Wind farm Kalin / Bulgaria

Wind farm Kalin / Bulgaria – 99 MW

♦ 55 x Vestas V100 with 1,8 MW rated power

♦ 95 m hub height

♦ average wind speed 5,9 m/s in 95 m hub height

♦ located at the border to Romania

♦ planning period 2007 - 2011

♦ ready for construction 2011

Project Kalin

• Site Evaluation• Wind measurement• Energy assessment

Predicted Annual Energy Yield (AEP) P 50

Predicted Annual Energy Yield (AEP) 55 Vestas V100 1,8MW 95m NH

Predicted wind park revenues are based on the wind studies from : Eurowind (19.11.2009) and Wind & Regen (20.12.2009)

Eurowind Wind & Regen Average

[MWh/y] [MWh/y] [MWh/y]

Predicted Annual Energy Yield (100%) 264'453.0 246'354.0 255'403.5

Energy Production Exceeding Probability P 50 264'453.0 246'354.0 255'403.5

Deduction Availability 2,0% 5'289.1 4'927.1 5'108.1

Electrical loss at 98% availability 0,8% 2'073.3 1'931.4 2'002.4

Total 257'090.6 239'495.5 248'293.1

Project Kalin - Permitting

Grid connection contract signed with NEK Right of utilization and construction right for the wind turbines and

the respective land lease agreements secured The change of the purpose of the land usage and the registration of

the servitudes of all single sites notarized Approval Environmental Impact Assessment EIA report in place Approved Detailed Spatial Plan (PUP) Construction Permit of the wind farm PPA and license in progress

Project Kalin - Regulatory

Changes in Bulgarian regulatory environment concerning:

• Feed In Tariff without inflation adjustment• Feed In Period reduced• Grid Connection Fee newly introduced

For Kalin the old conditions will still be applied.

• Total project costs amount to approx EUR 163 mill.

• Assumed debt / equity ratio of 69% / 31%• Equity capital of approx. EUR 51 mill. and a senior loan of EUR 112 mill. are

required.• For senior financing an export risk insurance covered senior loan can be foreseen.

The export risk insurance will cover all political, transfer and commercial risks of the project and the respective insurance-premium is supposed to be paid upfront. Therefore a premium of approx. EUR 17.5 mill. for an ECA loan cover financing would need to be added to the project costs of the wind farm.

Project Kalin – Financing

Project company:

Kalin Eko Stroi Ltd. (bulgarian OOD) V.Levski Str. 192 office 401 5800 PlevenBulgariaTel.: +359 (0) 64 82 20 97Fax: +359 (0) 64 82 20 98E-Mail: [email protected]

Manager: Dr. Melania Kaszas-SavosCompany founded in 2006

Project development:

Rübsamen Windenergie GmbHBrödermannsallee 1125469 HalstenbekGermanyTel.: +49 (0) 4101 69 67 94 5Fax: +49 (0) 4101 40 40 59E-Mail: [email protected]

Manager: Rosemarie RübsamenCompany founded in 1994