Venue: Brussels, Elia Emperor, Keizerslaan 20, room 0.20, 1000 Brussels, Belgium
Date: Wednesday 5 October 2016
Time: 13:00 – 17:00 h
- Approval of the Minutes of the meeting on 15/06/2016
- Pilot BidLadder: Feedback consultation Public Design Note
- R3 2017:
• Prequalification process
• State of affairs
- Pilot project R2 non-CIPU
- R1 update
- Website Working Group Balancing
- Varia
Agenda
2
R3 2017 – Special topics: Common settlement CIPU vs non-CIPU
The representative of EFET repeats that the scope of the secondary market is too limited, only CIPU and only in case of
outage. [MoM update]
Will be added.
R3 2017 – General design wrap-up
EFET states that there is no level playing field between CIPU and non-CIPU as [MoM update] there seems to be more
flexibility for a pool than for a CIPU unit, while in the CIPU system there are clear and high penalties.
Will be added.
The online report will be updated accordingly.
Feedback FEBEG – Requested additions to the MoM
4
Input received from
Febeg Teamwise VREG
Febeliec Nextkraftwerke (confidential) DSOs
BDRA (Aggregators) RWE/Essent/Powerhouse Mipa frost
Main messages : Overall positive appreciation Bidladder pilot
Key messages in consultation on the Public Design Note
6
Combo R3/BL preferred
DSO participation wanted
Congestion mngt
Asymmetric imbalance
adjustment
Legal constraint at regional
level for ToE
Clarity on legal framework
needed
Market model (A3, A2, B2, opt-
out) Contractual framework
In absence of any amendment to E-Law (and hence no ToE) , ELIA will faciliate access to Bidladder
as of 1/7/2017 for delivery points connected to TSO-grid (incl. PVN/RTL) where
BSP = BRPbsp = BRPsource = Supplier
“opt out” = Bilateral agreement exists between BSP and Supplier (and their respective BRPs)
Feedback Consultation Public Design Note
7
Scope pilot project is in line with retained options (A2/A3) in Final Study CREG 1459 on DSM.
Extension to model with correction of metering data (B2) subject to future evaluation.
ELIA will develop and implement asap the combination of Bidladder and R3non-CIPU within the
scope of current pilot project. ELIA will provide more details on timing by end of December.
Combo SDR and Bidladder not allowed.
Multiple BSPs on a single delivery point is not allowed for reasons of complexity and “traceability”.
However, submetering within Bidladder will be facilitated as from the start.
Combo R3/BL preferred
Only BRPsource is allowed to perform reactive balancing. Therefore BRPbsp is subject to asymmetric
imbalance adjustment. Any delivered flexibility is capped by ELIA
@delivery point level at Rref and
@bid level at Erequested.
Feedback Consultation Public Design Note
8
Asymmetric imbalance
adjustment
Contractual framework In line with Final Study CREG 1459, ELIA will assume role of Flexibility Data Manager and
inform/exchange information on aggregated delivered volumes to BSP and Supplier.
To that extent, ELIA will provide a standard agreement to all Suppliers for organizing this data
exchange.
Congestion mngt In line with current congestion mngt rules and constraints (as applied within CIPU-contract), ELIA
wants to apply an equivalent treatment to CIPU-units (typically an installed power ≥ 25 MW) and
delivery points in Bidladder with a Rref ≥ 25MW. Therefore, ELIA will not activate any bid
containing a delivery point with a Rref ≥ 25MW in a red zone.
However, ELIA will further discuss with market parties the modalities of congestion mngt in a
separate track via WG System Operations and European Market Design (cf. as announcement UG
22/09/2016)
Current scope of Bidladder pilot project excludes DSO-connected delivery points.
ELIA will discuss with DSOs the modalities to facilitate access to DSO-connected delivery points.
Feedback Consultation Public Design Note
9
VREG refers to necessary change to Flemish legislation to accommodate Transfer of Energy at
Plaatselijk Vervoersnet
Ceteris paribus also applicable to other regions.
In line with current price thresholds in CIPU max/min prices for bid prices are
o I bid: 0 ≤ bid price ≤ 4499,99€/MWh
o D bid: unlimited
DSO participation
wanted
Legal constraint at
regional level for ToE
Other
ELIA confirms only the BSP has to be tested at the entry into force of the GFA BidLadder, not for
each pool change nor for determining any Rref. Possible upside via imbalance mechanism but
ELIA gives no guarantees on the moment of testing nor imbalance price level (or direction), but
makes a best effort.
Balancing Service Provider instead of Flexibility Service Provider
2016 mei jul sep nov jan 2017
mrt mei 2017
GO LIVE
30 jun
End Feb'17: Estimated approval Bal. Rules & BRP-contract
End Dec'16: Submission Bal. Rules & BRP-contract
Evaluation status legal framework
31 okt
WG Bal.
5 okt
Final design proposal to CREG
30 sep
End public
consultation design
proposal
8 sep
TF BL
2 sep
Launch public
consultation design
proposal
10 aug
TF BL
5 jul
TF BL
TF BL
25 mei
TF BL
10 mei
Public consultation BRP
contract 7 nov - 2 dec
Public consultation GFA
BidLadder 1 mrt - 31 mrt
Public consultation Elia-
Supplier contract 1 mrt - 31 mrt
Time for contracting 1 mei - 30 jun
Planning
overview
• Indicative timings
• Content subject to legal framework
WG Bal.
7 nov
• Harmonize and open our products to move toward our Medium Term model
2 generic products open to all and replacing R3 Prod / R3 DP
R3 2017 Objective
12
CIPU Non CIPU
Standard product R3 Prod (€) -
Specific products
(limited energy) -
R3DP
ICH (€)
CIPU Non CIPU
Standard product R3 Standard (€) R3 Standard
Specific products
(limited energy) R3 Flex (€)
R3 Flex
ICH (€) (1)
2017: product opening
(1) Last year of ICH
R3 2017 Auctions
13
ICH
R3
Prod
R3
DP
2016
R3 Prod
R3 DP
700 MW
70 MW
Yearly auction Monthly auctions
ICH
2017
Max 200 MW
580 MW
Yearly auction Monthly auctions
R3
Std
R3
Flex
Min 250 MW
Max 330 MW
Sourced:
302 MW base
Sourced:
209 MW base
+ 1 MW pk
Sourced:
178 MW base
+ 11 MW lop
+ 10 MW pk
R3 2017 Status
14
March April May June July August Sept. Oct. Nov. Dec.
t
Design freeze
Bal. Rules draft
decision CREG
Bal. Rules final
decision CREG
BAL TFs
Gate Opening
Auctions for
Jan 17
R3 GFAs
ready for sign.
Start R3 GFAs
consultation
TODAY
Consult Bal Rules
Consult
GFAs
• Proposal of Elia based on stakeholders feedback
o BSP to be able to valorize non contracted flexibility from R3 delivery points on Bid Ladder
o Practical modalities will depend on R3 and Bid Ladder product design evolution
• Impact 2017: update of “R3 non CIPU” GFA when Bid Ladder will go live
Combination R3 non CIPU and Free Bids (Bid Ladder)
15
1. Availability control
R3
2. Exclusion in case
of low performance
Update of existing formula to take volume offered on BL
into account
• Reduction of R3 prequalified volume in case of low
perf (already foreseen in R3 2017)
• Exclusion of Bid Ladder in case of missing R3 (in
availability and/or activation control)
• 1 pool
delivering R3 Standard / Flex
consisting of multiple delivery points
Non CIPU pool mgt
16
FSP A
DP 1
DP 2
DP 3
…
Pool attributes:
• R3 Max
• R3 Max Standard
• …
R3 Max
R3 Max Standard
DP attributes:
• EAN
• UM
• R3ref
• …
R3ref definition:
• TSO DPs = declared to Elia
• DSO DPs = PQP (1)
R3ref usage:
• BRP notification
• Remove DP from pool when FSP do no test
(1) PQP = prequalified power by DSOs during NFS
• Removing DPs from pool
Value (“R3 Max”) of the pool is decreased by the sum of “R3ref”
Alternatively, BSP can redo prequal. of whole pool
• Adding DPs to pool without impact on pool “R3 Max”
No test needed
• Adding DPs to pool with impact on pool “R3 Max”
Simulation test on this new sub-pool + Prequalified volume Std and Flex added to the existing ones (“R3 Max”)
Alternatively, BSP can redo prequal
• Change mix R3 Flex – Std of existing pool
Re-test of complete
Non CIPU pool mgt
17 (1) if no agreement with Elia on this matter, prequal to be redone
Key principle: pools already tested successfully for R3 DP are automatically prequalified for R3 Flex non CIPU
3 different cases for non CIPU :
1. New BSP(s) prequalify complete new pool
2. New DP(s) existing BSP prequalify sub-pool(s) (can also requalify complete pool)
3. Existing BSP participating to Std prequalify complete pool
1st auction
19
1st auction New FSP or modified pool
20
Oct Nov. Dec.
t
01/11 16/11 15/12
Auctions
R3 (GCT)
Track
FSP - DSO
Track
FSP - Elia
Deadline
sign. GFA
07/11
Start NFS Deadline
sign. contract
DSO-FSP
End PQ NFS + start sign
DSO-FSP contr.
Prerequisite before test (07/11 TSO or 17/11 DSO):
- Application form certif .suppl.
- Tech data SM1 + CDS
- IT comm. Test
- DP data
- Qual. info R3 Std
DSO-FSP
contract ready
Auctions
R3 (GOT)
01/12
(1) Pay attention to delay for SM order. Delay between order and commissioning (8 weeks).
(2) Only if Prequal. power NFS 2017 <= Prequal. power NFS 2016 and signed contract DSO-FSP for 2016
PQ test new & exist. TSO DPs
PQ test
new DSO DPs
GFA ready
for sign.
PQ test exist. DSO DPs(2)
Deadline
test request
(17/11)
31/11
• Two modifications
1. Update of “R3 Max” (or “R3 Max Standard”) for auctions Elia
2. Update of list of DPs for settlement Elia (TSO DPs) or DSOs (DSO DPs)
• Tests are required in most cases:
• Add / remove DP(s) with impact on “R3 Max” (or “R3 Max Standard”)
• Change mix Std – Flex of existing pool
• New FSP
• DP(s) switching between 2 FSPs
• Tests are not required only when:
• DP(s) subtracted and FSP chose that Rref(s) is / are subtracted from “R3 Max” (no new prequal test)
• DP(s) added without impact on “R3 Max” (or “R3 Max Standard”)
Recurring process
22
Data mgt
Deadline
• Test request
• Pool data 3
Recurring process Update of pool R3 Max (or R3 Max Std)
23
M : notif. and test M + 1 : auction M + 2 : delivery
t
01 15
Test planning &
execution (2)
Auctions
R3 (GOT)
Auctions
R3 (GCT)
15 wds before EoM (1)(2)
(1) EoM = end of month
(2) Elia needs 15 wds to execute test, manage results of tests and update pool. Test requested after deadline, done at best effort
(3) List of DPs + in case of new DSO DP(s) : FSP provides proof of NFS and contract DSO-FSP signed
+- 2 mths between notification and delivery of new vol.
New volume delivery by FSP
(depending on auctions)
Deadline
• Pool data 3
Data
Mgt
If Test
If No Test
New volume delivery by FSP
(depending on auctions)
5 wds before EoM (1)
Deadline
• Pool data 3
Data
Mgt
Test
Special case
no test
5 wds before EoM (1)
Elia takes into account new R3 Max for offers in auction
Notify DSO of
updated pool
• Different use cases (TSO and DSO):
Add a DP without impact on R3 Max
Add / remove DP with impact on R3 Max
Change mix R3 Standard – Flex (change R3 Max Standard)
DP switch from one BSP to another
New BSP
• Contact: Customer Relations
• Amandine Leroux: [email protected]
• Aimilios Orfanos: [email protected]
Recurring process Use cases and contact
24
Start project
TECHNICAL PART
Timeline R2 non CIPU project
26
Q2 Q3 Q4 Q1 Q2 Q3 Q4
Ad hoc tests
+ data processing
participation stage
+ data processing
Conclusions +
drafting report
2016 2017
MARKET ANALYSIS
Market parties
interested in R2
load project +
workshop
Call for interest
launched by Elia
Selection and
Agreement
project partners
Challenging planning:
• Wind project: 2 years
• Complicated project with multiple partners
June 3rd: public workshop and call for candidates
July 26th: Call for proposal including:
• Questionnaire
• Selections and exclusion criteria
• Requirements for data exchange
• Control target March (10s. Values)
August 26th: deadline for proposal
August 29th – September 9th : Additional questions to providers
Next step: selection of candidates
Selection candidates: steps done so far
27
• 7 of the 5 candidates responded
• 4 of the 5 are eligible
Observations • Diversified technology (Biomass, CHP, Load, ….)
• Flexibility on TSO/DSO Grid
• Upwards/downwards Flex
• Relatively high costs
Selection candidates: status
28
Candidate Received Not Received/Not compliant
Candidate 1 X
Candidate 2 X
Candidate 3 X
Candidate 4 X
Candidate 5 X X
Candidate 6 X
Candidate 7 X
Ongoing work
• ToE/imbalance adjustment in case of BSP who is not a BRP
• Current working assumption: no imbalance adjustment for pilot project
• But investigate ToE solutions for enduring solution
• Budget
• Total amount/types of costs (in collaboration with CREG)
• Cooperation DSOs
• Role DSOs in project
• pre-conditions DSO flex participation
Objective
=> Final selection candidates before End October
Next Steps - ST
29
31
mai juin juil Aug Sep
t Oct Nov Dec Jan Fev Mar Avril
today
Final publication R1
battery technical
note on 30/06
Consult.
Adapt. Freeze R1 market design
Adapt
GFAS Consult.
signature
Go
live 2017 2016
IT implementation at Elia’s side
R1 – timing and next steps
CLOSED
Technical stream
Contractual stream
22 dec
06 feb.
06 march
07 nov
1st dec
22 dec
Market design stream
31 mars
30 avril
design.
Workshop on 22/06
End market consultation & treat remarks
TF bal – high level design principles R1
Design note – publication & start consultation
10 nov Workshop on detailed R1 design note
Results of the study “Abandon of ARP perimeter correction – Results of financial simulations” were added to the
documents of the Working Group Balancing of March:
R1 – Addendum to WG Balancing 17/03/2016
32
http://www.elia.be/en/users-group/Working-Group_Balancing/
New website structure online in October 2016
34
No changes
Specific documentation of past, current and future projects will
be made available via the following web pages:
Currently: the technical design note for FCR (R1)
published in June 2016.
Projects and publications: FCR (R1)
35
…
Currently,
- The study from 2015 on the delivery of downward aFRR by wind farm
- Information regarding the R2 non-CIPU Pilotproject (2016-2017)
Projects and publications: aFRR (R2)
36
Currently,
- The 2013 study on Cross border Balancing Belgium – Netherlands
- The 2014 study on Cross border Balancing Belgium – Netherlands – Germany
New: information will be available by the end of the year:
- Explore
- WGAS activities
Projects and publications: Cross border Balancing
37
New
New