workload optimization

40
www.doubletake.com Workload Optimization Karl Oman, Sr. Solutions Architect Double-Take Software (Canada) [email protected]

Upload: 1cloudroadcom

Post on 28-Jan-2015

133 views

Category:

Documents


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Workload Optimization

www.doubletake.com

Workload Optimization

Karl Oman, Sr. Solutions Architect

Double-Take Software (Canada)

[email protected]

Page 2: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Microsite www.doubletake.com/vmware

Page 3: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

3 www.doubletake.com

About Double-Take Software

• Focused on providing workload optimization solutions for:

• Disaster Recovery / Business Continuity

• High Availability and Failover

• Server/Data Migration

• Server and Desktop Management

• Headquartered in Southborough, MA

• Global Reach - North America, South America, Europe,

Middle East, Africa, and Asia

• Over 19,000 customers and 190,000 licenses

• Over half of the Fortune 500

• 21 out of 25 top US legal firms

• Comprehensive Professional Services and Support

• Strong partnerships with Microsoft, Dell, HP, IBM,

VMware and others

Page 4: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Enterprise Customers

Page 5: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Workload Optimization

Migration

• Move workloads between any combination of

platforms (x2x) with zero downtime

• Migrate within datacenters or across locations for DR

datacenter migrations and consolidations

•LAN/WAN friendly

Backup

• Continuously backup workloads with real-time, WAN

friendly protection

• Automated recovery from any point in time to a

vSphere virtual machine

•Recover files, folders, emails, databases, or whole data

sets and system state from any point in time

Availability

• Real-time byte-level replication (over any distance) of

workloads running on VMware vSphere

• Automated monitoring/failover of virtualized workloads

to protect workload uptime

•Failover workloads between dissimilar hardware

“Double-Take provides a turnkey solution for Managed migration,

centralization and backup of virtualized workloads”

Page 6: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Double-Take Availability

6 www.doubletake.com

Page 7: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Double-Take Software - Workload Solutions

Solution Points• Real-Time Replication – Near-Zero RPO

• Hardware and Storage Agnostic

• 1-1, N-1, 1-N, or Chained Configurations

• Protects Applications and System State

• Failover Occurs within Minutes

• Supports P2P, P2V, V2V, V2P

• Supports LAN or WAN Connections

• Geographically Extend MSCS Clusters

• Cluster to Cluster Failover

Real-Time ReplicationProduction Standby

Page 8: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Virtualized Target Servers

Failover Monitoring

Replication

Lower the TCO of your Disaster Recovery solution by

implementing Virtualized target servers and Double-Take

Page 9: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Complete Virtualization

Failover Monitoring

Replication

Lower the TCO of your entire infrastructure by implementing

Virtual machines and Double-Take for all of your servers

Page 10: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

How Real-Time Replication Works

Operating

System

Hardware

Layer

File System

Any IP Network

Applications

Operating

System

Double-Take

Filter

Hardware

Layer

File System

Applications

Initial Mirror of Data

WAN Optimized

Three Levels of Data

Compression and

Bandwidth Limiting

Capabilities

Page 11: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

11 www.doubletake.com

How Application Failover Works

Failover Monitoring

User Data or Application Data Replication

• IP ICMP or Heartbeat Monitoring

• Detect Failure in Seconds or Minutes

• Failover Server Name and IP address

• Failover DNS Records

• Start up application services

• Users can reconnect within minutes of failure

• Failover can occur across a LAN, WAN and even NAT

• Failover more than one Server Identity to the Same Target Server

• Failover Scripting for Custom Configurations

Source Target

Page 12: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

12 www.doubletake.com

How Failback Works

Failover Monitoring

Source Target

• Recover or Replace Source Server

• Restore Data to the Source Server

• Failback Source Identity

• Bring Source Applications Online

• Users Reconnect Within Minutes

• Start Replication and resume Failover Monitoring for Continued Protection

Restoration of Changes OnlyRe-establish Replication job

Page 13: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Virtualized Target Servers

Failover Monitoring

Replication

Lower the TCO of your Disaster Recovery solution by

implementing Virtualized target servers and Double-Take

Page 14: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Virtual Recovery Assistant

FS-System.vmdk

FS-Data.vmdk

EX-System.vmdk

EX-Data.vmdk

DB-System.vmdk

DB-Data.vmdk

C: System.vmdk

DT-VRAFS-System

FS-Data

File Server

Exchange

Database

C:

E:

EX-System.vmdk

EX-Data.vmdk

DB-System.vmdk

DB-Data.vmdk

C: System.vmdk

DT-VRA

FS-System.vmdk

FS-Data.vmdkFile Server

C:

E:EX-System

EX-Data

C:

E:

DB-System

DB-Data

C:

E:

Page 15: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

RPO and RTO

time

Time t=0. Point of failure

24 hrs days

RPO RTO

seconds

$

minutes

Recovery Time ObjectiveRecovery Point Objective

NSI reduces the cost of bothRPO and RTO significantly.

Page 16: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Host Level Protection:ESX & vSphere: Intermittent

w3-system.vmdk

w3-data.vmdk

WWW

ex-system.vmdk

ex-data.vmdk

EX

fs1-system.vmdk

fs1-data.vmdk

FS1

w3-system.vmdk

w3-data.vmdk

DRW

ex-system.vmdk

ex-data.vmdk

EX2

fs1-system.vmdk

fs1-data.vmdk

FS2

Page 17: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

17 www.doubletake.com

*-delta.vmdk

*.vmsd

*-delta.vmdk

*.vmsd

Replicating (SCP)*-delta.vmdk

*.vmsd

ESX Host Level Protection:How it Works

*.vmdk

*-flat.vmdk

*.vmx

Synchronizing (SCP)

Committing (remove_snapshot)

Source VM Files Replica VM Files

Administrative

Client

Source ESX

Server

Datastore (Source)

Target ESX

Server

Datastore (Target)

SSH SSH

Web

Services

*.vmdk

*-flat.vmdk

*.vmx

Monitoring (Time/Size)

Page 18: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Double-Take Backup

18 www.doubletake.com

Page 19: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Double-Take Software - Workload Solutions

Vancouver

Calgary

Storage

Corporate

Data Center

Saskatoon

Solution Points• Real-Time Replication – Near-Zero RPO

• Hardware and Storage Agnostic

• Local or Off-site Centralized Backup

• Full System or Granular Data Recovery

• Periodic or ANY Point in Time Recovery

• Data Compression for WAN Links

• Reduces Reliance on Tape Backup

Page 20: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

20 www.doubletake.com

Workload Backup

• Real-time replication of system state and data

• Backs up server images locally or remotely

• Integrates with VSS for point-in-time recovery

• Provides centralized backup with a single

repository server

• On-demand recovery

– Local or remote recovery

– Recovery to dissimilar hardware

– Supports P2P, P2V, V2V, and V2P

– Automatically provisions virtual machines for recovery

Page 21: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

21 www.doubletake.com

Backup and Recovery

Replication

Protect Multiple Production

Servers With One Backup

Repository

Recover Back to the

Original Server, to New

Hardware, or to a Virtual

Machine

Repository

Server

Page 22: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Double-Take Backup

• Basic Topology:

22 www.doubletake.com

Page 23: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Double-Take Backup

• Full Server Backup

23 www.doubletake.com

Page 24: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Backup Console

Page 25: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Select Image for Recovery

Page 26: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

How Backup Virtual Recovery Works

DB-System.vmdk

DB-Data.vmdk

C: System.vmdk

DT-VRA

System.vmdk

Backup VRA

Source2 Image

Source3 Image

LiveWireRepository

Server

C:

Source Image Source Data.vmdk

Source System.vmdk

Source Data.vmdk

Source System.vmdk

VMWare VMDKs are automatically provisioned by BackupRecover Server Image With Backup Virtual RecoveryVMDKs are detached and started as a separate VM

VMWare

ESX

Page 27: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Comparing RPO

Monday

12:00AM

Tuesday

12:00AM

Wednesday

12:00AMThursday

12:00AM

Friday

12:00AM

• Tape Backup – Every 24 Hours

• Snapshots – Every 6 hours

• Offsite Replication – Current Copy

• TimeData CDP – Any Point in Time

Page 28: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Double-Take Software - Workload Solutions

Solution Points

• Real-Time Replication – Near-Zero RPO

• Hardware and Storage Agnostic

• 1-1, N-1, 1-N, or Chained Configurations

• Protects Applications and System State

• Failover Occurs within Minutes

• Supports P2P, P2V, V2V, V2P

• Supports LAN or WAN Connections

• Geographically Extend MSCS Clusters

• Cluster to Cluster Failover

San Diego

Real-Time Replication

Production Standby

Chicago

Storage

Corporate Data Center

Los Angeles

Dallas

Solution Points

• Real-Time Replication – Near-Zero RPO

• Hardware and Storage Agnostic

• Local or Off-site Centralized Backup

• Full System or Granular Data Recovery

• Periodic or ANY Point in Time Recovery

• Data Compression for WAN Links

• Reduces Reliance on Tape Backup

Solution Points

• Real-Time Replication – Minimal Downtime

• Supports Dissimilar Hardware

• Entire System State or Selective Data

• Migrate Locally or Remotely

• Physical to Virtual and Virtual to Physical

• Automatic Virtual Server Provisioning

• Server Downtime of Minutes, not Hours

• Move Entire Virtual Servers between Hosts

• Perform Multiple Migrations Concurrently

• Monitor all Migration Jobs from a Single View

Real-Time ReplicationNew Hardware

Old Hardware

Solution Points

• Boot Desktops and Servers from SAN

• Centrally Manage Boot Images

• Workload Processing Occurs on the Client, Not the Host

• Changes May be Cached on the Client or Host

• Central Image is Easy to Maintain and Manage

• No Loss of Productivity for the End-User

Page 29: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

29 www.doubletake.com

• Universal Migration Solution

– P2V, V2P, V2V, P2P – dissimilar hardware allowed.

Page 30: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

30 www.doubletake.com

Double-Take Move

Double-Take replicates the workload in real-time while

users remain online and workingOnce a full copy of the workload has been replicated, users

can be migrated to the new server within minutes

Old Server Target Server

Double-Take

Move Console

Page 31: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

31 www.doubletake.com

Workload Portability – Double-Take

• Real-Time Replication

– Double-Take provides real-time replication of workloads for efficient

migration with only minutes of downtime

• Optimized for WAN

– Double-Take migrates workloads over IP networks, LAN or WAN,

with optimizations like compression and bandwidth limiting

– Double-Take makes site migration easy with options for migration

across subnets and support for dissimilar hardware and storage

• Across Hardware and Virtualization

– Double-Take migrates workloads between dissimilar hardware and

between physical and virtual systems in either direction

Page 32: Workload Optimization

www.doubletake.com

Page 33: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Site to Site Migration

Migrate workloads efficiently

between sites over any distance

Migrate from multiple sites for

datacenter consolidation

Page 34: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

34 www.doubletake.com

Workload Portability – Double-Take

• Double-Take Portability Solutions

– Physical Virtual

• Automatically provision virtual macMigrate workloads between

any combination of physical and virtual servers: P2P, P2V, V2V,

and V2P

• hines on VMWare ESX hosts for P2V conversion or V2V

migration

• “Physicalize” virtual servers with V2P conversions

– Save Time, Save Money

• Migrate data during normal business hours and perform fast

migrations within minutes instead of hours

• Eliminate costly downtime of business critical servers during

migration or conversion

• Consolidate and virtualize quickly and efficiently

Page 35: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

How Migration Works (x2x)

C: Volume

Operating System

and Applications

Data Volumes

User and Application Data

Staging

Area

Replication

Step 3: Target Server is RebootedStep 1: System State Real-Time ReplicationStep 2: System State is Applied

Old Server Target Server

Page 36: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Physical to Virtual Migration

FS-System.vmdk

FS-Data.vmdk

EX-System.vmdk

EX-Data.vmdk

DB-System.vmdk

DB-Data.vmdk

C: System.vmdk

DT-VRAFS-System

FS-Data

Exchange

Database

C:

E:

EX-System.vmdk

EX-Data.vmdk

DB-System.vmdk

DB-Data.vmdk

C: System.vmdk

DT-VRA

FS-System.vmdk

FS-Data.vmdkFile Server

C:

E:EX-System

EX-Data

C:

E:

DB-System

DB-Data

C:

E:

File Server

Double-Take automatically provisions

VMDKs for each workload volume

When a full workload is replicated,

migration can be completed in minutes

Page 37: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

37 www.doubletake.com

Workload Portability – Double-Take

• Migrate Any Windows Workload– Migrate domain controllers and SBS servers

• Across any Storage– Migrate data between dissimilar SANs or iSCSI appliances or from

DAS to SAN or iSCSI

• In Real-Time– Migrate workloads with real-time replication while users are online

and productive

– Reduce downtime to minutes instead of hours

• Virtual or Physical?– Either virtualize physical workloads or physicalize virtual workloads

– Automatic provisioning of virtual machines

• Efficiency– Perform dozens of migrations simultaneously

Page 38: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Workload Optimization

Migration

• Move workloads between any combination of

platforms (x2x) with zero downtime

• Migrate within datacenters or across locations for DR

datacenter migrations and consolidations

•LAN/WAN friendly

Backup

• Continuously backup workloads with real-time, WAN

friendly protection

• Automated recovery from any point in time to a

vSphere virtual machine

•Recover files, folders, emails, databases, or whole data

sets and system state from any point in time

Availability

• Real-time byte-level replication (over any distance) of

workloads running on VMware vSphere

• Automated monitoring/failover of virtualized workloads

to protect workload uptime

•Failover workloads between dissimilar hardware

“Double-Take provides a turnkey solution for Managed migration,

centralization and backup of virtualized workloads”

Page 39: Workload Optimization

WORLDWIDE SALES MEETING PUERTO RICO

Microsite www.doubletake.com/vmware

Page 40: Workload Optimization

www.doubletake.com

Q&AFor More Information

http://www.doubletake.com