sheet Metal, Big Horn Enegery,

Plaster, Rapid Fire Protection, Yellowstone Electric.

eting, 9am MST September 16

Safety Orientation Meeting, 7am MST Daily –

Big Horn Enegery, Cowan Construction

Plaster, Rapid Fire Protection, Yellowstone Electric.

September 16 – Conference

– Conference Office

Cowan Construction

Conference Office

Conference Office

Cowan Construction, Empire Lath and

Office

1

Empire Lath and

1

Page 2: WEST PARK HOSPITAL PHASE III · PDF fileWEST PARK HOSPITAL PHASE III Weekly Progress Report 0 ... Progress Photos Cable tray and J hooks are complete on the West ... Sheet

2

Work Progress

Site and Material Prep:

• All patient room soffits on the North side are complete.

• Fire tapping/caulking is ongoing in the Core/East end.

• Drywall is near complete on the West side.

• Tape and finishing of walls on the West end is underway.

Electrical:

• In wall rough in is complete on the North end.

• City inspection on in wall rough in is complete on the North end.

• In wall rough in is underway in the core/East end.

• Cable tray is complete on the West end and underway on the North.

HVAC:

• Exhaust and return duct in the attic is near complete.

• Roof curbs have been set into place.

• VAV’s are being installed on the West end.

• Condenser unit has shown up onsite.

Plumbing

• Insulating of water lines above ceiling continues on the West end.

• Insulating of water lines “in wall” is under way on the North end.

• MedGas rough in is complete on the North end.

• Sanitary lines are complete on the North end.

• Domestic water lines are complete on the North end.

• All plumbing inspections are complete on the North end.

• MedGas rough in is underway in the core/East end.

• Domestic water lines are underway in the core/West end.

Upcoming Activities

• Sheet rock starts on the North end.

• Bathroom tile install starts next week.

• Roofing starts next week around AHU 4.

• Fire Proofing of AHU 4 support beams.

Page 3: WEST PARK HOSPITAL PHASE III · PDF fileWEST PARK HOSPITAL PHASE III Weekly Progress Report 0 ... Progress Photos Cable tray and J hooks are complete on the West ... Sheet

3

Progress Photos

Cable tray and J hooks are complete on the West end. (Yellowstone Electric)

Cable tray and J hooks are underway on the North end. (Yellowstone Electric)

Page 4: WEST PARK HOSPITAL PHASE III · PDF fileWEST PARK HOSPITAL PHASE III Weekly Progress Report 0 ... Progress Photos Cable tray and J hooks are complete on the West ... Sheet

4

Condenser unit arrived on site for AHU 4. (Basin Mechanical/NorPac Sheet Metal)

The curb has been set into place for AHU 4. (Basin Mechanical/NorPac Sheet Metal)

Page 5: WEST PARK HOSPITAL PHASE III · PDF fileWEST PARK HOSPITAL PHASE III Weekly Progress Report 0 ... Progress Photos Cable tray and J hooks are complete on the West ... Sheet

5

All rough in for head walls are complete on the North end.

All in-wall rough in work is complete on the North end.

Page 6: WEST PARK HOSPITAL PHASE III · PDF fileWEST PARK HOSPITAL PHASE III Weekly Progress Report 0 ... Progress Photos Cable tray and J hooks are complete on the West ... Sheet

6

North end Corridor complete with all in wall rough in work. Sheet rock is being stocked for next week.

West end soffits are near complete. (Empire Lath and Plaster)

Page 7: WEST PARK HOSPITAL PHASE III · PDF fileWEST PARK HOSPITAL PHASE III Weekly Progress Report 0 ... Progress Photos Cable tray and J hooks are complete on the West ... Sheet

7

West end Corridor

Drywall is near complete on the West end and finishers are underway. (Empire Lath and Plaster)