WESTER COWDEN, STEADING SITE

UTILITIES AVAILABILITY SUMMARY MAY 2016

AMENDMENT RECORD ISSUE NO. SECTION NUMBER DATE OF AMENDMENT SIGNED

Prepared By: Checked/Approved By: Date Job Number CT CT 09.05.2016

416.008.00

CONTENTS 1.0 INTRODUCTION 2.0 WATER CONNNECTION 3.0 GAS CONNECTION 4.0 ELECTRICITY CONNECTION 5.0 DIVERSIONS

APPENDICES A. SCOTTISH POWER QUOTE B. SCOTTISH WATER PDE RESPONSE C. SGN BUDGET QUOTE

UTILITIES AVAILABILITY SUMMARY 1.0 INTRODUCTION

Rybka have been appointed by Salters Land Limited to review utility connection availability for their development at The Steading site, Wester Cowden, Dalkeith, EH22 2QA The work undertaken as part of this initial investigation is outlined below and this report provides an overall summary of utility connection options.

• Review available information on existing utility company record plans • Liaise with each utility network operator (Gas / Electricity / Water) to

establish their network availability to meet the demands of the development and the most suitable point of connection location for the development.

• Prepare a Scottish Water Pre-Development Enquiry (PDE) • Obtain budget cost from Scottish Power for point of connection to the

development • Obtain SGN gas budget connection quote

The initial utility enquiries have been processed based on 25 residential units with gas-fired heating installations.

2.0 WATER CONNNECTION

A pre-development enquiry (PDE) was processed with Scottish Water to determine availability of water and drainage services for the development. The PDE response is included in appendix B for reference. The PDE response confirms; Water: There is sufficient capacity in the Rosebery Water Treatment Works and also the local network to service the demands from your development. Connect to the 3" CI main that runs through site. Ensure appropriate standoff distances to the main are applied by new development, otherwise consultation with our Asset Impact Team may be advised. Scottish Water's current minimum level of service for water pressure is 1.0 bar or 10m head in the public main. Any property which cannot be adequately serviced using this pressure may require private pumping arrangements installed, subject to compliance with the current water byelaws. Wastewater: There is sufficient capacity in the Edinburgh Waste Water Treatment Works and the local network to service the demands from your development. Ok for foul only, and surface water should connect via surface water system if it cannot be disposed of on site. Scottish Water supports the principal of a sustainable urban drainage system (SUDS) and the developer should consider utilising this in the surface water drainage design. It is important to note that Scottish Water will not adopt surface water drainage systems that require the flows to be pumped. The SW PDE response confirms the development, subject to processing a successful connection application, can be connected to the existing 3” cast iron main that runs through the site. The existing main may require diversion to suit the new site layout proposals and the extent of this will require to be assessed against the detailed development plans in due course.

3.0 GAS CONNECTION

SGN have provided a budget quotation for gas connections to the development and this is included in appendix C. SGN have advised that gas service to the developments is available from their infrastructure. They note that their work is within close proximity of another GT and crosses third party pipeline. On request of any firm quotation, permissions will be sought from relevant owners and operators.

They have made no allowance for servitudes or third party permissions to carry out the work, these may be required. The costs exclude any diversion allowance – the requirement for same is to be determined following review of detailed site layout proposals and receipt of record utility company plans

4.0 ELECTRICITY CONNECTION

Scottish Power have provided a quotation and outline design drawing, as appendix A, for providing a low voltage (LV) point of connection for the development. The LV point of connection is identified as being at existing LV infrastructure at Easter Langside Crescent. In addition to the PoC works, SP have identified a possible requirement for diversion of their existing HV and LV infrastructure. The potential diversion requirements are noted on the SP drawing within appendix A. The SP quote includes an allowance for the LV diversion cost, however, the exact route will require to be determined to suit the proposed site layout when this detail is available. The SP quote allows only for the non-contestable works associated with the HV diversion, the actual HV diversion work will require to be developed and priced as and when site layout details are available.

5.0 DIVERSIONS

The initial enquiries with Scottish Power / Scottish Water indicate that diversion works may be required to facilitate the development. Copies of the utility company record plans have been requested to allow the nature of the existing assets to be understood. To allow a diversion strategy for the site to be developed, details of the proposed site layout will be required.

APPENDICES A. SCOTTISH POWER QUOTE

HI.2

HI.4

HI.3

HI.2

9

5

6

18

47

2

Wester Cowden

86.9m

89.6m

Trac

k

LANE

EASTER

72

97

80

88

93

82

LANGSIDE

11EASTER LANGSIDE AV

EASTER LANGSIDE CRESCENT

EASTER LANGSIDE PL

1

7

5

11

1

7

1

1

7

6

1

2

89.6m

5m

4m

4m

2m

1m

6m

4m

2m

1.0 m

.6m

12m

0505

1.4 m

89.6m

Plo t 28

0.8 7m

Plot 29

plot 32

Plo t 30

89.6m

plot 33

PLOT 2

4

Plo t 26

Plot 27

PLOT 2

5

5.9m

Plot 31

PLOT 2

0

15.8m

Plot 64

Plot 65

Plot 63

BM 89

.29m

Sheepf

old

PO LE3731

Wester

Cowden

WESTERNCOW DEN P /M

35 ( 3) LV in 4" Duct

185 (3 ) AL XLP E 11kV

4 x 3/

0.147

HDC L

V

3 x 3/

0.147

HDC L

VWESTER COWDEN

3732

3733

17564

3720

185mm(3) AL XLPE 11kV

185m

m(3)

AL XL

PE 11

kV

185mm(3) AL XLPE 11kV

185m

m(3)

AL XL

PE 11

kV

PLOT 6

6

Scale:- 1 : 1,098Date:- 11/04/2016 Produced By:-

nq034499
Polygonal Line
nq034499
Polygonal Line
nq034499
Polygonal Line
nq034499
Polygonal Line
nq034499
Polygonal Line
nq034499
Polygonal Line
nq034499
Callout
LV POC is of the existing 300 (3) wave at grid co-ordinates: 335123, 667260. Volt Drop (Inclusive of new load 60kVA) based on 5m from LV POC is 3.46%. Volt Drop Excluding new load is 2.56% with the ELI - 100 M-OHMS and the Fault Current - 2499A.
nq034499
Callout
Existing 185 (3) AL XLPE (highlighted blue) appears to run within site. ICP will be responsible for all works associated with these diversions with the exception of the closing joints and associated Engineering works. co-ordinates between: 335144, 667256 and 335073, 667169 and 335073, 667106 to 335074, 667067.
nq034499
Line
nq034499
Line
nq034499
Line
nq034499
Callout
LV Diversion required between co-ordinates: 335088, 667187 and 335164, 667234 (existing 0.06(4)cu. to LV OH line to pole 3733. New terminal pole with stays to be established on north side of this site. New cable will have to be 4 core as existing 4 core cable / wire. ICP will be responsible for all aspects of these diversions with the exception of the closing joint and termination onto existing pole 3733. ICP to advise customer to contact the supplier to request the disconnection of existing LV services (shown as blue dotted line). This quotation does not include for any Disconnections. Second LV Diversions between co-ordinates: 335071, 667111 to 335067, 667066, existing 95(4) with a 35 (3) to pick up existing services to nos. 7,8 & 9 Wester Cowden Cottages.
nq034499
Line
nq034499
Line
nq034499
Line
nq034499
Oval
nq034499
Polygonal Line
nq034499
Polygonal Line
nq034499
Polygonal Line
nq034499
Polygonal Line
nq034499
Text Box
ICP will be fully responsible for all associated Wayleaves / Servitudes associated with these diversions and POC.

B. SCOTTISH WATER PDE RESPONSE

25th April 2016

Rybka Limited24 Rutland StreetEdinburghEH1 2AN          

FAO Chris Thomson

EH22 Dalkeith Wester Cowden Steading siteDevelopment Enquiry Application Our Ref: 730391

Please quote our reference in all future correspondence

Thank you for your DIA Form regarding the above proposed development. Following anassessment of our assets I can now confirm that at this present time:

Water: There is sufficient capacity in the Rosebery Water Treatment Works and also thelocal network to service the demands from your development. Connect to the 3" CI mainthat runs through site. Ensure appropriate standoff distances to the main are applied by newdevelopment, otherwise consultation with our Asset Impact Team may be advised.

Scottish Water's current minimum level of service for water pressure is 1.0 bar or 10m headin the public main. Any property which cannot be adequately serviced using this pressuremay require private pumping arrangements installed, subject to compliance with the currentwater byelaws.

Wastewater: There is sufficient capacity in the Edinburgh Waste Water Treatment Worksand the local network to service the demands from your development. Ok for foul only, andsurface water should connect via surface water system if it cannot be disposed of on site.

Scottish Water supports the principal of a sustainable urban drainage system (SUDS) andthe developer should consider utilising this in the surface water drainage design. It isimportant to note that Scottish Water will not adopt surface water drainage systems thatrequire the flows to be pumped.

However, it is important to note that Scottish Water is unable to reserve capacity andconnections to the water & wastewater networks can only be granted on a first come firstserved basis. For this reason we may have to review our ability to serve the development onreceipt of an application to connect.

SCOTTISH WATER

Customer ConnectionsThe BridgeBuchanan Gate Business ParkCumbernauld RoadSteppsGlasgowG33 6FB

Customer ConnectionsFreephone Number - 0800 3890379E-Mail - [email protected]

You will be required to seek technical approval for your water & wastewater infrastructurefrom our technical design team. The relevant application/connection forms are available onour website at www.scottishwater.co.uk , please complete them and return to the aboveaddress together with all relevant documentation. You will also find many useful guides onScottish Water processes including a step by step guide to filling out the necessary forms.

I trust that the above is acceptable however, if you have any questions relating to the abovedo not hesitate to contact me at the above address.

Yours sincerely

Matthew McAleneyTechnical [email protected]

Scottish Water Disclaimer:

“It is important to note that the information on any such plan provided on Scottish Water’s infrastructure,is for indicative purposes only and its accuracy cannot be relied upon. When the exact location and the nature of the infrastructure on the plan is a material requirement then you should undertake an appropriate site investigation to confirm its actual position in the ground and to determine if it is suitable for its intended purpose. By using the plan you agree that Scottish Water will not be liable for any loss, damage or costs caused by relying upon it or from carrying out any such site investigation."

C. SGN BUDGET QUOTE

NF129a v4.0

26 April 2016 SGN Connections 

Our Ref: 1132505  Axis House Your Ref: n/a  5 Lonehead Drive 

Newbridge Edinburgh EH28 8TG   

Chris Thomas Rybka  Customer Service 0800 912 1700* 24 Rutland Street Edinburgh   EH1 2AN   Dear Chris Thomas  

25 new properties at the Steading Site, Wester Cowden, Dalkeith, Midlothian, EH22 2QA  Thank you for choosing us to give you a budget indication for 25 new connections at the above site, and please find our detailed quote below.  Work to be carried out SGN Connections to install appropriately sized gas infrastructure to suitable locations. SGN Connections to carry out all necessary excavation and reinstatement work up to the site boundary. No meter work is included.  Your budget indication is £ 94,920.00 (inc VAT)   Please note that this figure is a budget indication only, based on the information you’ve given us, and doesn’t represent an offer to carry out the work.  The work is within close proximity of another GT and crosses third party pipeline. On request of any firm quotation, permissions will be sought from relevant owners and operators.   We’re assuming no servitudes or third party permissions are required to carry out the work.  Please note that this budget indication doesn’t allow for any diversion of our existing infrastructure if we find it’s necessary. You can get further detail on this by calling SGN Diversions/Isolations on 0800 912 1722.  If you have any further questions, please feel free to contact me on the number at the top of this letter.  Yours sincerely   Diane Jamieson  Design Assistant   * All calls are recorded and may be monitored