1 BUILDING STRONG ® 1 Team New Orleans Greater New Orleans Hurricane and Storm Damage Risk Reduction System Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May 28, 2009 Waggaman, LA

Upload: duongkhue

Post on 08-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

1BUILDING STRONG ®

1

Team New OrleansGreater New Orleans Hurricane and Storm Damage

Risk Reduction System

Western Tie In Project Update

Individual Environmental Report 16 and borrow

Ms. Julie Vignes, Senior Project ManagerMay 28, 2009

Waggaman, LA

Page 2: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

2BUILDING STRONG ®

2

Team New Orleans

To discuss the proposed action that would connect the Westbank and Vicinity portion of the Greater New Orleans Hurricane and Storm Damage Risk Reduction System to the Mississippi River levee system in St. Charles Parish.

Why we are here tonight

Page 3: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

3BUILDING STRONG ®

3

Team New Orleans

Buying Down RiskAll stakeholders contribute to reducing risk

Initial Risk

Zoning BuildingCodes

OutreachEvacuationPlan

InsuranceLevee

Residual RiskRisk Reduction Tools

(Cumulative)

Page 4: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

4BUILDING STRONG ®

4

Team New Orleans

• Required of all major federal actions

• Analyze potential impacts to the human and natural environment and investigate reasonable alternatives

• Public Involvement is KEY! We want to hear from you!

• Goal: more informed decision making through public involvement

• Analysis documented in Individual Environmental Reports (IER)

National Environmental Policy Act: NEPA

Page 5: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

5BUILDING STRONG ®

5

Team New OrleansIndividual Environmental Report

Project Areas

Page 6: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

6BUILDING STRONG ®

6

Team New Orleans

• The NEPA process began with public scoping meetings for IER 16, the Western Tie In project, in March 2007

• From March 2007 through today, current project alternatives have been developed, impacts have been analyzed, and public input has been solicited and incorporated

• IER 16 is currently available for public review and may be downloaded at www.nolaenvironmental.gov

NEPA Process and Path Ahead

Page 7: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

7BUILDING STRONG ®

7

Team New OrleansWestbank and Vicinity Risk Reduction

Current or approved alignmentsProposed or recommended alignments

Page 8: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

8BUILDING STRONG ®

8

Team New Orleans

• Borrow site excavation and material placement

• Contract WBV 18.1 from Lake Cataouatche Pump Station to Hwy 90

•Contract WBV 15b.1 for construction of the Lake Cataouatche Pump Station

Recently Completed ConstructionLake Cataouatche

Page 9: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

9BUILDING STRONG ®

9

Team New OrleansOngoing Construction

Lake Cataouatche

• Borrow material processing to allow for placement into the levee section

• Construction of WBV 15a.1 from Segnette State Park to Lake Cataouatche Pump Station. Construction completion is anticipated in Jul. 2009

• Construction of WBV 17b.1 is at the northern most end of the reach in the vicinity of Hwy 90. Construction completion is anticipated in Nov. 2009

Page 10: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

10BUILDING STRONG ®

10

Team New OrleansProposed Action

Alternative 3

Page 11: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

11BUILDING STRONG ®

11

Team New Orleans

• Ties into existing Lake Cataouatche Levee, Davis Pond Guide Levee and Mississippi River Levee in St. Charles Parish

• Includes a levee parallel to and south of the Outer Cataouatche Canal

• Include navigable closure structure in Bayou Verret and adjacent drainage structures

• Floodwall crossing Hwy 90 with an elevated bridge

• Maintains water exchange above Hwy 90

Proposed ActionAlternative 3

Page 12: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

12BUILDING STRONG ®

12

Team New Orleans

Schedule

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov

• Industry Day• Geotech Input

• ROE Request• A/E P&S Submittal

2008 2009

• Award Contract

• Issue Notice to Proceed

• IER Complete

• RE Obtained

• Advertise RFP

* Construction Complete 1 June 2011

• Public meeting at Cytec

Page 13: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

13BUILDING STRONG ®

13

Team New Orleans

• Efforts to minimize impacts• Minimal impacts to Hwy 90 traffic patterns• Altered navigation access during construction• Elevated noise levels• Wet unpaved roads (to minimize dust)• Risk reduction

What Residents Can Expect

Page 14: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

14BUILDING STRONG ®

14

Team New OrleansBorrow - All Sites Investigated

Page 15: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

15BUILDING STRONG ®

15

Team New Orleans

Page 16: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

16BUILDING STRONG ®

16

Team New Orleans

Page 17: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

17BUILDING STRONG ®

17

Team New Orleans

• IER 13 – Hero Canal Levee and Eastern Terminus

o Released for public review and comment: Apr. 3, 2009o Comment period extended to: Jun. 1, 2009

• IER 16 – Western Tie In

• Released for public review May 1, 2009

• Public comment period closes May 30, 2009

• IER 5 – Outfall Canal Closure Structures

• Released for public review May 4, 2009

• Public comment period closes Jun. 3, 2009

• IER 1 Supplemental – La Branch Wetlands• Released for public review May 15, 2009

• Public comment period closes Jun. 13, 2009

Note - copies available at www.nolaenvironmental.gov or by request

Currently Available for Public Review

Page 18: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

18BUILDING STRONG ®

18

Team New Orleans

Opportunities for Public Input• Regular public meetings throughout New Orleans metro area

• Comments may be submitted at: www.nolaenvironmental.gov

Questions and comments regarding Greater New Orleans Storm Damage Risk Reduction System projects should be addressed to:

Gib OwenPM-RSP.O. Box 60267New Orleans, LA 70160-0267Telephone: 504-862-1337E-mail: [email protected]

Page 19: Western Tie In Project Update - mvn.usace.army.mil 16 and...Western Tie In Project Update Individual Environmental Report 16 and borrow Ms. Julie Vignes, Senior Project Manager May

19BUILDING STRONG ®

19

Team New Orleans

Resourceswww.nolaenvironmental.gov http://www.mvn.usace.army.mil