world bank document€¦ · november 30, 2015 this document has ... mop ministry of planning nbc...

34
Document of The World Bank FOR OFFICIAL USE ONLY Report No: PP1544 PROJECT PAPER ON A PROPOSED GRANT IN THE AMOUNT OF 0.35 US$ MILLION (TRUST FUND FOR STATISTICAL CAPACITY BUILDING) TO THE KINGDOM OF CAMBODIA FOR A CAMBODIA ENHANCEMENT OF POVERTY ANALYSIS CAPACITY PROJECT (P151424) November 30, 2015 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 26-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

Document of

The World Bank

FOR OFFICIAL USE ONLY Report No: PP1544

PROJECT PAPER

ON A

PROPOSED GRANT

IN THE AMOUNT OF 0.35 US$ MILLION (TRUST FUND FOR STATISTICAL CAPACITY

BUILDING)

TO THE

KINGDOM OF CAMBODIA

FOR A

CAMBODIA ENHANCEMENT OF POVERTY ANALYSIS CAPACITY PROJECT

(P151424)

November 30, 2015

This document has a restricted distribution and may be used by recipients only in the

performance of their official duties. Its contents may not otherwise be disclosed without World

Bank authorization.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

CURRENCY EQUIVALENTS

(Exchange Rate Effective November 17, 2015)

1 USD = 4,039.75 KHR

FISCAL YEAR

January 1 – December 31

ABBREVIATIONS AND ACRONYMS

ADB Asian Development Bank

CPI Consumer Price Index

CSES Cambodian Socio-Economic Survey

DA Designated Account

FM Financial Management

FY Fiscal Year

GGF Good Governance Framework

GRS Grievance Redress Service

IA Implementing Agency

IBRD International Bank for Reconstruction and Development

IDA International Development Association

IFR Interim Financial Report

M&E Monitoring and Evaluation

MEF Ministry of Economics and Finance

MoP Ministry of Planning

NBC National Bank of Cambodia

NIS National Statistical Institute

NSDP National Strategic Development Plan

NSDS National Strategy for Developing Statistics

NSS National Statistical System

NWGPM National Working Group on Poverty Measurement

OECD Organization for Economic Cooperation and Development

PARIS21 Partnership in Statistics for Development in the 21st

Century

PDO Project Development Objectives

RGC Royal Government of Cambodia

SIDA Swedish International Development Cooperation

SOP Standard Operating Procedures

TFSCB Trust Fund for Statistical Capacity Building

TORs terms of reference

TTL Task Team Leader

UN United Nations

UNDP United Nations Development Programme

USAID United States Agency for International Development

WBG The World Bank Group

Page 3: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

Regional Vice President: Axel van Trotsenburg

Country Director: Ulrich Zachau

Global Practice Senior Director: Ana L. Revenga

Practice Manager: Salman Zaidi

Task Team Leader: Carolina Mejia-Mantilla

Page 4: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

ROYAL GOVERNMENT OF CAMBODIA

CAMBODIA ENHANCEMENT OF POVERTY ANALYSIS CAPACITY PROJECT

(P151424)

TABLE OF CONTENTS

Page

I. STRATEGIC CONTEXT .................................................................................................1

A. Country Context ............................................................................................................ 1

B. Sectorial and Institutional Context ................................................................................ 2

C. Higher Level Objectives to which the Project Contributes .......................................... 4

II. PROJECT DEVELOPMENT OBJECTIVES ................................................................4

A. PDO............................................................................................................................... 4

B. Project Beneficiaries ..................................................................................................... 4

C. PDO Level Results Indicators ....................................................................................... 4

III. PROJECT DESCRIPTION ..............................................................................................5

A. Project Components ...................................................................................................... 5

B. Project Cost and Financing ........................................................................................... 6

IV. IMPLEMENTATION .......................................................................................................7

A. Institutional and Implementation Arrangements .......................................................... 7

B. Results Monitoring and Evaluation .............................................................................. 7

C. Sustainability................................................................................................................. 7

V. KEY RISKS AND MITIGATION MEASURES ............................................................8

VI. APPRAISAL SUMMARY ................................................................................................9

A. Economic and Financial Analysis ................................................................................. 9

B. Financial Management .................................................................................................. 9

C. Procurement .................................................................................................................. 9

D. Safeguards ................................................................................................................... 10

E. World Bank Grievance Redress .................................................................................. 10

Annex 1: Results Framework and Monitoring .........................................................................11

Annex 2: Detailed Description of the Project Components .....................................................13

Annex 3: Implementation Arrangements (optional) ................................................................16

Annex 4: PARIS21 NSDS Guidelines - Phases of NSDS Formulation ....................................22

Page 5: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

i

APPRAISAL DATA SHEET

Cambodia

Enhancement of Poverty Analysis Capacity (P151424)

PROJECT PAPER

EAST ASIA AND PACIFIC

0000009334

Report No.: PP1544

Basic Information

Project ID EA Category Team Leader(s)

P151424 C - Not Required Carolina Mejia-Mantilla

Lending Instrument Fragile and/or Capacity Constraints [ ]

Investment Project Financing Financial Intermediaries [ ]

Series of Projects [ ]

Project Implementation Start Date Project Implementation End Date

14-Jan-2016 31-Dec-2017

Expected Effectiveness Date Expected Closing Date

14-Jan-2016 31-Dec-2017

Joint IFC

No

Practice

Manager/Manager

Senior Global Practice

Director Country Director

Regional Vice

President

Salman Zaidi Ana L. Revenga Ulrich Zachau Axel van Trotsenburg

Approval Authority

Approval Authority

CD Decision

Borrower: KINGDOM OF CAMBODIA

Responsible Agency: General Directorate of Planning, Ministry of Planning

Contact: Thavrak Tuon Title: Director General

Telephone No.: 85523216394

Email:

[email protected]

Page 6: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

ii

Project Financing Data(in USD Million)

Total Project Cost: 0.35 Total Bank Financing: 0.00

Financing Gap: 0.00

Financing Source Amount

Borrower 0.00

Trust Fund for Statistical Capacity Building 0.35

Total 0.35

Expected Disbursements (in USD Million)

Fiscal

Year

2016 2017 2018 0000 0000 0000 0000 0000 0000 0000

Annual 80000.0

0

160000.00 110000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Cumulati

ve

80000.0

0

240000.00 350000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Institutional Data

Practice Area (Lead)

Poverty and Equity

Contributing Practice Areas

Cross Cutting Topics

[ ] Climate Change

[ ] Fragile, Conflict & Violence

[ ] Gender

[ ] Jobs

[ ] Public Private Partnership

Sectors / Climate Change

Sector (Maximum 5 and total % must equal 100)

Major Sector Sector % Adaptation

Co-benefits %

Mitigation

Co-benefits %

Public Administration, Law, and Justice Public

administration-

Other social

services

40

Public Administration, Law, and Justice General public

administration

sector

60

Total 100

Page 7: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

iii

I certify that there is no Adaptation and Mitigation Climate Change Co-benefits information

applicable to this project.

Themes

Theme (Maximum 5 and total % must equal 100)

Major theme Theme %

Social protection and risk management Poverty strategy, analysis and

monitoring

60

Social protection and risk management Social Protection and Labor Policy &

Systems

20

Social protection and risk management Other social protection and risk

management

20

Total 100

Proposed Development Objective(s)

The project's objectives are to help strengthen Cambodia's national statistical system through the

development of a National Strategy for Developing Statistics (NSDS) and to improve the Government's

capacity to produce and interpret poverty and inequality indicators.

Components

Component Name Cost (USD Millions)

Support to the NSDS 0.09

Building the government’s capacity to produce and interpret

poverty and inequality statistics

0.11

Provincial and national CPI pilot 0.09

Project management 0.06

Compliance

Policy

Does the project depart from the CAS in content or in other significant

respects?

Yes [ ] No [ X ]

Does the project require any waivers of Bank policies? Yes [ ] No [ X ]

Have these been approved by Bank management? Yes [ ] No [ X ]

Does the project meet the Regional criteria for readiness for implementation? Yes [ X ] No [ ]

Safeguard Policies Triggered by the Project Yes No

Environmental Assessment OP/BP 4.01 X

Natural Habitats OP/BP 4.04 X

Forests OP/BP 4.36 X

Pest Management OP 4.09 X

Page 8: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

iv

Physical Cultural Resources OP/BP 4.11 X

Indigenous Peoples OP/BP 4.10 X

Involuntary Resettlement OP/BP 4.12 X

Safety of Dams OP/BP 4.37 X

Projects on International Waterways OP/BP 7.50 X

Projects in Disputed Areas OP/BP 7.60 X

Legal Covenants

Name Recurrent Due Date Frequency

Description of Covenant

Conditions

Source Of Fund Name Type

Description of Condition

Team Composition

Bank Staff

Name Role Title Specialization Unit

Carolina Mejia-Mantilla Team Leader

(ADM

Responsible)

Economist GPVDR

Latharo Lor Procurement

Specialist

Procurement

Specialist GGODR

Reaksmey Keo Sok Financial

Management

Specialist

Consultant GGODR

Anahit Poghosyan Team Member Operations Analyst GPVDR

Johan A. Mistiaen Peer Reviewer Senior Economist GPVDR

Mildred Gonsalvez Team Member Program Assistant GPVDR

Samuel Freije-Rodriguez Peer Reviewer Lead Economist GPVDR

Seble Berhanu Team Member Legal Analyst LEGES

Page 9: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

1

I. STRATEGIC CONTEXT

A. Country Context

1. Cambodia’s society has experienced a remarkable transformation since the end of the

internal conflict in 1999. The country has benefitted immensely from political stability and

integration to international markets in the last two decades. Economic growth averaged 7.9%

per year over the period 2003–2013, the 17th fastest in the world. Real GDP growth for 2013

and 2014 remained strong, at 7.4% and 7.1% respectively. Economic growth, particularly in

the agricultural sector which benefited from significant increases in the international price of

rice (the main agricultural product), has lifted a large proportion of the population above the

poverty line. Between 2004 and 2012, poverty incidence under the national poverty line1

declined from 53% to 17.7% of the population. Economic growth has been pro-poor:

consumption for the bottom 40 percent of the distribution grew at an annualized rate of 5.9%

during 2008-2012, compared to a 4.92% growth for the total population.

2. Despite the dramatic reduction of poverty in rural areas (again, using the national poverty

line), from 55.7% in 2004 to 21% in 2012, poverty incidence is much higher among rural

households compared to their urban counterparts, and ninety percent of the poor continue to

live in rural areas. An important caveat worth bearing in mind is that the above assessment of

very good progress in poverty reduction and rapid pro-poor growth depends crucially on how

much the cost-of-living for the Cambodian population increased during this period, as

measured by the Consumer Price Index (CPI).

3. Despite tremendous progress, most households that escaped poverty did so by a small

margin, leaving them highly vulnerable to falling back into poverty again. Given the high

concentration of non-poor households close to the poverty line, a small reduction in

consumption, resulting from a covariate or idiosyncratic shock, can drag them back into

poverty. The proportion of the population whose consumption is between the poverty line

and two times the national poverty line2 has increased from 36.7% in 2004 to 54.3% in 2012.

These numbers are particularly worrisome given the precarious state of the social protection

system in the country, which has historically relied on the more traditional safety nets such as

family, friends and faith-based communities, such as pagodas. Currently, there is no

comprehensive safety net program to protect households from climate, price or

macroeconomic shocks.

4. By the same token, given the clustering of a large share of the population just above the

poverty line, even a small underestimation of change in the cost-of-living over time could

lead to a large overestimation of the pace of progress with poverty reduction.

1 World Bank estimates, which differ slightly from the official estimates.

2 This is considered the group to be at risk of falling back into poverty again.

Page 10: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

2

B. Sectorial and Institutional Context

5. In 2014 the Royal Government of Cambodia launched the National Strategic

Development Plan (NSDP) 2014-2018. The plan established key priorities and measureable

target objectives in key policy areas. The NSDP is an effort to have a comprehensive guide

for public policies, whose progress can be measured through objective indicators. A key

element to the impact of the NSDP, is the collection and processing of reliable statistics in a

timely manner by the National Statistical Institute (NIS), under the Ministry of Planning

(MoP).

6. The NIS’s institutional mandate is to plan, collect, and process economic and social

statistics. This involves working closely with various line ministries, and collecting

household data through census and surveys, as in the case of the Cambodian Socio-Economic

Survey (CSES). Historically, the NIS has benefited from (and depended upon) substantial

financial and technical support from various development partners. The World Bank has

been one of the main sources of financial and technical resources for the NIS. Together with

SIDA, USAID, and the UNDP, the WBG financed the 2003/04 round of the Cambodian

Socio-Economic Survey (CSES). It also provided support for the development of the 2007

Statistical Master Plan. Currently, PARIS21 (OECD) is helping the Government of

Cambodia in the formulation of a National Strategy for the Development of Statistics

(NSDS) to serve as a strategic complement to the NSDP and help guide the various ongoing

statistical strengthening initiatives.

7. In 2011, the government of Cambodia established the National Working Group on Poverty

Measurement (NWGPM), an inter-ministerial group in charge of poverty measurement and

of conducting independent analysis linking poverty to policy decisions. The core members of

the NWGPM, responsible for the statistical calculations and the technical decisions belong to

the MoP and the NIS, but other members of the NWGPM also discuss the results and provide

feedback before the numbers are officially released. Over the past few years, staffs at NIS

and NWGPM have worked hard to fulfil this institutional mandate, but face significant

challenges in terms of institutional arrangements and technical capacity.

8. Main issues and challenges: One of the key constraints the NIS currently faces is the lack of

sustained financial resources, which significantly curtails its ability to invest in skills training

for staff. The lack of adequate capacity among current staff to analyze poverty and changes

in the income distribution is a particularly noteworthy constraint, as it limits the institution’s

ability to monitor progress to eliminate poverty and boost shared prosperity. Key data gaps

are also problematic, some of which are due to weak coordination between the NIS and the

statistical units of line ministries that feed administrative records to the system. A greater

awareness of the importance of statistics for the design, implementation and evaluation of

public policies amongst public official of all ministries is required.

9. A substantial data limitation is the lack of national and provincial CPI estimates for the last

three years (2013 - 2015), which are crucial for the poverty estimates, as mentioned above.

The official CPI corresponds just to Phnom Penh, ignoring the price dynamics of rural areas

where 75% of the population lives. The main problem seems to be the inadequate capacity of

Page 11: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

3

the regional and local statistical offices, which lack the personnel and equipment needed to

fulfill their tasks. Currently, the data is collected in (six) provinces but the provincial offices

do not have the ability to process the data, which gets sent back to the capital with

considerable delay. The result is that the provincial and national CPIs have not been

processed and published in a timely manner since 2012. In addition, with a coverage of six

provinces, out of a total of 25 in Cambodia, it may not be truly representative at the national

level.3

10. As noted above, the government has started the process of designing, implementing and

monitoring a NSDS, following the standards and procedures of PARIS21 and the UN

statistics division. The NSDS is a medium-term plan to enable the country to build a reliable

National Statistical System that produces the data necessary to design, implement, and

monitor national development policies and programs. It provides a vision of the development

of statistics and a detailed, costed action plan over a period of around 5 years covering the

production of all official statistics. This a lengthy and costly process (see the NSDS

Guidelines in the Annex 4)4 that merits support from all members of the international

development community. So far, the government has partially completed Phases I and II; the

intention of this project is to support the completion of these two phases and make

considerable progress in the subsequent phases.

11. Regarding the NWGPM, the technical capacity of the core members of the NWGPM to

produce and, more importantly to interpret poverty indicators, remains limited. The latest

official poverty estimate was released in 2012, albeit the 2013 and 2014 CSES data has been

collected and processed already. Part of the explanation of why the numbers have not been

released is that the core members of the group lack important technical foundations, and also

the necessary software to perform the estimations and robustness checks. More prominently,

the team lacks the expertise to interpret the statistics and present them to the different

ministries in a way that it would inform and shape policymaking. A long-term, hands on

training on poverty measurement and inequality statistics and how to embed them in policy

analysis, to the core members of the NWGPM should allow the government to independently

monitor the welfare of the country’s population, contribute to the mid-term evaluation of the

NSDP, and thus, shape or modify the policies in place to further reduce poverty in Cambodia.

12. The various activities sponsored through this project have three main areas of focus:

a) Contribute to the timely completion of well-designed and comprehensive

NSDS;

b) Improve capacity for poverty monitoring and analysis;

c) Improve the timeliness and quality of price data collection at the provincial and

national level.

3 Nonetheless, a coverage of six provinces is much better than just the capital (which is what the NIS is currently

using as the official CPI). 4 As have been established by PARIS21, of the OECD; an organization that focuses entirely in encouraging and

assisting low-income countries to design, implement and monitor NSDS.

Page 12: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

4

C. Higher Level Objectives to which the Project Contributes

13. The project is aligned with the government’s NSDP and is particularly timely since the

government plans to undertake the mid-term review of the NSDP in 2016. During the review,

the policy priorities that are not on track to achieve the 2018 targets will be identified,

analyzed and revised. The review is a valuable opportunity to re-direct resources and effort to

the policy areas and activities in which the country is lagging behind, and the quality of the

inputs to be used in the review will enhance the effectiveness of the exercise.

14. Similarly, by strengthening the government’s capacity to measure and analyze poverty, it will

help both the government and the WBG identify and prioritize which sectors are key for

poverty reduction in a potential upcoming Country Partnership Framework. The grant will

also contribute to strengthen the Bank’s relationship with the Ministry of Planning and the

National Institute of Statistics, key public institutions for the engagement of the WBG in the

country.

II. PROJECT DEVELOPMENT OBJECTIVES

A. PDO

15. The project’s objectives are to help strengthen Cambodia’s national statistical system through

the development of a National Strategy for Developing Statistics (NSDS) and to improve the

government’s capacity to produce and interpret poverty and inequality indicators.

B. Project Beneficiaries

16. The outputs prepared through this project will benefit the Royal Government of Cambodia, in

particular the Ministry of Planning and the National Institute of Statistics. But more

generally, the project will contribute to the welfare all the population of Cambodia, who will

benefit from a better statistical system, better socio-economic statistics, and improved

capacity to analyze and formulate better evidence-based policies.

C. PDO Level Results Indicators

17. The indicators that will be used to measure progress against the PDOs are:

a) Draft of the NSDS developed by the government of Cambodia.

b) Improved capacity for poverty monitoring and analysis, as evidenced by the

publication of two poverty analysis notes authored by the core members of the

NWGPM.

c) Improved price data collection, as evidenced by the preparation and

publication of pilot provincial and nationally representative CPIs using the new

methodologically sound framework.

Page 13: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

5

III. PROJECT DESCRIPTION

A. Project Components

18. The project has four components, which are summarized below. A more detailed description

can be found in Annex 2.

19. Component I: Support to the NSDS ($94,000). The objective of this component is to

support the Government of Cambodia in the intermediate phases of developing a National

Strategy for the Development of Statistics (NSDS)5, using the protocol developed by

PARIS21 (OECD). More specifically, the component will support the following activities

within each of the phases:

a) Preparation: Launch of the NSDS

b) Assessment: Sectoral statistics assessment

c) Envisioning / Strategic Goal Setting: Develop the vision, mission and strategic

goals of the NSDS, prepare sequenced actions plan for statistics development

for the next 5 years, develop a monitoring and evaluation (M&E) system and

identify costs and resources for implementation of the action plans

d) Endorsement/ Adoption of Strategy: Finalize and approve NSDS, organize

small workshop/seminars to promote the adoption and support to the NSDS.

20. Note that the component will not finance the activities of the fifth phase of the NSDS

(Implementation, monitoring and review and evaluation) since the timeframe for this last

phase goes beyond the implementation period of the current project. Nevertheless, the

government has affirmed its commitment to complete the process with the support of

PARIS21.

21. Component II: Building the government’s capacity to produce and interpret poverty

and inequality statistics ($105,000). The objective of this component is to enhance the

capacity of the Cambodian government to independently produce and interpret poverty

statistics.6 The project will provide a long-term modular training to ten members of the

NWGPM that combines theory and practice.

a) Module I: Stata training, construction of consumption aggregate, introduction

to poverty measurement: poverty line, different poverty indicators (headcount,

gap, severity).

b) Module II: poverty profile, growth incidence curves and inequality indicators.

c) Module III: Linking poverty to policy, how to obtain policy implications.

22. Each module consists of five two-day face-to-face sessions (spaced by approximately a

month), for a total of ten days per module; which are complemented by individual work of

the participants on their own. At the end of modules II and III, the participants to the training

5 See the NSDS guidelines phase by phase in the Annex 4.

6 This component of the grant will help the RGC in identifying, documenting, and assessing potential poverty issues

and gaps concerning indigenous peoples and other vulnerable groups in the country.

Page 14: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

6

are expected to produce, publish and disseminate a short report on poverty related issues,

based on the knowledge acquired throughout the training. The reports should be free and

available to the public. The World Bank will be closely involved with the training process

and will supervise the content, outputs and technical standards provided. All the required

software and hardware will be provided to the core members of the group.

23. Component III: Provincial and national CPI pilot ($94,500). The objective of this

component is to improve the collection and processing of the current provincial CPI and

national CPI. It must be noted that the national CPI is a necessary input poverty

measurement. Currently, the provincial data offices collect the price information in an

untimely manner and do not have the capacity and the adequate tools to process it. As a

result, neither the provincial CPI nor the national CPI for the last two years are publicly

available. The component encompasses the following activities:

a) Revision of the current price questionnaire, as well as the provincial and

national CPI formula (weights) according to the new CSES results.

b) Establishment of a revised protocol for data revision and data flow between

the central and provincial statistical offices, with clear requirements, deadlines

and responsibilities.

c) Training of the provincial staff on price collection methodologies, sampling

and software used. Provision of the necessary hardware and software for both

the central Phnom Penh office, as well as the provinces.

d) Data collection/processing in ten provinces (Kandal, Kampong Cham, Siem

Reap, Battambang, Sihanouk Ville, Kratie, Koh Kong, Svay Rieng,

Rattanakiri, and Kampot).

e) Estimation and publication of a pilot provincial CPI/ national CPI using new

adjustments/data. The provincial and national pilot CPIs should be free and

available to the public.

24. Component IV: Project Management ($56,500). This component will finance the

operating costs—i.e. reasonable costs of goods required for day-to-day coordination,

administration, and supervision of project activities. This includes a project coordinator,

financial management consultant, a professional audit service for the project expenditures,

and the equipment required.

B. Project Cost and Financing

Project Component Project

Cost (U$)

Grant

Financing

%

Financing

I. Support to the NSDS 94,000 100%

II. Building the government’s capacity to

produce and interpret poverty and

inequality statistics

105,000 100%

III. Provincial and national CPI pilot 94,500 100%

IV. Project management 56,500 100%

Total 350,000 350,000 100%

Page 15: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

7

IV. IMPLEMENTATION

A. Institutional and Implementation Arrangements

25. The Ministry of Planning (MoP) of the Royal Government of Cambodia will be the

implementing agency. The National Institute of Statistics (NIS) is part of the MoP, and thus

is also considered to be a part of the implementing agency for this project. The MoP has

experience with the execution of similar projects supported by the Trust Fund for Statistical

Capacity Building (TFSCB). The agency received a USD 220,000 grant from the TFSCB

during 2005-2007 to help develop the national statistical strategy for Cambodia, which

resulted in the Statistical Master Plan of 2007. However, bearing in mind the time gap

between the projects, grant-specific financial management and procurement training will

need to be provided for additional fiduciary support, as detailed in Annex 3.

26. The Bank will work closely with other development partners also involved in strengthening

the statistical system of Cambodia, such as the UNDP, the Asian Development Bank (ADB),

and specially PARIS21, from the OECD. The Bank will establish a close collaboration with

PARIS21 for the implementation of the first component of the project: the design and

formulation of the NSDS.

B. Results Monitoring and Evaluation

27. The PDO level results and the intermediate results will be monitored by the project team of

the MoP/NIS (helped by the project coordinator), following the results framework detailed in

Annex 1. The project team will compile semi-annual reports on the progress, outputs and

results achieved under each component of this project.

C. Sustainability

28. In terms of sustainability, there are three main aspects to be considered for this project. The

first one is related to the completion of the last phase of the NSDS, the implementation,

monitoring and evaluation of the NSDS. The activities of this phase are not supported by this

project since they go beyond its implementation period. Nonetheless, the government, with

the full support of Paris21, is committed to the completion and implementation of the NSDS.

The Bank will also follow up the process closely in order to assess the government’s

commitment to the process.

29. The second aspect important for the sustainability of the project is the significant turnover of

the staff not only in the MoP/NIS, but also in the other ministries that feed data to the NSS.

This can slow the reports/ assessments required for the NSDS of this project, and also

translate into a loss of resources if the participants of the trainings change positions or

institutions. To overcome this the Bank has asked the project team of the MoP/NIS to be very

selective of those individuals participating in the trainings. They must be engaged and

committed staff with a medium term career prospect in the institution and real interest in

improving the NSS. In addition, and considering turnover is unavoidable, the project will

Page 16: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

8

leave written documentation (both in English and Khmer) of the most important elements of

the poverty estimation and provincial CPI trainings.

30. The third important aspect related to sustainability is the data collection/estimation of the

provincial and national CPIs once the project is completed. Albeit the project aims to

overcome to the low technical capacity and lack of equipment of the provincial statistical

offices, which seem to be the main issue, the concern remains. The government has

emphasized its commitment to continue with the task once the project is finalized.

Nonetheless, the Bank team will remain vigilant that the NIS is planning ahead in terms of

budget, personnel and processes in order to fulfill the promise.

V. KEY RISKS AND MITIGATION MEASURES

31. The overall risk for this project is considered to be moderate. The two main sources of risk

are relates to the institutional capacity for implementation and sustainability and the fiduciary

aspects of the project. In terms of the institutional capacity, the implementation agency has

scarce technical and project management skills. That is why the project included appropriate

resources to have a person exclusively devoted to the management of the project, as well as a

financial management consultant. In addition, the Bank will be accompanying and

supervising the implementation agency in terms of the technical aspects.

32. The fiduciary risk comes from the fact that the implementation agency has experience in

using simple and manual accounting systems (by maintaining a cash book and related records

but no knowledge/experience in the disbursement procedures and accounting software).

Similarly, a big portion of the project’s activities are about training and workshops, which are

considered risky by nature. In order to mitigate this risk, and as discussed in the next section,

the Bank will take a set of appropriate measures.

33. Systematic Operations Risk-rating Tool

Risk category Rating

1. Political and Governance M

2. Macroeconomic L

3. Sector Strategies and Policies M

4. Technical Design of Project or Program M

5. Institutional Capacity for Implementation and Sustainability S

6. Fiduciary S

7. Environment and Social M

8. Stakeholders L

9. Other -

OVERALL M

Page 17: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

9

VI. APPRAISAL SUMMARY

A. Economic and Financial Analysis

34. Economic and Financial Analysis. The project is not suitable for the conventional cost-

benefit and financial analysis given the nature of the output of the different components.

Nonetheless, the benefits of a strong, reliable and efficient statistical system for an informed

design, implementation and evaluation of public policies are well established. In this

particular case, the project is timely, as some of the outputs can be used in the mid-term

review of the National Development Strategic Development Plan, which is planned for 2016.

Although very modest immediate financials returns are expected from this project, in the

long run, a more efficient use of public resources based on reliable data, may help to enhance

the effectiveness of public spending.

B. Financial Management

35. Considering the scope of the FM work in relation to the project’s size, the financial

assessment considers that the Implementing Agency (IA) has an adequate FM system and

arrangements after the implementation of a number of mitigating measures. The FM risk is

rated as ‘High’ before the mitigation measures and ‘Substantial’ after the implementation of

the agreed actions.

36. The following mitigation measures were agreed be implemented: i) purchase of accounting

software, ii) training on FM, disbursement procedures and software, iii) agreement on the

format of the semester IFR, iv) requirement to submit bi-annual IFR to the Bank no later than

45 days after the end of each semester, and also requirement of annual audit of the financial

statements by an independent private audit firm whose terms of reference (ToRs) are

acceptable to the Bank. The audited financial statements and management letter shall be

submitted to the Bank no later than six months after the end of the FY. See Annex 3 for more

details on the financial management arrangement.

C. Procurement

37. There are two procurement categories among what is expected to be financed by the project

“Cambodia Enhancement of Poverty Analysis Capacity Project administered by the IA.

These are: procurement of Goods and of Consulting Services of various types. The

procurement of goods and consultant services under the project and financed in whole or in

part by the trust-fund will be carried out in accordance with the IDA’s "Guidelines:

Procurement under IBRD Loans and IDA Credits" dated January 2011 and revised July

2014. Also, they will follow the procedures set forth in the RGC’s Sub-Decree 74 on

Promulgating of the Standard Operating Procedures for all externally financed

projects/programs in Cambodia dated May 22, 2012 and relevant provisions of the

Procurement Manual for all externally financed projects/programs in Cambodia (updated

version May 2012).

Page 18: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

10

38. The implementing agency will be responsible for the procurement arrangements pertaining

this project. Given the overall small value of procurement under this project, the past

experience of the MoP in carrying out the Bank funded project, the current governance and

procurement environment in Cambodia and the limited procurement capacity of the

procurement officer, the overall procurement risk rating for this project is “Substantial”.

However, the risks will be managed and mitigated through the following agreed action plan,

and the residual procurement risk of this project is “Moderate”. The mitigation activities

include: i) The application of the Standard Operating Procedures (SOP), and ii) in addition to

prior review supervision, the World Bank will carry out procurement ex-post review at a rate

of 15% of all post review contracts. More details about procurement are provided in Annex

3.

D. Safeguards

39. The project is not expected to have any adverse social or environmental impacts and thus no

safeguard policies are triggered. The social impact is expected to be positive because it will

nurture public debates on matters of economic, welfare, and social concern and better target

of public policies and use of public resources.

E. World Bank Grievance Redress

40. Communities and individuals who believe that they are adversely affected by a World Bank

(WB) supported project may submit complaints to existing project-level grievance redress

mechanisms or the WB’s Grievance Redress Service (GRS). The GRS ensures that

complaints received are promptly reviewed in order to address project-related concerns.

Project affected communities and individuals may submit their complaint to the WB’s

independent Inspection Panel, which determines whether harm occurred, or could occur, as a

result of WB non-compliance with its policies and procedures. Complaints may be submitted

at any time after concerns have been brought directly to the World Bank's attention, and

Bank Management has been given an opportunity to respond. For information on how to

submit complaints to the World Bank’s corporate Grievance Redress Service (GRS) please

visit http://www.worldbank.org/GRS. For information on how to submit complaints to the

World Bank Inspection Panel, please visit www.inspectionpanel.org.

Page 19: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

11

Annex 1: Results Framework and Monitoring

Country: Project Name

Project Development Objective (PDO): The project’s objectives are to help strengthen Cambodia’s national statistical system through the development of a

National Strategy for Developing Statistics (NSDS) and to improve the government’s capacity to produce and interpret poverty and inequality indicators.

PDO Level Results Indicators* C

ore

Unit of

Measure Baseline

Cumulative Target Values** Frequency

Data Source/

Methodology

Responsibility for

Data Collection 2016 2016 2017 2017

1 semester 2 semester 1 semester 2 semester

Indicator One:

Draft of the NSDS developed by

the government of Cambodia

Text Not

applicable

First Draft Second

Draft

Final Draft Bi-annual MoP/NIS project

team

MoP/NIS project team

Indicator Two:

Improved capacity for poverty

monitoring and analysis, as

evidenced by the publication of

two poverty analysis notes

authored by the core members of

the NWGPM.

Text Not

applicable

First Draft

Note 1

Final Draft

Note 1,

First Draft

Note 2

Final Draft

Note 2

Bi-annual MoP/NIS project

team

MoP/NIS project team

Indicator Three: Improved price

data collection, as evidenced by

the preparation and publication of

pilot provincial and nationally

representative CPIs using the new

methodologically sound

framework.

Text Not

applicable

First Draft

Final Draft Bi-annual MoP/NIS project

team

MoP/NIS project team

INTERMEDIATE RESULTS

Intermediate Result (Component One): Support to the NSDS

Intermediate Result indicator One:

Sectoral statistics assessment

document

Text Not

applicable

First Draft

Final Draft Bi-annual MoP/NIS project

team

MoP/NIS project team

Intermediate Result indicator Two:

Action Plan for Statistics

/identification of costs document

Text Not

applicable

First Draft

Final Draft Bi-annual MoP/NIS project

team

MoP/NIS project team

Intermediate Result indicator

Three:

Monitoring and evaluation plan

Text Not

applicable

First Draft

Final Draft Bi-annual MoP/NIS project

team

MoP/NIS project team

Page 20: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

12

document

Intermediate Result (Component Two): Building the government’s capacity to produce and interpret poverty and inequality statistics.

Intermediate Result indicator One:

Completion of training modules

Proportion 0% 33% 66% 100% - Bi-annual MoP/NIS project

team

MoP/NIS project team

Intermediate Result indicator Two:

Attendance to each module of the

WGPM members

Proportion 0% 80% 80% 80% - Bi-annual MoP/NIS project

team

MoP/NIS project team

Intermediate Result (Component Three): Provincial and national CPI pilot

Intermediate Result indicator One:

Identification of the weaknesses of

the current methodology,

estimation of formula

Proportion 0% 100% Quarterly MoP/NIS project

team

MoP/NIS project team

Intermediate Result indicator Two:

Number of provinces where

training and the provision of

equipment is completed.,

Number 0 5 10 Quarterly MoP/NIS project

team

MoP/NIS project team

Intermediate Result indicator

Three:

Price data collection

Proportion 0% 50% 100% Quarterly MoP/NIS project

team

MoP/NIS project team

*Please indicate whether the indicator is a Core Sector Indicator (see further http://coreindicators)

**Target values should be entered for the years data will be available, not necessarily annually

Page 21: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

13

Annex 2: Detailed Description of the Project Components

Component I: Support to the NSDS

Phase Specific Actions Output Time (from

starting date)

I. Preparation Launch of the NSDS: High level meeting of

stakeholders (government officials, data

producers/users, development partners) to

introduce the NSDS process, understand the

willingness to support of the national

stakeholders and present short term data

needs

Report of meeting outlining the

processes to be undertaken and feedback

from the participants

Two months

II. Assessment Sectoral statistics assessment

Report of the availability, source,

periodicity and quality of key sectoral

indicators

Six months

III. Envisioning /

Strategic Goal

Setting

Shape the vision, mission and strategic goals

of the NSDS

Prepare sequenced actions plan for statistics

development for the next 5 years

Develop a monitoring and evaluation (M&E)

system of the NSDS

Identify costs and resources for

implementation of the action plans

Draft of the NSDS, with M&E

framework.

Estimated costs for the implementation

Twelve months

IV. Endorsement/

Adoption of

Strategy

Finalize and approve NSDS

Organize small workshop/seminars to

promote the adoption and support to the

NSDS

Publication and dissemination of the

NSDS

Two/three dissemination workshops of

the NSDS

Eighteen months

Page 22: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

14

Component II: Building the government’s capacity to produce and interpret poverty and inequality statistics

Module Content Output (Deliverables)7 Time (from

starting date)

I. First Module a) STATA training

b) Construction of consumption

aggregate

c) Introduction to poverty

measurement: poverty line,

different poverty indicators

(headcount, gap, severity)

1. Note with guidelines on how to

measure poverty in Cambodia.

Four months.

II. Second Module a) Poverty profile

b) Growth incidence curves and

inequality indicators

1. Note with poverty update (including

poverty headcount rate, gap, and

severity) and analysis using 2013

and 2014 CSES.

Eight months.

III. Third module a. Linking poverty to policy: how to

obtain policy implications

1. Note aimed at using poverty

indicators for policy makers,

perhaps focusing in a specific area

(health/education/etc.)

Twelve months.

7 To be delivered by the participants of the training, except perhaps for the first one.

Page 23: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

15

Component III: Provincial and National CPI pilot

Specific Activity Output (Deliverables)8 Time (from starting

date)

Revision of the current price questionnaire, as

well as the provincial and national CPI formula

(weights) according to the new CSES results.

Revised questionnaire and updated

national CPI formula.

Two months.

Establishment of a revised protocol for data

revision and data flow between the central and

provincial statistical offices, with clear

requirements, deadlines and responsibilities.

1. Document containing the protocol

described.

Two months.

Training of the provincial staff on price

collection methodologies, sampling and software

used. Provision of the necessary hardware and

software for both the central Phnom Penh office,

as well as the provinces.

Fourth months.

Data collection/processing in ten provinces:

Kandal, Kampong Cham, Siem Reap,

Battambang, Sihanouk Ville, Kratie, Koh Kong,

Svay Rieng, Rattanakiri, and Kampot.

1. Processed data in ten provinces. Twelve months.

Estimation of the provincial CPI/ national CPI

using new adjustments/data.

1. Pilot provincial CPI and pilot

nationally representative CPI,

Fourteen months.

8 To be delivered by the participants of the training, except perhaps for the first one.

Page 24: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

16

Annex 3: Implementation Arrangements (optional)

CAMBODIA: CAMBODIA ENHANCEMENT OF POVERTY ANALYSIS CAPACITY

(P151424)

Financial Management, Disbursements and Procurement

Financial Management

Taking into account a scope of financial management of the proposed small project, the IA’s

FM system and staff is deemed acceptable and sufficient provided that the following actions

are satisfactorily implemented:

Action Responsibility Target

Completion*

Carry out one day training on FM and

disbursement procedures and agree on the

format of the semester IFR

IA and Bank Before effectiveness

Purchase an accounting software, install and

training provided to the FM persons

IA and short

term FM

Consultant

engaged by the

project

No later than 3

month after

effectiveness

Prepare a short and simple manual on FM

procedures on segregation of duties (preparer,

review and approval) and policies on training

and workshop and IOC related expenses

IA No later than 3

month after

effectiveness

Engage an external auditor acceptable to the

Bank

IA and MEF No later than 6

month after

effectiveness

*The above-listed actions after effectiveness will be monitored by the team as part of

regular Project supervision, without including additional legal covenants in the grant

agreement.

A Designated Account (DA) denominated in US$ having a fixed ceiling at the National

Bank of Cambodia (NBC) will be open for the project’s operations. The ceiling of DA will

be US$80,000. Two signatories are required to withdraw cash from DA. The DA is

replenished every quarter, or monthly dependent on the cash requirement, using Statement

of Expenditures for post review expenses and Summary Sheet for prior review contracts.

Below is a proposed fund flow diagram.

Page 25: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

17

The Grant proceeds will be disbursed against eligible expenditures as indicated in the Table

below.

Table 1. Allocation of Grant Proceeds

Category Total Amount of Grant

Allocated

(US$ Equivalent)

Percentage of Expenditures

to be financed

(inclusive of Taxes)

(1) Goods, Consultant’s services, Non-

consulting services, Training and

Workshops and Operating Costs

350,000 100%

TOTAL 350,000

A break-down of budget by different categories such as goods, non-consulting services,

consultant’s services, training and operating costs will be presented in the budget and work plan

of the project subject to review and no-objection from the TTL.

The FM legal covenants are:

The IA shall submit a semester IFR to the Bank no later than 45 days after the end of

each semester;

The IA shall have financial statements audited annually and have the audited financial

The World Bank

Direct payment

Funds to DA

MOP

DA in US$ at

NBC

: Fund flow : Fund request

Consultants/Suppliers

Page 26: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

18

statements and management letter submitted to the Bank no later than 6 months after each

fiscal year.

The Bank will carry out one FM supervision for the first six month after effectiveness and

subject to the assessment of the first mission, the mission will be once every year afterward.

Disbursements

The following disbursement method will be used:

Reimbursement: The Bank may reimburse the Recipients for expenditures eligible for

financing pursuant to the Financing Agreement (eligible expenditures) that the Recipients

has pre-financed from its own resources.

Advance: The Bank may advance the Grant proceeds into a designated account to finance

eligible expenditures as they are incurred and for which supporting documents will be

provided at a later date.

Direct Payment: The Bank may make payments at the Recipients’ request, directly to a

third party e.g. supplier, and consultant for eligible expenditures.

Minimum application value for direct payment and reimbursement is US$10,000. The project

will have a Disbursement Deadline of four months after the Closing Date. All expenditures that

incur before/by the Closing Date will be eligible.

Procurement

1. Procurement arrangement

Procurement for the proposed project will be carried out in accordance with the World

Bank’s Procurement and Consultant Guidelines dated January 2011 and revised July 2014,

and the procedures set forth in the RGC’s Sub-Decree 74 on Promulgating of the

Standard Operating Procedures for all externally financed projects/programs in Cambodia

dated May 22, 2012 and relevant provisions of the Procurement Manual for all externally

financed projects/programs in Cambodia (updated version May 2012) and the provisions

stipulated in the Financing Agreement and in agreed Procurement Plan.

A draft procurement plan for the project was prepared. This plan will be discussed and

agreed with the Bank team. The plan will be updated with the Bank’s prior concurrence,

annually or as required, to reflect changes in implementation needs and improvements in

institutional capacity. The procurement risks of the project will be managed and mitigated

Page 27: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

19

through an action plan that has been incorporated into the project design and the project

financing agreement.

2. Assessment of the Agency's Implementation Capacity

Procurement activities will be carried out by the Ministry of Planning (MoP) of the Royal

Government of Cambodia based on the existing government institutional arrangements.

The MoP has experience with the execution of similar projects supported by the Trust

Fund for Statistical Capacity Building. The agency received a grant from the TFSCB for a

total amount of USD 222,000 between the years 2005-2007 in order to develop the

national statistical strategy for Cambodia, which resulted in the Statistical Master Plan of

2007. However, the procurement officer for this project has a limited of procurement

knowledge because the long time gap of implementation of Bank’s finance projects.

Given the overall small value of procurement under this project, the past experience of the

MoP in carrying out the Bank funded project, the current governance and procurement

environment in Cambodia and the limited procurement capacity of the procurement

officer, the overall procurement risk rating for this project is “Substantial”. However, the

risks will be managed and mitigated through the following agreed action plan, and the

residual procurement risk of this project is “Moderate”.

3. Actions to Mitigate Procurement Risks and to Build Agencies’ Capacity.

To address the risks associated with overall governance and procurement environment, the

following measures have been agreed:

(a) The updated Standard Operating Procedures (SOP) for all Externally Funded

Projects/Programs in Cambodia promulgated through Sub-Decree 74 on May 22, 2012

incorporates the Good Governance Framework (GGF). The GGF includes various

elements for improving transparency and accountability through strengthened

procurement arrangements, strengthened financial management, enhanced public

disclosure, involvement of civil society, a complaints mechanism, a code of ethical

conduct, sanctions, and for addressing project-specific implementation risks. This SOP

will be applicable for this project;

(b) In addition to the prior review supervision, the World Bank will carried out the

procurement ex-post review annually at a rate of 15% of all post review contracts.

To address the risk associated with the limited procurement capacity of the procurement

officer, the Bank procurement specialist assigned for this project will provide all necessary

Page 28: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

20

training, including the hand-on training to this procurement officer and other project staff

of MoP when needed;

4. Procurement Plan. The draft detailed procurement plans for the project was prepared.

This plan will be discussed and agreed with the Bank team. The plan will be updated with

the Bank’s prior concurrence, at least annually or as required to reflect the actual project

implementation needs.

A. Draft Procurement Plan for Cambodia Enhancement of poverty Analysis Capacity

Period covered by this procurement plan: Year 2015- 2017

I. Goods and non-consulting services

Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as

stated in Appendix 1 to the Bank’s Guidelines for Procurement:

Procurement

Method

Contract Value

Threshold ($’000)

Prior Review

Threshold ($’000) Comments

1 Shopping <100 First contract

2 Direct Contracting - All contracts Regardless of value

1. Procurement of Goods

II. Selection of Consultants

Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in

Appendix 1 to the Bank’s Guidelines for Selection and Employment of Consultants:

Selection Method

Contract Value

Threshold ($’000)

Prior Review

Threshold ($’000) Comments

1. Competitive Methods (Firms) –

Selection Based on Consultant

Qualifications (CQS)

<300 First contract

2. Individual Consultants - Only in exceptional

case & Sole-source

selection >10

Note: Short list comprising entirely of national consultants (Firms registered or incorporated in the country):

If it is warranted as per the provisions of paragraph 2.7 of the Consultant Guidelines, short lists of

consultants for services estimated to cost less than $100,000 equivalent per contract may be composed

entirely of national consultants.

Page 29: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

21

Frequency of Procurement Supervision. Field procurement supervision will be conducted as part of the

regular implementation support missions, which will be conducted at least twice a year.

Page 30: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

22

Annex 4: PARIS21 NSDS Guidelines - Phases of NSDS Formulation

The design of the NSDS encompass five distinct phases, comprising of specific tasks outlined in the following table:

Steps and expected outputs Specific actions

Tentative

timeline

Proposed role/action by national

authorities

A. Preparation Phase

1. Commitment from national

authorities and other preparatory

discussions

Expected output(s):

a) Formal letter from national

authorities requesting for support

from donor/s.

a) Confirm Government’s commitment to

move forward with the NSDS process.

a) Submit letter to formally

request support for NSDS

design

2. Formation of a national/steering

committee on NSDS

Expected output(s):

a) National/steering committee.

a) Consider the establishment of a national

/ steering committee to mobilize political

support and resources for development

of the NSDS, to name a national NSDS

coordinator, and to oversee strategy

development.

a) Relevant national stakeholders

coordinate to discuss the

establishment of the committee.

b) Develop terms of reference.

c) Identify committee membership.

d) Identify national NSDS

coordinator.

e) Conduct follow-up

meetings/discussions.

3. Development of a roadmap for

NSDS

Expected output(s):

a) Develop a roadmap for designing the

NSDS, including definition of

governance/ oversight of the process and

identification of resources needed and

timetable of designed activities.

a) National NSDS coordinator

develops draft of roadmap, in

collaboration with NSS, and

circulates for

comments/feedback

Page 31: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

23

Steps and expected outputs Specific actions

Tentative

timeline

Proposed role/action by national

authorities

a) Detailed roadmap for the NSDS. b) Establish fora for user and producer

consultations and/or working groups to

solicit comments/ recommendations on

key priorities, etc.

4. Launch of NSDS

process/Inception

Expected output(s):

a) Report of meeting outlining what

the NSDS would mean for the

national statistical system (NSS);

the process to be undertaken;

feedback from meeting participants

about the process as well as priority

capacity building needs.

a) Organize a meeting of relevant

stakeholders (High-level government

officials, data producers, data users,

development partners) to: (i) make them

familiar with the NSDS process and

roadmap, what might be expected from

it, how to design it, implications in all

steps of the process (ii) understand

willingness of all national stakeholders

to support each step of the process (iii)

present priority short-term data and

capacity building needs, if any

a) Develop agenda and facilitate

meeting discussions.

b) Identify participants.

c) Provide logistical support.

B. Assessment Phase

5. Assessments: overall assessment

of the capacity of the national

statistical system (NSS) and

sectoral assessments/statistical

plan/NSDS as required

Expected output(s):

a) Assessment design and guide.

b) Report of overall assessment of

a) Review of governance structures

including legal, institutional and

organizational set-up.

b) Assessment of staffing skills, and

development of a training plan;

statistical infrastructures; quality and

availability of key sectoral indicators.

c) Assessment of the previous statistics

plan (implementation and achievements,

issues and challenges)

a) Identify specific assessment areas

(sectors) to review, stakeholders

to be involved and timetable of

assessment activities.

b) Design assessment guide and

facilitate conduct of assessment

activities.

c) Disseminate the assessment report

through user-producer forum

Page 32: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

24

Steps and expected outputs Specific actions

Tentative

timeline

Proposed role/action by national

authorities

NSS capacity.

c) Report of each sectoral

assessment (optional)

d) Conduct forum to present the results of

the assessments for validation and

adoption.

C. Envisioning Phase/Strategic Goal Setting

6. Designing of NSDS (vision,

mission, strategic goals, action

plans, M&E mechanisms)

Expected output(s):

a) Draft NSDS, with M&E

framework.

b) Estimated costs for

implementation of NSDS.

1. Outline the vision, mission, strategic

goals, linkages with the national

development plan, regional statistics

plan (ASEAN RSDS) , and other

international commitments

2. Prepare sequenced actions plans (sector

plans) for statistics development for the

next 5-10 years based on outcomes of

the inception workshop and overall

assessment of the NSS.

3. Develop a monitoring and evaluation

(M&E) system to include identification

of appropriate performance indicators

(including baselines, milestones and

targets), and the institutional

arrangements for the M&E.

4. Identify costs and resources for

implementation of the action plans

a) Relevant national stakeholders to

decide on the roles and

responsibilities and scope of work

to develop the draft NSDS.

b) Conduct national consultations to

solicit comments and

recommendations on the draft

NSDS (including costs and

resources needed for various

components and if possible,

financing commitments from

government and development

partners)

D. Endorsement and adoption of strategy and fund-raising

Page 33: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

25

Steps and expected outputs Specific actions

Tentative

timeline

Proposed role/action by national

authorities

7. Finalization and adoption of

NSDS

Expected output(s):

a) Final NSDS.

b) Government endorsement for

the final NSDS.

a) Finalize and approve/adopt NSDS a) Conduct further consultations with

all relevant stakeholders at various

levels to finalize and adopt the

NSDS and prepare for

implementation.

b) Obtain official government

endorsement of the NSDS.

c) Publication and dissemination of

the NSDS.

8. NSDS advocacy

Expected output(s):

a) Workshop reports.

b) NSDS advocacy material.

a) Organize small workshops/seminars to

promote adoption and support to the

NSDS.

b) Produce advocacy materials to promote

participation in and funding of the NSDS

a) Organize workshops/seminars.

b) Prepare advocacy materials

E. NSDS implementation, monitoring/review and evaluation

9. Implementation of short-term

data and capacity needs of the

NSS

a) Support meeting short-term data and

capacity building needs

a) Identify and prioritize the short-

term data and capacity building

needs of the NSS.

b) Prepare proposals for the program

of activities to address the short-

term needs.

c) Include in the NSDS the short-

term data and capacity needs of

the NSS

10. NSDS implementation

Expected output(s):

a) Roll-out implementation of action plans

outlined in NSDS in phases (existing

statistical activities and arrangements to

a) Outline timetable and

stakeholders for implementation.

b) Organize briefings.

Page 34: World Bank Document€¦ · November 30, 2015 This document has ... MoP Ministry of Planning NBC National Bank of Cambodia ... SIDA, USAID, and the UNDP, the WBG financed the 2003/04

26

Steps and expected outputs Specific actions

Tentative

timeline

Proposed role/action by national

authorities

a) Timetable for implementation.

b) Compiled feedback and

recommendations at each stage.

continue). c) Implement NSDS.

11. NSDS monitoring and mid-term

review

Expected output(s):

a) Monitoring report.

a) Conduct annual monitoring / reporting of

NSDS implementation and make

changes based on evolving needs

a) Identify monitoring agency at

national level and conduct regular

monitoring.

b) Develop and disseminate report.

12. Final evaluation

Expected output(s):

a) Evaluation report.

a) Conduct an evaluation of the NSDS

implementation to form the basis for the

design of the next NSDS

End of

NSDS

period

a) Engage evaluator/agency/

consultant at national level.

b) Develop report on findings,

lessons learned and

recommendations for next NSDS.

c) Disseminate evaluation report.