NORTH LONDON WASTE AUTHORITY
NORTH LONDON HEAT AND
POWER PROJECTEN10071
The Planning Act 2008 The Infrastructure
Planning (Applications: Prescribed
Forms and Procedure) Regulations 2009
Regulation 5 (2)
June 2016
PLANS AND DRAWINGS UPDATED FOR DEADLINE 6 OF EXAMINATION
AD07 .10
Drawing Title Status Revision Scale Size Regulation
Works Plans (5 (2) (j) of the APFP Regulations 2009)
C_0001 WORKS PLAN - KEY PLAN For Approval 01 1:1250 A0 Reg 5 (2) (j)
C_0001a WORKS PLAN - KEY PLAN - SPLIT VIEW BY WORKS For Approval 01 NTS A0 Reg 5 (2) (j)
C_0002 WORKS PLAN - WORKS 1a AND 1b: ERF AND ASSOCIATED DEVELOPMENT For Approval 01 1:1250 A0 Reg 5 (2) (j)
C_0003 WORKS PLAN - SECTION - WORKS 1a: ERF BUILDING STRUCTURE ENVELOPE For Approval 01 1:1000 A0 Reg 5 (2) (j)
C_0004 WORKS PLAN - WORKS 2: RESOURCE RECOVERY FACILITY For Approval 01 1:1250 A0 Reg 5 (2) (j)
C_0005 WORKS PLAN - SECTION - WORK 2: RRF BUILDING STRUCTURE ENVELOPE For Approval 01 1:500 A0 Reg 5 (2) (j)
C_0006 WORKS PLAN - WORKS 3: ECOPARK HOUSE For Approval 01 1:1250 A0 Reg 5 (2) (j)
C_0007 WORKS PLAN - SECTION - WORK 3: ECOPARK HOUSE BUILDING STRUCTURE ENVELOPE For Approval 01 1:500 A0 Reg 5 (2) (j)
C_0008 WORKS PLAN - WORKS 4: UTILITIES AND INFRASTRUCTURE WORK, LANDSCAPING, ACCESS, SECURITY AND LIGHTING, AND WEIGHBRIDGES For Approval 01 1:1250 A0 Reg 5 (2) (j)
C_0009 WORKS PLAN - WORKS 5: TEMPORARY LAYDOWN AREA For Approval 01 1:1250 A0 Reg 5 (2) (j)
C_0010 WORKS PLAN - WORKS 6: SITE PREPARATION AND DEMOLITION For Approval 01 1:1250 A0 Reg 5 (2) (j)
C_0011 WORKS PLAN - WORKS 7: DECOMMISSIONING AND DEMOLITION OF EXISTING EfW FACILITY For Approval 01 1:1250 A0 Reg 5 (2) (j)
Indicative plans
D_0001 INDICATIVE LAYOUT OF ERF AND ASSOCIATED DEVELOPMENT Indicative 01 1:1250 A0
D_0002 INDICATIVE ERF EXTERNAL RAMPS Indicative 01 1:500 A0
D_0003 INDICATIVE LAYOUT OF RRF Indicative 01 1:1250 A0
D_0004 INDICATIVE LAYOUT OF ECOPARK HOUSE Indicative 01 1:1250 A0
D_0005 INDICATIVE UTILITIES Indicative 01 1:1500 A0
D_0006 INDICATIVE DRAINAGE Indicative 01 1:1250 A0
D_0007 INDICATIVE SOFT AND HARD LANDSCAPE WORKS Indicative 01 1:1250 A0
D_0010 INDICATIVE ACCESS AND CIRCULATION Indicative 01 1:1250 A0
D_0011 INDICATIVE SECURITY AND LIGHTING Indicative 01 1:1250 A0
D_0012 INDICATIVE TEMPORARY LAYDOWN AREA Indicative 01 1:1250 A0
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
PURSUENT TO REGULATION:
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
JRSCO
01
1:1250 @ A0
GdPF
C_0001
ORDER LIMITS
00 FOR APPROVAL
FOR APPROVAL
LIMITS OF DEVIATION:
WATER
BOROUGH BOUNDARY
0 25m 50m 100m
OCT 2015
OCTOBER 2015
REGULATIONS 2009
REGULATION 5(2)(j) OF THE APFP
WORKS PLAN - KEY PLAN
UTILITIES WORKS
LIGHTING, SECURITY, WEIGHBRIDGES AND
WORKS No. 4: ACCESS, LANDSCAPE,
WORKS No. 1a
WORKS No. 1b
WORKS No. 2
WORKS No. 3
WORKS No. 4
WORKS No. 5
WORKS No. 6
WORKS No. 7
FOR APPROVAL01 JUN 2016
SEE DRAWING C_0002
SEE DRAWING C_0002
SEE DRAWING C_0008
SEE DRAWING C_0010
SEE DRAWING C_0011
SEE DRAWING C_0006
SEE DRAWING C_0009
SEE DRAWING C_0004
SEE DRAWING C_0011
WORKS No. 1a: CONSTRUCTION OF ERF
WORKS No. 1b: ERF ASSOCIATED DEVELOPMENT
DEMOLITION
WORKS No. 6: SITE PREPARATION AND
DEMOLITION OF EXISTING EfW
WORKS No. 7: DECOMISSIONING AND
WORKS No. 3: ECOPARK HOUSE
WORKS No. 5: TEMPORARY LAYDOWN AREA
WORKS No. 2: CONSTRUCTION OF RRF
DEMOLITION OF EXISTING EfW
WORKS No. 7: DECOMISSIONING AND
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
REV DATE FOR
NORTH LONDON WASTE AUTHORITY
DATE
NORTH
PURSUENT TO REGULATION:
REVISION
www.grimshaw-architects.com
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
2015 Ordnance Survey 100019153
© Crown copyright and database rights
PROJECT
NORTH LONDON HEAT AND POWER
DRAWING TITLE
indemnifies Grimshaw from and against all loss so arising.
risk and without limiting Grimshaws rights the user releases and
copied. any unauthorised use of this document is at the user’s sole
by Grimshaw; and this document may not be otherwise used, or
for which it has been created and delivered, as notified in writing
document may only be used for the express purpose and project
are subject to payment in full of all Grimshaw charges; this
unless otherwise agreed in writing; all rights to use this document
© Copyright Grimshaw architects pty limited.
Intellectual Property
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
01 02 03 04
05 06 07
JRSCO GdPF
01
NTS
FOR INFORMATION
C_0001a
OCTOBER 2015
NOT TO SCALE
SEE DRAWING C_0002 SEE DRAWING C_0004
NOT TO SCALE
SEE DRAWING C_0006
NOT TO SCALE
SEE DRAWING C_0008
NOT TO SCALE
SEE DRAWING C_0009
NOT TO SCALE
SEE DRAWING C_0010
NOT TO SCALE
SEE DRAWING C_0011
NOT TO SCALE
WORKS PLAN - KEY PLAN
SPLIT VIEW BY WORKS
LIMITS OF DEVIATION:
WORKS No. 1a AND 1b WORKS No. 2 WORKS No. 3 WORKS No. 4
WORKS No. 5 WORKS No. 6 WORKS No. 7
WORKS No. 1a
WORKS No. 1b
WORKS No. 2
WORKS No. 3
WORKS No. 4
WORKS No. 5
WORKS No. 6
WORKS No. 7
ORDER LIMITS
REGULATIONS 2009
REGULATION 5(2)(j) OF THE APFP
00 OCT 2015 FOR INFORMATION
FOR INFORMATION01 JUN 2016
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
PURSUENT TO REGULATION:
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
ORDER LIMITS
JRSCS
1:1250@ A0
GdPF
01
OF THE APFP REGULATIONS 2009
REGULATION 5(2)(j)
C_0002
00 FOR APPROVAL
FOR APPROVAL
ERF AND ASSOCIATED DEVELOPMENTWATER
BOROUGH BOUNDARY
0 25m 50m 100m
OCT 2015
OCTOBER 2015
be accommodated.
the building structure envelopes set out in drawing C_0003 can
-The limits of deviation set out are horizontal limits within which
LIMITS OF DEVIATION WORKS No.1b
WORKS PLAN - WORKS No. 1a AND 1b:
FOR APPROVAL01 JUN 2016
LIMITS OF DEVIATION WORKS No. 1a para (i)(b) AND (i)(d)
LIMITS OF DEVIATION WORKS No. 1a para (iii) AND (iv)
(excluding Works No. 1a para (iii) AND (iv)
LIMITS OF DEVIATION WORKS No. 1a
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
PURSUENT TO REGULATION:
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
+69.0m AOD
+117.5m AOD
+12.5m AOD
-3.5m AOD
+44.0m AOD
+57.0m AOD
+69.0m AOD
+50.0m AOD
-2.5m AOD
-3.5m AOD
+117.5m AOD
+57.0m AOD
+44.0m AOD
+12.5m AOD
+117.5m AOD
+69.0m AOD
+41.2m AOD
+57.0m AOD
+50.0m AOD
-2.5m AOD
+12.5m AOD
+69.0m AOD
+41.2m AOD
+57.0m AOD
+12.5m AOD
+117.5m AOD
0 25m 50m 100m
1:1000
01 ELEVATION A
1:1000
02 ELEVATION B
1:1000
03 ELEVATION C
1:1000
04 ELEVATION D
JRSCS
1:1000@ A0
GdPF
01C_0003
OF THE APFP REGULATIONS 2009
REGULATION 5(2)(j)
0 25m 50m 100m
0 25m 50m 100m
0 25m 50m 100m
00 FOR APPROVAL
FOR APPROVAL
224m 24m
106m
ERF BUILDINGS STRUCTURE ENVELOPEOCT 2015
OCTOBER 2015
ORDER LIMITS
The parameters for these Works are set out within the DCO.
parameters that control scale within the building envelope limit.
(length, width, height). Works No. 1a para (iii) and (iv) have
The limits of deviation set out are building envelope limits -
LIMITS OF DEVIATION WORKS NO. 1a
LIMITS OF DEVIATION WORKS NO. 1a para (i)(b) AND (i)(d)
LIMITS OF DEVIATION WORKS NO. 1a para (iii) AND (iv)
WORKS PLAN - SECTION - WORKS NO. 1a:
NUMBERS WITHIN WORKS NO. 1a OF SCHEDULE 1 IN THE DCO
ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH
NOTE:
FOR APPROVAL01 JUN 2016
ELEVATION AE
LE
VA
TIO
N B
ELEVATION C
EL
EV
ATIO
N D
Tipping Hall
Process lines
N
MAXIMUM BUILDING LENGTH
MAXIMUM BUILDING WIDTH
Steam turbine
Control room and offices
Entry and exit ramps
Stack
Cooling equipment
Incinerator bottom ash bunker
Observation platform
MAXIMUM BUILDING WIDTH
handling equipment
Waste Bunker and waste
(v)
(i)(a) (i)(f)
(i)(c)
(i)(e)
(i)(d)
(iii)
(iii)
(i)(c)
(i)(e)
(v)(i)(b)
(i)(a)
(i)(b)
(i)(f)
(i)(d)
(iii)
(iv)
(i)(c)
(i)(e)(i)(b)
(i)(b)
(i)(a)
(v)
(i)(f)
(iv)
(iii)
(i)(c)
(i)(e)
(i)(a)
Works No. 1a para Description
(i)(b)
(i)(c)
(i)(d)
(i)(e)
(i)(f)
(ii)
(iii)
(iv)
(v)
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
PURSUENT TO REGULATION:
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
0 25m 50m 100m
1:1250
01 PLAN
OF THE APFP REGULATIONS 2009
REGULATION 5(2)(j) JRSCS
1:1250@ A0
GdPF
01C_0004
ORDER LIMITS
00 FOR APPROVAL
FOR APPROVAL
BOROUGH BOUNDARY
WATER
OCT 2015
OCTOBER 2015RESOURCE RECOVERY FACILITY
be accommodated.
the building structure envelopes set out in drawing C_0005 can
-The limits of deviation set out are horizontal limits within which
LIMITS OF DEVIATION WORKS No. 2
WORKS PLAN - WORKS No. 2:
FOR APPROVAL01 JUN 2016
RRF
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
PURSUENT TO REGULATION:
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
OF THE APFP REGULATIONS 2009
REGULATION 5(2)(j) JRSCS GdPF
01C_0005
0 25m 50m
1:500
03
ELEVATION C
ORDER LIMITS
FOR APPROVAL
FOR APPROVAL
ELEVATION C
OCT 2015
OCTOBER 2015
ELEVATION A
EL
EV
ATIO
N B
EL
EV
ATIO
N D
0 25m 50m
1:500
02 ELEVATION B
0 25m 50m
1:500
01 ELEVATION A
0 25m 50m
1:500
04 ELEVATION D
+30.5m AODRRF
RRF BUILDING STRUCTURE ENVELOPE
N
+30.5m AODRRF
+30.5m AODRRF
+30.5m AODRRF
1:500@ A0width, height) relating to Works No. 2 paras (i), (ii) and (iii)
-The limits of deviation set out are building envelope limits (length,
orientated north-south
Enclosing rectangle
WORKS PLAN - SECTION - WORKS No. 2:
(i), (ii) and (iii)
(i), (ii) and (iii)
(i), (ii) and (iii)
(i), (ii) and (iii)
00
01 FOR APPROVAL
NUMBERS WITHIN WORKS NO. 2 OF SCHEDULE 1 IN THE DCO
ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH
NOTE:
(iii)
(ii)
(i)
LIMITS OF DEVIATION WORKS No. 2
JUN 2016
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
PURSUENT TO REGULATION:
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
1:1250
01 PLAN
0 25m 50m 100m
JRSCS
1:1250@ A0
GdPF
01C_0006
OF THE APFP REGULATIONS 2009
REGULATION 5(2)(j)
ORDER LIMITS
00 FOR APPROVAL
FOR APPROVAL
WATER
BOROUGH BOUNDARY
OCT 2015OCTOBER 2015ECOPARK HOUSE
be accommodated.
the building structure envelopes set out in drawing C_0007 can
-The limits of deviation set out are horizontal limits within which
LIMITS OF DEVIATION WORKS No. 3
WORKS PLAN - WORKS No. 3:
FOR APPROVAL01 JUN 2016
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
PURSUENT TO REGULATION:
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
JRSCS GdPF
01C_0007
OF THE APFP REGULATIONS 2009
REGULATION 5(2)(j)
ELE
VA
TIO
N C
1:500
03 ELEVATION C
+24.6m AOD
ECOPARK HOUSE
ORDER LIMITS
00 FOR APPROVAL
FOR APPROVAL
WORKS No. 3
WATER
OCT 2015OCTOBER 2015
ELE
VA
TIO
N A
ELEVATION B
ELEVATION D
1:500
04 ELEVATION D
1:500
02 ELEVATION B
1:500
01 ELEVATION A
WORKS No. 3
ECOPARK HOUSE BUILDING STRUCTURE
ENVELOPE
+24.6m AOD
ECOPARK HOUSE
+24.6m AOD
ECOPARK HOUSE
+24.6m AOD
ECOPARK HOUSE
No. 3
WORKS
N
1:500@ A0
0 25m 50m
0 25m 50m
0 25m 50m
0 25m 50m
No. 3WORKS
No. 3WORKS
width, height) relating to Works No. 3, excluding the boat canopy
-The limits of deviation set out are building envelope limits (length,
LIMITS OF DEVIATION WORKS No. 3
WORKS PLAN - SECTION - WORKS No. 3
FOR APPROVAL01 JUN 2016
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
PURSUENT TO REGULATION:
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
OF THE APFP REGULATIONS 2009
REGULATION 5(2)(j) JRSCS
1:1250@ A0
GdPF
01C_0008
ORDER LIMITS
00 FOR APPROVAL
FOR APPROVAL
BOROUGH BOUNDARY
A ACCESS POINT
A
A
A
WATER
0 25m 50m 100m
OCT 2015OCTOBER 2015
A
A
UTILITIES AND INFRASTRUCTURE WORK,
AND LIGHTING, AND WEIGHBRIDGES
LANDSCAPING, ACCESS, SECURITY
WORKS PLAN - WORKS No. 4:
LIMITS OF DEVIATION WORKS No. 4 FOR APPROVAL01 JUN 2016
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
PURSUENT TO REGULATION:
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
ACCESS POINT
JRSCS
1:1250@ A0
GdPF
01C_0009
OF THE APFP REGULATIONS 2009
REGULATION 5(2)(j)
ORDER LIMITS
00 FOR APPROVAL
FOR APPROVAL
BOROUGH BOUNDARY
WATER
0 25m 50m 100m
OCT 2015
OCTOBER 2015TEMPORARY LAYDOWN AREALIMITS OF DEVIATION WORKS No. 5
WORKS PLAN - WORKS No. 5:
FOR APPROVAL01 JUN 2016
A
A
A
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
PURSUENT TO REGULATION:
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
JRSCS
1:1250@ A0
GdPF
01C_0010
OF THE APFP REGULATIONS 2009
REGULATION 5(2)(j)
ORDER LIMITS
00 FOR APPROVAL
FOR APPROVAL
BOROUGH BOUNDARY
WATER
0 25m 50m 100m
OCT 2015OCTOBER 2015
6(iii)
SITE PREPARATION AND DEMOLITIONLIMITS OF DEVIATION WORKS No. 6
LIMITS OF DEVIATION WORKS No. 6 para (ii)
WORKS PLAN - WORKS No. 6:
FOR APPROVAL01 JUN 2016
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
PURSUENT TO REGULATION:
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
OF THE APFP REGULATIONS 2009
REGULATION 5(2)(j) JRSCS
1:1250@ A0
GdPF
01C_0011
ORDER LIMITS
00 FOR APPROVAL
FOR APPROVAL
BOROUGH BOUNDARY
WATER
0 25m 50m 100m
OCT 2015OCTOBER 2015DECOMMISSIONING AND DEMOLITION OF
EXISTING EfW FACILITY
LIMITS OF DEVIATION WORKS No. 7
WORKS PLAN - WORKS No. 7:
FOR APPROVAL01 JUN 2016
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
ORDER LIMITS
JRSCS
1:1250@ A0
GdPF
01D_0001
00
WATER
BOROUGH BOUNDARY
0 25m 50m 100m
INDICATIVEINDICATIVE LAYOUT OF
INDICATIVE
OCT 2015
OCTOBER 2015ERF AND ASSOCIATED DEVELOPMENTWORKS AREA
Works No. 1b para (iv)
Works No. 1b para (ii)
Works No. 1a para (iii)
Works No. 1a para (iv)
para (iv)
Works No. 1b
para (i)
Works No. 1b
Works No. 1b para (iv)
para (v)
Works No. 1b
Works No. 1a para (ii)
para (i)(f)
Works No. 1a
para (i)(d)
Works No. 1a
Works No. 1a para (i)(c)
Works No. 1a para (i)(e)
para (i)(b)
Works No. 1a
para (i)(a)
Works No. 1a
para (v)
Works No. 1a
Works No. 1b para (iii)
para (ii)
Works No. 1a
Works No. 1b para (iv)
WORKS NO. 1(a)
WORKS NO. 1(a) paras (i)(b) AND (i)(d)
WORKS NO. 1(b)
INDICATIVE01 JUN 2016
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
ACCESS TO MAINTENANCE ROAD
'IN'
TO
TIPPING HALL
EXIT
FROM
MAINTENANCE
ROAD
'OUT'
FROM
TIPPING
HALL
+22.5m AOD
TIPPING HALL LEVEL
+22.5m AOD
TIPPING HALL LEVEL
1:500
03
1:500
01
1:500
02
JRSCS GdPF
01D_0002
1:500@ A0
OUT RAMP - ELEVATION B
IN RAMP - PLAN
ELEVATION B
ELEVATION A
ELEVATION B
IN-RAMP
OUT-RAMP
0 25m 50m
0 25m 50m
0 25m 50m
9,2
m
14,2m
122,8m
6,8
m
6,8m
ELEVATION A
31,8
m
IN RAMP - ELEVATION A
N
ROAD SURFACE
UPSTAND
ROAD SURFACEUPSTAND
RETAINING WALL
RETAINING WALL
87
m
73,7m
RAMPS
EXTERNAL
ORDER LIMITS
MAINTENANCE ROAD
INDICATIVE ERF EXTERNAL RAMPS
INDICATIVE
OCTOBER 201500 OCT 2015 INDICATIVE
Works No. 1a para (ii)
Works No. 1a para (ii)
Works No. 1a para (ii)
Works No. 1a para (ii)
INDICATIVE01 JUN 2016
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
0 25m 50m 100m
1:1250
01 PLAN
JRSCS
1:1250@ A0
GdPF
01D_0003
00
ORDER LIMITS
BOROUGH BOUNDARY
WATER
BUILDING / STRUCTURE
WORKS AREA
(i) (iii)
(v)
INDICATIVEINDICATIVE LAYOUT OF RRF
INDICATIVE
OCT 2015
OCTOBER 2015
NUMBERS WITHIN WORKS NO. 2 OF SCHEDULE 1 IN THE DCO
ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH
NOTE:
(ii)
(iv)
reuse and recycling centre
fire control water tank(s) and pump house equipment
recycling and fuel preparation facility
odour abatement and dust supression and equipment
offices, and staff and visitor welfare facilities
Description
(i)
Works No. 2 para
(ii)
(iii)
(iv)
(v)
INDICATIVE01 JUN 2016
RRF
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
ARDRA ROAD
PU
MPIN
G S
TATIO
N
SA
LM
ON'S B
RO
OK
EN
FIE
LD DIT
CH
1:1250
01 PLAN
0 25m 50m 100m
JRSCS
1:1250@ A0
GdPF
01D_0004
00
ORDER LIMITS
WATER
BOROUGH BOUNDARY
BUILDING / STRUCTURE
WORKS AREAINDICATIVE
INDICATIVE
OCT 2015OCTOBER 2015
INDICATIVE LAYOUT OF
ECOPARK HOUSE
WORKS No. 3
INDICATIVE01 JUN 2016
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
JRSCS
1:1250@ A0
GdPF
01D_0005
ORDER LIMITS
WORKS
GENERIC
CORRIDOR
DISTRIBUTION
PRIMARY
DISTRIBUTION
RAW WATER
FOOTPRINT
STRUCTURES
BUILDING /
SEWER:
SEWER ROUTE
EXISTING
SEWER DIVERSION
PROPOSED
CONNECTIONS
SEWER
POTABLE WATER:
POWER, GAS,
BOROUGH BOUNDARY
SALMON'S BROOK:
SALMON'S BROOK BANKSTRUCTURES
BUILDING /
INDICATIVE UTILITIES
INDICATIVE
0 25m 50m 100m
OCTOBER 201500 OCT 2015 INDICATIVE
(iii)
(iii)
(iii)
RAW WATER:
NUMBERS WITHIN WORKS NO. 4 OF SCHEDULE 1 IN THE DCO
ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH
NOTE:
the construction of surface water pumps, pipework and attenuation tanks
stabilisation works to the eastern bank of Salmon's Brook
erection of a water pumping station
the creation of connections to existing or new pipes, cables, systems and associated apparatus
the laying or installation of new pipes, cables, systems and associated apparatus
CCTV, telecoms and data
gas
electricity
raw water
foul water
surface water
waste water
potable wate
cables, systems and associated apparatus
diversion, repositioning, decommissioning, removal, replacement, modification or upgrading of existing pipes,
Description
(ii)
(i)(e)
Works No. 4 para
(i)(a)
(i)(b)
(i)(d)
(i)(e)
(i)(f)
(i)(g)
(i)(h)
(ii)
(iv)
(iii)
(i)(h)(aa)
(i)(h)(bb)
(i)(h)(cc)
(i)(h)(aa)
(i)(h)(bb)
(i)(h)(aa)
(i)(h)(aa)
INDICATIVE01 JUN 2016
(i)(c)
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
JRSCS
1:1250@ A0
GdPF
01D_0006
ORDER LIMITS
DISCHARGE ZONE (SWD)
ENFIELD DITCH SURFACE WATER
ATTENUATION TANKS
LOCATION FOR BELOW-GROUND
BOROUGH BOUNDARY
DISCHARGE ZONE
SURFACE WATER
ENFIELD DITCH
DRAINAGE ZONE 1
DRAINAGE ZONE 2
DRAINAGE ZONE 3
INDICATIVEWATER
DRAINAGE ZONE 1
DRAINAGE ZONE 2
DRAINAGE ZONE 3
0 25m 50m 100m
INDICATIVE DRAINAGE
OCTOBER 2015
(iii)(i)
00 OCT 2015 INDICATIVEBE UTILISED
EXISTING DRAINAGE TO
TEMPORARY DRAINAGE
DRAINAGE
TEMPORARY
TO BE UTILISED
EXISTING DRAINAGE
TO BE UTILISED
EXISTING DRAINAGE
ROUTE TO ATTENUATION
SURFACE WATER DRAINAGE
NUMBERS WITHIN WORKS NO. 4 OF SCHEDULE 1 IN THE DCO
ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH
NOTE:
(ii)
(iv)
INDICATIVE01 JUN 2016
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
JRSCS
1:1250@ A0
GdPF
01D_0007
ROADS
HARD LANDSCAPE
SOFT LANDSCAPE
GREEN ROOF
BROWN ROOF
ORDER LIMITS
INDICATIVE
0 25m 50m 100m
BOROUGH BOUNDARY
WATER
INDICATIVE SOFT AND
HARD LANDSCAPE WORKS
TEMPORARY HARDSTANDING
OCTOBER 2015
(v)
00 OCT 2015 INDICATIVE
(v)
NUMBERS WITHIN WORKS NO. 4 OF SCHEDULE 1 IN THE DCO
ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH
NOTE:
(vi)
(vi)
INDICATIVE01 JUN 2016
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
BRIDGE
19.2m OVERALL
8.1m CLEAR SPAN
FOOTPATH
STRUCTURE
9m NEW BRIDGE FOOTPATH
STRUCTURE
BRIDGE
12m EXISTING
SECTION AA
SECTION BB
DECKING REPLACED
BRIDGE PLAN
15.0m CLEAR SPAN
SECTION
BRIDGE
14.5m OVERALL
EXISTING DRAINAGE DITCH PROFILE
8.1m CLEAR SPAN
FINISHED ROAD LEVEL
+11.125 AOD MINIMUM
FLOOD LEVEL AT +10.67m AOD)
CLIMATE CHANGE''
(''100 YEAR PLUS
SOFFIT LEVEL
+10.445 AOD MINIMUM
EXISTING DRAINAGE DITCH PROFILE
FINISHED ROAD LEVEL
+11.125 AOD MINIMUM
SOFFIT LEVEL
+10.445 AOD MINIMUM
DECKING REPLACED
BRIDGE SECTION
EXISTING DRAINAGE DITCH PROFILE
15.0m CLEAR SPAN
FLOOD LEVEL +600mm)
CLIMATE CHANGE''
(''100 YEAR PLUS
SOFFIT LEVEL
+11.22 mAOD MINIMUM
FINISHED ROAD LEVEL
MINIMUM
16m 12m
4m
Office
06 WEIGHBRIDGES PLAN + SECTION
W1 PLAN W2 PLAN
W1 SECTION
Footpaths
FOOTPATHS COVERED ROUTE
Fence Canopy
07
NTS
Bridge B1
02 BRIDGE B1 PLAN
03 BRIDGE B1 CROSS SECTIONS
Bridge B2
04 BRIDGE B2 PLAN
1:250
05 BRIDGE B2 CROSS SECTION
Weighbridges
PROTECTED AND COVERED ROUTESTYPICAL SECTION OF FOOTPATHS,
W1
P5
W1
P6
P7
B2
W2
NEW ACCESS TO ECOPARK FROM LEE PARK WAY
LEE PARK WAY
P3S1
P4
S2
P2
W1
W1
P1
B1
AA
1:1250
01 PLAN 0 25m 50m 100m
Weighbridges
Bridges
Cycle Shelters
JRSCS
1:1250@ A0
GdPF
01D_0010
ROAD
FROM DEEPHAM'S FARM
NEW ACCESS TO ECOPARK
S1
S2
DescriptionShelters
Cycle
B1
B2
Description Length (m) Width (m)Height (m)
8.1 (Clear Span)
14.5
9.0 n/a
n/a15.0 (Clear Span)
NO
southern entrance to site
New Bridge widening of
over Enfield Ditch
Entrance from Lee Park Way
1 16
1 2 12
2 1
0
Type Dimension
required (m)
Total width
Type W1
Type W2
Lanes/Type
No. Weighbridge
Lanes/Type
No. By-pass
Offices/Type
No. Weighbridge
Remote Office
WEIGHBRIDGES
BRIDGES
PARKING
STRUCTURE
BUILDING /
FOOTPATHS
COVERED ROUTE
FOOTPATHSA
A
INTO THE SITE
PEDESTRIAN ACCESS
INTO THE SITE
VEHICLE ACCESS
CYCLE PATHS
BRIDGES
ORDER LIMITS
PARKING AREA
ACCESS AND HIGHWAYS
AA
A
BY-PASS ROAD UNDER TIPPING HALL
Bridge B2
Bridge B1
NTS
NTS
NTS
NTS
Weigh bridges
lane
By-pass Weigh bridges
W1 SECTION
ACCESS
MAINTENANCE VEHICLE
LANES AND OFFICE WHEN INDICATED
WEIGHBRIDGE, BY-PASS
Cycle shelter for Staff in Central Parking zone
Cycle shelter for visitors in Central Parking zone
BOROUGH BOUNDARY
WATER
INDICATIVE ACCESS AND CIRCULATION
INDICATIVE
OCTOBER 2015
(vii)
(x)
(xii)
00 OCT 2015 INDICATIVEROADS AND FOOTPATHS
EDMONTON ECOPARK SITE
PROTECTED ROUTE WITHIN
ECOPARK SITE
WITHIN EDMONTON
PROTECTED ROUTE
NUMBERS WITHIN WORKS NO. 4 OF SCHEDULE 1 IN THE DCO
ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH
NOTE:
(xi)
(viii)
(viii)
(viii)
(viii)
(ix)
(viii)
(viii)
(viii)
INDICATIVE01 JUN 2016
Parking
P1
P2
P3
P4
P7
Security Gatehouse parking
EcoPark House - Accessible parking
Coach drop-off
Operational Vehicles parking
ERF - Accessible parking
Central Parking
P5/P6
Zone Description
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
G
G
B
G
B
GG
G
G
G
G
EXTERNAL FENCE LINE
INTERNAL FENCE LINE
CCTV COVERAGE
ZONE REQUIRING
BUILDING / STRUCTURE
B
GGATEHOUSES
LIGHTING/CCTV
ORDER LIMITS
JRSCS
1:1250@ A0
GdPF
01D_0011
G1
G2
G3
VEHICLE BARRIER
VEHICLE GATE
INDICATIVE
SECURITY
WATER
0 25m 50m 100m
BOUNDARY
BOROUGH
EXTERNAL LIGHTING
ZONE REQUIRING
OCTOBER 2015
(xiv)
(xiv)
(xiv)
(xviii)
(xviii)
00 OCT 2015 INDICATIVEINDICATIVE SECURITY AND LIGHTING
F1
F2
Gatehouses Fence
G1
G2
G3
Description
Advent Way (South)
Deephams Farm Road (North)
Lee Park Way (East)
F1
Description
F2 Internal Fence
Site Perimeter Fence
NUMBERS WITHIN WORKS NO. 4 OF SCHEDULE 1 IN THE DCO
ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH
NOTE:
(xiii)
(xvii)
INDICATIVE01 JUN 2016
AUTHORISEDCHECKEDDRAWN
DRAWING NUMBER REVISION
SCALE
STATUS
PROJECT
DRAWING KEY
DATE
DATEREV. FOR
NORTH
www.grimshaw-architects.com
100019153
rights 2015 Ordnance Survey
© Crown copyright and database
design engineers.
Amec Foster Wheeler site wide
with Ramboll ERF engineers and
NLHPP as developed in coordination
parameters established for the
This drawing sets out works
Intellectual Property
DRAWING TITLE
POWER PROJECT
NORTH LONDON HEAT AND
arising.
indemnifies Grimshaw from and against all loss so
limiting Grimshaws rights the user releases and
this document is at the user’s sole risk and without
otherwise used, or copied. any unauthorised use of
writing by Grimshaw; and this document may not be
it has been created and delivered, as notified in
used for the express purpose and project for which
Grimshaw charges; this document may only be
this document are subject to payment in full of all
unless otherwise agreed in writing; all rights to use
© Copyright Grimshaw architects pty limited.
AD
VE
NT W
AY
LEE P
AR
K W
AY
DE
EP
HA
MS F
AR
M R
OA
D
COOKS FERRY ROUNDABOUT
ADVEN
T WAY
WALTHAMSTOW AVENUE
A406 - NORTH CIRCULAR
ARGON ROAD
LO
WE
R H
ALL L
AN
E
A406 - N
ORTH CI
RCULAR
RIV
ER L
EE N
AVIG
ATIO
N
JRSCS
1:1250@ A0
GdPF
01D_0012
FENCE LINE
ACCESS POINT
ACCESS
LAYDOWN AREA:
ORDER LIMITS
A
INDICATIVE
FABRICATION AREA
PARKING, STORAGE AND
SITE ACCOMMODATION,
WATER
0 25m 50m 100m
BOUNDARY
BOROUGH OCTOBER 2015
(iii)
(v)
(vii)
(i)
(x)
00 INDICATIVEOCT 2015INDICATIVE TEMPORARY
LAYDOWN AREA
CONNECTIONS
ZONE OF UTILITIES
NUMBERS WITHIN WORKS NO. 5 OF SCHEDULE 1 IN THE DCO
ALL PARAGRAPH REFERENCES ON THIS PLAN ARE TO PARAGRAPH
NOTE:
(ii)
(iv)
(ii)
(ii)
(vi)
(viii)
(ix)
(ii)
INDICATIVE01 JUN 2016
A
A
NORTH LONDON WASTE
AUTHORITY 1 b Berol House, 25 Ashley Road
Tottenham Hale N17 9LJ
Telephone: 020 8489 5730 Fax: 020 8365 0254
Email: [email protected]