what’s new in ust system standards? - neiwpccneiwpcc.org/tanks2012old/presentations/tuesday...

16
What’s New In UST System Standards? Bob Renkes Executive VP | General Counsel Petroleum Equipment Institute Tulsa, OK x National Tanks Conference St. Louis, Missouri March 20, 2012 x

Upload: ngokhue

Post on 23-May-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

What’s New In UST System Standards?

Bob Renkes Executive VP | General Counsel Petroleum Equipment Institute

Tulsa, OK x

National Tanks Conference St. Louis, Missouri March 20, 2012

x

About PEI

About PEI’s Recommended Practices

PEI’s Recommended Practices of Interest to UST Regulators • Installation of USTs • Installation of ASTs for Motor Vehicle Fueling • Installation and Testing of Vapor-Recovery Systems

(Stage II) • Testing Continuity of Hanging Hardware • Inspection and Maintenance of Fuel

Dispensing Equipment • Inspection and Maintenance of UST Systems • Overfill Protection for Shop Fabricated ASTs • Installation of Bulk Plants • Installation of Marina Fueling Systems • Storage and Dispensing of Diesel Exhaust Fluid

Recommended Practices for the Inspection and

Maintenance of UST Systems (PEI/RP900-08)

PEI RP900 Daily • Leak Detection

• Automatic Tank Gauge (ATG) • Electronic Leak-Detection Monitor • Mechanical Line-Leak Detector • Daily Inventory

• Tank Fill Area • Fill Cover • Spill-Containment Manhole • Fill Pipe

PEI RP900 Monthly • Leak Detection Recordkeeping

• ATG, CIM, MPLT, SIR, IC, GWM, SVM, MIMT, MIMP

• Tanks • Grade-Level Covers • Spill-Containment Manhole Drain Valve • Drop Tube • Tank Gauge Stick • Check for Water • Tank Vents • Tanks

• Observation and Monitoring Wells • Impressed-Current Cathodic Protection

PEI RP900 ATG, CIM, MPLT, SIR, IC, GWM, SVM, MIMT, MIMP

PEI RP900 Annual • Submersible Turbine Pumps With and Without

Containment Sumps • Other Tank-Top Sumps • Other Sumps • ATG Manhole • Fill Area • Overfill Prevention

• Drop Tube Shutoff • Ball-Float Valve • Overfill Alarm

• Leak Detection • Corrosion Protection • Fuel Dispensers With and Without Containment Sumps

Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and

Secondary Containment Equipment at UST Facilities

(PEI/RP1200)

PEI RP1200

PEI RP1200 To: UST Stakeholders

“…we received a number of questions about the proposed PEI document RP 1200, Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities. When final, RP 1200 could be used to comply with some of the requirements in EPA’s proposal.”

—Carolyn Hoskinson

3-1-2012

PEI RP1200 Publication Schedule

January 24, 2012 — Release date March 26, 2012 — Comment deadline April 24-26, 2012 — Meeting date Summer 2012 — Publication date

RP1200 Comments to Date 12 — Tank Owners 67 — Regulators 31 — Equipment manufacturers 28 — Testing companies 2 — Staff

www.pei.org/rp1200