Page 1: WIS 96 Project Update · • Additional project information, including project displays, can be found at the design website listed on the Resources slide. WIS 96 Proposed Improvements

WIS 96Project Update

Tim Rank, Project ManagerJeremy Bartz, Project Leader

WisDOTJuly 2020

Page 2: WIS 96 Project Update · • Additional project information, including project displays, can be found at the design website listed on the Resources slide. WIS 96 Proposed Improvements

WIS 96

• OverviewProposed Project Scope/NeedProposed ImprovementsRight-of-way NeedsTraffic ControlScheduleResourcesProject Contacts

Page 3: WIS 96 Project Update · • Additional project information, including project displays, can be found at the design website listed on the Resources slide. WIS 96 Proposed Improvements

WIS 96Proposed Project Scope/NeedProjects 4075-35-71 and 4075-35-72 include

4.9 miles of WIS 96 from Claribel Street to County D, between Kaukauna and Wrightstown in Brown & Outagamie County (will be built together)Last improvement project took place in 2000

and 2005

Page 4: WIS 96 Project Update · • Additional project information, including project displays, can be found at the design website listed on the Resources slide. WIS 96 Proposed Improvements

WIS 96Proposed Project Scope/Need

Deteriorating pavement, drainage structures, curb and gutter, and sidewalk need repairMultiple curb ramps along the corridor are

currently not Americans with Disabilities Act (ADA) compliant.

Page 5: WIS 96 Project Update · • Additional project information, including project displays, can be found at the design website listed on the Resources slide. WIS 96 Proposed Improvements

WIS 96Proposed Project Scope/Need

Page 6: WIS 96 Project Update · • Additional project information, including project displays, can be found at the design website listed on the Resources slide. WIS 96 Proposed Improvements

WIS 96Proposed Improvements

• 4075-35-71 (Claribel Street to County JJ) Resurface level improvement: mill and overlay within the existing pavement

footprint Culvert pipe repair/replacement-2 locations Miscellaneous curb & gutter repairs Curb ramp improvements at Lamp Lighter Dr. Pavement marking Shoulder work

• Additional project information, including project displays, can be found at the design website listed on the Resources slide.

Page 7: WIS 96 Project Update · • Additional project information, including project displays, can be found at the design website listed on the Resources slide. WIS 96 Proposed Improvements

WIS 96Proposed Improvements

• 4075-35-72 (County JJ to County D) Resurface level improvement: mill and overlay within the existing pavement

footprint Culvert pipe repair/replacement-5 locations Storm sewer repair/replacement-4 locations Miscellaneous curb & gutter or sidewalk repairs Curb ramp improvements at all intersections within Wrightstown Pavement marking Shoulder/centerline rumble strips: from County JJ to Van Dyke Street Shoulder work: from County JJ to Van Dyke Street

• Additional project information, including project displays, can be found at the design website listed on the Resources slide.

Page 8: WIS 96 Project Update · • Additional project information, including project displays, can be found at the design website listed on the Resources slide. WIS 96 Proposed Improvements

WIS 96Right-of-way Needs

Temporary Limited Easements (TLE)• Will be needed at some culvert replacement locations to allow for

temporary disturbance and sufficient work space to repair pipes• Needed at most curb ramp improvement locations within the Village of

Wrightstown to allow grading and blending in of adjacent properties

Permanent (Fee)• Will be needed at some curb ramp improvement locations in the village

of Wrightstown due to updated layout of the sidewalk• Will purchase area were existing sidewalk is outside of the existing

right of way to place the sidewalk into WisDOT right of way for future maintenance needs

• May need at select culvert locations…to be confirmed in final design

Page 9: WIS 96 Project Update · • Additional project information, including project displays, can be found at the design website listed on the Resources slide. WIS 96 Proposed Improvements

WIS 96Traffic Control

Work expected to take place under flagging operations with single lane closuresRoad will remain open to traffic during

construction for the majority of the project….except:

• Short term detour will be needed for culvert pipe replacements

• Tentative detour = WIS 55 - I-41 - County U

Page 10: WIS 96 Project Update · • Additional project information, including project displays, can be found at the design website listed on the Resources slide. WIS 96 Proposed Improvements

WIS 96Schedule

Additional public outreach will be conducted in late 2021 to provide updates prior to real estate acquisition and final design.Real estate acquisition will begin in early 2022.Design is on-going and will continue through

the summer of 2023.Construction is tentatively scheduled for 2025

with the possibility of advancement to 2024 if funding becomes available.

Page 11: WIS 96 Project Update · • Additional project information, including project displays, can be found at the design website listed on the Resources slide. WIS 96 Proposed Improvements

WIS 96Resources

Design website https://wisconsindot.gov/Pages/projects/by-

region/ne/96kauwrit/default.aspx

See website for comment sheet and exhibits Track the project during construction on the WisDOT Northeast

Region Construction Website https://projects.511wi.gov/region/northeast

In This Together Recognizes businesses located in work zones have special

needs The program is offered to business and community leaders as

an idea source as they plan for road construction in their area Find out more at: http://wisconsindot.gov/Pages/projects/in-

together/default.aspx

Page 12: WIS 96 Project Update · • Additional project information, including project displays, can be found at the design website listed on the Resources slide. WIS 96 Proposed Improvements

WIS 96Project Contacts

Tim Rank, P.E.Project ManagerWisDOT NE Region944 Vanderperren WayGreen Bay, WI 54304Phone: (920) 360-2579Email: [email protected]

Jeremy Bartz, P.E.Project LeaderWisDOT NE Region944 Vanderperren WayGreen Bay, WI 54304Phone: (920) 362-6356Email: [email protected]