Wisconsin Department of Transportation
Version 06-2014 Solving tomorrow’s transportation challenges
Division of Transportation Systems Development Bureau of Project Development 4802 Sheboygan Avenue, Rm 601 P O Box 7916 Madison, WI 53707-7916 mTelephone: (608) 266-1631 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459
June 19, 2017
NOTICE TO ALL CONTRACTORS: Proposal #01: 1003-10-84, WISC 2017 326
Illinois State Line - Madison STH 11 to CTH O IH 39 Rock County 1005-11-71 Illinois State Line – Madison Racine St Inch/Midland Ct Park & Ride IH 39 Rock County
1005-10-76, WISC 2017 327 Illinois State Line - Madison CTH O to USH 14 Interchange North IH 39 Rock County
Letting of July 11, 2017 This is Addendum No.01, which provides for the following: Special Provisions:
Revised Special Provisions Article
No. Description
25 Notice to Contractor – Airport Operating Restriction – Site Specific 41 Base Aggregate Dense 1 ¼-Inch, Item 305.0120
145 Survey Project 1003-10-84, Item SPV.0105.001; 1005-10-76, Item SPV.0105.002; 1005-11-71, Item SPV.0105.003
156 Roadside Infiltration Ditch Compost, Item SPV.0180.150 Schedule of Items:
Revised Bid Item Quantities
Bid Item Item Description Unit Old
Quantity Revised Quantity
Proposal Total
205.0100 Excavation Common CY 676,186 -69,199 606,987 208.1100 Select Borrow CY 120,715 -66,530 54,185 624.0100 Water MGAL 14,340.4 -139 14,201.4 630.0120 Seeding Mixture No. 20 LB 5,130 95 5,225
630.0130 Seeding Mixture No. 30 LB 4,794 -95 4,699 643.1000 Traffic Control Signs Fixed Message SF 1,992.58 -434.75 1,557.83 645.0130 Geotextile Type R SY 1,070 -675 395 646.0106 Pavement Marking Epoxy 4-Inch LF 173,960 -11,400 162,560
646.0841.S Pavement Marking Grooved Wet Reflective Contrast Tape 4-Inch
LF 13,560 -200 13,360
SPV.0035.001 Roadway Embankment CY 236,256 180 236,436
SPV.0035.002 Roadside Infiltration Ditch Granular Backfill Sand
CY 23,030 -12,030 11,000
SPV.0060.201 Fixed Message Sign Portable Support Each 37 -7 30 SPV.0090.150 Compost Tube LF 40,515 -1,340 39,175 SPV.0180.150 Roadside Infiltration Ditch Compost SY 27,105 -5,075 22,030
Deleted Bid Item Quantities
Bid Item Item Description Unit Old
Quantity Revised Quantity
Proposal Total
SPV.0105.001 Survey Project 1003-10-84 LS 1 -1 0 SPV.0105.002 Survey Project 1005-10-76 LS 1 -1 0
Plan Sheets:
Revised Plan Sheets Plan
Sheet Plan Sheet Title (brief description of changes to sheet)
1003-10-84
14 Construction Details: Revised the Roadside Infiltration Ditch construction detail at the infiltration pond (VA Ramp).
21 Construction Details: Roadside infiltration ditching application was removed from the VD ramp and the grading at the bottom of the VD pond was updated.
54 Erosion Control - Stage 4 Phase 1: Select inlet and discharge elevation updates. 65 Storm Sewer: Select inlet and discharge elevation updates.
201 Miscellaneous Quantities: Updates to the Earthwork Summary table. 216 Miscellaneous Quantities: Updates to the Finishing Items table.
219 Miscellaneous Quantities: Updates to the Tracking Pads Summary table and Fixed Message Summary table.
228 Miscellaneous Quantities: Updates to the Roadside Infiltration Ditch Summary table and removal of the Survey Project table.
350 Special Sign Details: Removed sign plate detail that will be installed under ID 1003-10-76. 490 Earthwork: Updates to the EBS column. 491 Earthwork: Updates to the EBS column.
518-520 Cross Sections: Stage 2 Phase 2 (NB): Updates to pond VA. 594-596 Cross Sections: Stage 2 Phase 2 (NB): Updates to pond VA. 614-615 Cross Sections: Stage 2 Phase 2 (NB): Updates to pond VD.
1005-10-76 1064 Pavement Marking: Removed pavement marking quantity 1065 Pavement Marking: Removed pavement marking quantity 1404 Miscellaneous Quantities: Revise pavement marking quantities
Deleted Plan Sheets
Plan Sheet
Plan Sheet Title (brief description of why sheet was deleted)
1005-10-76 1066 Pavement Marking: Removed due to staging of adjacent project.
The responsibility for notifying potential subcontractors and suppliers of these changes remains with the prime contractor.
Sincerely,
Mike Coleman Proposal Development Specialist Proposal Management Section
ADDENDUM NO. 01
PROJECT ID 1003-10-84, 1005-10-76, 1005-11-
June 19, 2017
Special Provisions 25. Notice to Contractor – Airport Operating Restrictions – Site Specific. Add the following to the end of the table:
41. Base Aggregate Dense 1 ¼-Inch, Item 305.0120.
Replace the first sentence with the following:
Revise standard spec 305.2.2.1 when base is ≥ 50% crushed gravel as follows:
145. Survey Project 1003-10-84, Item SPV.0105.001; 1005-10-76, Item SPV.0105.002; 1005-11-71,
Item SPV.0105.003. Replace entire article title and article language with the following: 145. Survey Project 1005-11-71, Item SPV.0105.003.
A Description Standard spec 105.6 and 650 are modified to define the requirements for construction staking for this contract. Add the following to standard spec 105.6.1: Horizontal and vertical control points, provided by the department, are generally at 1-mile intervals for horizontal control and at 1/2-mile intervals for vertical control. Control points will be provided in a hard copy and ASCII electronic format. Replace standard spec 105.6.2 with the following: The department will not perform any construction staking for this contract. The contractor shall perform all survey required to layout and construct the work under this contract, subject to engineer’s approval.
Project ID Structure Location Latitude Longitude Heights Issue Date
Expiration Date
Aeronautical Study No.
1005-10-76
Crane (Temporary for B-53-214)
I-39 SB Milwaukee Street Crossing
42-41-47.4 N NAD 83
88-59-02.7 W
160 feet AGL 1034 feet AMSL
11/29/2016 05/29/2018 2016-AGL-15942-OE
1005-10-76
Crane (Temporary for B-53-337)
I-39 NB Mt. Zion Avenue Crossing
42-42-01.8 N NAD 83
88-59-01.9 W
160 feet AGL 1025 feet AMSL
11/29/2016 05/29/2018 2016-AGL-15943-OE
The survey includes establishing horizontal and vertical position for all aspects of construction including but not limited to storm sewer, subgrade, base, curb, gutter, curb and gutter, pipe culverts, structure layout, pavement, barriers (temporary and permanent), electrical installations, supplemental control, slope stakes, ponds, ITS, FTMS, ramp gates, parking lots, utilities, landscaping elements, irrigation system layout, installation of community sensitive design elements, traffic control items, fencing, etc. The department may choose to perform quality assurance survey during construction. This quality assurance survey does not relieve the contractor of the responsibility for furnishing all survey work required under this contract. Delete standard spec 650.1. B (Vacant) C Construction Survey required under this item shall be according to all pertinent requirements of standard spec 650 and shall include all other miscellaneous survey required to layout and construct all work under this contract. D Measurement The department will measure Survey Project (Project Number) as a single lump sum unit of work, acceptably completed. E Payment The department will pay for measured quantities at the contract unit price under the following bid item:
ITEM NUMBER DESCRIPTION UNIT SPV.0105.003 Survey Project 1005-11-71 LS
Payment is full compensation for performing all survey work required to layout and construct all work under this contract. (5/14/2013)
156. Roadside Infiltration Ditch Compost. Replace entire section titled C.3 Placement and Settling of Roadside Infiltration Ditch Compost with the following:
C.3 Preparation, Placement and Settling of Roadside Infiltration Ditch Compost IH 39 NB/SB Roadside Infiltration Ditch Compost Place 4-inches of roadside infiltration ditch compost on top of previously placed roadside infiltration ditch granular backfill sand, as detailed in the plan, within the same calendar day of the roadside infiltration ditch granular backfill sand placement. The placement of roadside infiltration ditch granular backfill sand is paid for separately. Rototill the 4-inches of roadside infiltration ditch compost into the previously placed roadside infiltration ditch granular backfill sand to an elevation approximately 1-foot below the proposed elevation of the roadside infiltration ditch. Methods to induce mild settling of the roadside infiltration ditch compost layer, such as lightly tamping, may be used to prepare a stable planting medium and to stabilize the ponding depth. Vibrating-style plate compactors or other vibratory compactors are not allowed to induce settling.
Infiltration Pond (VA Ramp) As detailed in the plans, excavate the roadside infiltration ditch area to a depth of 4 inches. Excavation of the roadside infiltration ditch area is paid for separately under bid item Excavation Common. Within the same calendar day of excavation, place 4 inches of roadside infiltration ditch compost. Rototill the 4-inches of roadside infiltration ditch compost into the existing sand and gravel strata to an elevation approximately 1-foot below the proposed elevation of the roadside infiltration ditch.
Methods to induce mild settling of the roadside infiltration ditch compost layer, such as lightly tamping, may be used to prepare a stable planting medium and to stabilize the ponding depth. Vibrating-style plate compactors or other vibratory compactors are not allowed to induce settling.
Replace the last paragraph in section titled C.4 Compaction Avoidance with the following:
Avoid smearing during the placement of the roadside infiltration ditch compost of the existing sand and gravel strata or the previously placed roadside infiltration ditch granular backfill sand layer and the roadside infiltration ditch compost layer.
Schedule of Items Attached, dated June 19, 2017, are the revised Schedule of Items Pages 4, 5, 23, 25, 27, 28, 33, 35, and 37-39. Plan Sheets The following 8½ x 11-inch sheets are attached and made part of the plans for this proposal: 1003-10-84: Revised: 14, 21, 54, 65, 201, 216, 219, 228, 350, 490, 491, 518-520, 594-596, and 614-615 1005-10-76: Revised: 1064-1065, and 1404 Deleted: 1066
END OF ADDENDUM
E
22
E
22
E
22
E
22
E
33
E
33
E
33
- 7
-
72
•6.5
,.----25
·1
8 T
26------,.
6.5
'/
[)A
�u
'/
®�
[�
u
£w
@ �
@ [ru
J@
0
[ru@
�W
D � �
@
:-...
1<-15
.625
I
2A
I
12----,J._
10.s
-.l L
-21
.375
_____J.___15
J
1.
875
,I,
t<--
22.7
5 55.625
�7
.75.1
115.625
J
132
6.000
" Rad
ius,
1.000
" Border
, Whllll o
n Grw
n;
�
Co
--
Co
111..A
�&,'W
�
· ••
·-----
�
a..1-..
. •
---
-.:
•-"
�
,a-...11
.
]UU
'
0 ffl
I
N
...
�J�I �,�
-(O
CD
1G
(lL
�..
� D
,._
,._
i =I
=I
... -* .,
u,
N
� "";
� i
/ !
I
23__j
7_&2
5 53.
625 38
.625
NO
TE
S
1.
All
Sig
ns
a
re
T
yp
e
II -
Ty
pe
H
R
ef
lec
tiv
e
V
0-..
2.
Co
lo,
:
Ba
ck
gr
ou
nd
-GR
EE
N
Me
ss
ag
e
-W
HIT
E
3.
Me
ss
ag
e
Se
rie
s
-E
ex
ce
pt
a
s
Sh
ow
n
1��1·
72
·1 2A
.&15 -----r-
a ---,.---21
.&25-
---,
5.75
'/
]if�
' [
)A�u
®[
ffe\�
u
[Q)@
�@
W@
[ru
� [MJ
�l[
/
<-14
.875
I
2A
I 12
-h
_375
l l..-
-23
_625____J._
12.8
75--.,
I
1.25
,I,
<-----
17
64
15---,
<-----
30.62
5-----,J
l.-9---,J..__
25.3
75
I 28
.625----,
2.
375
6.000"
Raclus
, 1.0
00" Border
, "EXll'
E; "
175"
E; "
EASr E
; "DalaYan" E
Mod
; "1"
E; "
MIL
E" E
;
ffl
IN
...
�1 .. 1
st
-·
J,
J,
T
1 i
... .. i -...
il!i j ., -* ! in
in
-+ i�
18
PR
OJ
EC
T
NO
: 10
03
-10
-8
4
I HW
Y:IH
39
IC
OU
NT
Y: R
OC
K
I S
PE
CIA
L
SIG
N
DE
TA
ILS
-
TR
AF
FIC
C
ON
TR
OL
S
HE
ET
I E
FI
LE
NA�
: s
:,M
A0,3
500-
-35
99\3
557\
002\
CIVI
L30\
FIN
tt.. \1
0031
084
\SI-EE
TSPLAN\
0701
0LS0
.0WG
L
AY
CUT
NN
.E
-0
70
10
7 .
SO
PLO
T DA
TE
: 6
1912
017
9:1
0 AM
P
LO
T
BY
:
.JtiCI(
,
RO
BER
T
A.
PL
OT
N
AM
E
:
PL
OT
S
CA
LE
:
1
I
N:
20
F
T
WIS
OO
T /
CA
OO
S
SH
EE
T - 7
-
E
99
E
99
E
99
E
99
E
99
E
99
E
99
E
99
E
99
E
99
1064
1065
PR
OJE
CT
NO
: 10
05-1
0-76
& 1
005-
11-7
1H
WY
: IH
39/
90C
OU
NT
Y:
RO
CK
MIS
CE
LLA
NE
OU
S Q
UA
NT
ITIE
SS
HE
ET
EF
ILE
NA
ME
: G:\W
DO
TS
W\W
SW
10
-11
02
4\P
S&
E\D
raft
PS
&E
\Sh
ee
tsO
RIG
INA
TO
R:
KL
EN
GIN
EE
RIN
G, I
NC
.O
RIG
. DA
TE
:R
EV
. DA
TE
:P
RIN
T D
AT
E:
Jun
e 7
, 20
17
33
*64
6.0
12
66
46
.09
00
.S6
47
.02
56
64
7.0
45
66
47.
05
66
647
.07
0664
6.0
841
.S6
46
.08
43
.SS
YM
BO
LSC
UR
BS
TO
P L
INE
EP
OX
Y 8
-INC
HL
AT
EE
PO
XY
EP
OX
YE
PO
XY
(YE
LL
OW
)(D
AS
HE
D Y
EL
LO
W)
(DA
SH
ED
WH
ITE
)(W
HIT
E)
(WH
ITE
)4
-INC
H (
WH
ITE
)4
-INC
H (
YE
LL
OW
)S
EA
SO
N(W
HIT
E)
(YE
LL
OW
)1
8-IN
CH
(WH
ITE
)(Y
EL
LO
W)
6-IN
CH
(Y
EL
LOW
)4-
INC
H8-
INC
HL
OC
AT
ION
STA
TIO
N -
ST
AT
ION
(LF
)(L
F)
(LF
)(L
F)
(LF
)(L
F)
(LF
)(L
F)
(EA
)(L
F)
(LF
)(L
F)
(LF
)(L
F)
(LF
)(L
F)
100
5-1
0-7
6C
AT
EG
OR
Y 1
000
IH 3
9/9
0C
TH
O -
PA
LM
ER
DR
IVE
73
8+
17
- 7
79
+64
82
94 -
- -
-45
33
28
80
----
88
91
----
----
----
207
4 -
-P
AL
ME
R D
RIV
E -
SP
RIN
G B
RO
OK
TR
AIL
77
9+
64
- 8
00
+04
40
77 -
- -
-29
25
43
7 --
--
42
29
-- -
- -
- -
- -
- -
-1
019
--
SP
RIN
G B
RO
OK
TR
AIL
- R
UG
ER
AV
EN
UE
80
0+
04
- 8
06
+72
13
45 -
- -
-13
45
--
-- -
-1
51
3 --
--
--
--
--
--
33
6 -
-R
UG
ER
AV
EN
UE
- M
ILW
AU
KE
E S
TR
EE
T8
06
+7
2 -
84
9+
918
617
--
--
861
7 -
- --
--
96
95
-- -
- -
- -
- -
- -
-2
155
--
MIL
WA
UK
EE
ST
EE
T -
MO
UN
T Z
ION
AV
EN
UE
8
49
+9
1 -
86
2+
622
555
--
31
025
56
--
-- -
-2
90
7--
----
----
--3
93
--
MO
UN
T Z
ION
AV
EN
UE
- U
SH
14
86
2+
62
- 8
87
+00
77
0 -
-1
93
77
1 -
- --
--
86
7--
----
----
-- -
- -
-IH
39
/90
SU
BTO
TA
L2
56
58
--
50
32
07
47
33
17
-- -
-2
81
01 --
--
--
--
--
--
597
7 -
-
NB
IH 3
9/9
0 O
N R
AM
P A
T S
TH
11
(R
A R
AM
P)
76
4+7
4'R
A' -
78
0+
35'R
A'
--
--
--
38
01
52
01
92
2 -
- -
- --
--
--
--
--
--
--
40
5N
B IH
39
/90
ON
RA
MP
(R
A R
AM
P)
SU
BT
OT
AL
--
--
--
38
01
52
01
92
2 -
- -
- --
--
--
--
--
--
--
40
5
NB
IH 3
9/9
0 O
FF
RA
MP
AT
ST
H 1
1 (
RB
RA
MP
)7
38+
17
'RB
' -7
44
+5
8'R
B'
--
--
--
24
52
24
39
91
95
--
-- -
- -
- -
- -
- -
- -
-2
07
NB
IH 3
9/9
0 O
FF
RA
MP
(RB
RA
MP
) S
UB
TO
TA
L -
- -
- -
-2
45
22
43
99
19
5 -
- --
--
--
--
--
--
--
20
7
SB
IH 3
9/9
0 O
N R
AM
P A
T S
TH
11
(R
C R
AM
P)
73
8+
23'R
C' -
75
0+
94'R
C'
--
--
58
--
24
91
26
86
22
--
-- -
- -
- -
- -
- -
- -
-4
06
SB
IH 3
9/9
0 O
N R
AM
P (
RC
RA
MP
) S
UB
TOT
AL
--
--
58
--
24
91
26
86
22
--
-- -
- -
- -
- -
- -
- -
-4
06
SB
IH 3
9/9
0 O
FF
RA
MP
AT
ST
H 1
1 (
RD
RA
MP
)7
61+
80
'RD
' -7
80
+5
6'R
D'
--
--
62
130
34
89
83
64
22
--
-- -
- -
- -
- -
- -
- -
-2
07
SB
IH 3
9/9
0 O
FF
RA
MP
(R
D R
AM
P)
SU
BT
OT
AL
--
--
62
130
34
89
83
64
22
--
-- -
- -
- -
- -
- -
- -
-2
07
PA
LM
ER
DR
24
+25
'PD
' - 2
7+
19'
PD
'5
90
----
--
--
-- -
- -
---
----
----
----
--P
AL
ME
R D
R S
UB
TO
TA
L5
90
--
--
--
--
-- -
- -
- --
--
--
--
--
--
--
--
RU
GE
R A
VE
NU
E4
3+7
5'R
U' -
47
+9
0'R
U'
--
105
--
--
--
-- -
- -
- --
--
--
--
--
--
--
--
RU
GE
R A
VE
NU
E S
UB
TO
TA
L -
-10
5 -
- -
- -
- --
--
--
-- -
- -
- -
- -
- -
- -
- -
-
MIL
WA
UK
EE
ST
RE
ET
52
+7
1'M
K' -
55
+4
1'M
K'
54
0 -
-1
35
--
--
-- -
- -
- --
--
--
--
--
--
--
--
MIL
WA
UK
EE
ST
RE
ET
SU
BT
OTA
L5
40
--
13
5 -
- -
- --
--
--
-- -
- -
- -
- -
- -
- -
- -
-
MO
UN
T Z
ION
AV
EN
UE
62
+05
'MZ
' - 6
7+
65'
MZ
' -
-14
0 -
- -
- -
- --
--
--
-- -
- -
- -
- -
- -
- -
- -
-M
OU
NT
ZIO
N A
VE
NU
E S
UB
TO
TA
L -
-14
0 -
- -
- -
- --
--
--
-- -
- -
- -
- -
- -
- -
- -
-
UN
DIS
TR
IBU
TED
16
121
58
213
75
29
12
25
61
16
29
-- -
- -
- -
- -
- -
-2
73
65
10
05
-10
-76
PR
OJ
EC
T T
OT
AL
28
40
026
08
40
24
05
06
,09
04
65
013
00
29
,73
0 --
--
--
--
--
--
6,2
50
1,2
90
100
5-1
1-7
1C
AT
EG
OR
Y 1
000
PA
RK
AN
D R
IDE
15
+2
2'R
PR
' - 2
3+
45'
RP
R'
85
5 -
- -
- -
- -
- --
--
--4
475
17
180
02
15
25
5 -
- -
-P
AR
K A
ND
RID
E S
UB
TOT
AL
UN
DIS
TR
IBU
TED
25--
-- -
- -
- --
--
----
53
-- -
-1
5 -
- -
-
10
05
-11
-71
PR
OJ
EC
T T
OT
AL
88
0 -
- -
- -
- -
- --
--
--4
480
20
180
02
15
27
0 -
- -
-
29
28
026
08
40
24
05
06
09
04
65
013
00
29
730
448
02
01
800
21
52
70
625
012
90
6,0
90
29
,73
04
480
20
27
06
,25
01
,29
0
*AD
DIT
ION
AL
QU
AN
TIT
Y F
OU
ND
IN "
TE
MP
OR
AR
Y P
AV
EM
EN
T M
AR
KIN
G IT
EM
S"
TA
BL
E
PA
VE
ME
NT
MA
RK
ING
64
7.0
65
6*6
46.
01
06
EP
OX
Y 4
-INC
H
53
,55
0
64
6.0
84
2.S
GR
OO
VE
D C
ON
TRA
ST
WE
T
RE
FL
EC
TIV
E E
PO
XY
PA
RK
ING
ST
AL
L
EP
OX
YD
IAG
ON
AL
EP
OX
Y G
RO
OV
ED
WE
T R
EF
LE
CT
IVE
C
ON
TR
AS
T T
AP
E
TO
TA
L5
,95
0
5,9
50
54
,43
02
,01
5
1404
Wisconsin Department of Transportation 06/19/2017 11:36:53
Proposal ID: 20170711001 Project(s): 1003-10-84, 1005-10-76, 1005-11-71
Federal ID(s): WISC 2017326, WISC 2017327, N/A
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber
0440 204.0245
Removing Storm Sewer (size) 006. 30-Inch
LF
313.000
_________._____ _________._____
0450 204.0245
Removing Storm Sewer (size) 007. 33-Inch
LF
41.000
_________._____ _________._____
0460 204.0245
Removing Storm Sewer (size) 008. 36-Inch
LF
482.000
_________._____ _________._____
0470 204.0245
Removing Storm Sewer (size) 009. 48-Inch
LF
184.000
_________._____ _________._____
0480 204.0275
Closing Culvert Pipes EACH
1.000
_________._____ _________._____
0490 204.0280
Sealing Pipes EACH
2.000
_________._____ _________._____
0500 204.0291.S
Abandoning Sewer CY
223.900
_________._____ _________._____
0510 204.9060.S
Removing (item description) 001. CrashCushion
EACH
4.000
_________._____ _________._____
0520 204.9060.S
Removing (item description) 005. ApronEndwalls
EACH
15.000
_________._____ _________._____
0530 204.9105.S
Removing (item description) 001.Electrical Equipment
LUMP SUM _________._____LS
0540 204.9180.S
Removing (item description) 001.Concrete Flumes
SY
445.000
_________._____ _________._____
0550 205.0100
Excavation Common CY
606,987.000
_________._____ _________._____
0560 206.1000
Excavation for Structures Bridges(structure) 001. B-53-0330
LUMP SUM _________._____LS
0570 206.1000
Excavation for Structures Bridges(structure) 002. B-53-0331
LUMP SUM _________._____LS
Proposal Schedule of Items Page 4 of 39
Wisconsin Department of Transportation 06/19/2017 11:36:53
Proposal ID: 20170711001 Project(s): 1003-10-84, 1005-10-76, 1005-11-71
Federal ID(s): WISC 2017326, WISC 2017327, N/A
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber
0580 206.1000
Excavation for Structures Bridges(structure) 003. B-53-0332
LUMP SUM _________._____LS
0590 206.1000
Excavation for Structures Bridges(structure) 004. B-53-0333
LUMP SUM _________._____LS
0600 206.1000
Excavation for Structures Bridges(structure) 005. B-53-0334
LUMP SUM _________._____LS
0610 206.1000
Excavation for Structures Bridges(structure) 006. B-53-0335
LUMP SUM _________._____LS
0620 206.1000
Excavation for Structures Bridges(structure) 007. B-53-0214
LUMP SUM _________._____LS
0630 206.1000
Excavation for Structures Bridges(structure) 008. B-53-0215
LUMP SUM _________._____LS
0640 206.1000
Excavation for Structures Bridges(structure) 009. B-53-0336
LUMP SUM _________._____LS
0650 206.1000
Excavation for Structures Bridges(structure) 010. B-53-0337
LUMP SUM _________._____LS
0660 206.1000
Excavation for Structures Bridges(structure) 012. B-53-229
LUMP SUM _________._____LS
0670 206.1000
Excavation for Structures Bridges(structure) 013. B-53-230
LUMP SUM _________._____LS
0680 208.1100
Select Borrow CY
54,185.000
_________._____ _________._____
0690 209.0300.S
Backfill Coarse Aggregate (size) 001. No.1
CY
324.700
_________._____ _________._____
0700 209.1500
Backfill Granular Grade 1 TON
4,030.000
_________._____ _________._____
0710 210.1500
Backfill Structure Type A TON
6,435.000
_________._____ _________._____
Proposal Schedule of Items Page 5 of 39
Wisconsin Department of Transportation 06/19/2017 11:36:53
Proposal ID: 20170711001 Project(s): 1003-10-84, 1005-10-76, 1005-11-71
Federal ID(s): WISC 2017326, WISC 2017327, N/A
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber
3190 614.0905
Crash Cushions Temporary EACH
26.000
_________._____ _________._____
3200 614.2300
MGS Guardrail 3 LF
4,492.000
_________._____ _________._____
3210 614.2310
MGS Guardrail 3 HS LF
187.500
_________._____ _________._____
3220 614.2500
MGS Thrie Beam Transition LF
354.400
_________._____ _________._____
3230 614.2610
MGS Guardrail Terminal EAT EACH
15.000
_________._____ _________._____
3240 614.2620
MGS Guardrail Terminal Type 2 EACH
4.000
_________._____ _________._____
3250 616.0100
Fence Woven Wire (height) 001. 4-FT**P**
LF
18,900.000
_________._____ _________._____
3260 616.0206
Fence Chain Link 6-FT **P** LF
17,950.000
_________._____ _________._____
3270 616.0700.S
Fence Safety LF
18,000.000
_________._____ _________._____
3280 618.0100
Maintenance And Repair of Haul Roads(project) 001. 1003-10-84
EACH
1.000
_________._____ _________._____
3290 618.0100
Maintenance And Repair of Haul Roads(project) 002. 1005-10-76
EACH
1.000
_________._____ _________._____
3300 618.0100
Maintenance And Repair of Haul Roads(project) 003. 1005-11-71
EACH
1.000
_________._____ _________._____
3310 619.1000
Mobilization EACH
1.000
_________._____ _________._____
3320 624.0100
Water MGAL
14,201.400
_________._____ _________._____
3330 625.0500
Salvaged Topsoil SY
417,400.000
_________._____ _________._____
3340 627.0200
Mulching SY
343,660.000
_________._____ _________._____
Proposal Schedule of Items Page 23 of 39
Wisconsin Department of Transportation 06/19/2017 11:36:53
Proposal ID: 20170711001 Project(s): 1003-10-84, 1005-10-76, 1005-11-71
Federal ID(s): WISC 2017326, WISC 2017327, N/A
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber
3520 629.0205
Fertilizer Type A CWT
362.000
_________._____ _________._____
3530 630.0120
Seeding Mixture No. 20 LB
5,225.000
_________._____ _________._____
3540 630.0130
Seeding Mixture No. 30 LB
4,699.000
_________._____ _________._____
3550 630.0200
Seeding Temporary LB
890.000
_________._____ _________._____
3560 630.0300
Seeding Borrow Pit LB
220.000
_________._____ _________._____
3570 633.0100
Delineator Posts Steel EACH
169.000
_________._____ _________._____
3580 633.0500
Delineator Reflectors EACH
258.000
_________._____ _________._____
3590 633.1000
Delineator Brackets EACH
251.000
_________._____ _________._____
3600 633.5200
Markers Culvert End EACH
139.000
_________._____ _________._____
3610 634.0614
Posts Wood 4x6-Inch X 14-FT EACH
18.000
_________._____ _________._____
3620 634.0616
Posts Wood 4x6-Inch X 16-FT EACH
49.000
_________._____ _________._____
3630 634.0618
Posts Wood 4x6-Inch X 18-FT EACH
22.000
_________._____ _________._____
3640 634.0620
Posts Wood 4x6-Inch X 20-FT EACH
14.000
_________._____ _________._____
3650 634.0622
Posts Wood 4x6-Inch X 22-FT EACH
4.000
_________._____ _________._____
3660 634.0808
Posts Tubular Steel 2x2-Inch X 8-FT EACH
4.000
_________._____ _________._____
3670 635.0200
Sign Supports Structural Steel HS LB
14,028.000
_________._____ _________._____
3680 636.0100
Sign Supports Concrete Masonry **P** CY
225.400
_________._____ _________._____
Proposal Schedule of Items Page 25 of 39
Wisconsin Department of Transportation 06/19/2017 11:36:53
Proposal ID: 20170711001 Project(s): 1003-10-84, 1005-10-76, 1005-11-71
Federal ID(s): WISC 2017326, WISC 2017327, N/A
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber
3840 641.1200
Sign Bridge Cantilevered (structure) 004.S-53-108
LUMP SUM _________._____LS
3850 641.6600
Sign Bridge (structure) 001. S-53-0076 LUMP SUM _________._____LS
3860 641.6600
Sign Bridge (structure) 002. S-53-0077 LUMP SUM _________._____LS
3870 642.5401
Field Office Type D EACH
1.000
_________._____ _________._____
3880 643.0200.S
Traffic Control Surveillance andMaintenance (project) 001. 1003-10-84
DAY
1,000.000
_________._____ _________._____
3890 643.0200.S
Traffic Control Surveillance andMaintenance (project) 002. 1005-10-76
DAY
989.000
_________._____ _________._____
3900 643.0200.S
Traffic Control Surveillance andMaintenance (project) 003. 1005-11-71
DAY
45.000
_________._____ _________._____
3910 643.0300
Traffic Control Drums DAY
183,121.000
_________._____ _________._____
3920 643.0420
Traffic Control Barricades Type III DAY
9,005.000
_________._____ _________._____
3930 643.0705
Traffic Control Warning Lights Type A DAY
14,605.000
_________._____ _________._____
3940 643.0715
Traffic Control Warning Lights Type C DAY
29,599.000
_________._____ _________._____
3950 643.0800
Traffic Control Arrow Boards DAY
432.000
_________._____ _________._____
3960 643.0900
Traffic Control Signs DAY
52,648.000
_________._____ _________._____
3970 643.0910
Traffic Control Covering Signs Type I EACH
5.000
_________._____ _________._____
3980 643.0920
Traffic Control Covering Signs Type II EACH
5.000
_________._____ _________._____
3990 643.1000
Traffic Control Signs Fixed Message SF
1,557.830
_________._____ _________._____
Proposal Schedule of Items Page 27 of 39
Wisconsin Department of Transportation 06/19/2017 11:36:53
Proposal ID: 20170711001 Project(s): 1003-10-84, 1005-10-76, 1005-11-71
Federal ID(s): WISC 2017326, WISC 2017327, N/A
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber
4000 643.1050
Traffic Control Signs PCMS DAY
4,244.000
_________._____ _________._____
4010 643.3000
Traffic Control Detour Signs DAY
4,000.000
_________._____ _________._____
4020 644.1410.S
Temporary Pedestrian Surface Asphalt SF
9,940.000
_________._____ _________._____
4030 644.1420.S
Temporary Pedestrian Surface Plywood SF
2,120.000
_________._____ _________._____
4040 644.1601.S
Temporary Curb Ramp EACH
3.000
_________._____ _________._____
4050 644.1616.S
Temporary Pedestrian Safety Fence LF
1,690.000
_________._____ _________._____
4060 645.0111
Geotextile Type DF Schedule A SY
6,083.000
_________._____ _________._____
4070 645.0120
Geotextile Type HR SY
6,400.000
_________._____ _________._____
4080 645.0130
Geotextile Type R SY
395.000
_________._____ _________._____
4090 645.0140
Geotextile Type SAS SY
25,500.000
_________._____ _________._____
4100 645.0220
Geogrid Type SR SY
17,120.000
_________._____ _________._____
4110 646.0106
Pavement Marking Epoxy 4-Inch LF
162,560.000
_________._____ _________._____
4120 646.0107.S
Pavement Marking Grooved Epoxy 4-Inch
LF
26,130.000
_________._____ _________._____
4130 646.0126
Pavement Marking Epoxy 8-Inch LF
12,590.000
_________._____ _________._____
4140 646.0690.S
Removing Pavement Markings WaterBlasting
LF
301,550.000
_________._____ _________._____
4150 646.0841.S
Pavement Marking Grooved WetReflective Contrast Tape 4-Inch
LF
13,360.000
_________._____ _________._____
Proposal Schedule of Items Page 28 of 39
Wisconsin Department of Transportation 06/19/2017 11:36:53
Proposal ID: 20170711001 Project(s): 1003-10-84, 1005-10-76, 1005-11-71
Federal ID(s): WISC 2017326, WISC 2017327, N/A
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber
4750 677.0150
Install Camera Pole 50-FT EACH
1.000
_________._____ _________._____
4760 677.0200
Install Camera Assembly EACH
1.000
_________._____ _________._____
4770 690.0150
Sawing Asphalt LF
28,809.000
_________._____ _________._____
4780 690.0250
Sawing Concrete LF
8,638.000
_________._____ _________._____
1.00000
4790 715.0415
Incentive Strength Concrete Pavement DOL
119,676.400
119,676.40
1.00000
4800 715.0502
Incentive Strength Concrete Structures DOL
56,244.000
56,244.00
4810 999.1000.S
Seismograph LUMP SUM _________._____LS
4820 999.1500.S
Crack and Damage Survey LUMP SUM _________._____LS
5.00000
4830 ASP.1T0A
On-the-Job Training Apprentice at$5.00/HR
HRS
2,000.000
10,000.00
5.00000
4840 ASP.1T0G
On-the-Job Training Graduate at$5.00/HR
HRS
3,000.000
15,000.00
4850 SPV.0005
Special 001. Subsoiling ACRE
1.000
_________._____ _________._____
4860 SPV.0035
Special 001. Roadway Embankment CY
236,436.000
_________._____ _________._____
4870 SPV.0035
Special 002. Roadside Infiltration DitchGranular Backfill Sand
CY
11,000.000
_________._____ _________._____
4880 SPV.0035
Special 100. Compost CY
400.000
_________._____ _________._____
4890 SPV.0035
Special 700. High Performance Concrete(HPC) Masonry Structures **P**
CY
6,581.000
_________._____ _________._____
Proposal Schedule of Items Page 33 of 39
Wisconsin Department of Transportation 06/19/2017 11:36:53
Proposal ID: 20170711001 Project(s): 1003-10-84, 1005-10-76, 1005-11-71
Federal ID(s): WISC 2017326, WISC 2017327, N/A
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber
5050 SPV.0060
Special 103. Concrete Cutoff Wall EACH
6.000
_________._____ _________._____
5060 SPV.0060
Special 104. Covering Storm Sewer EACH
21.000
_________._____ _________._____
5070 SPV.0060
Special 105. V Notch Weir Wall EACH
6.000
_________._____ _________._____
5080 SPV.0060
Special 201. Fixed Message SignPortable Support
EACH
30.000
_________._____ _________._____
5090 SPV.0060
Special 202. Barrier Wall Delineation EACH
2,308.000
_________._____ _________._____
5100 SPV.0060
Special 203. Temporary Concrete BarrierGate
EACH
2.000
_________._____ _________._____
5110 SPV.0060
Special 204. Reinstall TemporaryConcrete Barrier Gate
EACH
2.000
_________._____ _________._____
5120 SPV.0060
Special 350. Anchor Bolt Cover Shroud EACH
7.000
_________._____ _________._____
5130 SPV.0060
Special 351. Pull Box Non-Conductive18x24-Inch
EACH
15.000
_________._____ _________._____
5140 SPV.0060
Special 352. Pull Box Non-Conductive24x42-Inch
EACH
59.000
_________._____ _________._____
5150 SPV.0060
Special 353. Pull Box Non-Conductive24x36-Inch
EACH
9.000
_________._____ _________._____
5160 SPV.0060
Special 401. Fiber Tracer Marker Post EACH
16.000
_________._____ _________._____
5170 SPV.0060
Special 402. Install Wireless MeshRadio Assembly
EACH
1.000
_________._____ _________._____
5180 SPV.0060
Special 403. Install Hardwired BluetoothSensor
EACH
1.000
_________._____ _________._____
5190 SPV.0060
Special 404. Install IP Radio EACH
2.000
_________._____ _________._____
Proposal Schedule of Items Page 35 of 39
Wisconsin Department of Transportation 06/19/2017 11:36:53
Proposal ID: 20170711001 Project(s): 1003-10-84, 1005-10-76, 1005-11-71
Federal ID(s): WISC 2017326, WISC 2017327, N/A
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber
5340 SPV.0090
Special 001. Concrete Curb and Gutter24-Inch Type D
LF
66.000
_________._____ _________._____
5350 SPV.0090
Special 002. Concrete Pavement JointSealing
LF
50,800.000
_________._____ _________._____
5360 SPV.0090
Special 003. Re-Lap Guard Rail LF
550.000
_________._____ _________._____
5370 SPV.0090
Special 004. Reinstall Temporary SnowFence
LF
8,510.000
_________._____ _________._____
5380 SPV.0090
Special 005. Fence Chain Link Polymer-Coated 6-Foot Ground Mounted **P**
LF
1,181.000
_________._____ _________._____
5390 SPV.0090
Special 006. Furnishing Snow Fence LF
400.000
_________._____ _________._____
5400 SPV.0090
Special 007. Installing Snow Fence LF
400.000
_________._____ _________._____
5410 SPV.0090
Special 100. Pipe Boring & Jacking 36-Inch
LF
364.000
_________._____ _________._____
5420 SPV.0090
Special 101. Pipe Boring & Jacking 48-Inch
LF
204.000
_________._____ _________._____
5430 SPV.0090
Special 102. Drain Slotted VaneLongitudinal
LF
1,535.000
_________._____ _________._____
5440 SPV.0090
Special 103. Drain Slotted VaneLongitudinal Temporary
LF
112.000
_________._____ _________._____
5450 SPV.0090
Special 150. Compost Tube LF
39,175.000
_________._____ _________._____
5460 SPV.0090
Special 202. Maintenance and Removalof Conc Barrier Temp Precast Left inPlace by Othrs
LF
16,850.000
_________._____ _________._____
5470 SPV.0090
Special 203. Traffic Control Gawk ScreenFurnished
LF
41,820.000
_________._____ _________._____
Proposal Schedule of Items Page 37 of 39
Wisconsin Department of Transportation 06/19/2017 11:36:53
Proposal ID: 20170711001 Project(s): 1003-10-84, 1005-10-76, 1005-11-71
Federal ID(s): WISC 2017326, WISC 2017327, N/A
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber
5480 SPV.0090
Special 204. Traffic Control Gawk ScreenInstalled
LF
43,020.000
_________._____ _________._____
5490 SPV.0090
Special 650. Water Service Lateral, 1-Inch
LF
85.000
_________._____ _________._____
5500 SPV.0090
Special 850. Fence Chain Link Polymer-Coated 6-Ft. **P**
LF
1,584.000
_________._____ _________._____
5530 SPV.0105
Special 003. Survey Project 1005-11-71 LUMP SUM _________._____LS
5540 SPV.0105
Special 004. Concrete Pavement JointLayout
LUMP SUM _________._____LS
5550 SPV.0105
Special 005. Survey Project 1003-10-84with Optional AMG for Conc Pavmnt andBase Course
LUMP SUM _________._____LS
5560 SPV.0105
Special 006. Survey Project 1005-10-76with Optional AMG for Conc Pavmnt andBase Course
LUMP SUM _________._____LS
5570 SPV.0105
Special 350. Electrical Service MeterBreaker Pedestal Special (CB100)
LUMP SUM _________._____LS
5580 SPV.0105
Special 351. Electrical Service MeterBreaker Pedestal Special (CB300)
LUMP SUM _________._____LS
5590 SPV.0105
Special 352. Electrical Service MeterBreaker Pedestal Special (CB500)
LUMP SUM _________._____LS
5600 SPV.0105
Special 353. Electrical Service MeterBreaker Pedestal Special (CB700)
LUMP SUM _________._____LS
5610 SPV.0105
Special 401. Salvage ITS Equipment LUMP SUM _________._____LS
5620 SPV.0105
Special 701. Removing and ResettingSteel Girders B-53-0214
LUMP SUM _________._____LS
Proposal Schedule of Items Page 38 of 39
Wisconsin Department of Transportation 06/19/2017 11:36:53
Proposal ID: 20170711001 Project(s): 1003-10-84, 1005-10-76, 1005-11-71
Federal ID(s): WISC 2017326, WISC 2017327, N/A
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber
5630 SPV.0105
Special 702. Removing and ResettingSteel Girders B-53-0215
LUMP SUM _________._____LS
5640 SPV.0165
Special 200. Fixed Message Signs Leftin Place
SF
188.000
_________._____ _________._____
5650 SPV.0165
Special 700. Longitudinal GroovingBridge Deck **P**
SF
150,820.000
_________._____ _________._____
5660 SPV.0165
Special 701. Temporary Shoring Railroad SF
1,300.000
_________._____ _________._____
5670 SPV.0165
Special 850. Wall Concrete PanelMechanically Stabilized EarthLRFD/QMP **P**
SF
17,620.000
_________._____ _________._____
5680 SPV.0165
Special 851. Temporary Wall Wire FacedMechanically Stabilized EarthLRFD/QMP
SF
3,690.000
_________._____ _________._____
5690 SPV.0180
Special 150. Roadside Infiltration DitchCompost
SY
22,030.000
_________._____ _________._____
5700 SPV.0195
Special 700. Excavation, Hauling, andDisposal of Contaminated Soil
TON
1,340.000
_________._____ _________._____
Section: 0001 _________._____Total:
Total Bid: _________._____
Proposal Schedule of Items Page 39 of 39