westinghouse ap1000 plant overview and projects update · 2015-09-09 · westinghouse ap1000®...

21
Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 September 2015 Westinghouse AP1000 ® Plant Overview and Projects Update AP1000 is a trademark or registered trademark of Westinghouse Electric Company LLC, its affiliates and/or its subsidiaries in the United States of America and may be registered in other countries throughout the world. All rights reserved. Unauthorized use is strictly prohibited. Other names may be trademarks of their respective owners.

Upload: lebao

Post on 08-Jun-2018

227 views

Category:

Documents


3 download

TRANSCRIPT

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

1

September 2015

Westinghouse AP1000® Plant Overview and Projects

Update

AP1000 is a trademark or registered trademark of Westinghouse Electric Company LLC, its affiliates and/or its subsidiaries in the United States of America and may be registered in other countries throughout the world. All rights reserved. Unauthorized use is strictly prohibited. Other names may be trademarks of their respective owners.

2

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

Westinghouse Electric Company

• Founded in 1886 in Pittsburgh,

Pennsylvania, by George

Westinghouse

• Responsible for some of the

world’s most important

achievements:

– Alternating current technology

– First commercial radio

broadcast (KDKA-1920)

– USS Nautilus nuclear

submarine

– First camera on the moon

– Commercial nuclear power

3

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

New Plants and

Major Projects Delivers both new-plant

projects and major

projects for new and

operating plants on a

global basis

Decommissioning,

Decontamination

and Remediation Deploys global technologies

and forms local partnerships to

carry out long-term projects

Nuclear Fuel and

Components

Manufacturing Designs and delivers fuel for

PWR, BWR, VVER and AGR

reactors, and oversees

manufacturing operations

worldwide

Westinghouse Global Capabilities and Experience

Operating Plants

Business Delivers operating plant

products and services,

including global field

services, instrumentation and

control, welding and

machining, and installation-

related functions

Engineering Center of Excellence Supports all product lines by driving common engineering

capabilities and accelerating innovation

Westinghouse technology is the basis

for nearly 50 percent of nuclear power

plants operating worldwide!

4

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

Strategically Positioned to Develop and Support the

Worldwide Fleet

5

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

Why Nuclear Energy?

• Meets policy goals to reduce

greenhouse gas emissions

• Highly reliable and safe

baseload power source

• Stable fuel price

• Competitive costs

• Supply security

• Fuel diversity

• Large number of well-paying

jobs and an anchor of the

local tax base

Photos © Georgia Power Company; South Carolina Electric & Gas Company; Sanmen Nuclear Power Company Ltd.; Shandong Nuclear Power Company

Ltd. All rights reserved.

6

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

• Passive safety replaces

mechanical and electrical systems

– harnesses natural forces like

gravity, convection and

condensation to achieve safe

shutdown

• Strong licensing pedigree based

on reviews in multiple countries;

first Generation III+ reactor to

receive design certification from the

U.S. NRC

• Simplified design and modular

construction provide a plant that is

easier and less expensive to build,

operate and maintain

Westinghouse AP1000® Plant: Safe, Simple and

Standardized

AP1000 Plant Site at Sanmen, China

©Sanmen Nuclear Power Company Ltd. All rights reserved.

7

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

AP1000 Plant Value Proposition

Proven Technology and

Innovative Passive Safety Systems

Delivery Certainty Regulatory Certainty Reviewed by multiple countries; first

Generation III+ reactor to receive design certification from the U.S. NRC

Passive safety replaces mechanical and

electrical systems – harnesses natural forces like gravity, convection and

condensation to achieve safe shutdown

Standard design, experience from

current projects and modular construction enable “nth of a kind”

delivery performance

6

8

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

AP1000 Plant Is a Mature Technology

7,000+ Man-Years of Design

Work and Licensing Reviews

Westinghouse engineers work with utilities to develop a new generation of plants: safe, standardized, easier to construct and maintain

AP600 Design Certification approved by U.S. NRC – December 1999

Sanmen and Haiyang construction permits issued by China NNSA – March/September 2009

AP1000 Design Certification approved by U.S. NRC – December 2005

AP1000 Design Certification Amendment approved by U.S. NRC – December 2011

Combined licenses (COLs) approved by U.S. NRC for Vogtle and V.C. Summer projects – February/March 2012

AP1000 Final Safety Analysis Report submitted to China NNSA by customers – July/October 2012

First nuclear concrete for V.C. Summer 2 and Vogtle 3 – March 2013

1990

2000

2010

First nuclear concrete placed at Sanmen 1 and Haiyang 1 – March/September 2009

Photo © Sanmen Nuclear Power Company Ltd. All rights reserved.

Final major construction lift for Sanmen 1 and Haiyang 1 (CB20) – January/March 2014

Main control room operational at Sanmen 1 and Haiyang 1 – March 2014/May 2015

9

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

Achieving Nth-of-a-Kind Delivery

• Continued focus on safety and quality

• Further improvements in cost and

schedule will increase certainty of

next wave of projects – First-of-a-kind (FOAK) challenges

resolved

– Standard, stable design established

• Optimization initiatives underway – Lessons learned and best practices to

refine project delivery

– Certainty and security of supply

activities

– Manufacturability and constructability

enhancements Photos © Sanmen Nuclear Power Company Ltd. All rights reserved.

10

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

Long-Term Value for Customers

• Mature technology and strong AP1000 plant licensing pedigree

• Experience from first plants applied to new projects

• Fast-growing global fleet – Owner group benefits: experience

sharing, spare parts, etc.

• Proven commitment to product and service innovations that enhance plant operations and maintenance

• Demonstrated record of helping to build local capabilities and develop local professionals

AP1000 plant technology and delivery

experience are ready to meet the

need for safe, clean, reliable energy!

Photos © Georgia Power Company and South Carolina Electric & Gas Company. All rights reserved.

11

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

V.C. SUMMER

VOGTLE

HAIYANG

SANMEN

AP1000 Plant Global Project Delivery

• Eight AP1000 units under construction worldwide - Four units in China

- Four units in the United States

Photos © Georgia Power Company; South Carolina Electric & Gas Company; Sanmen Nuclear Power Company Ltd.; Shandong Nuclear Power Company Ltd.

All rights reserved.

12

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

China AP1000 Plant Projects

Haiyang 1&2 Shandong Province

Sanmen 1&2 Zhejiang Province

13

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

China AP1000 Plant Progress: Sanmen

Unit 2 Steam Generator (SG) Lift – June 2015

Photos © Sanmen Nuclear Power Company, Ltd. All rights reserved.

Unit 1 Main Control Room – January 2014 Unit 1 SG Secondary Hydro Test – December 2014

Unit 1 View – May 2015

14

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

China AP1000 Plant Progress: Haiyang

Photos © Shandong Nuclear Power Company, Ltd. All rights reserved.

Unit 2 Conical Roof Assembly – January 2015 Unit 1 CB20 Set – March 2014

Unit 2 CV Top Head Set – August 2015 Unit 1 Main Control Room – May 2015

15

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

Progress of China Projects: Transition to Turnover

and Testing Activities

• Major equipment delivered and installed at all

four units

– Reactor Vessel

– Steam Generators

– Reactor Vessel Internals

– Polar Crane

– Integrated Head Package

● Main Control Room (MCR) declared

operational at Sanmen Unit 1 and Haiyang

Unit 1

● Digital I&C turnover to Startup staff in progress

● Steam Generator Secondary Hydrostatic

(SGSH) test completed at Sanmen Unit 1 and

Haiyang Unit 1

● Sanmen and Haiyang operators completed China NNSA reactor operator license exams

● Technology transfer well advanced

Photo © Sanmen Nuclear Power Company, Ltd. All rights reserved.

Photo © Shandong Nuclear Power Company, Ltd. All rights reserved.

Haiyang Unit 1 – May 2015

Sanmen Unit 1 – July 2015

16

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

2009 to 2015 Sanmen Site Progress: Time Lapse View

Photos © Sanmen Nuclear Power Company Ltd.

17

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

U.S. AP1000 Plant Projects

V.C. Summer 2&3 Jenkinsville, South Carolina

Vogtle 3&4 Waynesboro, Georgia

18

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

Photos © Georgia Power Company. All rights reserved.

Unit 3 Steam Generator Delivery – June 2015

U.S. AP1000 Plant Progress: Vogtle Site

Unit 3 Turbine Island – April 2015

Containment Ring Fabrication – July 2015 Unit 3 CA01 Module Set – August 2015

19

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

U.S. AP1000 Plant Progress: V.C. Summer Site

Photos © South Carolina Electric & Gas Company. All rights reserved.

Unit 3 Reactor Vessel Delivery – June 2015 V.C. Summer Aerial View – March 2015

Unit 2 CA01 Module Lift – July 2015 Unit 2 Shield Building Panel Lift – July 2015

20

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.

Progress of U.S. Projects: Going Vertical With

Major Construction Milestones

• Nuclear Island basemat concrete pours

completed for all four units

• Containment Vessel Bottom Head (CVBH) and CA04 module (Reactor Vessel cavity)

set in nuclear island for all four units

• CV first ring set for initial unit at each site;

fabrication of additional rings continues

• Component and module fabrication

proceeding; major modules CA20, CA05 and

CA01 set for initial unit at each site

• First Shield Building panels set for initial unit at each site

• Reactor Vessel and Steam Generators

delivered for initial unit at each site;

additional equipment and component deliveries continue to proceed

Photo © Georgia Power Company. All rights reserved.

Photo © South Carolina Electric & Gas Company. All rights reserved.

Vogtle Unit 3 Nuclear and Turbine Islands – July 2015

V.C. Summer Unit 2 Nuclear Island – July 2015

21

Westinghouse Non-Proprietary Class 3 © 2015 Westinghouse Electric Company LLC. All Rights Reserved.