GOVERNMENT OF THE PUNJAB
PLANNING & DEVELOPMENT DEPARTMENT
(REGIONAL PLANNING SECTION)
WORKING PAPER
1. Name of the Project. PUNJAB ECONOMIC OPPORTUNITIES
PROGRAMME (PEOP)
2. Location The project will be implemented in four districtsof Southern Punjab as under
Bahawalpur
Bahawalnagar
Lodhran
Muzaffargarh
3. Cost of the Project Estimated cost of the project is Rs 6.9 billion and
current year MTDF allocation is Rs 1.4 billion
under GS No 2288. Item-wise cost of the Project
is available at Annex-A
4. Gestation Period of the Project 4 years
5. Authority responsible for
i. Sponsoring.
ii. Execution
iii. Operation and
maintenance.
iv. Concerned
Federal Ministry
Planning and Development Department,
Government of the Punjab
Department for International Development
(DFID)
Planning & Development Department,
Government of Punjab
Livestock and Dairy Development DepartmentGovernment of the Punjab
Planning & Development Department,
Government of Punjab
Livestock and Dairy Development Department
Government of the Punjab
6. Provision in ADP 2009-10 Rs. 1,400.000
7. Provision in PSDP MTDF allocation is Rs 1.4 billion under GS No2288
8. BRIEF BACKGROUND OF THE PROJECT
Punjab Economic Opportunity Programme (PEOP) has been designed in line with
the objectives of the federal and provincial governments for uplifting social and economic
plight of the poor. The districts have been identified on the basis of regional parities and
since the southern districts in Punjab are the most poverty struck, therefore, this program
will focus on four southern districts of Punjab, namely Bahawalpur, Bahawalnagar,
Lodhran and Muzaffargarh.
The GoPb is allocating more funds for the development of poor rural areas. GoPb
developed a growth strategy as part of Pakistans National Poverty Reduction Strategy.
-
8/9/2019 Working Paper of PEOP
2/17
The growth strategy highlights the need to create jobs through skills development and to
promote agricultural diversification. The GoPb has also developed a comprehensive
Punjab (public) Resources Management Programme (PRMP) designed to strengthen
provincial finances; reform institutions for pro-poor delivery and encourage economic
growth through private sector development. Department for International Development
(DFID) also commits in Pakistan Country Plan for 2008-2013, to make growth work for
every one.
PEOP has been conceived keeping in view the development needs of the
southern districts because of their poor ranking in the poverty index and bringing such
areas and people out of the poverty quagmire is in line with the policies of both
Government of Punjab and DFID.
9. BRIEF DESCRIPTION OF THE PROJECT
PEOP is being jointly funded by the Government of Punjab and DFID. United
Kingdoms Department for International Development is contributing 30 million (25
million for program activities and 5 million as technical assistance and Center for
Inclusive Growth) while Government of the Punjab is contributing another 25 million
equivalent for the Programme. The Programme will have the following components:
Skill Development
Livestock Development
Technical Assistance
Centre for Inclusive Growth
The specific objectives, of PEOP are as follows:
Support the marginalised regions in Punjab through policy level
interventions and direct interventions at the grass root level.
Poverty alleviation through improvement in credentials and quality of
human resource.
Improve skill level to increase income opportunities of the unemployed and
improving the income level of employed by improving their skill set.
Improve their income by enhancing the quantity and quality of their
livestock. Provision of marketable skills and interventions to improve incomes of the
poor farmers in the livestock and dairy sector.
The two main programme components of PEOP will focus on provision of
marketable skills and interventions to improve incomes of the poor farmers in the
livestock and dairy sector. The Punjab Skills Development Fund will train approximately
250,000 people to enhance their employment opportunities. PSDF will provide funds for
both private and public sector training providers that will subsequently link skills
development to jobs for men and women. PSDF will be managed by a not for profit
company which will be registered under the Companies Ordinance 1984. PSDF will be an
independent not for profit entity which will be financially and administratively
independent body and will report to the Board of Directors of the program. The board will
-
8/9/2019 Working Paper of PEOP
3/17
be a mix with representatives from the GoPb, DFID and the private sector. The Steering
Committee will periodically review progress of the PSDF. On the demand side, a voucher
scheme will provide an opportunity for poorer people to access training in functional
literacy, basic level trade skills, small business skills and home-based work.
The focus of the livestock and dairy development component will be to improve
incomes of the poor through enhanced yields (both quality and quantity) of meat and milk
in the livestock sector and better access to markets. This will be achieved through the
Project Implementation Team to be based in the department which will implement it
through the private and public sector service providers. For the livestock and dairy sector,
the programme will introduce modern management practices to improve yields for poor
farmers, remove market distortions and improve womens access to livestock assets and
livelihood opportunities. This intervention will benefit 150,000 poor people.
The programme proposes a small (0.5m) facility to set up a Centre for Inclusive
Growth in a suitable research/academic institution. The facility would research and apply
its findings to help define workable pro poor policies in Punjab. It will tend to analyse the
pro poor policies of the Punjab government and will look into the interventions of
different donor agencies on mitigating poverty.
Technical co-operation (4.5m) will be used to strengthen Punjab Governments
capacity to deliver this programme. This will involve support for analysis, policy
development, staff training, monitoring and evaluation and communications.
10. COMMENTS OF REGIONAL PLANNING SECTION
i. PC-I is proposed to be funded by DFID. ECA Section may, therefore, update the
house about the comments of DFID on the PC-I.
ii. PC-I contains mainly two components; one for skill development through Punjab
Skill Development Fund and the other for Livestock and Diary Development
Interventions to be implemented by Livestock & Dairy Development Department.
a. Details of potential interventions of livestock & dairy development
department have been laid down in the PC-I.
b. Sub details of interventions of skill development to be carried out by thePunjab skill development fund are also required to be incorporated in the PC-
I so as a not for profit company established under section 42 of companies
ordinance 1984 is provided with a clear cut mandate of business.
iii. An amount of Rs.12.500 million has been proposed to be spent on the livestock
interventions in the gestation period of four years. The capacity of the department
for taking up the activities of the indicated scope is required to be established.
iv. Location of Programme Coordination Unit and Project Implementation Team is
required to be decided by the PDWP.
v. As the Punjab Skill Development Company will operate through outsourcing of
different components of training to institutions in public/private sector districts
offices of the company are not required and may, therefore, be dispensed with.
vi. The summary of the cost of the project is given as under:-
(Rs. in million)
-
8/9/2019 Working Paper of PEOP
4/17
Component Total Total Cost
Skill Enhancement Component, Targets of Trainees 250,000 2,710.350
PSDF Management Cost 431.40
Total Cost 3,141.750
Livestock & Dairy Development Component, Enhancing
Milk Production, Women Empowerment, Feed and Fodder
Centres, Other sub projects on insemination, health and
nutrition improvement, trainings and other components laid
out in PC1 and the Programme document, Provision ofCommunity Bulls
2,754.470
PIT Management Cost 387.280
Livestock Component Sub-total 3,141.75
Technical Cooperation 564.525
Center for Inclusive Growth 62.720
Total Programme Cost 6,900.000
a. Management cost of PSDF comes to 14% which is hired.
b. Unit cost of training comes to Rs. 12567 per person.
c. PC-I is silent about type of training, mode of training and duration oftraining.
d. Process of training selection of training institutions, selection of courses
and syllabus of training has been left to the not for profit company.
e. Training of 250,000 persons in four districts during four years duration is
an ambitious target.
11. RECOMMENDATION
The scheme may be considered for approval subject to above observations.
-
8/9/2019 Working Paper of PEOP
5/17
GOVERNMENT OF THE PUNJAB
PLANNING & DEVELOPMENT DEPARTMENT
(REGIONAL PLANNING SECTION)
WORKING PAPER FOR PDWP
1. Name Of Survey / Feasibility Short term Consultancies for Expert Assignments in PMUsustainable Development of Walled City Lahore
2. Location The project will be implemented in P&D Department,
Lahore
3. Capital Cost Approved Rs. 5.00 Million
4. Gestation Period of the
Project
Approved
Revised
5. Authority responsible for
Sponsoring.
PMU-Sustainable Development of walled City of Lahore
Project, Services and General Administration Department
(Cabinet Wing), Government of the Punjab Lahore.
6. Provision in ADP 2009-10 Rs.Rs.5.00 million
7. Approval Date 21-04-2007
8. Technical Nature of Tasks
and the Expertise required
The pilot Project was designed on the basis of a pre-
feasibilities report prepared by a consultant. The pre-feasibilities report has laid down the following:
a) Route (alignment) of the Royal Trail
b) Six Action Area on the route
c) Major interventions required in the action
areas
d) Tentative cost estimate of each action area
(which are not based on detailed calculations)
Before the actual civil works can begin on the Royal
Trail, the following tasks remain to be carried out:
1. A survey of the trail has be to be carried out,
which includes:a) Preparation of TORs for surrey
b) Fields / Indicators to be surveyed include
i. Economic indicators
ii. Social Indicators
iii. Environmental Indicators
iv. Infrastructural Survey
c) Measurements of structures and their site
plan (through the software Total Station)
2. Preparation of Conceptual Design
3. Detailed Technical Design
4. Detailed Cost Estimates5. Implementation
6. Monitoring and Evaluation
9. Description & justification
of the Scheme
A
B
PMU of SDWCL has establish the following
technical experts:
Re-generating the Walled City
Preserving, restoring and protecting its
cultural heritage
Display and re use of cultural heritage
Promotion and facilitation for tourism relatedeconomic activity
Under at pilot project following activities were
designed by the consultant:
Route ( alignment) of the Royal Trail
-
8/9/2019 Working Paper of PEOP
6/17
C
Six Action Areas on the route
Majors interventions required in the Action
Areas
d) Tentative cost estimate of each Action area
(which are not based on detailed calculations)
For starting identified action of pilot project a no of
Surveys are required to be calculated by PMU which
include:
a)
Preparation of TORs for the Survey
Fields/Indicators to be surveyed include
Economic indicators
Social indicators
Environmental Indicators
Infrastructural Survey
Measurements of structure and their site
plan (through the software TOTAL
STATION)
b) Preparation of Conceptual Designc) Detailed Technical Design
d) Detailed cost estimates
e) Implementation
f) Monitoring and Evaluation
For accomplishment of the above Surveys
technical Expertise of PMU was argument
approved of
PC-II for Short term Consultancies for ExpertAssignments in PMU sustainable Development of
Walled City Lahore.
10. Implementation Position So far as amount Rs. 3.5 million has been spent onthe PC-II scheme. Physical Programme of the scheme
has not been given in the PC-II.
11. Current Status The gestation period of the project in expiring
on 30-06-2010. Short term Consultancies forExpert Assignments in PMU sustainable
Development of Walled City Lahore (SWDCL)
has direct extension in Gestation Period for
year i.e. up to 30-06-2010
12. Expected Outcome of the
Survey/ Feasibilities study
and details of projects
likely to be submitted after
the survey/ study.
The Consultancies are expected to
a) Pre feasibilities & feasibilities for pilot projects.
b) Provide a strong and technical basis to subprojects.
c) Technical designs.
d) Survey will be carried out as under:
Preparation of TORs of the survey
Fields / indicators to be survived
e) Tourism related studies.
f) Management Sciences
PC-Is for sub projects covering the various competent of
the master plan.
13. Major Targets Consultancy for following expert assignments:
Preparation TORs for the survey
Fields indicators to be surveyed
Measurement of structure and their site plans
Preparation of conceptual design
Detailed technical design
13 Project Scrutiny 1) A provision for feasibility study already exists inPMUof Walled City Project which includes
-
8/9/2019 Working Paper of PEOP
7/17
foreign and local consultancies. The requirement
of separate PC-II for capacity the studies needs
justification.
2) The scheme was approved in 2006-07 PC-II in
silent about the physical progress of the schemes
against the following allocations:
Allocation Year Amount
2006-07 Rs.0.60 million
2007-08 Rs.1.96 million2008-09 -Nil-
2009-2010 Rs.0.94 million
2010-11 Rs.1.50 million
Total Rs.5.00 million
3) The period of agreement with World Bank will
expire on September 201. The justification of the
carrying over the Pc-II beyond the PMU Period
does not exist.
14 Recommendation The scheme is placed before PDWP forum forconsideration subject to above points.
-
8/9/2019 Working Paper of PEOP
8/17
GOVERNMENT OF THE PUNJAB
PLANNING & DEVELOPMENT DEPARTMENT
(REGIONAL PLANNING SECTION)
WORKING PAPER FOR PDWP
1. Name by whichsurvey/feasibility will be
identified..
Sustainable Development of Walled City of LahoreProject (Phase II), Feasibility Study
2. Location Lahore
3. Capital Cost Rs. 1092.00 Million
Breakup of the Cost is as under:
Rehabilitation / Restoration of
Circular Garden Walled City
Rs. 117.00 M
Improvement of Park Rs. 3.00 M
Construction of New Market Rs. 135.00 M
Construction of infill Buildingat Chowk Parani Kotwali
Rs. 20.00 M
Construction of Wall Around
Walled City Lahore.
Rs. 500.00 M
4. Gestation Period of the
Project
02 years
5. Authority responsible for
Sponsoring.
PMU- SDWCL, Government of the Punjab
6. Provision in ADP 2009-10 Rs. 40.00 Million vide ADP No. 4430
7. Description & justification
of the Scheme
The primary object of the scheme is rehabilitation /
restoration of Cultural Heritage and Infrastructure ofthe Walled City Lahore. The interventions are as
under:
Rehabilitation / Restoration of Circular
Garden Walled City
Improvement of Park
Construction of New Market
Construction of infill Building at Chowk
Parani Kotwali
Construction of Wall around Walled City
Lahore.The scheme will be completed in a accordance with
the parameters given in the consultant selection
guidelines 2006 issued by P&D Department.
However, the exact manpower requirement would be
reelected in the separated PC-I for each scheme.
8. Major Targets i. Removal of encroachments
ii. Reconstruction of historic Wall of Walled city
Lahore.
iii. Development of grater Iqbal Park
iv. Developing a New forecourt to the dehli gate
new market building.v. Construction of a model infill structure
vi. Consultancy
9. Expected Outcome of the
Survey/ Feasibilities study
After completion of the scheme it would attract
foreign tourist from all over the world and in this way
-
8/9/2019 Working Paper of PEOP
9/17
and details of projects
likely to be submitted after
the survey/ study.
it will generate a lot of revenue
10. Comments of RP Section A meeting was held under the chairmanship ofSecretary, P&D on 06-04-2010 and it was proposed that
notional allocation of Rs. 50.00 Million may be provided
in ADP 2010-11 subject to clearance of the concept of the
project from PDWP.
Accordingly SDWCL has forwarded PC-II keeping in
view the mandate and progress of the Phase I of thePMU for approval of PDWP
11. Recommendation The scheme is placed before PDWP forum forconsideration / approved
-
8/9/2019 Working Paper of PEOP
10/17
GOVERNMENT OF THE PUNJAB
PLANNING & DEVELOPMENT DEPARTMENT
(REGIONAL PLANNING SECTION)
WORKING PAPER
1. Name of the
Project.
Pilot Project for the Improvement of Solid Waste Management,
Walled City Lahore
2. Location Shahi Guzargha (Delhi Gate to Wazir Khan Mosque, & theadjoining streets), Walled City Lahore (Detail of Pilot Area
annexed)
3. Authority
responsible for:
Sponsoring Government of the Punjab
(With the Technical Assistant of Sustainable Development of
Walled City Lahore Project)
Execution Project Management Unit, Sustainable Development of Walled
City Lahore Project
4.Project
Objectives &
its
Relationship
with Sectoral
Objectives
The basic objectives of the project are;1. To test & run community based solid waste management
system in the pilot area for likely further replication in the
entire Walled City of Lahore.
2. To improve the solid waste management of the pilot area
comprising part of Shahi Guzaragh (and the adjoining
streets).
3. To demonstrate modern & efficient handling of solid
waste management through a replicable project.
The Project has been conceived in the backdrop of the pilot
project of the SDWCL which aims at the restoration and urban
renewal of the Shahi Guzaragh area. Improving the cleanliness ofthe area is not only an essential civic services delivery issue but it
also linked inextricably to the sustenance of cultural heritage of
the walled city. The cultural heritage, in turn, carries great
potential in terms of contribution towards socio-economic
development.
Operational Methodology:
The consumers, both domestic and commercial, will be
asked to collect solid waste in the bags.
These bags, along with the daily sweeping, will becollected by hand carts and the three-wheeler trippers to
the truck that would promptly carry the load to the land
fill site.
There will be two shifts every day. The first shift
sweeping/waste collection will start at 4.00am daily. Door
to door collection of bags will start at 6.00am. Truck/s
will consultation with the community.
The sanitary staff will be provided clean uniforms and
collection aids.
-
8/9/2019 Working Paper of PEOP
11/17
5. Capital
Cost
estimates(A)
Sr. No Description Qty Est. Cost
Per Unit
Total Cost
1 CNG three
wheeled mini
tippers
2 300,000 600,000
2 Handcarts (Three
Wheeler)
15 5,000 75,000
3 Handcarts (Three
Wheeler)
10 12,000 120,000
4 Motorcycle (for
supervision)
1 50,000 50,000
5 Durable Goods
(kassi with handle,
phowri road
scraper, polythene
bags etc.)
75,000
6 Lime Stone 10,000
7 Insecticide 20,000
8 Liveries (uniform,
shoes, cap, gloves)
120,000
9 Material for Social
mobilization
10 Transport (truck,
etc, POL/CNG)
1,200,000
11 Repair of
equipment &
transport
50,000
12 Cost of other
stores (brooms,
mulberry, baskets,
phenyl, etc)
100,000
Others 100,000
Total 2,530,000
6. Requirement of
staff (B)
//Requirement of staff:
Sr.
No
Designation Qty Per Month
Salary /
Allowance
Per Annum
Expenditure
Existing
1 Manager 1 30,000 360,000
2 Contingent paid staff
(sanitary
workers etc)
1,200,000
Total 1,560,000
Total (A+B)=2,530,000+1,560,000=4,090,000.00
7. Demand and
Supply Analysis
Solid Waste of Shahi Guzargah is managed as a part of the lager
arrangement for the city of Lahore. There is one sanitary worker
in Lahore against every 1000 consumers. The capacity of CDGL
for lifting solid waste in the whole of city is 4000 metric tons perday. That leaves behind 1200 metric tons of solid waste produces
in Lahore on a daily basis. WCL and the Shahi Guzargah have
their share of the left over solid waste. There is a huge visible
gape in the demand for the management of solid waste and the
actual provision of services.
-
8/9/2019 Working Paper of PEOP
12/17
8. Project Benefits
and analysis
The Project is linked up with the CDWCL project. SDWCLP in
turn, aims at improving the quality of life in the Walled City by
urban renewal and preserving the rich cultural heritage.
9. Environmental
Impact
The Project will have a direct bearing on environment.
Improvement in solid waste management coupled with a modern
water supply and sanitation system (Under SDWCLP) will lead to
improved environments.
10 Social Impact There will be two visible impacts. First, the level of cleanliness in
the target area will be visibly raised. Secondly, the involvement
community in decision regarding management and disposal of
solid waste empowering the community.
11 Implementation
schedule
The project implementation will commence with immediate
affect following the approval. The procurements will be made in
the initial two months and the actual waste management system
will be in place from third months onwards.
-
8/9/2019 Working Paper of PEOP
13/17
GOVERNMENT OF THE PUNJAB
PLANNING & DEVELOPMENT DEPARTMENT
(REGIONAL PLANNING SECTION)
WORKING PAPER FOR PDWPP
-
8/9/2019 Working Paper of PEOP
14/17
1 Name of the
Project
Improvements of Solid Waste Management Shahi Guzargah, Walled
City, Lahore(Target Area)
2 Location Shahi Guzargah and the adjoining streets within Walled City Lahore
(Target Area)
3 Sponsoring Government of the Punjab ( With the technical assistance of Sustainable
Development of Walled City Lahore Project )
4 Execution
Operation and
maintenance
City District Government, Lahore
5 Plan Provision The major component of the scheme is to be funded by the Government
of the Punjab to the tune of Rs.5.488 million.The routine maintenance cost would be borne by the CDGL as before.
6 Objectives The basic objectives of the project are:
1. To improve the solid waste management of the area comprising
Shahi Guzargah and the adjoining streets (Target Area).
2. To reinforce and strengthen the solid waste management operating
of the CDGL by building their capacity.
3. To improve the quality of service delivery for the residents of Shahi
Guzargah neighborhood.
4. To demonstrate modern and efficient handling of solid waste
management through a duplicable project.7 Justification Total length of the Shahi Guzargah is about 1.6 KML. Then total
catchment area that generates solid waste comprises 43 streets. There
are approximately 3800 commercial units in this locality, out of which
955 are situated directly at the Shahi Guzargah. In addition to that, there
are 2490 housing units located in the area. The overall population of the
Walled City Lahore is estimated around 0.4 million.
Proposed Description.
The current project suggests increasing efficiency of the existing solid
waste management system on and around Shahi Guzargah by filing up
the deficiency gaps, increasing the capacity of CDGL and involving the
community. The implementation of the project would be based on the
concept of community participation. The idea is to provide an immediate
relief to the citizens and give visible results.
Following are the salient features of the intervention:
Removal of the Garbage Containers
100% increase in collection of solid waste
Timing of lifting to be adjusted to commercial activity
Usage of collection bags
Community awareness and participation
Machinery and Equipment
Restoration and Rehabilitation of Royal Trail
8 Operational
Methodology
The consumers, both domestic and commercial, will be asked to collect
solid waste in the bags. These bags, along with the daily sweeping, will
be collected by hand carts and the three wheeler trippers to the garbage
transfer stations.
There will be two shifts every day. Time will be determined in
consultation with the community.
The route will be sprinkled with water twice a day. The sanitary staff will
be provided clean uniforms and collection bags.
9 Estimates of the
Project
Approved Cost 5.488 M
Revised Cost 9.000 M
10 Capital Cost
-
8/9/2019 Working Paper of PEOP
15/17
The project will have adirect bearing on environmen
Description Qty Est. Cost per unit Total
Cost
Revised Cost
CNG three
wheeled mini
trippers
2 250,000 500,000 500,000
Handcarts
(Two
Wheelers)
15 5,000 75,000 75,000
Handcarts
(Three carts)
12 10,000 120,000 120,000
Motorcycle
(for
supervision)
2 80,000 160,000 Nil
Durable
Goods (kassi
with handle,
phowri roadscraper etc)
75,000 75,000
Polythene
bags
500,000 500,000
Lime Stone 10,000 10,000
Insecticide 20,000 30,000
Liveries
(uniform,
shoes,cap,
gloves)
28 2000 56,000 78,000
Communicati
on Material
for Socialmobilization
10,0000 10,000
Transport
(POL/CNG)
240,000 240,000
Repair of
equipment &
transport
50,000 50,000
Construction
of garbage
Transport
Station
1,000,0
00
Nil
Cost of other
stores(broom
s, mulberry
baskets,
phenyl, etc)
100,000 100,000
others 100,000 100,000
1 Solid Waste
Manager
1 30,000 360,000 - SDWCL
2 Contingent
paid staff
(sanitary
workers etc)
Lumpsum
2,112,000 7,112,000 SDWCL /
CDGL
-
8/9/2019 Working Paper of PEOP
16/17
Total 2,472,000 7,112,000
-
8/9/2019 Working Paper of PEOP
17/17
YUJUSTIFICATION FOR REVISION
Explanatory Memo:
The scheme titled: Improvement of Solid Waste Management, Shahi
Guzargah, Walled City of Lahore (Target Area) was approved in the DDSC meeting,
held on 12th
March, 2009 at a total cost of Rs. 5.488 million for a period of 12th
months.
There has been a very encouraging response from residents of the Target
Area i.e. Royal Trail, Delhi Gate, Lahore for the scheme and it has become a social capital
for the PMU-SDWCL and people are now open mindedly welcoming the initiatives of the
project. Moreover, the operational area of the scheme has also been increased and more
streets of the Royal Trail, Delhi gate, Lahore have been added on the request of the
inhabitants. It is pertinent to point out that an amount of Rs.2, 112,000/- was allocated in
the PC-I of the scheme for payment of salaries to the Sanitary Workers and their
Supervisors. However, these funds have been utilized fully till 30th April, 2010. Therefore,
the PMU-SDWCL requires more funds in this head for payment of salaries to the staffduring the months of May and June, 2010.