WATER 148 STREET WATER MAIN PROJECT FRASER RIVER HIJORTH ROAD PARK GUILDFORD HEIGHTS PARK GREEN TIMBERS PARK HAWTHORNE PARK ROBIN PARK GREEN TIMBERS GREENWAY IQRA ISLAMIC SCHOOL ELLENDALE ELEMENTARY ÉCOLE RIVERDALE ELEMENTARY GUILDFORD PARK SECONDARY MARY JANE SHANNON ELEMENTARY HOLLY ELEMENTARY GUILDFORD RECREATION CENTRE HIJORTH ROAD ELEMENTARY BONACCORD ELEMENTARY MOUNTAINVIEW MONTESSORI JOHNSTON HEIGHTS SECONDARY WILLIAM F. DAVIDSON ELEMENTARY GUILDFORD TOWN CENTRE A E EE E E R R RS GREENWAY G RS S Y Y S D D T EI HT GH H HT O FO S R N N A CN THORNTON YARD 108A Ave 111 Ave 111A Ave dge South Fraser Perimeter Rd 116A Ave King Rd Grosvenor Rd McBride Dr 148 St Wallace Dr Ellendale Dr 108 Ave 106 Ave 105A Ave 107 Ave 106A Ave Ferguson Div Guildford Dr 152 St 150 St 105 Ave 149 St 146 St 144 St 104A Ave 143 St 104 Ave 148 St 100 Ave Halstead Pl 103A Ave 103 Ave 101 Ave 102A Ave 144 St 98 Ave 96 Ave Fraser Hwy 152 St 95A Ave 109 Ave 148A St 141 St Wellington Dr St Andrews Dr 147A St 110 Ave 146 St 112 Ave 115A Ave 116 Ave Surrey Rd 140A St 141A St 115 Ave 142 St Blackbird Cr 97 Ave 150 St 148A St 151 St 95 Ave 99A Ave 154 St Port Mann Bridge Trans Canada Highway South Fraser Perimeter Rd 116A Ave King Rd Grosvenor Rd McBride Dr 148 St Wallace Dr Ellendale Dr 108 Ave 108A Ave 106 Ave 105A Ave 107 Ave 106A Ave Ferguson Div Guildford Dr 152 St 150 St 105 Ave 149 St 146 St 144 St 104A Ave 143 St 104 Ave 148 St 100 Ave Halstead Pl 103A Ave 103 Ave 101 Ave 102A Ave 144 St 98 Ave 96 Ave Fraser Hwy 152 St 95A Ave 109 Ave 148A St 141 St Wellington Dr St Andrews Dr 147A St 110 Ave 146 St 112 Ave 115A Ave 116 Ave Surrey Rd 140A St 141A St 115 Ave 142 St Blackbird Cr 97 Ave 150 St 148A St 151 St 95 Ave 99A Ave 154 St 111A Ave 111 Ave 148 Street Water Main: Whalley Section Existing Whalley Reservoir Future Connection to Whalley Reservoir 148 Street Water Main: Port Mann Section Existing Water Main Existing Water Main CITY OF SURREY Underground Valve Chambers Underground Valve Chambers

Upload: others

Post on 03-Nov-2019

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WATER · WILLIAM F. DAVIDSON ELEMENTARY GUILDFORD TOWN CENTRE ERSS GREENWGREEE AY D EIGHHTHHTT FOOR A N CN THORNTON YARD 108A Ave 111 Ave 111A Ave Port Mann Bridge South Fras er Pe

WATER

148 STREET WATER MAIN PROJECT

FRASER RIVER

HIJORTHROADPARK

GUILDFORDHEIGHTS

PARK

GREEN TIMBERSPARK

HAWTHORNEPARK

ROBINPARK

GREEN TIMBERS GREENWAY

IQRA ISLAMIC SCHOOL

ELLENDALEELEMENTARY

ÉCOLERIVERDALE

ELEMENTARY

GUILDFORD PARKSECONDARY

MARY JANESHANNON

ELEMENTARY

HOLLYELEMENTARY

GUILDFORDRECREATION

CENTRE

HIJORTH ROADELEMENTARY

BONACCORDELEMENTARY

MOUNTAINVIEWMONTESSORI

JOHNSTON HEIGHTSSECONDARY

WILLIAM F. DAVIDSON

ELEMENTARY

GUILDFORDTOWN CENTRE

AE EEEE RRRS GREENWAYGRSS YY

SDD

TEI HTGHHHTOFO

SR

NNA

CN THORNTON YARD

108A Ave

111 Ave

111A Ave

Port Mann Bridge

South Fraser Perimeter Rd

116A Ave

King Rd

Grosvenor R

d

McBride Dr

148 St

Wallace Dr

Ellen

dale

Dr

108 Ave

106 Ave

105A Ave

107 Ave

106A Ave

Ferguson Div

Guildford Dr

152 St

150 St

105 Ave

149 St

146 St

144 St

104A Ave

143 St

104 Ave

148 St

100 Ave

Halstead Pl

103A Ave

103 Ave

101 Ave

102A Ave

144 St

98 Ave

96 AveFraser Hwy

152 St

95A Ave

94 Ave

109 Ave

148A St

141 St

Wellington Dr

St Andrews Dr147A

St110 Ave

146 St

112 Ave

115A Ave

116 Ave

Surrey Rd

140A St

141A

St

115 Ave

142 St

Blackbird Cr

97 Ave

150 St

148A St

151 St

95 Ave

99A Ave

154 St

Port Mann Bridge

Trans Canada Highway

South Fraser Perimeter Rd

116A Ave

King Rd

Grosvenor R

d

McBride Dr

148 St

Wallace Dr

Ellen

dale

Dr

108 Ave

108A Ave

106 Ave

105A Ave

107 Ave

106A Ave

Ferguson Div

Guildford Dr

152 St

150 St

105 Ave

149 St

146 St

144 St

104A Ave

143 St

104 Ave

148 St

100 Ave

Halstead Pl

103A Ave

103 Ave

101 Ave

102A Ave

144 St

98 Ave

96 AveFraser Hwy

152 St

95A Ave

94 Ave

109 Ave

148A St

141 St

Wellington Dr

St Andrews Dr147A

St110 Ave

146 St

112 Ave

115A Ave

116 Ave

Surrey Rd

140A St

141A

St

115 Ave

142 St

Blackbird Cr

97 Ave

150 St

148A St

151 St

95 Ave

99A Ave

154 St

111A Ave

111 Ave

148 Street Water Main:Whalley Section

Existing Whalley Reservoir

Future Connection to Whalley Reservoir

148 Street Water Main:Port Mann Section

Existing Water Main

Existing Water Main

CITY OFSURREY

Underground Valve Chambers

Underground Valve Chambers

Page 2: WATER · WILLIAM F. DAVIDSON ELEMENTARY GUILDFORD TOWN CENTRE ERSS GREENWGREEE AY D EIGHHTHHTT FOOR A N CN THORNTON YARD 108A Ave 111 Ave 111A Ave Port Mann Bridge South Fras er Pe

WATER

148 STREET WATER MAIN PROJECT

Project Activities

Project Details

Typical construction activities include:

• Installing a new water main that runs parallel to an existing water main

• Installing new underground valve chambers

• Connecting the new water main to the existing water distribution system

HoursGenerally between 7 AM and 7 PM Monday to Saturday (May require some bylaw variances)

Port Mann Section (North)

Whalley Section (South)

Timeline: Winter 2018 to Spring 2021 Spring 2019 to Spring 2021

Length of Water Main: 3 km 2 km

Pipe Diameter: 1.5 m 1.5 m

Location: Between the Whalley Reservoir at 104A Avenue to Surrey Road

and 115 Avenue

Between 105 Avenue and Green Timbers Greenway

on 148 Street

Valve Chambers:

Two locations:

• 111 Avenue and Wallace Drive

• 105A Avenue and 148 Street

Two locations:

• South of 100 Avenue and 148 Street

• North of Green Timbers Greenway and 148 Street

Page 3: WATER · WILLIAM F. DAVIDSON ELEMENTARY GUILDFORD TOWN CENTRE ERSS GREENWGREEE AY D EIGHHTHHTT FOOR A N CN THORNTON YARD 108A Ave 111 Ave 111A Ave Port Mann Bridge South Fras er Pe

HOW BIG IS THE WATER MAIN?There are all different sizes of water mains in our region’s distribution system, but the water main being installed for this project is approximately 1.5 metres in diameter.

New Water Main 1.5 m

(approximately 5')

Person Height 1.8 m

(approximately 6')

WATER

148 STREET WATER MAIN PROJECT

Minimizing Construction ImpactsTo minimize the impacts of this essential water main’s construction activities, Metro Vancouver contractors and crews must:

Use newer, low-emission vehicles and generators

Water or sweep the road to control dust

Monitor the discharge of groundwater from trench excavation

Page 4: WATER · WILLIAM F. DAVIDSON ELEMENTARY GUILDFORD TOWN CENTRE ERSS GREENWGREEE AY D EIGHHTHHTT FOOR A N CN THORNTON YARD 108A Ave 111 Ave 111A Ave Port Mann Bridge South Fras er Pe

WATER

148 STREET WATER MAIN PROJECT

Keeping Traffic Moving Safely and EfficientlyMetro Vancouver is committed to minimizing the impacts to traffic and access during construction of this essential water infrastructure project.

Whenever possible, regular traffic patterns and parking will be restored at the end of each day. Detour routes and ongoing schedule and information updates will be communicated through:

• On-site signage

• Traffic control personnel

• Public notifications

• The Metro Vancouver website

Bike: The bike lane along 148 Street may be closed in sections of the water main route during active construction. In most areas, bikes will be accommodated on the street.

Pedestrian: Sidewalk access will generally be maintained during construction. Crosswalks, and occasionally one side of the sidewalk, may be closed intermittently during construction.

Bus: Bus stops along the construction route affected by road closures will be temporarily moved. Closer to construction, Coast Mountain Bus Company will provide locations of temporary bus stops and any needed route detours. Please see www.translink.ca/Schedules-and-Maps/Alerts for updates.

Motor Vehicle: As construction progresses, sections of 148 Street will be intermittently closed to all traffic. Pedestrian access to parking in the surrounding area will be maintained.

Driveway Access: There may be instances where access to a particular driveway or road is temporarily restricted. Advance notification will be provided to affected residents and businesses should a temporary access restriction occur.

Residents with mobility issues should speak to a Metro Vancouver team member to ensure any home or community access is not disrupted.