wp2 – studies and strategies for sustainable operational, organizational and policy schemes
DESCRIPTION
WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes. Progress Report. Gabriel Neagu WP2 Leader National Institute for R&D in Informatics – ICI, Bucharest [email protected], www.ici.ro. Outline. WP2 execution status Inputs from 1 st year WP2 deliverables - PowerPoint PPT PresentationTRANSCRIPT
The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775
www.see-grid.eu
SEE-GRID-2
WP2 – Studies and Strategies for sustainable operational, organizational
and policy schemes
Gabriel NeaguWP2 Leader
National Institute for R&D in Informatics – ICI, [email protected], www.ici.ro
Progress Report
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 2
Outline
WP2 execution statusInputs from 1st year WP2 deliverables NGI Sustainability indicators Policy documents Plans for the 2nd project year
Contributions per partner Activity reports for May – August Up-dated plans for the remaining period
WP2 Action plan
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 3
A2.1 - Study deployment solutions for Grid CAs, distributed ROCs, M/W components:
Analysis and studies of the technical aspects of Grid organisation, such as Certification Authorities, Operations Centres, middleware, and management solutions
CERN
A2.2 - Sustainable roadmap for SEE National Grid Initiatives:
Recommendations for long-term sustainability of NGIs and eInfrastructure in the region
ICI
WP2 Activities
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 4
Deliverables: D2.1 - Regional and National Organizational and Policy Schemes:
M06/ICI D2.2 - Sustainable organizational and operational approach: M09/ICI D2.3 - Sustainability and Impact Analysis of SEE National Grid
Initiatives: M12 (v1) and M24 (final) / IPBMilestones: M2.1 - Sustainable organizational and operational approach defined
M09 M2.2 - Final Sustainability and Impact Analysis of SEE National Grid
Initiatives M24
WP2 Deliverables and milestones
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 5
NGI Sustainability indicators for the 2-nd project year
NGI setup and recognition NGI organization and Consortium expansion NREN cooperation eInfrastructure national strategy National Policy documents eIRG plans National-level projects Other sources of funding in grid area including related projects Industrial cooperation Technical independence i.e. national-level services Expansion of national infrastructure Sites migrated to EGEE production Expansion to new applications and user communities
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 6
Policy documents
NGI Kick-off documents: Agreement on NGI Establishment / Government recognition or
Letter of support / Agreement on NGI enlargementNGI policy documents: Memorandum of Understanding between NGI and SEE-GRID-2
project /site hosting institution / application (project); Security policy documents (LCG/EGEE JSPG): Grid Security and
Availability Policy, Grid AUP and VO AUP, VO Security Policy, Site Registration Policy, Audit requirements;
CP/CPS; Requirements for LCG User Registration and VO Membership
Management; Site oriented policy documents: Service Level Agreement (SLA)
between site & NGI / VO / application; Procedure guides: site / VO / user registration
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 7
Policy documents (2)
Site oriented policy documents: SLA between SEE-GRID-2 project and Grid site / SLA between Grid
site and Virtual Organization / SLA between Grid site and Application / Site Operations Procedure Policy
Technical procedure Guides): Site registration procedure / VO registration procedure / User
registration procedure / Operation Guide / Technical guide on recommended middleware configuration of sites.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 8
NGI status – National recognition
Albania: - Bosnia-Herzegovina: NGI-BA (03/2006) - no national level body
exists to formally recognize NGI Bulgaria: BGGC (01/2003) - Yes Croatia: CRO GRID (01/2004) - Yes Hungary: MGKK (2003) – Yes FYR of Macedonia: MARGI (04/2005) – in progress Moldova: MDGRID (05/2007) - Yes Montenegro: MGI (11/2006) - Yes Romania: RoGrid (05/2002) - Yes Serbia: AEGIS (04/2005) - Yes Turkey: TR-Grid (09/2003) - Yes
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 9
NGI status – eInfrastructure adoption
Albania: no Bosnia-Herzegovina: no Bulgaria: yes Croatia: no Hungary: FYR of Macedonia: no national document, it will be a NGI document Moldova: in progress Montenegro: no Romania: yes Serbia: no Turkey: yes
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 10
Albania
Plan for the 2-nd project year NGI setup and recognition
The launch of NGI is planned for September 2007 National-level projects
Several proposals would be submitted to Ministry of Education and Science, regarding both Grid infrastructure and applications
Other sources of funding in grid area including related projects The support is expected from bilateral and regional (SEE-ERA.NET)
projects Expansion of national infrastructure
Extension of existing sites (INIMA, FIE, FNS), and inclusion of new sites (FECO and universities of Elbasani and Shkodra)
Expansion to new applications and user communities Expansion into new domains, such as meteorology and seismology
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 11
Bosnia-Herzegovina
Plan for the 2-nd project year NGI setup and recognition
Improve the NGI organization and attempt the National level recognition. This could include recognition at various levels i.e. Ministries of Science / Technology / Education where applicable: state/entity/canton
NGI organization and Consortium expansion Planned inclusion of 3-5 new members
NREN cooperation NREN National recognition will be attempted
eInfrastructure national strategy If political issues allow
National-level policies If political issues allow
eIRG membership status If political issues allow
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 12
Bosnia-Herzegovina
Plan for the 2-nd project year (cont.): National-level projects
One long-term project is in preparation Other sources of funding in grid area including related projects
By SARNET and by individual universities. Technical independence i.e. national-level services
National CA is planned RB, BDII servers (or gLite counterparts)
Expansion of national infrastructure All sites are due for upgrade, 2 new sites will be introduced
Expansion to new applications and user communities Attempt the expansion into new domains: electromagnetics, fluid
dynamics, seismology, meteorology, biomed
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 13
Bulgaria
Plan for the 2-nd project year: NGI organization and Consortium expansion
BGGC expects new members eInfrastructure national strategy
eInfrastructure national strategy will be recognized on governmental level eIRG plans
contribution to eIRG workshops, participation at eIRG meetings regularly National-level projects
National-level projects are expected for expansion of infrastructure Other sources of funding in grid area including related projects
New bilateral and regional projects are expected to start Technical independence i.e. national-level services
Full technical independence in the production status will be achieved Expansion of national infrastructure
A total of more than 300 CPUs is expected to be achieved
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 14
Bulgaria
Report on May-August 2007: NGI organization and Consortium expansion
Agreement was signed with University of Ruse Interest was declared by one additional organization
National-level projects One big national project and two small projects were activated; it will
support configuration up-grades Expansion to new user communities
HEP user community plus new members in SEE-GRID
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 15
Croatia
Plan for the 2-nd project year: NGI organization
Establishment of CRO GRID 2 National Grid Infrastructure (CRO NGI) and Croatian [Hrvatska] National Grid Initiative (HNGI)
More formal internal organisation and decision-making mechanisms establisheds (Steering Commitee)
eInfrastructure national strategy e-Croatia (e-Hrvatska) strategy
National-level projects CRO GRID 2
Other sources of funding in grid area including related projects EGEE-II, SEE-GRID-2, EU funded CenVis (Centre for Scientific Visualisation) DARIAH bi-lateral and multi-lateral projects
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 16
Croatia
Plan for the 2-nd project year (cont): Industrial cooperation
Ericsson Nikola Tesla, CRO GRID related contracted relationship; IBM Hrvatska; interested industrial and other entities
Technical independence i.e. national-level services Improved Grid services at the national level Implementation of organisational mechanisms and production
infrastructure maintenance procedures Functionality and performance expansion and optimisation:
Expansion of national infrastructure The infrastructure will be expanded as the needs arise. Plans are being made to establish CRO GRID National Grid Infrastructure
in a similar way as by CARnet (no formal document, but strict rules).
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 17
Croatia
Report on May-August 2007: NGI organization
Establishment of Steering Committee for CRO NGI The Regulation act of CRO NGI and the Budget for the Croatian
eInfrastructure was adopted on the first meeting of the official CRO NGI board
Establishment of National Committee for NGI at Croatian Academy of Sciences and Arts
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 18
FYR of Macedonia
Plan for the 2-nd project year: NGI organization and Consortium expansion, NREN cooperation
Inclusion of new member (SEE University, Tetovo) eInfrastructure national strategy
National strategy for Electronic Communication with ICT, Ministry of Transport and Communications
Meeting with newly appointed Minister of Information Society The National Grid Strategy document will be presented to the ‘SS Cyril
and Methodius' University Council for approval. Depending of interest and inclusion of other Universities in NGI (from
Tetovo, Bitola) this document will be proposed for adoption to the Inter University Council.
National recognition of MARGI.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 19
FYR of Macedonia
Plan for the 2-nd project year (cont): Other sources of funding in grid area including related projects
SEE-ERA.NET call UNESCO initiative for new project: Improving Innovation Capacities in
the Universities Technical independence i.e. national-level services
CA accreditation planed to run in Jul/August 2007, CP/CPS document to be finished in March 2007; VOMS; RGMA; BDII.
Expansion of national infrastructure Inclusion of new site (Tetovo)
Expansion to new applications and user communities Large Scale Computations in Molecular Chemical Physics of Interacting
Systems Grid Enabled System for Mining, Gathering, Clustering and Retrieval
Images from the Web Mass Processing of Digital and Analog Seismological signals
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 20
FYR of Macedonia
Report on May-August 2007: NGI national-level recognition – In progress
Briefings with Minister of Information society of R. Macedonia, result UKIM/MARNet is recognized as the main coordinator of the Grid Initiative in Macedonia
JRU documents prepared as continuation of the previously signed MoA (2004-2006)
eInfrastructure national strategy On the request of the Minister of ICT
– Proposition of the MARNet budget 2008 year– Talks for possibilities of expansion of the backbone to all public
universities (Bitola, Tetovo, new univ. Shtip) NGI expansion. other sources of funding in grid area including
related project Preparation and dissemination activities (Linux installations) for the
preparation of the new grid site at South East Europe University
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 21
FYR of Macedonia
Report on May-August 2007: Industrial cooperation
Briefings with MB of MASIT Chamber of Commerce (result -presence of its president on Industrial day in Thessaloniki and dissemination event preparation under SEITA/MASIT conference in September 2007)
Expansion to new applications and user communities Grid enabled system for mining, gathering, clustering and
retrieval images from the web Technical independence i.e. national-level services
Preparing Linux machine and installation of CA software Participation in EUGRIDPMA meeting
Doctorial virtual Studies Close collaboration with IPP, preparatory meeting and 1 month common
work of Anastas Mishev with IPP team.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 22
FYR of Macedonia
Up-dated plan for the remaining period: National-level projects
Preparation s for national Call Other sources of funding in grid area including related projects
Contributions to current FP7 projects preparations (SEE-GRID-SCI) Technical independence i.e. national-level services
Activate the national CA Improve the current level of deployment of national-level services
Expansion of national infrastructure Up-grade current sites, activate SEEU site
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 23
Greece
Plan for the 2-nd project year: National-level projects
Expansion of the HellasGrid infrastructure Other sources of funding in grid area including related projects
Participation in various Grid Related project proposals Industrial cooperation
Increase contacts with industrial partners Expansion of national infrastructure
Yes, via national project Expansion to new applications and user communities
On going effort via dissemination and participation to related projects
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 24
Hungary
Plan for the 2-nd project year: Expansion of national infrastructure
Further increase of HunGrid resources Expansion to new applications and user communities
Expand to new user communities in areas of data mining, drug discovery, bioinformatics, climate modeling, B2B, geophysics, network modeling, etc
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 25
Hungary
Plan for the 2-nd project year: Other sources of funding in grid area including related
projects Participation in various Grid Related project proposals
Industrial cooperation Increase contacts with industrial partners
Expansion of national infrastructure Further increase of HunGrid resources
Expansion to new applications and user communities Expand to new user communities in areas of data mining, drug
discovery, bioinformatics, climate modeling, B2B, geophysics, network modeling, etc
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 26
Hungary
Report on May-August 2007: NGI organization and Consortium expansion
Additional JRU established with 3 members in total: DEPARTMENT OF METEOROLOGY at ELU and SEISMOLOGICAL OBSERVATORY of GGRI
The current JRU has been formed by two smaller application developer/user teams and one team that deals with grid development, operation, support, and training. This 'satellite' JRU will exploit the nationwide Grid resources (operated by the another HGCC JRU) together with other international resources for a specific purpose, namely for applications in the field of seismology and meteorology. The another JRU has been established earlier by the Hungarian Grid Competence Center (HGCC) involving the key and most experienced Grid players from Hungary. This center has launched the National Grid Initiative, and intends to become the national reference point.
SZTAKI is member in both JRUs The management of two separated JRUs with different objectives (instead of
one heterogeneous JRU) and with different leaders seems to be more feasible.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 27
Hungary
eIRG plans Already eIRG member, working towards
National-level projects Same number of projects as before, working on the projects. + SEE-GRID-SCI
Industrial cooperation Industrial collaboration was initiated with Oracle Hungary, first
negotiation was done beginning of May as an outcome of the HU-Hungarian Grid Induction and Application Development Training
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 28
Moldova
Plan for the 2-nd project year: NGI setup and recognition
MD Grid NGI establishment in May 2007 NGI organization and Consortium expansion, NREN cooperation
Inclusion of State University of Moldova, Institute of Ecology and Geography, Faculty of Economical Cybernetics of AESM and the Institute of Applied Physics of the ASM.
eInfrastructure national strategy New strategy to be accepted in collaboration with MD Grid NGI
eIRG plans Application for Moldova membership to be prepared and sent.
National-level projects Adopting by Moldovan government of the Concept of National
Information System for Science and Innovation will include grid-related topics.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 29
Moldova
Plan for the 2-nd project year (cont): Other sources of funding in grid area including related projects
NATO Proposal for upgrading of NGI regional and global connectivity Industrial cooperation
Negotiations for new grid nodes and users involvement from MoldHidroMeteo State Enterprise and the Institute of Economics and Statistics of Moldova.
Technical independence i.e. national-level services Necessary resources for CA, VOMS, RB/WMS to be determined and
established. Expansion of national infrastructure
Inclusion of new sites Expansion to new applications and user communities
Creation of MD-Grid user communities, applications selection and gridification.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 30
Moldova
Report on May-August 2007: NGI setup and recognition
MD-Grid Kick-off meeting MD-Grid NGI Consortium Agreement signed by 6 NGI participants (May
10 2007):– Research and Educational Networking Association of Moldova – coordinator– Institute of Mathematics and Computer Science of the Academy of Sciences
of Moldova– Faulty of Radioelectronics and Telecommunications of the Technical
University of Moldova– Institute of Geology and Seismology of the Academy of Sciences of Moldova– State Hydrometeorological Service– School of Public Heals, State University of Medicine and Pharmacy
“N.Testemitanu” NGI Recognized by: MID – Ministry of Information Development and
ASM
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 31SEE-GRID-2 PSC 05 Meeting – Thessaloniki, Greece, 11-12.09.2007 31
MoldovaInauguration of MD-Grid NGI in Moldova: May 14 2007, Kick-off session during RENAM Users Conference-2007
Presentations: •National Grid Initiative: MD-Grid - Starting point and perspectivesby Prof. Andrei Andries, General Director of RENAM •Sustainable development of eInfrastructure in South-East Europe• by Dr. Peter Bogatencov•National Grid Initiative MD-Grid for science and educationby Dr. Veaceslav Sidorenco•Participation of IMI ASM in MD-GRID and cooperation with RENAM in joint GRID node deploymentby Dr. Svetlana Cojocaru, vice-director of the Institute of Mathematics and Computer Science of ASM.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 32SEE-GRID-2 PSC 05 Meeting – Thessaloniki, Greece, 11-12.09.2007 32
Moldova
MD-Grid NGI Consortium Agreement
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 33
Moldova
Report on May-August 2007 (cont.): eIRG plans
Letter of application sent. Answer gotten: Moldova cannot be member of eIRG , observer only, but there is no policy at the moment
Industrial cooperation Negotiation of cooperation prospects with two domestic Companies that
plan to be involved in GRID applications development Technical independence i.e. national-level services
CA building documents preparation continued Expansion of national infrastructure
Organization of the tender for purchasing of the equipment according to the MoUs with institutions
Expansion to new applications and user communities 1 application, nominated and gridification started
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 34
Moldova
Up-dated plan for the remaining period: NGI organization and Consortium expansion
State University of Moldova, the Academy of Economical Studies of Moldova
eInfrastructure national strategy new MD-Grid NG eInfrastructure to be determined
eIRG plans application for Moldova observer Membership to be prepared and sent
National-level projects Adopting by Moldovan government of the Concept of National
Information System for Science and Innovation will include grid-related topics.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 35
Moldova
Up-dated plan for the remaining period (cont): Other sources of funding in grid area including related projects
FP7, SEEGRID-SCI Industrial cooperation
negotiations for new grid nodes and users involvement from the Academy of Economical Studies of Moldova.
Technical independence i.e. national-level services necessary resources for CA, VOMS, RB/WMS to be determined and
established. Expansion of national infrastructure
negotiations for new grid nodes creation Expansion to new applications and user communities
creation of MD-Grid users communities, PRNNS application gridification and deployment.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 36
Montenegro
Plan for the 2-nd project year: NGI organization and Consortium expansion, NREN cooperation
Increase number of MGI members eInfrastructure national strategy
First draft of the national Grid strategy will be written and presented in for approval by the Ministry of Education and Science.
Promote the national Grid strategy and work on its implementation Other sources of funding in grid area including related projects
Search for additional sources of funding, especially from industry. Industrial cooperation
Dissemination of information about Grid technology among IT and other industry in Montenegro.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 37
Montenegro
Plan for the 2-nd project year (cont): Technical independence i.e. national-level services
Establish the National Grid CA (CP/CPS to be finished until May 2007 and completion is expected until end of 2007)
Expansion of national infrastructure Improve the Grid infrastructure by upgrading the existing site and
introducing new ones. Expansion to new applications and user communities
Increase the number of users and applications.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 38
Romania
Plan the 2-nd project year: NGI organization and Consortium expansion
RoGrid expansion with one more institution during 2007 NREN cooperation
Cooperation with RoEduNet for NREGI development National-level projects
The new R&D Call for proposals at the National level Plan is scheduled for June-July 2007.
Other sources of funding in grid area including related projects Via international cooperation. Utilization of Structural Funds will be
attempted. Industrial cooperation
Activate cooperation with IT private high-tech companies
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 39
Romania
Plan for the 2-nd project year (cont): Technical independence i.e. national-level services
Activate the national CA Expansion of national infrastructure
It is planned to include 1-2 new sites Expansion to new applications and user communities
The expansion to the ESR, BioMed, and Simulation and Optimization fields will be attempted.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 40
Romania
Report on May-August 2007: NGI organization and Consortium expansion
Two new institutions have been included in the consortium: West University of Timisoara - Computer Science Department, and Technical University of Cluj-Napoca – Computer Science Department
National-level projects Participation in the National Research Programme Call 1 (June 2007) A proposal for NREGI development was submitted to the National
Committee for Research Infrastructures Other sources of funding in grid area including related projects
EGEE III, SEE-GRID-SCI, Structural funds. Industrial cooperation
IT private high-tech companies included in proposal consortia for the NRP Call1
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 41
Romania
Report on May-August 2007 (cont): Technical independence i.e. national-level services
National CA accredited in July 2007 Expansion of national infrastructure
Site of the new RoGrid comers Expansion to new applications and user communities
Modelling, simulation and optimization (MOSI) applications on Grid are under development (ICI, NCIT, WUT, TUCN, INCAS)
EQUSIM application was defined by NIPNE in cooperation with National Institute for Earth Science Bucharest
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 42
Romania
Up-dated plan for the remaining period: National-level projects
Starting winning projects from NRP Call 1 Other sources of funding in grid area including related projects
Contributions to current FP7 projects preparations (EGEE III, SEE-GRID-SCI)
Technical independence i.e. national-level services Activate the national CA Improve the current level of deployment of national-level services
Expansion of national infrastructure Up-grade current sites
Expansion to new applications and user communities MOSI applications deployment and support
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 43
Serbia
Plan for the 2-nd project year: NGI organization and Consortium expansion, NREN cooperation
Improve AEGIS organization with signing of new MoU and forming JRU Maintain excellent relation with NREN
eInfrastructure national strategy Work towards eInfrastructure national strategy
eIRG plans Establish eIRG membership (in progress)
National-level projects Seek national funding from newly introduced Ministry of
Telecommunications and Information Society Other sources of funding in grid area including related projects
Obtain equipment grants from SNIP and IPA (in progress) Get further funding in grid area through participation in FP7 and
regional calls (e.g. see-era.net)
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 44
Serbia
Plan for the 2-nd project year (cont): Industrial cooperation
Expand industrial cooperation, by interacting with hi-tech SMEs (e.g. IRVAS, SEWA)
Technical independence i.e. national-level services Achieve full technical independence of national-level services, after
accreditation of CA Expansion of national infrastructure
Further expand AEGIS infrastructure by introducing new sites, and by upgrading existing ones
Expansion to new applications and user communities Expand to new applications and user communities such as Meteorology
and Archeology
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 45
Serbia
Report on May-August 2007: NGI organization and Consortium expansion, NREN cooperation
Annual AEGIS Assembly held on September 8 AEGIS organization improved by signing of new MoU and forming of JRU Excellent relation with NREN maintained – it is one of the founding
members of AEGIS Industrial cooperation
Industrial cooperation improved, two hi-tech SMEs (e.g. IRVAS, SEWA) are members of AEGIS
Technical independence i.e. national-level services Full technical independence of national-level services is achieved; AEGIS
CA accredited Expansion of national infrastructure
Upgrade of AEGIS01-PHY-SCL in progress, new sites will be added in 2007
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 46
Turkey
Plan for the 2-nd project year: NGI organization and Consortium expansion, NREN cooperation
TR-Grid will be expanded with the participation of new members from governmental departments and industry: Prime Ministry State Planning Organization, National Meteorology Service, Turkish Atomic Energy Authority, Kandilli Observatory and Earthquake Research Center , AGMLAB
JRU will be formed as a mechanism for NGI eInfrastructure national strategy
TR-Grid strategy and policy will be finalized. eIRG plans
TUBITAK expects to become a member of eIRG. Other sources of funding in grid area including related projects
All of the TR-Grid members are trying to participate in different projects from national and international level.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 47
Turkey
Plan for the 2-nd project year (cont): Industrial cooperation
Meetings will be organized to strengthen the industrial and governmental collaboration of TR-Grid.
Technical independence i.e. national-level services Full technical independence will be achieved.
Expansion of national infrastructure Increase in the number of CPUs to over 1000 cores is expected.
Expansion to new applications and user communities TR-Grid will support new grid applications from different research fields
and looking at multidisciplinary applications.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 48
Turkey
Report on May-August 2007: NGI organization and Consortium expansion
1 new member – Turkish Atomic Energy Authority (TAEA) TR-Grid JRU was formed in August 2007 with 9 members of NGI
eInfrastructure national strategy + policy documents Strategy document is finalized and Management Board of ULAKBIM
decided to form an advisory board that will work as the decision maker Site and User Policy documents are finalized
eIRG plans The membership of TUBITAK to eIRG is in progress
National-level projects TR-Grid e-Infrastructure Project has been extended until the end of June
2007 and total project budget was increased to 800K Euro
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 49
Turkey
Report on May-August 2007 (cont): Other sources of funding in grid area including related projects
TR-Grid e-Infrastructure Project, EUMEDGRID, EGEE-2 Industrial cooperation
The industrial collaboration was initiated with AGMLAB (SME) in the semantic and search engine areas. ULAKBIM and AGMLAB developed an academic research engine which will use TR-Grid infrastructure and grid services.
EDA Engineering and Analysis (SME specialized in Computational Fluid Dynamics)
Expansion of national infrastructure 8 sites are operational. Minimum site configuration is 64 core and 1
Tbyte storage area. As total 1000 cores and 40 Tbyte storage. Sites migrated to EGEE production
All of the 8 sites are part of EGEE infrastructure
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 50
Views from National Events
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 51
Turkey
Up-dated plan for the remaining period: NGI organization and Consortium expansion, NRN cooperation
TR-Grid will be expanded with the participation of new members from governmental departments and industry:
– Prime Ministry State Planning Organization, National Meteorology Service, Kandilli Observatory and Earthquake Research Center
eIRG plans membership of eIRG
National-level projects expected expansion of infrastructure with the new submitted projects
Other sources of funding in grid area including related projects TR-Grid is involved in the proposals of next phase Grid projects: EGEE-
III, EUMEDGRID2, SEE-GRID-SCI. Industrial cooperation
Meetings will be organized to strengthen the industrial and governmental collaboration of TR-Grid.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 52
Turkey
Up-dated plan for the remaining period (cont): Expansion of national infrastructure
more storage Expansion to new applications and user communities
TR-Grid supports new grid applications from different research fields and looking for multidisciplinary applications.
SEEGRID PSC 05 Meeting – Thessalonica, 11-12.09.2007 53
WP2 Action plan
Provision of missing 3M reports and up-dated plansDecide on the list of NGI sustainability indicatorsDefine metrics per NGI/S indicatorEvaluate potential impact on NGI/S for each metric and for each indicatorExperiment this impact analysis framework on currently reported NGI statusContinuous monitoring of NGI/S metrics and indicators