Cross-regional roadmap on capacity calculation and long- term capacity allocation Impact for the FUI regional roadmap Work document FUI Implementation Group Meeting 30 September 2011

Upload: devin-orr

Post on 30-Dec-2015

17 views

Category:

Documents


0 download

DESCRIPTION

Cross-regional roadmap on capacity calculation and long-term capacity allocation Impact for the FUI regional roadmap. Work document FUI Implementation Group Meeting 30 September 2011. Capacity calculation. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Work document FUI Implementation Group Meeting 30 September 2011

Cross-regional roadmap on capacity calculation and long-term capacity

allocationImpact for the FUI regional roadmap

Work documentFUI Implementation Group Meeting30 September 2011

Page 2: Work document FUI Implementation Group Meeting 30 September 2011

Capacity calculation

• The cross-regional roadmap on capacity calculation defines how to implement flow-based method especially in highly meshed region.

• FB method not relevant for the FUI regional roadmap (stick to the ATC approach)

Need to ensure compatibility ATC in FUI and implementation of FB in CWE region

Page 3: Work document FUI Implementation Group Meeting 30 September 2011

Long term capacity allocation (1/2)

• Cross-regional rodmap identified for areas of work :

– Harmonisation of the allocation rules– Harmonisation of the allocation platforms– Harmonisation of the nomination process– Possible implementation of FTRs

• Cross-regional roadmap identified the need for coordination at european level and at regional one.• First milestone of FUI regional roadmap plans to consult on a detailed roadmap for implementing the target model for LT including firmness.

Need to be postponed. Roadmap for implementation of a single set of allocation rules including firmness will be discussed at regional level after the definition of “a wish list for a single set of rules” by ACER in coordination with ENTSO-E with stakeholders consultation - Q3 2012 at the latest

Page 4: Work document FUI Implementation Group Meeting 30 September 2011

Long term capacity allocation (2/2)

• Harmonisation of the allocation platforms: at the latest by mid 2013, decision (NRAs+TSOs) to merge or not the existing allocation platforms based on a CBA performed by ENTSO-E.

• Harmonisation of the nomination process: agreement in Q3-Q4 2012 on an implementation schedule based on the benchmark of the current situation (done Q2 2012 and the decision to move towards FTRs

• Possible implementation of FTRs: based on the impact assessment to implement FTRs (done Q2 2012), CR roadmap plans to elaborate a pan-European implementation planning by ENTSO-E and ACER with stakeholders consultation Q3-Q4 2012.

To be tackled in FUI region accordingly