DESCRIPTION
Window Details in Solid Masonry/ Veneer Construction (Continued). Window Assembly Review. Finished window assembly depends on: architectural design of structure region of country/climate material of structure type of window Must be familiar with installation sequence - PowerPoint PPT PresentationTRANSCRIPT
Window Details in Solid Masonry/ Veneer Construction (Continued)
Window Assembly Review Finished window assembly depends on:
– architectural design of structure– region of country/climate– material of structure– type of window
Must be familiar with– installation sequence– proper weatherproofing
Window Types - Materials Same as in wood construction
– wood– steel– aluminum– vinyl/wood covered with vinyl (wood clad)– combination
Window Types - Styles in Masonry Construction
Same as in Wood Construction– casement– horizontal sliding– double-hung– awning
– louver/jalousie– fixed sash– combination types– bay, bow, box
Combination Units max light large viewing
area good ventilation very common
today 2 casement with
center picture window
Detailing Windows in Masonry Construction Limited flexibility with masonry construction
– stay with standard sizes designed for block Window action is not important Weatherproofing & installation are important Brick and Brick Veneer masonry have some
flexible– can adjust for different masonry openings
Pictorial - Window in Masonry Construction
Horizontal sliding window - wood frame attached to concrete block
Masonry Construction Window Details Metal drip at sill Caulking used to seal
head and jamb
Steel Casement in Masonry Construction Pre-cast concrete sill with
drip slot on underneath side Sash block (see page 105 of
text) used for head and jamb
Window fin fits into the slot of the sash block and grout fixes the window in place
Brick Window Exterior
Head and sill materials can be different than jamb material
Brick Construction - Window Elevation and Nomenclature
Coordinate elevation drawing with drawing notations for each detail
Brick Construction - Head Detailof wood casement
Notation 21 Notice steel angles
supporting the brick Caulking used to
weather seal installation
Space and drywall to finish interior
Brick Construction - Jamb Detailof wood casement window
Notation 22 Caulking use to seal
installation Metal ground at
exposed edge of drywall
Brick Construction - Sill Detail
Notation 23 Notice handle to open and
close casement window Brick sill is sloped to
divert water away from window
Again, caulking and metal trim use to seal and finish installation
Vertical Mullion Detail Notation 24 Two casement windows side-by-side, joint
covered with trim to finish installation
Head Detail (masonry) Note use of caulking and wood trim
Wood sliding window
Sill Detail (masonry) Note use of grout and caulking
Wood sliding window
Brick Veneer Construction Details
Notice sloped brick sill Notice brick shown in
section and elevation Notice inside finish
moldings Brick at head detail
supported by angle
Wood Window - Double HungElevation/Head/Jamb/Sill Details
Extra Credit Assignment Elevate and detail each window type for the
Hotel project on Sheet A-8.
The End.
Drawing Exercise Window Detail (cont); 3”=1’-0”
Head Detail Do not place a break line through the header Header with 1/2” spacer between 2-2x8 headers 1/2” gypsum board interior wall 5/8” solid sheathing/remove plaster etc shown 2 3/4” x 3 1/2” x 3/16” steel angle lintel double 1/4” glass with 1/2” air space (use proper
glass symbol) typical all details
Drawing Exercise Window Detail (cont) 3”=1’-0”
Jamb Detail show sill lines (brick & wood) in Jamb Detail finished jamb from 2”x6” align all details trimmer note is 2-2x4 studs (no inch marks
Sill Detail Extend brick sill to overhang 1 1/2” underneath side, show entire
brick sill and more below it Add thin lines for jamb beyond coordinate and reference all details with elevation