CGM

Recent Work

Healthcare

CCSF Student Health Center

San Francisco, CA

CCSF Health Center, San Francisco, California

CCSF Health Center, Classroom level entrance

Exam Room Classroom Nurse’s Station

San Francisco, CA

SFGH Rebuild

Entry Lobby

Exterior

Potrero Avenue

Entry/Drop-off

Emergency Generator Project

SFGH - Lobby

Emergency Generator Project

SFGH - Lobby

Vestibule Interior

Vestibule Exterior Rendering Vestibule Exterior

Vestibule Interior from Bldg 12

VA Martinez Vestibule Buildings 20-22

CMiller
Text Box
22

VA – Palo Alto

Bldg 51 – Regenerative Bone & Joint Center

Demolition of Existing Building

Existing Bldg. 51

Bldg. 50

New Single Story Structure

Existing Bldg. 51

Bldg. 50

New Rehab. R&D Labs

Existing UPS

Addition of 2nd Floor - Office, Conference Rooms & Main Lobby

Existing Bldg. 51

Bldg. 50

Relocated UPS

Demolition of Existing Bldg. 51 metal building

Bldg. 50

Addition of Genomics & Translational Labs 24,000sf (2 - 3 story - 4,000sf floor plates buildings)

Genomics & Translation Labs

Bldg. 50

Addition of CCR/WRIISC Labs 3 story (5,000sf floor plate building)

CCR/WRIISC

Genomics & Translation Labs

Bldg. 50

Expansion Labs

Main Lobby

Second Floor Lobby

Aquatic Therapy

VA Palo Alto

Aquatic Therapy

VA Palo Alto

Aquatic Therapy

VA Palo Alto

Aquatic Therapy

VA Palo Alto

June 26th, 2014

Antioch Health Center - Contra Costa Health Services 2335 Country Hills Drive, Antioch CA

Location

Antioch Health Center - Contra Costa Health Services 2335 Country Hills Drive, Antioch CA

June 26th, 2014

Aquatic Therapy

Gray Areas (TBD) $ 132,960.00

$

Facility Standardization $ 110,370.00

Procedural/Operational Renovations $ 0.00

Mandatory Renovations

ESTIMATED AMOUNTS:

$ 1,358,000.00

GROUND FLOOR SUBTOTAL $ 1,601,330.00 *

Gray Areas (TBD) $ 48,120.00

$

Facility Standardization $ 332,510.00

Procedural/Operational Renovations $ 682,885.00

Mandatory Renovations

ESTIMATED AMOUNTS:

$ 4,764,955.00

FIRST FLOOR SUBTOTAL $ 5,829,470.00 *

Gray Areas (TBD) $ 0.00

$

Facility Standardization $ 490,590.00

Procedural/Operational Renovations $ 916,340.00

Mandatory Renovations

ESTIMATED AMOUNTS:

$ 2,571,880.00

SECOND FLOOR SUBTOTAL $ 3,978,810.00 *

Gray Areas (TBD) $ 110,040.00

$

Facility Standardization $ 562,280.00

Procedural/Operational Renovations $ 1,254,340.00

Mandatory Renovations

ESTIMATED AMOUNTS:

$ 1,204,060.00

THIRD FLOOR SUBTOTAL $ 3,130,720.00 *

Gray Areas (TBD) $ 110,030.00

$

Facility Standardization $ 553,790.00

Procedural/Operational Renovations $ 1,051,480.00

Mandatory Renovations

ESTIMATED AMOUNTS:

$ 1,368,600.00

FOURTH FLOOR SUBTOTAL $ 3,083,900.00 *

Children’s Center Waiting Room

Entry Lobby

Intermountain Healthcare Riverton, UT

Cafeteria Delivery Room

Children’s Center Waiting Room

Riverton Hospital

Entry Loby

Intermountain Healthcare Riverton, UT

Delivery Room

Gladstone Institutes – Mission Bay, San Francisco, CA

Gladstone Institutes – Mission Bay, San Francisco, CA

Aquatic Therapy Center

Gladstone Institutes – Mission Bay, San Francisco, CA

Aquatic Therapy Center

Gladstone Institutes – Mission Bay, San Francisco, CA

LLNL - TSF Livermore, CA

LLNL - TSF Livermore, CA