world trade center construction redevelopment subcommittee … · 2015-06-04 · block 169 / lot...
TRANSCRIPT
![Page 1: World Trade Center Construction Redevelopment Subcommittee … · 2015-06-04 · block 169 / lot 2.02 7,000 sq. ft. nj transit storage harrison car maintenance facility lester m](https://reader033.vdocuments.net/reader033/viewer/2022053006/5f0995fd7e708231d42789c6/html5/thumbnails/1.jpg)
World Trade Center ConstructionRedevelopment Subcommittee April 29, 2010
![Page 2: World Trade Center Construction Redevelopment Subcommittee … · 2015-06-04 · block 169 / lot 2.02 7,000 sq. ft. nj transit storage harrison car maintenance facility lester m](https://reader033.vdocuments.net/reader033/viewer/2022053006/5f0995fd7e708231d42789c6/html5/thumbnails/2.jpg)
Memorial Plaza – Architectural MetalsRecommended Authorization
Lowest Responsive Bidder AuthorizationSkyline Steel Corporation $ 7,101,556E t W k (8%) $ 568 124Extra Work (8%) $ 568,124Bovis Construction Management Services $ 706,179Total $ 8,375,859
![Page 3: World Trade Center Construction Redevelopment Subcommittee … · 2015-06-04 · block 169 / lot 2.02 7,000 sq. ft. nj transit storage harrison car maintenance facility lester m](https://reader033.vdocuments.net/reader033/viewer/2022053006/5f0995fd7e708231d42789c6/html5/thumbnails/3.jpg)
One World Trade Center – Scaffolding and Sidewalk Sheds Recommended Authorization
Lowest Responsive Bidder Authorization
Atlantic Hoist & Scaffolding LLC $ 14,600,000Extra Work (8%) $ 1,168,000Total $ 15,768,000
![Page 4: World Trade Center Construction Redevelopment Subcommittee … · 2015-06-04 · block 169 / lot 2.02 7,000 sq. ft. nj transit storage harrison car maintenance facility lester m](https://reader033.vdocuments.net/reader033/viewer/2022053006/5f0995fd7e708231d42789c6/html5/thumbnails/4.jpg)
One World Trade Center – Alternate Power Supply EquipmentAdditional Funding to Existing Electrical Trade Contract
Contractor: Five Star Electric CorporationTotal Current Board Authorization: $ 199,980,000
$Additional Funding: $ 5,500,000Extra Work (8%) $ 440,000Revised Total $ 205,920,000
![Page 5: World Trade Center Construction Redevelopment Subcommittee … · 2015-06-04 · block 169 / lot 2.02 7,000 sq. ft. nj transit storage harrison car maintenance facility lester m](https://reader033.vdocuments.net/reader033/viewer/2022053006/5f0995fd7e708231d42789c6/html5/thumbnails/5.jpg)
One World Trade Center – Steel Painting and Perimeter Safety System Supplemental Agreement to Existing Structural Steel Trade Contract
Contractor: DCM Erectors, Inc.Total Current Board Authorization $ 280,480,000Steel PaintingSteel PaintingBase Contract $ 7,050,000Extra Work (8%) $ 564,000Perimeter Safety SystemBase Contract $ 9,000,000Extra Work (8%) $ 720,000Revised Total $ 297,814,000
![Page 6: World Trade Center Construction Redevelopment Subcommittee … · 2015-06-04 · block 169 / lot 2.02 7,000 sq. ft. nj transit storage harrison car maintenance facility lester m](https://reader033.vdocuments.net/reader033/viewer/2022053006/5f0995fd7e708231d42789c6/html5/thumbnails/6.jpg)
DRP – Additional Funding for Program Management Support ServicesRecommended Authorization
Contractor: The Louis Berger GroupOriginal Authorized Amount $47,500,000Additi l F di (N t t E d) $30 000 000
Extension of original authorization to provide:
Additional Funding (Not to Exceed) $30,000,000Total $77,500,000
Uninterrupted program management services Intimate knowledge of site projectsClaims and change resolutionCost controlDocument controlSchedule integration and analysisFTA reportingFTA reportingFor WTC Transportation Hub, 1 WTC, WTC Memorial and Museum, WTC Vehicular Security Center, and other redevelopment projects
F t i d th h A il 2012For a two-year period through April 2012
![Page 7: World Trade Center Construction Redevelopment Subcommittee … · 2015-06-04 · block 169 / lot 2.02 7,000 sq. ft. nj transit storage harrison car maintenance facility lester m](https://reader033.vdocuments.net/reader033/viewer/2022053006/5f0995fd7e708231d42789c6/html5/thumbnails/7.jpg)
DRP – Additional Funding for Construction Management Consultant Services
Original Authorized Amount $ 79,112,979
Contractor: Parsons Brinckerhoff and URS CorporationRecommended Authorization
Additional Funding (Not to Exceed) $ 20,000,000Total $ 99,112,979
Extension of original authorization to provide:
Construction audits
Sit f t d t h i l iSite safety and technical servicesLogistics planning and implementationConstruction progress reportingInspection supportInspection supportTenant construction alteration review
For the period through December 2011
![Page 8: World Trade Center Construction Redevelopment Subcommittee … · 2015-06-04 · block 169 / lot 2.02 7,000 sq. ft. nj transit storage harrison car maintenance facility lester m](https://reader033.vdocuments.net/reader033/viewer/2022053006/5f0995fd7e708231d42789c6/html5/thumbnails/8.jpg)
PATH – Temporary Easement Agreement with Lester M. Entin AssociatesRecommended Authorization
WTCC WORK TRAIN STORAGE YARD LOCATION
ENTIN PROPERTY
ROUTE 280NORTHEAST CORRIDOR
NORTHEAST CORRIDOR
PATH
STORAGE YARD LOCATION43.600 +/‐ SQ. FT.
BLOCK 169 / LOT 2.027,000 SQ. FT.
NORTHEAST CORRIDOR
NJ TRANSIT STORAGE
PATHHARRISON CAR MAINTENANCE
FACILITY
LESTER M. ENTIN ASSOCIATES
PATH PROPERTYBLOCK 213 / LOT 5.04
15,000 SQ. FT.
NN
TOTAL PROJECT AREA
FUTURE ACCESS ROAD/LOADING AREA
56,600 +/‐ SQ. FT
TOTAL PROJECT AREA AVAILABLE TO PA
2.3 ACRES (100,200 +/‐ SQ. FT)