WRAP Board Meeting April 3, 2003. Current status of Model Tribal Implementation Plan (309 Regional Haze TIP) Rosanne Sanchez New Mexico Environment Department. STIP II Workgroup. Next phase review TIP Template after conversions have been made from the SIP template. 4 EPA Representatives - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: WRAP Board Meeting April 3, 2003

WRAP Board MeetingApril 3, 2003

Current status of

Model Tribal Implementation Plan(309 Regional Haze TIP)

Rosanne Sanchez

New Mexico Environment Department

Page 2: WRAP Board Meeting April 3, 2003

STIP II Workgroup

• Next phase review TIP Template after conversions have been made from the SIP template.

• 4 EPA Representatives (Steve Body lead Region 10)

• Doug McDaniel and Monica Morales• Seek out tribal reviewers• Bob Gruenig and Bill Grantham NTEC

Page 3: WRAP Board Meeting April 3, 2003

STIP II ProjectState and Tribal Implementation Plan

309 SIP Template

• Completed in March 2003 (not finalized)

• Composed of 4 major sections

• Template section has 12 chapters

309 TIP Template

• Completion set for May 2003 ???

• 90 day review

• Designed after the model SIP

• *Additional sections added relevant to tribes (7).

Page 4: WRAP Board Meeting April 3, 2003

Additional SectionsEnvironmental Protection Agency’s Trust Responsibility to Tribes

Guiding Elements of the Tribal Authority Rule as it Applies to TIP Development

Implementing a Tribal Regional Haze Program in Indian Country

General Definitions in the Regional Haze Rule

The Advantages and Disadvantages in Adopting a Regional Haze TIP

Completeness Documentation

Market Trading Forum and Tribal Set-Asides

Appendices

(slightly differs)

Page 5: WRAP Board Meeting April 3, 2003

Potential Challenges

• Modification of rule and template language

• Delay in receiving EPA comments. Due to challenging questions posed.

• Lack of tribal representatives to review document.

• Other unforeseen issues

Page 6: WRAP Board Meeting April 3, 2003

Any Questions?

WISH ME LUCK !