World´s Greenest High Performance Data Center
EcoDataCenterSustainability for future generations
Our Services
FalunStockholm
Colocation Data Center for Mission Critical Requirements
Lockable racks, cages, private rooms or own buildings
Totally 3 buildings with 11.300 m2 each
Totally 18 MW fully redundant power and cooling
Customer office space and storage facility
Multiple redundant fiber optic and cross connect options
On site support and remote hands
Located in Falun, 200 km northwest from Stockholm
Average annual temperature 6°C
73 hours > 25°C – 436 hours > 20°C (annually)
Our Data Center
Our Value Proposition
World Class PerformanceTier IV – First in North Europe
Greener means Lower Cost
World's GreenestData Center
World's Greenest Data Center
PUE<
1,15
World’sGreenestElectricity
Mix
EnergyEfficientTier IVDesign
HeatWasteReuse
ERE = 0,45
World’s Greenest Electricity Mix
100%Renewable
7 gCO2 eq./kWhCO2 emissions
(life cycle analysis)
0,75Primary energy
Factor(High resource
Efficiency) Own Solar PV cell park 2 MW
Wind power 5 x 2 MW3,484 hrs production(39.8%) during 2013
Hydroelectric power locally fromSundborn Power Station and 715 MW from regional power
stations with regional 130 kV grid
CHP plant with secondaryforest fuels 16 MW
World's Greenest Data Center
PUE<
1,15
World’sGreenestElectricity
Mix
EnergyEfficientTier IVDesign
HeatWasteReuse
ERE = 0,45
Power Usage Effectiveness
1,91
1,65
1,20
1,18
1,15
- 0,50 1,00 1,50 2,00 2,50
US Environmental Protection Agency
Uptime Institute 2013 Data CentreIndustry Survey
ViaWest Lone Mountain Tier IV
SuperNap Tier IV
EcoDataCenter Tier IV
Total Energy*IT Energy
PUE =
Facility EnergyReduced by
77%
* Total Energy = Facility Energy + IT Energy
PUE < 1.15 – Energy Efficient Tier IV Design
Ultra EfficientElectricalSystem
Ultra EfficientCoolingPlant
OptimizedAir
Management
EnergyEfficientBuilding
World's Greenest Data Center
PUE<
1,15
World’sGreenestElectricity
Mix
EnergyEfficientTier IVDesign
HeatWasteReuse
ERE = 0,45
Heat Island around Data Centers
Power Usage Effectiveness
Total EnergyIT Energy
PUE =
Energy Reuse Effectiveness
Total Energy – Reused EnergyIT Energy
ERE =
100% of all electricity used in servers is converted to heat waste
PUE = ERE Global Warming
Our Energy Ecosystem
Cooling
Heating
Wood pelletsCombined CoolingHeating & Power
PlantForestFuels
Heating Plant
Wind Power
Waste Heat District Heating &Cooling System
Solar Power
Hydro Power
Data Center
Cooling
Power
Our Heat Balance
Combined CoolingHeating & Power
Plant
Waste Heat
Data Center
Cooling
HeatingDistrict Heating &Cooling System
Warm seasonExcess heat in CHP plant used to cool data
center during warm season with steam driven absorption chiller
35% of hours per year
Cold seasonWaste heat in data center reused to heat city
during cold season with steam drivenabsorption heat pump65% of hours per year
ERE0,45
CO2 emissions
-20 gCO2 eq/kWhelectricty
Our Value Proposition
World Class PerformanceTier IV – First in North Europe
Greener means Lower Cost
World's GreenestData Center
World Class Performance
Multi-TierData CenterUptime for
Tier IV100%
World ClassPhysicalSecurity
Hi Density20 kW
availablefor allracks
Uptime
Tier IV Design Certified Colocation DC’s
Tier IV Power and Cooling Infrastructure
Power Cooling
Four separate electrical systems(transformer, generators, UPS, PDU)
Multi-tier power supply (Tier IV and III)
Redundant high & medium voltage supply
2 own CHP power plants for backup
Busway with full flexibility in PDU power(16A 1-P, 16A 3-P, 32A 1-P, 32A 3-P, 63A 1-P, 63A 3-P)
Two fully separate cooling circuits (A + B)
Primary cooling from centralizedCCHP plant with absorption chiller
and absorption heat pump for heat reuse
Secondary cooling with free cooling andTurbocor compressor
CRAH with hot/cold air containment
World Class Performance
Multi-TierData CenterUptime for
Tier IV100%
World ClassPhysicalSecurity
Hi Density20 kW
availablefor allracks
Uptime
Security Zone System (4-5 Zones)
Standbygenerators
Coolingroom B1
Standbygenerators
Standbygenerators Cooling room A2 Standby
generators
Coolingroom B2
Data Rooms
Data Rooms
Cooling room A1
Storage
Storage
Entrance
Security Systems
Precast concrete walls for fire and intrusion protection
Highprotection
doors
Highprotection
locks
Advanced accesscontrol systems
VESDA smoke detectionArgonite Fire Supression
Fire alarm
Video surveillanceAlarm system
World Class Performance
Multi-TierData CenterUptime for
Tier IV100%
World ClassPhysicalSecurity
Hi Density20 kW
availablefor allracks
Uptime
High Density Colocation
20 kW power and coolingavailable for all racks
Full flexibility to changecapacity with busway
Our Value Proposition
World Class PerformanceTier IV – First in North Europe
Greener means Lower Cost
World's GreenestData Center
Our Cost Position
Energy Opex Capex
Reduced Energy Cost
BaseCase
PUE 1,65
EnergyEfficiencyPUE 1,15vs. 1,65
WasteHeatReuse
Energy TaxReductionOwn Wind
Power
PossibleEnergy TaxReduction
DC > 5 MW
AlternativeCase
EcoDataCenter Cost
Our Value Proposition
World Class PerformanceTier IV – First in North Europe
Greener means Lower Cost
World's GreenestData Center
EcoDataCenterHealthy environment for future generations