Wing LDA

CALICE Collaboration MeetingDESY Hamburg, 21. March 2013

André WelkerLennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz Geib, Sascha Krause, Yong

Liu, Lucia Masetti, Phi Chau, Uli Schäfer, Rouven Spreckels, Stefan Tapprogge, Rainer Wanke

Page 2: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

Read-out-chain

André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013

SiPMASICdetector interface

digitalanalogHBU

data-aggregator

(LDA)

clock- and control-card

(CCC)

SiPMASICdetector interface

digitalanalogHBU

controlclocktriggerdatabusy

DAQ PC

beam control

Ethernet

on-detector-electronicoff-detector-electronic

Ethernet control, trigger, clock, busy

2

fan-out

moreLDAs

Page 3: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

Read-out-chain

André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013

SiPMASICdetector interface

digitalanalogHBU

data-aggregator

(LDA)

clock- and control-card

(CCC)

SiPMASICdetector interface

digitalanalogHBU

controlclocktriggerdatabusy

DAQ PC

beam control

Ethernet

on-detector-electronicoff-detector-electronic

Ethernet control, trigger, clock, busy

2

fan-out

moreLDAs

Page 4: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

Position of the LDA

3

LDA integrated in the 10x10cm cableshaft:

André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013

HCAL- /TPC-cabelshaft with coolingpipes

ECAL-cableshaft

110cm

challenges:problems:• LDA outside of the

detector 96 cables in the

cableshaftsolution/problem:• 110 cm PCB timedelay between each layer (up to 5ns)solution:• on-board-electronic regulates timing differences10cm

Page 5: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

Position of the LDA

3

LDA integrated in the 10x10cm cableshaft:

André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013

HCAL- /TPC-cabelshaft with coolingpipes

ECAL-cableshaft

110cm

challenges:problems:• Pitch between the 48

layers depends on (18/23 mm for W/Fe)solution: Smallest possible

HDMI micro connector

• Now only - One Ethernet cable - One control cable in the detector

10cm

Ethernet-UplinkControl cable CCC

Page 6: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

Mechanic and flexibility:LDA with rigid-flex connections:

central module right wingleft wing

4André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013

Active and PassiveLDA consists of 4 parts:1. Three passive PCBs:

The 96 connectors are on these PCBs.2. One active PCB:

it is a daughter module for tests and fast repairs.

rigid-flex connection

Page 7: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

Wing-LDAThe first PCB:

1. Wing with 17 HDMI-connectors routed:

5André Welker, CALICE Collaboration Meeting, Cambridge, Sep. 18, 2012

450mm

old ideas

Page 8: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

Wing-LDAThe second PCB:

2. Center PCB with 12 HDMI-connectors:

6André Welker, CALICE Collaboration Meeting, Cambridge, Sep. 18, 2012

400mm

DATA/BUSY

TRIG/CLK/DATA

DATA/BUSY

TRIG/CLK/DATA

old ideas

Page 9: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

LDA LayoutPassive PCB:

1. Wing with 32 HDMI connectors:

7

367,5mm

André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013

99mm

Page 10: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

LDA LayoutPassive PCB:

2. Central module with 32 HDMI connectors:

8

365mm

André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013

99mm

Page 11: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

SD

FPGA FPGA FPGA FPGA

MARSHDMI-CCC

RJ45

280mm

80mm

LDA LayoutActive PCB:

3. Daughter module with 4 FPGAs and a Mars module:

André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013 9

Page 12: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

Active PCB:

3. FPGA daughter module

10

280mm

Zynq

André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013

Mars-ZX3

LDA

Peculiarity:- Manages 1100 signals and sends them over the Ethernet- Has a Zynq processor who

- has implemented an Arm9 dual core (with Linux)- and one FPGA

- Same module as CCCData/BUSYLegend:

Control/Trigger/Clock

FPGA FPGA FPGAFPGA

CCC-ConnectorEthernet

Data

BUSY

Page 13: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

2 GeV

beam

May 2013 Testbeam (DESY)

André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013 11

DAQ PC

data

clock- andcontrol card

(CCC)

beam control

control

- Next testbeam with 8 layers at the end of may

controlbusy

Page 14: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

LDA Status

• LDA collects parallel data from 96 detector layers and leads the clock to each of them without a timing delay

• 80% of the LDA design is finished

• Order the PCBs in 1 week

• Firmware will be finished in 1 month

• Software is finished

• Ready to readout two full ILD detector segments with 48 layers each

12André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013

Page 15: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

Integration of CCC and LDA

1. Read-out data and send slow control data from the HBU layers as before over USB, but integrate the CCC for clock, trigger and busy

signals

2. Read-out data by USB but send slow control data, clock, busy, trigger over the CCC

3. Integrate the LDA for data read-out instead of the USB, without interference from us in the regular data acquisition

4. Firmware and software will be written by us, so we don‘t interrupt the manpower on the DIF side

13André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013

Steps:

Page 16: Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz

André Welker, CALICE Collaboration Meeting , DESY, 21. March 2013