Lab On Chip Sorting Device

Winter Deliverables II

Page 2: Winter deliverables ii

Visit VA blood facilities Ask questions about blood sorting methods Ask doctors is this a product they would use “survey” Complete immersion report

Meet with Vanessa Johnson Sit in on lab sessions (When Open) Use access to http://medtraining.org for lab training

Budget Cross Check Prototype cost Price all supplies need to make prototype Mass produced cost

Begin initial constriction of basic prototype, evaluate design, redesign to fix problems, build new basic prototype. Test device with nanoparticles Analyze changes needed to use blood

What We Are Suppose To Do

Page 3: Winter deliverables ii

Complete immersion ReportExample of Photo Etching Contact with Vanessa Johnson about trip to VA

Use access to http://medtraining.org for lab training

Budget Cross CheckPrototype costPrice all supplies need to make prototypeMass produced cost

Begin initial constriction of basic prototype, evaluate design, redesign to fix problems, build new basic prototype.

What We Have Done

Page 4: Winter deliverables ii

Photolithography

Page 5: Winter deliverables ii

We plan on going to the VA Hospital in Shreveport Louisiana This Friday 2/1/13

Visit VA

Page 6: Winter deliverables ii

Plan on meeting with Miss Johnson when go visit VA Hospital

Used the http://medtraining.org website

Meet With Miss Johnson/Lab Training

Page 7: Winter deliverables ii

Material Price

RIE $50 each

Micro Bead Solution $200

Budget Price Check

• Other expenses such as the machinery needed to create the prototype are supplied by the school.

Page 8: Winter deliverables ii

Here is the mask we are suppose to have done

Sending to IMF to build a Reactive ion etched chip (lab on chip)

Test

Page 9: Winter deliverables ii

Next we plan on getting nanoparticles to start testing device

Make changes where necessary

Next Plan