· working full-fashion dec, dec 1 st at each end of next 21/22/23 rs rows. 8/12/16 sts. loosely...

2
G0285Jacket POEMA www.gedifra.com

Upload: others

Post on 24-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · Working full-fashion dec, dec 1 st at each end of next 21/22/23 RS rows. 8/12/16 sts. Loosely cast off all sts. Piece meas 66/67/68cm [26/26.5/26.75]in from cast-on. FINISHING

G0285Jacket

POEMA

www.gedifra.com

Page 2:  · Working full-fashion dec, dec 1 st at each end of next 21/22/23 RS rows. 8/12/16 sts. Loosely cast off all sts. Piece meas 66/67/68cm [26/26.5/26.75]in from cast-on. FINISHING

Copyright © 2018 Gedifra s.r.l. - Via Bezzecca 7, 50139 Firenze (FI) Italy ° www.Gedifra.com ° All rights reserved. Reproduction in whole or any part of all material, including illustrations in this publication is strictly forbidden. No part may be reproduced, stored in a retrieval system, or transmitted in any form or by any means elec-tronic, mechanical, photocopying, recording or otherwise without prior written permission of the copyright owners. All projects offered are for home use only and may

not be made for sale. Yarn quantities are approximate as they are based on average requirements. Please note images are for guidance only.

G0285 JACKET EU dress size 36/38,40/42,44/46, US size 8/ 10, 12/ 14, 16/ 18See size diagram for more details.

Instructions are given for each size. When only one figure is given, it ap-plies to all sizes.

MATERIALSGedifra Poema (36% wool, 26% alpaca, 26% mohair, 12% nylon; 145 m/50 g): 450/500/550 g in col 1506.One pair size 6mm (UK 4/US 10) need-les; cable needle [cn]; 2 stitch holders

REVERSE STOCKING STITCHP on RS, k on WS.STOCKING STITCHK on RS, p on WS.RIB PATTERNRS rows: K2, p2.WS rows: Work sts as they appear.CABLE PANELWorked over 20 sts.Rows 1 – 8: Work in st st.Row 9: Sl 5 sts to cn and hold in front of work, k5, then k5 from cn; sl 5 sts to cn and hold in back of work, k5, then k5 from cn.Row 10 (WS): Purl.Rep rows 1 – 10 throughout.FULL-FASHION DECREASEAt beg of RS row, k1, sl 1 kwise, k1, pass slipped st over knitted st; at end of RS row, work to last 3 sts, k2tog, k1.TENSION14 sts and 22 rows to 10cm/4in measu-red over st st on size 6mm needles or size needed to achieve tension.PLEASE CHECK YOUR TENSION AS IT IS ESSENTIAL TO ACHIEVE THIS TENSION IN ORDER TO ACHIEVE SUCCESS.

BACKCast on 76/82/87 sts. Work in rib patt until piece meas 8cm/3.25in from cast-on.Next row (RS): Purl.Next row (WS): Knit.Cont in rev st st until piece meas 50cm/19.75in from cast-on, ending with RS facing for next row.Shape raglan:Cast off 2 sts at beg of next 2 rows. 72/78/83 sts.Working full-fashion dec, dec 1 st at each end of next 21/22/23 RS rows. 30/34/37 sts.Loosely cast off all sts.Piece meas 70/71/72cm [27.5/28/28.25]in from cast-on.

LEFT FRONT Cast on 45/47/49 sts.Next row (RS): Work 38/40/42 sts in rib patt, work in garter st to end.Cont in patt as established until piece meas 8cm/3.25in from cast-on, ending with RS facing for next row.

Next row (RS): Work 38/40/42 sts in rev st st, work in garter st to end. Cont in patt as established until piece meas 35/36/36.5cm [13.75/14.25/14.5]in from cast-on, ending with RS facing for next row.Shape neck: Work 2 rows even. Next dec row (RS): Work in rev st st to last 9 sts, k2tog, work to end. 43/45/47 sts.Rep dec row every alt 6th and 4th row 14/15/16 more times. At same time,when piece meas 50cm/19.75in from cast-on, Shape raglan:Next row (RS): Cast off 2 sts at beg of row, work to end.Working full-fashion dec, dec 1 st at beg of next 21/22/23 RS rows. 7 sts rem for collar.Collar:Cont in garter st for 14cm/5.5in.Place sts on holder.RIGHT FRONT Complete as given for left front, rever-sing shapings.SLEEVESCast on 44/46/48 sts.Next row (RS): * K2, p2; rep from * to last 0/2/0 sts, k0/k2/k0. Next row (WS): Work sts as they ap-pear.Cont in rib patt as established until piece meas 8cm/3.25in from cast-on, ending with RS facing for next row.Next row (RS): Work in rev st st over 12/13/14 sts, work row 1 of cable panel over 20 sts, work in rev st st to end. Cont in patt as established for another 7 rows, ending with RS facing for next row.

Shape sleeve: Next inc row (RS): Inc 1 st at each end of row. 46/48/50 sts.Cont in patt, rep inc row every 8th row 4/6/8 times. 54/60/66 sts. Work increased sts in rev st st.Work even in patt until piece meas 46cm/18in from cast-on, ending with RS facing for next row.Shape sleeve cap:Cast off 2 sts at beg of next 2 rows. 50/56/62 sts.Working full-fashion dec, dec 1 st at each end of next 21/22/23 RS rows. 8/12/16 sts.Loosely cast off all sts.Piece meas 66/67/68cm [26/26.5/26.75]in from cast-on. FINISHINGPin pieces to measurements and block. Sew shoulder seams.Join right and left collar and sew to back neck.Sew in sleeves. Sew side and sleeve seams.

ABBREVIATIONS beg = begin(ning)cont = continuedec = decreas(e)(ing) inc = increas(e)(ing) k = knit kwise = as if to knitmeas = measurespatt = patternp = purlrem = remain(ing)rep = repeat RS = right sidesl = slidest(s) = stitch(es) tog = together WS = wrong side

Skill Level

4.25/4.75/5

6.5/6.75/7 6/6.5/7

1.25/1.75/1.75

6/6.75/7

15

3,25

12.25/13/13.75

16.5

4

6.5/6.75/7

BackHalf

SleeveHalf

Left Front

16,5

7,75

/8,2

5/8,

75

1.25/1.5/1.5

26/2

6.5/

26.7

5

7.75

/8.2

5/8.

75

7.75

/8.2

5/8.

75

3.25

3.25

14.2

5/14

.25/

14.5

13.5

/13.

75/1

4

1.75/2.25/2.75

10.75/11.5/12.25

27.5

/28/

28.2

5