Workshop on Implementation of BAT Conclusions for Waste Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation of BAT Conclusions for Waste Incineration, Brussels, 04.06.2019 1

Upload: others

Post on 02-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Workshop on Implementation of BAT Conclusions for Waste Incineration€¦ · Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation

Workshop on Implementation of BAT Conclusions for Waste

Incineration Puzzle piece 1: NOC/OTNOC issue

Hubert de Chefdebien

CEWEP-ESWET-FEAD workshop - Implementation of BAT Conclusions for Waste Incineration, Brussels, 04.06.2019 1

Page 2: Workshop on Implementation of BAT Conclusions for Waste Incineration€¦ · Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation

The NOC-OTNOC-EOT issue

CEWEP-ESWET-FEADworkshop-ImplementationofBATConclusionsforWasteIncineration,Brussels,04.06.2019

•  IED requests compliance with ELVs in NOC on one hand and

within the R-EOT on the other one •  Definitions of NOC-OTNOC-EOT •  Missing information •  General proposals for implementation and compliance

2

Page 3: Workshop on Implementation of BAT Conclusions for Waste Incineration€¦ · Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation

NOC, OTNOC & EOT in the IED

CEWEP-ESWET-FEADworkshop-ImplementationofBATConclusionsforWasteIncineration,Brussels,04.06.2019

IED,chaptersIetII IED,AnnexVIGeneralrule(forallsectorscoveredbyIED)-Article3(13):BATAELsdefinedinNOC-Article15.3:setELVsensuringthat:EmissionsdonotexceedBATAELsinNOC

Specificruleforincinerationforsubstancescontinuouslymonitored-AnnexVI,Part81.2:ELVtocomplywithwithintheR-EOT(exceptwhenburnerisinoperationandnowasteiscombusted)

NB:Forperiodicmeasurement:complianceonlyinNOC

ConsequencesEIPPCBrequiredtheoperatorstoreporttheOTNOCsituationson17,520Excelrows(½-hrvaluesover1year)foreachcontinuouslymonitoredsubstance,-Thiswasdonebyhandsincetheinformationwasnotavailable(becauseuselessuptonow)

2setsofELVsnecessaryforcontinuousmeasurts.:-BATAEL-basedELVsforNOCsituations-IEDAnnexVIELVsforR-EOT(NOC&someOTNOC)situationsNeedtodistinguishNOCfromOTNOCsituations

EIPPCBfilteredoutthevaluesinOTNOC1)  Reportedbytheoperators2)  Supposedbythem(usingmiscellaneousfilters)

RiskthatcertainauthoritiesrequireBATAELs-basedELVsalsoinOTNOC(R-EOT).

•  R-EOT:Relevant-EffectiveOperatingTime•  NOC:NormalOperationConditions•  OTNOC:OtherThanNormalOperationConditions•  ELV:EmissionLimitValue

3

Page 4: Workshop on Implementation of BAT Conclusions for Waste Incineration€¦ · Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation

Regulatory requirements on compliance either in NOC or within the R-EOT for the different air ELVs

CEWEP-ESWET-FEADworkshop-ImplementationofBATConclusionsforWasteIncineration,Brussels,04.06.2019

Monitoringregime Period Substances BATAEL-

basedELVs IEDAnnexVIELVs

Continuous

Dailyaverage Dust,HCl,HF,SO2,NOx,TOC,CO InNOC InR-EOT(NOC&OTNOC

whenwasteburning)Dailyaverage Hg*,NH3 InNOC -

½-hraverage Dust,HCl,HF*,SO2,NOx,TOC,CO** - InR-EOT(NOC&OTNOC

whenwasteburning)10-minaverage CO** - InR-EOT(NOC&OTNOC

whenwasteburning)

Longtermsampling

2-4weeks,1month

PCDD/F+PCB-DL* InNOC -PCDD/F* InNOC -Hg* InNOC -

PeriodicHg* InNOC InNOC

Every6months

Heavymetals,PCDD/F InNOC InNOCPCDD/F+PCB-DL* InNOC -

*Conditional/Optional(SeeBATAELtablesinSession4above)**CO:IEDAnnexIVeither½-hror10-min

4

Page 5: Workshop on Implementation of BAT Conclusions for Waste Incineration€¦ · Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation

The EOT includes most OTNOC situations (in addition to all NOC situations)

CEWEP-ESWET-FEADworkshop-ImplementationofBATConclusionsforWasteIncineration,Brussels,04.06.2019

OTNOCs1.  Start-up

& Shut-down periods2.  Leaks 3.  Malfunctions

- of process equipment including abatement system - of measuring equipment

4.  Momentary stoppages 5.  Definitive cessation of operations 6.  Breakdown7.  Bypassing of abatement systems8.  Regular maintenance9.  Exceptional conditions

R-EOT1.  Start-up (ONLY 2nd phase, with waste)

& Shut-down (ONLY 1st phase)2.  Leaks 3.  Malfunctions

- of process equipment including abatement system - of measuring equipment

4.  Momentary stoppages 5.  Definitive cessation of operations6.  Breakdown7.  Bypassing of abatement systems8.  Regular maintenance9.  Exceptional conditions

AccordingtoIED,Articles14.1.fand47

CompliancewithBATAEL-basedELVsnotrequiredin

CompliancewithcontinuousAnnexVIELVsrequiredforincineratorsaswellin

•  OTNOC:OtherThanNormalOperatingConditions-ELVs:EmissionLIMITValues•  R-EOT:Relevant-EffectiveOperatingTime

AccordingtoGuidelines(Decision2012/119/EU)in§4.6.2.2.3.iiand&5.4.7.2.6

NodefinitionofNOCandOTNOC.JustlistsofexamplesofOTNOC.

5

Page 6: Workshop on Implementation of BAT Conclusions for Waste Incineration€¦ · Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation

The R-EOT includes NOC and some OTNOC situations. BATAEL-based ELVs are applicable in NOC

CEWEP-ESWET-FEADworkshop-ImplementationofBATConclusionsforWasteIncineration,Brussels,04.06.2019

AnonexhaustivelistofOTNOCisgiveninIED,Article14.1.f.(OTNOC“suchasstart-upandshut-downoperations,leaks,malfunctions,momentarystoppages

anddefinitivecessationofoperations”)andinArticle47(“Inthecaseofabreakdown,theoperatorshallreduceorclosedownoperationsassoonaspracticableuntil(NOC)canberestored”).SeeItems1to6below.

ThreeadditionalOTNOCsarementionedintheGuidelines(Decision2012/119/EU)in§4.6.2.2.3.ii(“bypassingofabatementsystems”)&5.4.7.2.6(“regularmaintenance,exceptionalconditions").

Seeitems7to9below.NOC(NormalOperatingConditions)

OTNOC(OtherThanNormalOperatingConditions)

R-EOT(RelevantEffectiveOperatingTime)

-Start-up&Shut-downperiods(nowasteburning)

-Specificexceptionalconditions

-Start-up&Shut-down(whenwasteburning)

-Leaks-Malfunctionsofprocessequipment

includingabatementsystem-Breakdown-Bypassingofabatementsystems-Regularmaintenance(online)-Exceptionalconditions

N-EOT(Not‘Effective’)OperatingTime

NR-EOTNonRelevantEffectiveOperatingTime

-Momentarystoppages-Definitivecessationofoperations

R-EOT(Relevant)EffectiveOperatingTime

6

Page 7: Workshop on Implementation of BAT Conclusions for Waste Incineration€¦ · Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation

OTNOC and NOC situations within the EOT (chronologically)

CEWEP-ESWET-FEADworkshop-ImplementationofBATConclusionsforWasteIncineration,Brussels,04.06.2019

OTNOCOutsideEOT

Linestopped

Start-upphase1(burneralone)

Start-upphase2(wasteburning)

Shutdownphase1(wasteburning)

Shutdownphase2(Nowasteburning)

Linestopped

EOT,EffectiveOperatingTime

R-EOT:RelevantEOT(continuousIEDAnnexVIELVsapply)NR-EOT*

*NR-EOT:NonrelevantEOT(continuousIEDAnnexVIELVsdonotapply)**NOC:NormalOperatingConditions(BATAEL-basedELVsapply)***OTNOC:OtherThanNormalOperatingConditions(BATAEL-basedELVsdonotapply)

OTNOC***withinR-EOT

OTNOCwithinR-EOT

OTNOCwithinR-EOT

NOC** NOC NOC

NR-EOT*

OTNOCOutsideEOT

OTNOCoutsideR-EOT

OTNOCoutsideR-EOT

Mainte-nanceinoperation

OTNOCwithinR-EOT

Malfunc-tion

7

Page 8: Workshop on Implementation of BAT Conclusions for Waste Incineration€¦ · Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation

Missing in the draft WI BREF BAT conclusions

CEWEP-ESWET-FEADworkshop-ImplementationofBATConclusionsforWasteIncineration,Brussels,04.06.2019

•  The BAT conclusions do not include •  The mention that

•  BATAELsaresetinNOC•  BATAEL-basedELVsshouldbesetinNOC

•  The clear definitions of NOC and OTNOC (criteria to switch from one to the other during operation)

•  The calculation rules, e.g.: •  TherulestocalculateadailyaverageinNOCe.g.whensome½-hraveragevaluesofthedaywereinOTNOC

•  Themaximumnumberofnonvalidpointsinaday,etc.•  The fact that ½-hr BATAELs of 2006 WI BREF do not apply •  The fact that continuous sampling is usually performed in R-EOT

(and not in NOC)

•  NOC:NormalOperatingConditions•  OTNOC:OtherThanNormalOperatingConditions•  BATAELs:BATAssociatedEmissionLevels•  ELVs:EmissionLimitValues

8

Page 9: Workshop on Implementation of BAT Conclusions for Waste Incineration€¦ · Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation

The nature of BATAELs changed between IPPC and IED

CEWEP-ESWET-FEADworkshop-ImplementationofBATConclusionsforWasteIncineration,Brussels,04.06.2019

•  Former BATAELs (under IPPC) were typical values. See yellow oval. •  New BATAELs are capping values. They should be based on maximum daily

average values of the year in NOC. See orange circles.

•  Former BATAELs should not be used under IED. •  Important because no new BATAELs for ½-hr averages in the revised WI BREF

Y-axis:concentrati

on(mg/Nm3)

X-axis:days

HCl daily average (mg/Nm3) over a year

9

Page 10: Workshop on Implementation of BAT Conclusions for Waste Incineration€¦ · Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation

Proposals 1

CEWEP-ESWET-FEADworkshop-ImplementationofBATConclusionsforWasteIncineration,Brussels,04.06.2019

•  Definition of OTNOCs •  To use the list given in the IED and in the BREF drawing up Guidance

(Decision 2012/119/EU) •  To use the same rules as EIPPCB when filtering out the reported data •  To define end of start-up as when reaching stable state as for LCPs •  To use control system signals (alarms) to automatically identify OTNOCs

and NOC for both: •  CalculatingaveragevaluesinNOC•  OTNOCManagementPlan(seeBAT-c18)

•  Calculation of daily average values in NOC •  Use the same rules as EIPPCB when processing the reported data

10

Page 11: Workshop on Implementation of BAT Conclusions for Waste Incineration€¦ · Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation

Proposals 2

CEWEP-ESWET-FEADworkshop-ImplementationofBATConclusionsforWasteIncineration,Brussels,04.06.2019

•  ELVs setting and checking •  No 1/2-hr BATAEL-based ELVs, as said the EIPPCB •  Using Article 15.3 (b) for assessment of capacity to meet BAT

performances, including non exceedance of daily and periodic BATAELs

TwowaystosetBATAEL-basedELVs(alwaysunderNOC)

Article15.3(b)“SettingdifferentELVsthanthoseunder15.3(a)”TotheconditionofannualcheckthatemissionsinNOCdidnotexceedtheBATAELs

Article15.3(a)“SettingELVsthatdonotexceedtheBATAELs”

BATAEL

range

ExampleofBATAEL-basedELVaccordingto15.3(a)

OtherexampleofBATAEL-basedELVaccordingto15.3(a)

ExampleofBATAEL-basedELVaccordingto15.3(b)

+AnnualcheckingthatemissionsinNOCdidnotexceedtheBATAEL

11

Page 12: Workshop on Implementation of BAT Conclusions for Waste Incineration€¦ · Incineration Puzzle piece 1: NOC/OTNOC issue Hubert de Chefdebien CEWEP-ESWET-FEAD workshop - Implementation

Thank you!

Questions?

CEWEP-ESWET-FEAD workshop - Implementation of BAT Conclusions for Waste Incineration, Brussels, 04.06.2019 12