NORTH LONDON WASTE AUTHORITY

NORTH LONDON HEAT AND

POWER PROJECTEN10071

The Planning Act 2008 The Infrastructure

Planning (Applications: Prescribed

Forms and Procedure) Regulations 2009

Regulation 5 (2)

June 2016

PLANS AND DRAWINGS UPDATED FOR DEADLINE 6 OF EXAMINATION

AD07 .10

Drawing Title Status Revision Scale Size Regulation

Works Plans (5 (2) (j) of the APFP Regulations 2009)

C_0001 WORKS PLAN - KEY PLAN For Approval 01 1:1250 A0 Reg 5 (2) (j)

C_0001a WORKS PLAN - KEY PLAN - SPLIT VIEW BY WORKS For Approval 01 NTS A0 Reg 5 (2) (j)

C_0002 WORKS PLAN - WORKS 1a AND 1b: ERF AND ASSOCIATED DEVELOPMENT For Approval 01 1:1250 A0 Reg 5 (2) (j)

C_0003 WORKS PLAN - SECTION - WORKS 1a: ERF BUILDING STRUCTURE ENVELOPE For Approval 01 1:1000 A0 Reg 5 (2) (j)

C_0004 WORKS PLAN - WORKS 2: RESOURCE RECOVERY FACILITY For Approval 01 1:1250 A0 Reg 5 (2) (j)

C_0005 WORKS PLAN - SECTION - WORK 2: RRF BUILDING STRUCTURE ENVELOPE For Approval 01 1:500 A0 Reg 5 (2) (j)

C_0006 WORKS PLAN - WORKS 3: ECOPARK HOUSE For Approval 01 1:1250 A0 Reg 5 (2) (j)

C_0007 WORKS PLAN - SECTION - WORK 3: ECOPARK HOUSE BUILDING STRUCTURE ENVELOPE For Approval 01 1:500 A0 Reg 5 (2) (j)

C_0008 WORKS PLAN - WORKS 4: UTILITIES AND INFRASTRUCTURE WORK, LANDSCAPING, ACCESS, SECURITY AND LIGHTING, AND WEIGHBRIDGES For Approval 01 1:1250 A0 Reg 5 (2) (j)

C_0009 WORKS PLAN - WORKS 5: TEMPORARY LAYDOWN AREA For Approval 01 1:1250 A0 Reg 5 (2) (j)

C_0010 WORKS PLAN - WORKS 6: SITE PREPARATION AND DEMOLITION For Approval 01 1:1250 A0 Reg 5 (2) (j)

C_0011 WORKS PLAN - WORKS 7: DECOMMISSIONING AND DEMOLITION OF EXISTING EfW FACILITY For Approval 01 1:1250 A0 Reg 5 (2) (j)

Indicative plans

D_0001 INDICATIVE LAYOUT OF ERF AND ASSOCIATED DEVELOPMENT Indicative 01 1:1250 A0

D_0002 INDICATIVE ERF EXTERNAL RAMPS Indicative 01 1:500 A0

D_0003 INDICATIVE LAYOUT OF RRF Indicative 01 1:1250 A0

D_0004 INDICATIVE LAYOUT OF ECOPARK HOUSE Indicative 01 1:1250 A0

D_0005 INDICATIVE UTILITIES Indicative 01 1:1500 A0

D_0006 INDICATIVE DRAINAGE Indicative 01 1:1250 A0

D_0007 INDICATIVE SOFT AND HARD LANDSCAPE WORKS Indicative 01 1:1250 A0

D_0010 INDICATIVE ACCESS AND CIRCULATION Indicative 01 1:1250 A0

D_0011 INDICATIVE SECURITY AND LIGHTING Indicative 01 1:1250 A0

D_0012 INDICATIVE TEMPORARY LAYDOWN AREA Indicative 01 1:1250 A0

WORKS PLANS

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

PURSUENT TO REGULATION:

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

JRSCO

01

1:1250 @ A0

GdPF

C_0001

ORDER LIMITS

00 FOR APPROVAL

FOR APPROVAL

LIMITS OF DEVIATION:

WATER

BOROUGH BOUNDARY

0 25m 50m 100m

OCT 2015

OCTOBER 2015

REGULATIONS 2009

REGULATION 5(2)(j) OF THE APFP

WORKS PLAN - KEY PLAN

UTILITIES WORKS

LIGHTING, SECURITY, WEIGHBRIDGES AND

WORKS No. 4: ACCESS, LANDSCAPE,

WORKS No. 1a

WORKS No. 1b

WORKS No. 2

WORKS No. 3

WORKS No. 4

WORKS No. 5

WORKS No. 6

WORKS No. 7

FOR APPROVAL01 JUN 2016

SEE DRAWING C_0002

SEE DRAWING C_0002

SEE DRAWING C_0008

SEE DRAWING C_0010

SEE DRAWING C_0011

SEE DRAWING C_0006

SEE DRAWING C_0009

SEE DRAWING C_0004

SEE DRAWING C_0011

WORKS No. 1a: CONSTRUCTION OF ERF

WORKS No. 1b: ERF ASSOCIATED DEVELOPMENT

DEMOLITION

WORKS No. 6: SITE PREPARATION AND

DEMOLITION OF EXISTING EfW

WORKS No. 7: DECOMISSIONING AND

WORKS No. 3: ECOPARK HOUSE

WORKS No. 5: TEMPORARY LAYDOWN AREA

WORKS No. 2: CONSTRUCTION OF RRF

DEMOLITION OF EXISTING EfW

WORKS No. 7: DECOMISSIONING AND

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

REV DATE FOR

NORTH LONDON WASTE AUTHORITY

DATE

NORTH

PURSUENT TO REGULATION:

REVISION

www.grimshaw-architects.com

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

2015 Ordnance Survey 100019153

© Crown copyright and database rights

PROJECT

NORTH LONDON HEAT AND POWER

DRAWING TITLE

indemnifies Grimshaw from and against all loss so arising.

risk and without limiting Grimshaws rights the user releases and

copied. any unauthorised use of this document is at the user’s sole

by Grimshaw; and this document may not be otherwise used, or

for which it has been created and delivered, as notified in writing

document may only be used for the express purpose and project

are subject to payment in full of all Grimshaw charges; this

unless otherwise agreed in writing; all rights to use this document

© Copyright Grimshaw architects pty limited.

Intellectual Property

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

01 02 03 04

05 06 07

JRSCO GdPF

01

NTS

FOR INFORMATION

C_0001a

OCTOBER 2015

NOT TO SCALE

SEE DRAWING C_0002 SEE DRAWING C_0004

NOT TO SCALE

SEE DRAWING C_0006

NOT TO SCALE

SEE DRAWING C_0008

NOT TO SCALE

SEE DRAWING C_0009

NOT TO SCALE

SEE DRAWING C_0010

NOT TO SCALE

SEE DRAWING C_0011

NOT TO SCALE

WORKS PLAN - KEY PLAN

SPLIT VIEW BY WORKS

LIMITS OF DEVIATION:

WORKS No. 1a AND 1b WORKS No. 2 WORKS No. 3 WORKS No. 4

WORKS No. 5 WORKS No. 6 WORKS No. 7

WORKS No. 1a

WORKS No. 1b

WORKS No. 2

WORKS No. 3

WORKS No. 4

WORKS No. 5

WORKS No. 6

WORKS No. 7

ORDER LIMITS

REGULATIONS 2009

REGULATION 5(2)(j) OF THE APFP

00 OCT 2015 FOR INFORMATION

FOR INFORMATION01 JUN 2016

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

PURSUENT TO REGULATION:

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

ORDER LIMITS

JRSCS

1:1250@ A0

GdPF

01

OF THE APFP REGULATIONS 2009

REGULATION 5(2)(j)

C_0002

00 FOR APPROVAL

FOR APPROVAL

ERF AND ASSOCIATED DEVELOPMENTWATER

BOROUGH BOUNDARY

0 25m 50m 100m

OCT 2015

OCTOBER 2015

be accommodated.

the building structure envelopes set out in drawing C_0003 can

-The limits of deviation set out are horizontal limits within which

LIMITS OF DEVIATION WORKS No.1b

WORKS PLAN - WORKS No. 1a AND 1b:

FOR APPROVAL01 JUN 2016

LIMITS OF DEVIATION WORKS No. 1a para (i)(b) AND (i)(d)

LIMITS OF DEVIATION WORKS No. 1a para (iii) AND (iv)

(excluding Works No. 1a para (iii) AND (iv)

LIMITS OF DEVIATION WORKS No. 1a

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

PURSUENT TO REGULATION:

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

+69.0m AOD

+117.5m AOD

+12.5m AOD

-3.5m AOD

+44.0m AOD

+57.0m AOD

+69.0m AOD

+50.0m AOD

-2.5m AOD

-3.5m AOD

+117.5m AOD

+57.0m AOD

+44.0m AOD

+12.5m AOD

+117.5m AOD

+69.0m AOD

+41.2m AOD

+57.0m AOD

+50.0m AOD

-2.5m AOD

+12.5m AOD

+69.0m AOD

+41.2m AOD

+57.0m AOD

+12.5m AOD

+117.5m AOD

0 25m 50m 100m

1:1000

01 ELEVATION A

1:1000

02 ELEVATION B

1:1000

03 ELEVATION C

1:1000

04 ELEVATION D

JRSCS

1:1000@ A0

GdPF

01C_0003

OF THE APFP REGULATIONS 2009

REGULATION 5(2)(j)

0 25m 50m 100m

0 25m 50m 100m

0 25m 50m 100m

00 FOR APPROVAL

FOR APPROVAL

224m 24m

106m

ERF BUILDINGS STRUCTURE ENVELOPEOCT 2015

OCTOBER 2015

ORDER LIMITS

The parameters for these Works are set out within the DCO.

parameters that control scale within the building envelope limit.

(length, width, height). Works No. 1a para (iii) and (iv) have

The limits of deviation set out are building envelope limits -

LIMITS OF DEVIATION WORKS NO. 1a

LIMITS OF DEVIATION WORKS NO. 1a para (i)(b) AND (i)(d)

LIMITS OF DEVIATION WORKS NO. 1a para (iii) AND (iv)

WORKS PLAN - SECTION - WORKS NO. 1a:

NUMBERS WITHIN WORKS NO. 1a OF SCHEDULE 1 IN THE DCO

ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH

NOTE:

FOR APPROVAL01 JUN 2016

ELEVATION AE

LE

VA

TIO

N B

ELEVATION C

EL

EV

ATIO

N D

Tipping Hall

Process lines

N

MAXIMUM BUILDING LENGTH

MAXIMUM BUILDING WIDTH

Steam turbine

Control room and offices

Entry and exit ramps

Stack

Cooling equipment

Incinerator bottom ash bunker

Observation platform

MAXIMUM BUILDING WIDTH

handling equipment

Waste Bunker and waste

(v)

(i)(a) (i)(f)

(i)(c)

(i)(e)

(i)(d)

(iii)

(iii)

(i)(c)

(i)(e)

(v)(i)(b)

(i)(a)

(i)(b)

(i)(f)

(i)(d)

(iii)

(iv)

(i)(c)

(i)(e)(i)(b)

(i)(b)

(i)(a)

(v)

(i)(f)

(iv)

(iii)

(i)(c)

(i)(e)

(i)(a)

Works No. 1a para Description

(i)(b)

(i)(c)

(i)(d)

(i)(e)

(i)(f)

(ii)

(iii)

(iv)

(v)

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

PURSUENT TO REGULATION:

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

0 25m 50m 100m

1:1250

01 PLAN

OF THE APFP REGULATIONS 2009

REGULATION 5(2)(j) JRSCS

1:1250@ A0

GdPF

01C_0004

ORDER LIMITS

00 FOR APPROVAL

FOR APPROVAL

BOROUGH BOUNDARY

WATER

OCT 2015

OCTOBER 2015RESOURCE RECOVERY FACILITY

be accommodated.

the building structure envelopes set out in drawing C_0005 can

-The limits of deviation set out are horizontal limits within which

LIMITS OF DEVIATION WORKS No. 2

WORKS PLAN - WORKS No. 2:

FOR APPROVAL01 JUN 2016

RRF

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

PURSUENT TO REGULATION:

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

OF THE APFP REGULATIONS 2009

REGULATION 5(2)(j) JRSCS GdPF

01C_0005

0 25m 50m

1:500

03

ELEVATION C

ORDER LIMITS

FOR APPROVAL

FOR APPROVAL

ELEVATION C

OCT 2015

OCTOBER 2015

ELEVATION A

EL

EV

ATIO

N B

EL

EV

ATIO

N D

0 25m 50m

1:500

02 ELEVATION B

0 25m 50m

1:500

01 ELEVATION A

0 25m 50m

1:500

04 ELEVATION D

+30.5m AODRRF

RRF BUILDING STRUCTURE ENVELOPE

N

+30.5m AODRRF

+30.5m AODRRF

+30.5m AODRRF

1:500@ A0width, height) relating to Works No. 2 paras (i), (ii) and (iii)

-The limits of deviation set out are building envelope limits (length,

orientated north-south

Enclosing rectangle

WORKS PLAN - SECTION - WORKS No. 2:

(i), (ii) and (iii)

(i), (ii) and (iii)

(i), (ii) and (iii)

(i), (ii) and (iii)

00

01 FOR APPROVAL

NUMBERS WITHIN WORKS NO. 2 OF SCHEDULE 1 IN THE DCO

ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH

NOTE:

(iii)

(ii)

(i)

LIMITS OF DEVIATION WORKS No. 2

JUN 2016

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

PURSUENT TO REGULATION:

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

1:1250

01 PLAN

0 25m 50m 100m

JRSCS

1:1250@ A0

GdPF

01C_0006

OF THE APFP REGULATIONS 2009

REGULATION 5(2)(j)

ORDER LIMITS

00 FOR APPROVAL

FOR APPROVAL

WATER

BOROUGH BOUNDARY

OCT 2015OCTOBER 2015ECOPARK HOUSE

be accommodated.

the building structure envelopes set out in drawing C_0007 can

-The limits of deviation set out are horizontal limits within which

LIMITS OF DEVIATION WORKS No. 3

WORKS PLAN - WORKS No. 3:

FOR APPROVAL01 JUN 2016

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

PURSUENT TO REGULATION:

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

JRSCS GdPF

01C_0007

OF THE APFP REGULATIONS 2009

REGULATION 5(2)(j)

ELE

VA

TIO

N C

1:500

03 ELEVATION C

+24.6m AOD

ECOPARK HOUSE

ORDER LIMITS

00 FOR APPROVAL

FOR APPROVAL

WORKS No. 3

WATER

OCT 2015OCTOBER 2015

ELE

VA

TIO

N A

ELEVATION B

ELEVATION D

1:500

04 ELEVATION D

1:500

02 ELEVATION B

1:500

01 ELEVATION A

WORKS No. 3

ECOPARK HOUSE BUILDING STRUCTURE

ENVELOPE

+24.6m AOD

ECOPARK HOUSE

+24.6m AOD

ECOPARK HOUSE

+24.6m AOD

ECOPARK HOUSE

No. 3

WORKS

N

1:500@ A0

0 25m 50m

0 25m 50m

0 25m 50m

0 25m 50m

No. 3WORKS

No. 3WORKS

width, height) relating to Works No. 3, excluding the boat canopy

-The limits of deviation set out are building envelope limits (length,

LIMITS OF DEVIATION WORKS No. 3

WORKS PLAN - SECTION - WORKS No. 3

FOR APPROVAL01 JUN 2016

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

PURSUENT TO REGULATION:

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

OF THE APFP REGULATIONS 2009

REGULATION 5(2)(j) JRSCS

1:1250@ A0

GdPF

01C_0008

ORDER LIMITS

00 FOR APPROVAL

FOR APPROVAL

BOROUGH BOUNDARY

A ACCESS POINT

A

A

A

WATER

0 25m 50m 100m

OCT 2015OCTOBER 2015

A

A

UTILITIES AND INFRASTRUCTURE WORK,

AND LIGHTING, AND WEIGHBRIDGES

LANDSCAPING, ACCESS, SECURITY

WORKS PLAN - WORKS No. 4:

LIMITS OF DEVIATION WORKS No. 4 FOR APPROVAL01 JUN 2016

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

PURSUENT TO REGULATION:

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

ACCESS POINT

JRSCS

1:1250@ A0

GdPF

01C_0009

OF THE APFP REGULATIONS 2009

REGULATION 5(2)(j)

ORDER LIMITS

00 FOR APPROVAL

FOR APPROVAL

BOROUGH BOUNDARY

WATER

0 25m 50m 100m

OCT 2015

OCTOBER 2015TEMPORARY LAYDOWN AREALIMITS OF DEVIATION WORKS No. 5

WORKS PLAN - WORKS No. 5:

FOR APPROVAL01 JUN 2016

A

A

A

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

PURSUENT TO REGULATION:

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

JRSCS

1:1250@ A0

GdPF

01C_0010

OF THE APFP REGULATIONS 2009

REGULATION 5(2)(j)

ORDER LIMITS

00 FOR APPROVAL

FOR APPROVAL

BOROUGH BOUNDARY

WATER

0 25m 50m 100m

OCT 2015OCTOBER 2015

6(iii)

SITE PREPARATION AND DEMOLITIONLIMITS OF DEVIATION WORKS No. 6

LIMITS OF DEVIATION WORKS No. 6 para (ii)

WORKS PLAN - WORKS No. 6:

FOR APPROVAL01 JUN 2016

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

PURSUENT TO REGULATION:

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

OF THE APFP REGULATIONS 2009

REGULATION 5(2)(j) JRSCS

1:1250@ A0

GdPF

01C_0011

ORDER LIMITS

00 FOR APPROVAL

FOR APPROVAL

BOROUGH BOUNDARY

WATER

0 25m 50m 100m

OCT 2015OCTOBER 2015DECOMMISSIONING AND DEMOLITION OF

EXISTING EfW FACILITY

LIMITS OF DEVIATION WORKS No. 7

WORKS PLAN - WORKS No. 7:

FOR APPROVAL01 JUN 2016

INDICATIVE PLANS

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

ORDER LIMITS

JRSCS

1:1250@ A0

GdPF

01D_0001

00

WATER

BOROUGH BOUNDARY

0 25m 50m 100m

INDICATIVEINDICATIVE LAYOUT OF

INDICATIVE

OCT 2015

OCTOBER 2015ERF AND ASSOCIATED DEVELOPMENTWORKS AREA

Works No. 1b para (iv)

Works No. 1b para (ii)

Works No. 1a para (iii)

Works No. 1a para (iv)

para (iv)

Works No. 1b

para (i)

Works No. 1b

Works No. 1b para (iv)

para (v)

Works No. 1b

Works No. 1a para (ii)

para (i)(f)

Works No. 1a

para (i)(d)

Works No. 1a

Works No. 1a para (i)(c)

Works No. 1a para (i)(e)

para (i)(b)

Works No. 1a

para (i)(a)

Works No. 1a

para (v)

Works No. 1a

Works No. 1b para (iii)

para (ii)

Works No. 1a

Works No. 1b para (iv)

WORKS NO. 1(a)

WORKS NO. 1(a) paras (i)(b) AND (i)(d)

WORKS NO. 1(b)

INDICATIVE01 JUN 2016

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

ACCESS TO MAINTENANCE ROAD

'IN'

TO

TIPPING HALL

EXIT

FROM

MAINTENANCE

ROAD

'OUT'

FROM

TIPPING

HALL

+22.5m AOD

TIPPING HALL LEVEL

+22.5m AOD

TIPPING HALL LEVEL

1:500

03

1:500

01

1:500

02

JRSCS GdPF

01D_0002

1:500@ A0

OUT RAMP - ELEVATION B

IN RAMP - PLAN

ELEVATION B

ELEVATION A

ELEVATION B

IN-RAMP

OUT-RAMP

0 25m 50m

0 25m 50m

0 25m 50m

9,2

m

14,2m

122,8m

6,8

m

6,8m

ELEVATION A

31,8

m

IN RAMP - ELEVATION A

N

ROAD SURFACE

UPSTAND

ROAD SURFACEUPSTAND

RETAINING WALL

RETAINING WALL

87

m

73,7m

RAMPS

EXTERNAL

ORDER LIMITS

MAINTENANCE ROAD

INDICATIVE ERF EXTERNAL RAMPS

INDICATIVE

OCTOBER 201500 OCT 2015 INDICATIVE

Works No. 1a para (ii)

Works No. 1a para (ii)

Works No. 1a para (ii)

Works No. 1a para (ii)

INDICATIVE01 JUN 2016

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

0 25m 50m 100m

1:1250

01 PLAN

JRSCS

1:1250@ A0

GdPF

01D_0003

00

ORDER LIMITS

BOROUGH BOUNDARY

WATER

BUILDING / STRUCTURE

WORKS AREA

(i) (iii)

(v)

INDICATIVEINDICATIVE LAYOUT OF RRF

INDICATIVE

OCT 2015

OCTOBER 2015

NUMBERS WITHIN WORKS NO. 2 OF SCHEDULE 1 IN THE DCO

ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH

NOTE:

(ii)

(iv)

reuse and recycling centre

fire control water tank(s) and pump house equipment

recycling and fuel preparation facility

odour abatement and dust supression and equipment

offices, and staff and visitor welfare facilities

Description

(i)

Works No. 2 para

(ii)

(iii)

(iv)

(v)

INDICATIVE01 JUN 2016

RRF

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

ARDRA ROAD

PU

MPIN

G S

TATIO

N

SA

LM

ON'S B

RO

OK

EN

FIE

LD DIT

CH

1:1250

01 PLAN

0 25m 50m 100m

JRSCS

1:1250@ A0

GdPF

01D_0004

00

ORDER LIMITS

WATER

BOROUGH BOUNDARY

BUILDING / STRUCTURE

WORKS AREAINDICATIVE

INDICATIVE

OCT 2015OCTOBER 2015

INDICATIVE LAYOUT OF

ECOPARK HOUSE

WORKS No. 3

INDICATIVE01 JUN 2016

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

JRSCS

1:1250@ A0

GdPF

01D_0005

ORDER LIMITS

WORKS

GENERIC

CORRIDOR

DISTRIBUTION

PRIMARY

DISTRIBUTION

RAW WATER

FOOTPRINT

STRUCTURES

BUILDING /

SEWER:

SEWER ROUTE

EXISTING

SEWER DIVERSION

PROPOSED

CONNECTIONS

SEWER

POTABLE WATER:

POWER, GAS,

BOROUGH BOUNDARY

SALMON'S BROOK:

SALMON'S BROOK BANKSTRUCTURES

BUILDING /

INDICATIVE UTILITIES

INDICATIVE

0 25m 50m 100m

OCTOBER 201500 OCT 2015 INDICATIVE

(iii)

(iii)

(iii)

RAW WATER:

NUMBERS WITHIN WORKS NO. 4 OF SCHEDULE 1 IN THE DCO

ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH

NOTE:

the construction of surface water pumps, pipework and attenuation tanks

stabilisation works to the eastern bank of Salmon's Brook

erection of a water pumping station

the creation of connections to existing or new pipes, cables, systems and associated apparatus

the laying or installation of new pipes, cables, systems and associated apparatus

CCTV, telecoms and data

gas

electricity

raw water

foul water

surface water

waste water

potable wate

cables, systems and associated apparatus

diversion, repositioning, decommissioning, removal, replacement, modification or upgrading of existing pipes,

Description

(ii)

(i)(e)

Works No. 4 para

(i)(a)

(i)(b)

(i)(d)

(i)(e)

(i)(f)

(i)(g)

(i)(h)

(ii)

(iv)

(iii)

(i)(h)(aa)

(i)(h)(bb)

(i)(h)(cc)

(i)(h)(aa)

(i)(h)(bb)

(i)(h)(aa)

(i)(h)(aa)

INDICATIVE01 JUN 2016

(i)(c)

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

JRSCS

1:1250@ A0

GdPF

01D_0006

ORDER LIMITS

DISCHARGE ZONE (SWD)

ENFIELD DITCH SURFACE WATER

ATTENUATION TANKS

LOCATION FOR BELOW-GROUND

BOROUGH BOUNDARY

DISCHARGE ZONE

SURFACE WATER

ENFIELD DITCH

DRAINAGE ZONE 1

DRAINAGE ZONE 2

DRAINAGE ZONE 3

INDICATIVEWATER

DRAINAGE ZONE 1

DRAINAGE ZONE 2

DRAINAGE ZONE 3

0 25m 50m 100m

INDICATIVE DRAINAGE

OCTOBER 2015

(iii)(i)

00 OCT 2015 INDICATIVEBE UTILISED

EXISTING DRAINAGE TO

TEMPORARY DRAINAGE

DRAINAGE

TEMPORARY

TO BE UTILISED

EXISTING DRAINAGE

TO BE UTILISED

EXISTING DRAINAGE

ROUTE TO ATTENUATION

SURFACE WATER DRAINAGE

NUMBERS WITHIN WORKS NO. 4 OF SCHEDULE 1 IN THE DCO

ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH

NOTE:

(ii)

(iv)

INDICATIVE01 JUN 2016

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

JRSCS

1:1250@ A0

GdPF

01D_0007

ROADS

HARD LANDSCAPE

SOFT LANDSCAPE

GREEN ROOF

BROWN ROOF

ORDER LIMITS

INDICATIVE

0 25m 50m 100m

BOROUGH BOUNDARY

WATER

INDICATIVE SOFT AND

HARD LANDSCAPE WORKS

TEMPORARY HARDSTANDING

OCTOBER 2015

(v)

00 OCT 2015 INDICATIVE

(v)

NUMBERS WITHIN WORKS NO. 4 OF SCHEDULE 1 IN THE DCO

ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH

NOTE:

(vi)

(vi)

INDICATIVE01 JUN 2016

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

BRIDGE

19.2m OVERALL

8.1m CLEAR SPAN

FOOTPATH

STRUCTURE

9m NEW BRIDGE FOOTPATH

STRUCTURE

BRIDGE

12m EXISTING

SECTION AA

SECTION BB

DECKING REPLACED

BRIDGE PLAN

15.0m CLEAR SPAN

SECTION

BRIDGE

14.5m OVERALL

EXISTING DRAINAGE DITCH PROFILE

8.1m CLEAR SPAN

FINISHED ROAD LEVEL

+11.125 AOD MINIMUM

FLOOD LEVEL AT +10.67m AOD)

CLIMATE CHANGE''

(''100 YEAR PLUS

SOFFIT LEVEL

+10.445 AOD MINIMUM

EXISTING DRAINAGE DITCH PROFILE

FINISHED ROAD LEVEL

+11.125 AOD MINIMUM

SOFFIT LEVEL

+10.445 AOD MINIMUM

DECKING REPLACED

BRIDGE SECTION

EXISTING DRAINAGE DITCH PROFILE

15.0m CLEAR SPAN

FLOOD LEVEL +600mm)

CLIMATE CHANGE''

(''100 YEAR PLUS

SOFFIT LEVEL

+11.22 mAOD MINIMUM

FINISHED ROAD LEVEL

MINIMUM

16m 12m

4m

Office

06 WEIGHBRIDGES PLAN + SECTION

W1 PLAN W2 PLAN

W1 SECTION

Footpaths

FOOTPATHS COVERED ROUTE

Fence Canopy

07

NTS

Bridge B1

02 BRIDGE B1 PLAN

03 BRIDGE B1 CROSS SECTIONS

Bridge B2

04 BRIDGE B2 PLAN

1:250

05 BRIDGE B2 CROSS SECTION

Weighbridges

PROTECTED AND COVERED ROUTESTYPICAL SECTION OF FOOTPATHS,

W1

P5

W1

P6

P7

B2

W2

NEW ACCESS TO ECOPARK FROM LEE PARK WAY

LEE PARK WAY

P3S1

P4

S2

P2

W1

W1

P1

B1

AA

1:1250

01 PLAN 0 25m 50m 100m

Weighbridges

Bridges

Cycle Shelters

JRSCS

1:1250@ A0

GdPF

01D_0010

ROAD

FROM DEEPHAM'S FARM

NEW ACCESS TO ECOPARK

S1

S2

DescriptionShelters

Cycle

B1

B2

Description Length (m) Width (m)Height (m)

8.1 (Clear Span)

14.5

9.0 n/a

n/a15.0 (Clear Span)

NO

southern entrance to site

New Bridge widening of

over Enfield Ditch

Entrance from Lee Park Way

1 16

1 2 12

2 1

0

Type Dimension

required (m)

Total width

Type W1

Type W2

Lanes/Type

No. Weighbridge

Lanes/Type

No. By-pass

Offices/Type

No. Weighbridge

Remote Office

WEIGHBRIDGES

BRIDGES

PARKING

STRUCTURE

BUILDING /

FOOTPATHS

COVERED ROUTE

FOOTPATHSA

A

INTO THE SITE

PEDESTRIAN ACCESS

INTO THE SITE

VEHICLE ACCESS

CYCLE PATHS

BRIDGES

ORDER LIMITS

PARKING AREA

ACCESS AND HIGHWAYS

AA

A

BY-PASS ROAD UNDER TIPPING HALL

Bridge B2

Bridge B1

NTS

NTS

NTS

NTS

Weigh bridges

lane

By-pass Weigh bridges

W1 SECTION

ACCESS

MAINTENANCE VEHICLE

LANES AND OFFICE WHEN INDICATED

WEIGHBRIDGE, BY-PASS

Cycle shelter for Staff in Central Parking zone

Cycle shelter for visitors in Central Parking zone

BOROUGH BOUNDARY

WATER

INDICATIVE ACCESS AND CIRCULATION

INDICATIVE

OCTOBER 2015

(vii)

(x)

(xii)

00 OCT 2015 INDICATIVEROADS AND FOOTPATHS

EDMONTON ECOPARK SITE

PROTECTED ROUTE WITHIN

ECOPARK SITE

WITHIN EDMONTON

PROTECTED ROUTE

NUMBERS WITHIN WORKS NO. 4 OF SCHEDULE 1 IN THE DCO

ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH

NOTE:

(xi)

(viii)

(viii)

(viii)

(viii)

(ix)

(viii)

(viii)

(viii)

INDICATIVE01 JUN 2016

Parking

P1

P2

P3

P4

P7

Security Gatehouse parking

EcoPark House - Accessible parking

Coach drop-off

Operational Vehicles parking

ERF - Accessible parking

Central Parking

P5/P6

Zone Description

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

G

G

B

G

B

GG

G

G

G

G

EXTERNAL FENCE LINE

INTERNAL FENCE LINE

CCTV COVERAGE

ZONE REQUIRING

BUILDING / STRUCTURE

B

GGATEHOUSES

LIGHTING/CCTV

ORDER LIMITS

JRSCS

1:1250@ A0

GdPF

01D_0011

G1

G2

G3

VEHICLE BARRIER

VEHICLE GATE

INDICATIVE

SECURITY

WATER

0 25m 50m 100m

BOUNDARY

BOROUGH

EXTERNAL LIGHTING

ZONE REQUIRING

OCTOBER 2015

(xiv)

(xiv)

(xiv)

(xviii)

(xviii)

00 OCT 2015 INDICATIVEINDICATIVE SECURITY AND LIGHTING

F1

F2

Gatehouses Fence

G1

G2

G3

Description

Advent Way (South)

Deephams Farm Road (North)

Lee Park Way (East)

F1

Description

F2 Internal Fence

Site Perimeter Fence

NUMBERS WITHIN WORKS NO. 4 OF SCHEDULE 1 IN THE DCO

ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH

NOTE:

(xiii)

(xvii)

INDICATIVE01 JUN 2016

AUTHORISEDCHECKEDDRAWN

DRAWING NUMBER REVISION

SCALE

STATUS

PROJECT

DRAWING KEY

DATE

DATEREV. FOR

NORTH

www.grimshaw-architects.com

100019153

rights 2015 Ordnance Survey

© Crown copyright and database

design engineers.

Amec Foster Wheeler site wide

with Ramboll ERF engineers and

NLHPP as developed in coordination

parameters established for the

This drawing sets out works

Intellectual Property

DRAWING TITLE

POWER PROJECT

NORTH LONDON HEAT AND

arising.

indemnifies Grimshaw from and against all loss so

limiting Grimshaws rights the user releases and

this document is at the user’s sole risk and without

otherwise used, or copied. any unauthorised use of

writing by Grimshaw; and this document may not be

it has been created and delivered, as notified in

used for the express purpose and project for which

Grimshaw charges; this document may only be

this document are subject to payment in full of all

unless otherwise agreed in writing; all rights to use

© Copyright Grimshaw architects pty limited.

AD

VE

NT W

AY

LEE P

AR

K W

AY

DE

EP

HA

MS F

AR

M R

OA

D

COOKS FERRY ROUNDABOUT

ADVEN

T WAY

WALTHAMSTOW AVENUE

A406 - NORTH CIRCULAR

ARGON ROAD

LO

WE

R H

ALL L

AN

E

A406 - N

ORTH CI

RCULAR

RIV

ER L

EE N

AVIG

ATIO

N

JRSCS

1:1250@ A0

GdPF

01D_0012

FENCE LINE

ACCESS POINT

ACCESS

LAYDOWN AREA:

ORDER LIMITS

A

INDICATIVE

FABRICATION AREA

PARKING, STORAGE AND

SITE ACCOMMODATION,

WATER

0 25m 50m 100m

BOUNDARY

BOROUGH OCTOBER 2015

(iii)

(v)

(vii)

(i)

(x)

00 INDICATIVEOCT 2015INDICATIVE TEMPORARY

LAYDOWN AREA

CONNECTIONS

ZONE OF UTILITIES

NUMBERS WITHIN WORKS NO. 5 OF SCHEDULE 1 IN THE DCO

ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH

NOTE:

(ii)

(iv)

(ii)

(ii)

(vi)

(viii)

(ix)

(ii)

INDICATIVE01 JUN 2016

A

A

NORTH LONDON WASTE

AUTHORITY 1 b Berol House, 25 Ashley Road

Tottenham Hale N17 9LJ

Telephone: 020 8489 5730 Fax: 020 8365 0254

Email: [email protected]