wrap-up ground segment coordination body workshop 2012 esa/esrin, frascati, 6-7 june 2012

17
Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

Upload: maximo-chadbourne

Post on 01-Apr-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

Wrap-up

Ground Segment Coordination BodyWorkshop 2012

ESA/ESRIN, Frascati, 6-7 June 2012

Page 2: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

Objectives of the Workshop

Give a high level Overview of the respective programmes of all participants +Give a more detailed overview on the status and the current achievements of the

GSCB activities (HMA, LTDP, QA4EO and CAL/VAL). +

Provide a forum for the mission operators +to present their plans and achievements with regard to: +

interoperability implementation, ? quality management concept, long term data preservation, and EO Ground Segments infrastructure evolution

to provide active comments on the GSCB workplan needs +/-

To actively discuss questions on respective plans of Agencies and workshop participants.

Page 3: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

Some Workshop Results

Page 4: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

4

Operating

today

Session 1:Coherent View of the GMES GSC Status Context, User

Access !

Page 5: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

Session 2: LTDP, Quality and CAL/VAL Framework in Earth Observation

1986-2012 and future

LTDP is a very advanced cooperation project across GSCB members and has become an ESA proposal to CMIN and has been recognised as

an important need in national funding plans !

Cloud Computing is a hype, and is very good to buffer unplanned, dynamic needs in re-processing and dissemination while for static

processing traditional architecture remains more cost efficient; both need to be implemented complementarily.

Cloud Computing

IaaS

SaaS

Hosting(VPS, Rental)

CDN

PaaS

Page 6: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

Session 3: Ground Segment of GSCB Missions

Envisat ERS-1/2 Proba

COSMO-SkyMED

TerraSAR-X

SPOT-4 Pléiades Jason Radarsat

METOP MSG

TanDEM-XRadarsat-2 SPOT-5

Sentinels

NovaSAR-S

Page 7: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

7

After a long and hard working day

Page 8: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

Session 4: Ground Segment of Major European Missions

Rapideye DMC

Ikonos

Deimos-1 Deimos-2

Nigeriasat-2ODINProba-V RISAT-1

RASAT

ASTROTERRAPAZINGENIO

AISSat-1

GeoEye-1 Oceansat-2 EROS

IRS-P6

WorldView

IRS-P3

QuickBird

Page 9: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

Preliminary Summary, Recommendations and

Conclusions

Page 10: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

• Standards and Interfaces will become even more important in the future and will have to be constantly reviewed and adjusted.

• General agreement one the need for coordination in Interface standards, Quality management and quality description, Cal VAL infrastructure, Longterm Data Preservation and newly data integrity and secure access management.

• HMA has to keep evolving with the goals to simplify and assuring complementarity with other existing or upcoming Interface Standards.

• Most Mission and GS operators are or are ready to follow standards as required for the GMES GSC or other Multi Mission Interfaces

Conclusions (1)

Page 11: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

LTDP principles defined via GSCB are at the basis of the European LTDP Framework for the preservation of Earth Observation data and associated knowledge.ESA LTDP programme proposal is based on the principle grown-up by GSCB/LTDP WG.

Cooperation in CAL/VAL is key for current and future missions. Cal/Val infrastructure operations worldwide have been reduced to or below a critical level for all instrument operators; a Cal/Val Interest Group under GSCB shall attempt to improve sharing and maintaining this infrastructure.Ensure coordinated European presence in international instances (CEOS WGCV, WMO, GEO)

Conclusions (2)

Page 12: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

Cooperation concept consolidated via GSCB has lead to the architecture for GMES.

The effort for accessing data from sentinels and contributing missions will inevitably stress the need for better coordination, product standards, access standards at all levels, from NRT to archiving and retrieval.

The pressing need to support the Sentinels PDGS collaborative ground segments and the scientific data access is a further reason for achieving rapid progress.

Conclusions GMES related

Page 13: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

Deal with data integrity/protection especially when using shared and linked infrastructure and systems: Address the basic standards for EO Ground Segments and data

protection (GS Security) Harmonization of Authentication mechanisms (Single Sign On) ?

Address harmonization of EO Product specifications & formats for archiving and dissemination (CEOS, GEO and others).

Address HMA standards simplification to maximize spread and use.

Explore LTDP practices and experience of communities outside EO and Earth Science and review GSCB LTDP recommendations to standards to ensure interoperability.

Specific Suggestions (1)

Page 14: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

14

Continue elaborating GS architectures using the combination of both clouds and traditional architectures. Convergence of efforts in Europe with respect to Cloud Computing and

standardization of interfaces. Address the management of large volumes of data

Build a coordinated European data offer, exploiting the efforts conducted under the GMES label. GEO may be the target customer base.

Follow closely the GEO developments and aim at improving accessibility of European data in GEOSS, building upon the European long-term data preservation framework and HMA initiatives.

Maintain this type of GSCB WS to ensure information flow.

Suggestions, inputs and recommendations to GSCB from audience and in side discussions (2)

Page 15: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

15

Points added during discussion :

•GSCB to adress future ground segment projects and architecture “ bringing the user to the data” rather than the data to the user;

•Link Image Information Mining activities to the overall concept

•Recognize that even non-Space Agencies non use HMA as standard in the interfaces and specifications; keep them involved

•GS Performance is more than “timeliness”; a list of GS and operational KPIs could be drafted.

Discussion

Page 16: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

Distribute Workshop Presentations.

Maintain GSCB website up to date with all GSCB evolutions.

Next GSCB Workshop will be held in 2 years (spring 2014).

GSCB: next steps

Page 17: Wrap-up Ground Segment Coordination Body Workshop 2012 ESA/ESRIN, Frascati, 6-7 June 2012

Michel Fortin(C. Casgrain, M. Adamovic,A. Mahmood)

Brigitte Behal(M. Winterholer, J.P. Gleyzes)

Gunter Schreier

Joaquin Gonzalez(Y. Lavergne, G. Mason)

Gunther KohlhammerMirko Albani (E. Forcada)

Stefano Bruzzi (G. Rum, C. Ananasso)

Caroline Cloutier

Peter Fletcher, Magali Dodemant(A. Bunn)

Thank you and Have a safe trip back

http://earth.esa.int/gscb/