CONTENTS Chapter Particulars Page GENERAL NOTE 1 BASIC RATES I LABOUR RATES 2 II SUPPLY OF MATERIAL 5 III CARRIAGE OF MATERIAL 19 IV HIRE CHARGES OF PLANTS AND MACHINERIES 30 MAIN WORKS V EARTHWORK IN EXCAVATION/EMBANKMENT AND PROTECTION WORK 33 VI MORTAR 72 VII CONCRETE AND CANAL LINING 79 VIII MASONRY 102 IX PLASTERING AND POINTING 125 X CENTERING, SHUTTERING AND RCC 141 XI FOUNDATION AND SURFACE TREATMENT 144

Upload: harish-kumar-mahavar

Post on 23-Nov-2015

33 views

Category:

Documents


3 download

DESCRIPTION

wrd

TRANSCRIPT

CONTENTS

ChapterParticularsPage

GENERAL NOTE1

BASIC RATES

ILABOUR RATES2

IISUPPLY OF MATERIAL5

IIICARRIAGE OF MATERIAL19

IVHIRE CHARGES OF PLANTS AND MACHINERIES30

MAIN WORKS

VEARTHWORK IN EXCAVATION/EMBANKMENT AND PROTECTION WORK33

VIMORTAR72

VIICONCRETE AND CANAL LINING79

VIIIMASONRY102

IXPLASTERING AND POINTING125

XCENTERING, SHUTTERING AND RCC141

XIFOUNDATION AND SURFACE TREATMENT144

DATA SHEET

1Hire charges of Truck1200.00Per shift of 8 hours

2Cost of Diesel39.88Per litre

3Wages

Mate145.00P day

Beldar135.00P day

Stone Braker Grade I155.00P day

Stone Braker Grade II145.00P day

Excavators135P day

Chawalia175.00P day

Stone dresser Grade I275.00P day

Stone dresser Grade II250.00P day

Mistri205.00P day

Driller/Grout pump driver145.00P day

Helper145.00P day

Fitter205.00P day

Blaster205.00P day

Mason Grade I250.00P day

Mason Grade II205.00P day

Royalties

Aggregate, stone0.00P. Cum

Earth0.00P. Cum

Material

Amonium nitrate30.00Kg

Gelatin70.00Kg

Fuse Coil5.00RM

Ordinary detonator10.00Each

Drill Rod 800 mm long3000.00Each

Electric Detonator25.00Each

Sealing Compound140.00Kg

Air hose double braided110.00Mt

Claw coupling45.00Each

Hose clamps40.00Each

Valve350.00Each

Suction pipe 3" dia230.00Mt

Foot Valve 3"500.00Each

GI pipe 3" dia400.00Mt.

Extention Rod 1" hex 800 mm2700.00Each

Extention Rod 1" hex 1600 mm5400.00Each

Extention Rod 1" hex 2400 mm8100.00Each

Extention Rod 1" hex 3200 mm13000.00Each

Coupling sleeves1"1900.00Each

Shank Rod2500.00Each

Bit 48 mm dia4350.00Each

Water Body1000.00Each

Water body washer 20.00Each

Lubricating oil 110.00lit

Grinding wheel 1250.00Each

Bit adopter1000.00Each

Shank adopter1000.00Each

T.C.T. Cross bit4350.00Each

GI/MS pipe 65 mm dia150.00Mt

Grout pump including water hose, air hose, fittings, repairs etc.300.00Each

Cost of Crusher broken Graded Aggregate

Upto 150 mm437.50P. Cum

Upto 80 mm488.50P. Cum458.665

Upto 40 mm528.00P. Cum

Upto 20 mm535.00P. Cum

Cost of Natural Graded Aggregate

Upto 150 mm435P. Cum

Upto 80 mm459P. Cum

Upto 40 mm487P. Cum

Upto 20 mm530.6P. Cum

GENERAL NOTES

1Notes have been given before each chapter wherever necessary, which must be read thoroughly before using the B.S.R. for incorporating appropriate provisions and specifications in estimates and tender documents.

2Rates are for complete finished items and inclusive of all ancillary works necessary for the completion of work covered under respective item as per standard specification unless otherwise specified in the description of the item.

3Rates of all items provided in this BSR are inclusive of all taxes, overheads and contractor's profit and labour welfare, camping, medical and sanitation facilities to labour, tools and plants etc., required to complete the work as per standard specifications.

4In case of disputes if any, regarding interpretation of the description of items in this Schedule of Rates, the decision of the Chief Engineer, Water Resources Rajasthan, Jaipur shall be final and binding.

5OPC/PPC (Fly ash based ) Cement of grade 43N/m2 shall be used unless otherwise specified.

CHAPTER-I

LABOUR RATES

1The labour rates are inclusive of all allowances including weekly holidays and no extra element will be admissible on this account.

2The rates of skilled and unskilled labours are inclusive of necessary tools, which are normally carried by them according to the trade practice.

3The rates do not include contractor's profit unless otherwise specified.

4The rate provided in item No. 13 may also be permissible for water arrangement from tube well/open well through electric / diesel operated pump sets. If water supply arrangements is not required for 8 hours a day than proportionate rate shall be permitted.

5Labour rates shall be governed by minimum wages act in force.

6These rates are for analysis and estimation purpose only.

S. No.ItemUnitRate

(in `)

UNSKILLED

1(a)Beldar/Women Cooli / Chowkidar /Water man / Earth- dresserPer Day135

(b)White washer/store or laboratory attendant/floor polisherPer Day145

(c)Dak Runner with his own cyclePer Day155

(d)Sweeper part time

i)For 2 hours45

ii)For 1/2 day (Four hours)80

iii)Per Day155

SEMI SKILLED

2MatePer Day145

3Helper for Carpenter /Black smith / Mechanic/Electrician / Plumber / Steel fabricator /Fitter / Driller / Truck / Tractor /Compressor/ Jack Hammer /DumperPer Day145

4(a)Security Guard with licensed gun owned by himPer Day205

(b)Security Guard without gun Per Day190

5Munshi/Survey Amin/ Density Observer/ Record Keeper/Time Keeper/ Gate Keeper/ Core Observer/ Laboratory Assistant / Gauge Reader / Telephone Assistant

(a)Grade I (Secondary Pass)Per Day205

(b)Grade IIPer Day155

6Cook cum Chowkidar Per Day155

7Stone breaker (unsing Ghan) / Turriya

(a)Grade I Per Day155

(b)Grade IIPer Day145

8ChawaliaPer Day175

9Gharat with Gharat man and bullock/buffaloPer Day300

10Billock/Camel/Buffalo pair with bullock man and plough para / cart/ drum if required Per Day350

11Rahat/Charas with bollock /Camel/Buffalo pair and driver including cost of water and lifting device etc. complete Per Day350

124-wheel hand "thela" with hammalPer Day205

13(a)Donkey man with six donkey and carrier bags.Per Day445

(b)Add/Subtract for each donkey Per Day50

14Operator for Jack Hammer/ Vibrator/ Pneumatic Tamper or pavement Breaker/shot-crete placerPer Day155

SKILLED

15Gardener

(a)Grade IPer Day155

(b)Grade IIPer Day145

16(a)Driver for pumps/Concrete MixersPer Day145

(b)Driver for Compressor/Generators Per Day155

(c)Heavy vehicle driver for Trucks/Dumpers/Tractors/ Stone crusher etc. (License holder) Per Day205

17Boat man/Blaster (with license)Per Day205

18Welder/Fitter/Line-man/Turner/Wireman/DrillerPer Day205102.5

19Stone Dresser/cutter (Silawat)

(a)Grade IPer Day275

(b)Grade IIPer Day250

20Mason/ Painter/ Carpenter/ Electrician /Black smith / plumber

(a)Grade IPer Day250

(b)Grade IIPer Day205

21Survey Mistry / earthwork Mistry / Work Mistry (Experienced/Trained) Patwari (Trained) / Tracer (I.T.I.) / Wireless Operator (Trained) / Receptionist Per Day205

22(a)Typist having knowledge of typing in computerPer Day205

(b)Computer Operator having knowledge of M.S. Office/Excel/Power point

(i)with own computer Per Day255

(ii)without computerPer Day205

23Light vehicle driver for Jeep/Car/Station wagon etc. (License holder) (Grade I)Per Day205

24Driver with life jackets and all accessories for working under water. Duty hours at sitePer Hour250

25Driver for Heavy Machine like chain type Dozers/Shovels, etc. (License Holder) Boring/Wagonet machine operator Per Day325

26Work Agents/Surveyors/Supervisors

(a)Possessing Civil Engineering Degree or equivalent. Per Day460

(b)Possessing Civil Engineering DiplomaPer Day400

CHAPTER - II

SUPPLY OF MATERIALS

NOTES:

1These rates are at work site inclusive of all leads and also inclusive of all taxes, levies, turn over tax, service tax, income tax, sales tax, octroi, panchayat tax, contractor's profit & royalty etc.

2The rates are also inclusive of making proper approaches to quarry, removal of over-burden and other essential operations required at quarry site, including opening of quarry.

3Measurments shall be made on the basis of stacks and effective height for payment purpose will be as prescribed below. No separate payment shall be made made for laying of stacks.

4Effective height of stacks for various materials shall be as under:

iStone,boulders,brick bats,morrum,sand,surkhi,flyash etc. 85 % of Av. Ht.

iiUn-slacked lime, aggregates etc. 90% of Av. Ht.

5These rates are for analysis and estimation purpose only.

S. No.ItemBasic rate in `Rate in `Unit

LabourMaterialTotal

1(i)Crusher broken stone aggregate of various sizes in accordance with IS:383 1970 for concrete work for dams, canals, and other important structures, well graded with size of aggregate.

(a)150 to 80 mm size310.00Cum

(b)80 to 40 mm size430.00Cum

(c)40 to 20 mm size530.00Cum

(d)20 to 10 mm size550.00Cum

(e)10 to 4.75 mm size500.00Cum

(ii)Hand broken stone aggregate of various sizes in accordance with IS:383 1970 for concrete work for dams, canals, and other important structures, well graded with size of aggregate.

(a)150 to 80 mm size

0.75 Beldars for collection and breaking @ 135.00101.25

T&P & labour welfare @ 3% on101.253.0375

Sundries 1% on 101.251.0125

Contractor's profit @ 10% on 101.2510.13

Average lead for transportation of material from quarry to work site 5 km184.00184.00

Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on299.4312.16

114.41197.17

Say114.00197.00311.00Cum

(b)80 to 40 mm ( Hand broken)

i1.5 Beldars for collection and breaking @135.00202.50

iiT&P & labour welfare @ 3% on202.506.08

iiiSundries 1% on 202.502.025

vContractor's profit @10% on 202.5020.25

viAverage lead for transportation of material from quarry to work site 5 km184.00184.00

viiIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 414.8516.84

228.83202.87

Say229.00203.00432.00Cum

(c)40 to 20 mm ( Hand broken)

i2 Beldars for collection and breaking @ 135.00270.00

iiT&P & labour welfare @ 3% on270.008.10

iiiSundries 1% on 270.002.7

vContractor's profit @10% on 270.0027.00

viAverage lead for transportation of material from quarry to work site 5 km184.00184.00

viiIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 491.8019.97

305.10206.67

Say305.00207.00512.00Cum

(d)20 to 12.5 mm ( Hand broken)

i3.0 Beldars for collection and breaking @ 135.00405.00

iiT&P & labour welfare @ 3% on 405.0012.15

iiiSundries 1% on 405.004.05

vContractor's profit @10% on405.0040.50

viAverage lead for transportation of material from quarry to work site 5 km184.00184.00

viiIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on645.7026.22

457.65214.27

Say458.00214.00672.00Cum

2Stones for Random Rubble masonry work at least 90% stones weighing not less than 37.50 Kg. and no dimension less than 23 cm for massive work

(a)Drilling and blasting charges

LabourMaterial

Drilling charges 2/3 of Item No. Chapter V1.3050.900.8733.93

Blasting charges 2/3 of Item No. Chapter V1.7168.111.1445.41

2.0179.34

(b)Labour charges for mucking sorting and stacking for 10 cum

2 Stone breakers @ 155.00310.00

3 Excavators @ 135.00405.00

4 Chawalias @ 175.00700.00

2 Carriers @ 135.00270.00

1 Beldar for sorting small stone and spalls & their disposal @ 135.00135.00

2 Beldars for stacking @ 135.00270.00

SayRs.2090.00

or P.Cum209.00

(c)Other charges

i Removal of over burden, approaches & mines Cost etc. L.S.35.00

iiT&P Labour welfare @ 3% on 209.006.27

iiiSundries 1% on 209.002.09

ivContractor's profit @ 10% on 209.0020.9

Average lead for transportation of material from quarry to work site 5 km184.00184.00

viIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on538.6121.87

238.18322.30560.48

Say 238.00322.00560.00Cum

3Stones for Random Rubble masonry, at least 75% stones not less than 15 cm in size in any direction and weighing not less than 23 kg.

(a)Labour charges

i 1 No. stone breaker @ 155.00155

ii3/8 No. Beldar for collection and stacking @ 135.0050.63

iiiRemoval of over burden at quarry L.S.3.302.20

ivDrilling and blasting charges 15 % of item (a+b) of chapter no V3.01119.010.4517.85

209.3820.05

b)Miscellaneous charges.

i Removal of over burden, approaches & mines Cost etc. L.S.35.00

ii T&P Labour welfare @ 3% on 209.386.28

iiiSundries 1% on 209.382.09

ivContractor's profit @ 10% on 209.3820.94

vAverage lead for transportation of material from quarry to work site 5 km184.00184.00

viIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on442.7417.98

236.60259.12495.72

Say 237.00259.00496.00Cum

4C.R. Masonry stone for face work of massive structures duly hammer dressed on all beds and sides, the beds joints & faces shall be chisel dressed for at least 8 cm back from face and at least 4 cm from sides height not less than 25 cm and weighing not less then 50 kg., 50% stones to have depth more than 45 cm & tail area not less than half the face area.

(a)Rate as per item No. 2 II above 238.00322.00

Add extra for wastage due to selecting suitable size stones 25% on 238.00322.0059.580.5

Sub toatl 'a'297.50402.50

(b)Add extra for

1.5 stone dressers for dressing of stones @ 275.00412.50

Chawalieas for rehandling of stones @ 175.0087.50

1 Beldar for sorting and disposal of wastage @ 135117.50

1/5 Mistry @ 205.0041.00

Sub toatl 'b'658.500.00

Other charges.

i T&P Labour welfare @ 3% on 658.5019.76

iiSundries 1% on 658.506.59

iiiContractor's profit @ 10% on 658.5065.85

ivIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on750.6930.48

Sub toatl ' c '85.6137.06

Total of (a+b+c)1041.61439.561481.17

Say 1042.00440.001482.00Cum

5(a)C.R. Masonry stone for face work of general structures duly hammer dressed not less than 20 cm in any direction and at least 50% stones to be more than 23 cm in depth.

(a)Rate as per item No. 3 II above 237.00259.00

Add extra for wastage due to selecting suitable size stones 25% on 237.00259.0059.2564.75

Sub toatl 'a'296.25323.75

(b)Add extra for

1.0 stone dressers for dressing of stones @ 275.00275.00

Chawalieas for rehandling of stones @ 175.0087.50

1 Beldar for sorting and disposal of wastage @ 135.00135.00

1/5 Mistry @ 205.0041.00

Sub toatl 'b'538.500.00

Other charges.

i T&P Labour welfare @ 3% on 538.5016.16

iiSundries 1% on 538.505.39

iiiContractor's profit @ 10% on 538.5053.85

ivIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 613.8924.92

Sub toatl ' c '70.0130.31

Total of (a+b+c)904.76354.061258.81

Say905.00354.001259.00Cum

(b)C.R. stones headers, hammer dressed finished size not less than 20 cm x 20 cm and depth not less than 30 cm

Rate as per item No. 5 (a) above905.00354.00

Add 10% extra for headers 90.5035.40

995.50389.40

Say 996.00389.001385.00Cum

6Stones for soling , boulder for rock toe, toe drain , rock fill etc. not less than 15 cm in any direction.

iLabour charges.`

1 Stone breaker @ 155.00155.00

iiOther charges.

T&P Labour welfare @ 3% on 155.004.65

Sundries 1% on 155.001.55

Contractor's profit @ 10% on 155.0015.50

Average lead for transportation of material from quarry to work site 5 km184.00184.00

Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 360.7014.64

175.15200.19

Say 175.00200.00375.00Cum

7(a)Quarry spalls properly screened and graded but not more than 10 cm and not less than 10 mm in size,

(i)Labour charges

Beldar for collection of 1.00 cum quarry spall @13567.5

(ii)Other charges

T&P Labour welfare @ 3% on 67.502.03

Sundries 1% on 67.500.68

Contractor's profit @ 10% on 67.506.75

Average lead for transportation of material from quarry to work site 5 km184.00184.00

Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 260.9510.59

76.275195.27

Say 76.00195.00271.00Cum

bQuarry rubish not more than 10 cm in size.184.00Cum

8(a)Pitching stones atleast 75% stones to be more than 40 kg, in weight and 23 cm x 25 cm x 30 cm in size

Rate as per item No. 8(b)213.00202.00

Add 25 % extra for bigger size stones 53.2550.5

266.25252.50

Say 266.00253.00519.00Cum

(b)Pitching stones atleast 75% stones to be more than 25 kg , in weight and 20 cm x 20 cm x 23 cm in size.

i Labour charges

1 stone breaker @ 155.00155.00

Beldar for 1 cum @135.0033.75

188.75

iiOther charges

T&P Labour welfare @ 3% on 188.755.66

Sundries 1% on 188.751.89

Contractor's profit @ 10% on 188.7518.88

Average lead for transportation of material from quarry to work site 5 km184.00184.00

Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on Rs.399.1816.21

213.29202.09

Say 213.00202.00415.00Cum

(c )Stones for Rip Rap at least one side not less than 23 cm in size.

iLabour charges.`

1 Stone breaker @ 155.00155.00

iiOther charges.

T&P Labour welfare @ 3% on 155.004.65

Sundries 1% on 155.001.55

Contractor's profit @ 10% on 155.0015.50

Average lead for transportation of material from quarry to work site 5 km184.00184.00

Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on360.7014.64

175.15200.19

Say 175.00200.00375.00Cum

9Cement (in bags) 50 Kg in weight. As per IS 1489 and IS 8112 as per requirment (excluding cost of bags)200.00Bag

10Un Slaked Lime.(Sojat or equivalent)5250.00Cum

11Surkhi pulverized as per IS specification i.e., passing through IS Sieve No. 9630.00Cum

12Sand (Un-screened)

i Labour charges

1/8 beldar for clearance of overburden such as silt, mucking boulders, and debries etc. for I cum @135.0016.88

2/5 Beldar will excavate one cum of unscreened sand @135.0054.00

70.88

iiOther charges

Cost of sand at quarry50.00

T&P Labour welfare @ 3% on 70.882.13

Sundries 1% on 120.881.21

Contractor's profit @ 10% on 70.887.09

Average lead for transportation of material from quarry to work site 15 km @ 251.00251.00

Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on382.3015.52

80.09317.73

Say 80.00318.00398.00Cum

13Sand screened and free from organic and deleterious material.

aLabour charges

As per item no 12 above80.00318.00

Wastage 15% on 318.0047.70

Add extra labour charges for screening sand 2/5 beldar @ 135.0054.00

bOther charges

T&P Labour welfare @ 3% on 54.001.62

Sundries 1% on 54.000.54

Contractor's profit @ 10% on 54.005.40

Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on109.264.44

141.02370.68

Say 141.00371.00512.00Cum

Bikaner Bajri having F.M. from 2.2 to 3.2 as per IS specifications. not required in Udaipur ZoneCum

Tibba sand F.M. not less than 0.75not required in Udaipur ZoneCum

14Natural Aggregate

(a)150 to 80 mm size

For 1 Cum

1.0 Beldar required for excavation, sorting, collection, screening and stacking @ 135.00135.00

T&P Labour welfare @ 3% on 135.004.05

Sundries 1% on 135.001.35

Contractor's profit @ 10% on 135.0013.50

Average lead for transportation of material from quarry to work site 5 km184.00184.00

Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 337.9013.72

152.55199.07

Say 153.00199.00352.00Cum

(b)80 to 40 mm size

For 1 Cum

1.33 Beldar required for excavation, sorting, collection, screening and stacking @ 135.00179.55

T&P Labour welfare @ 3% on 179.555.39

Sundries 1% on 179.551.80

Contractor's profit @ 10% on 179.5517.96

Average lead for transportation of material from quarry to work site 5 km184.00184.00

Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on388.6915.78

202.89201.58

Say 203.00202.00405.00Cum

(c)40 to 20 mm size

For 1 Cum

1.66 Beldar required for excavation, sorting, collection, screening and stacking @ 135.00224.10

T&P Labour welfare @ 3% on 224.106.72

Sundries 1% on 224.102.24

Contractor's profit @ 10% on 224.1022.41

Average lead for transportation of material from quarry to work site 5 km184.00184.00

Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on439.4717.84

253.23204.08

Say 253.00204.00457.00Cum

(d)20 to 10 mm size

For 1 Cum

2.17 Beldar required for excavation, sorting, collection, screening and stacking @ 135.00283.50

T&P Labour welfare @ 3% on 283.508.51

Sundries 1% on 283.502.84

Contractor's profit @ 10% on 283.5028.35

Average lead for transportation of material from quarry to work site 5 km184.00184.00

Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 507.1920.59

320.36207.43

Say 320.00207.00527.00Cum

(e)10 to 4.75 mm size

For 1 Cum

2.17 Beldar required for excavation, sorting, collection, screening and stacking @ 135.00292.95

T&P Labour welfare @ 3% on 292.958.79

Sundries 1% on 292.952.93

Contractor's profit @ 10% on 292.9529.30

Average lead for transportation of material from quarry to work site 5 km184.00184.00

Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on517.9621.03

331.03207.96

Say 331.00208.00539.00Cum

15Morrum or Murda

As per chapter V item 1 c47.00

Average lead for transportation of material from quarry to work site 1/2 km40.0040.00

87.0087.00Cum

16Mild steel

(a)Mild steel and medium tensile steel bars as per IS : 432-198235.00Kg.

(b)HYSD steel bars as per IS 1786-198539.00Kg.

(c)Structural steel 40.00Kg.

17Supply of bricks as per IS : 1077-1992

(a)Well burnt clay bricks ( size 230x110x70 mm) class designation 100 as per specification32001000 Nos.

(b)Well burnt clay bricks ( size 230x110x70 mm) class designation 75 as per specification28001000 Nos.

(c)Comman burnt clay bricks ( size 230x110x70 mm) class designation 50 as per specification24001000 Nos.

(d)Brick bats275Cum

(e)Supply of pucca clay tiles (size 30 x 15 x 5 cm) class designation 105 as per IS:3367-199335801000 Nos.

18Hydraulically compressed P.C.C. tiles 40 mm thick (50 mm compressed to 40 mm) in cement, sand, aggregate upto 10 mm (well graded crusher broken) as per specifications conforming to ISI 10646-1991 with concrete of M15 grade.

(a)300 x 300 mm size13.00Each

(b)150 x 300 mm size8.00Each

19Stone patties edges hammer dressed

(a)Length up to 1.50 m and thickness 50 mm and above270.00Sqm

(b)Length up to 1.50 m to 2.50 m and thickness 70 mm and above300.00Sqm

(c)Length up to 2.50 m to 4 m and thickness 80 mm and above430.00Sqm

20Cut stone sills, slab, or lintels one face plain and edge hammer dressed.

(a)100 to 125 mm thick 365.00Sqm

(b)126 to 150 mm thick 380.00Sqm

(c)151 to 200 mm thick 400.00Sqm

21Fly ash confirming to IS 3812-1981( in bags) 20 Kg in weight25.00Per bag

22Chemical for curing as per ASTM36.00Per Lit

23Empty bag of 50 kg capacity in good condition

a.Jute12.00Each

b.Plastic / Polythene 3.00Each

24ISI marked low Density Poly Ethylene (LDPE) film black, High Impact resistant, Heavy duty Grade 030 in thickness of 125, 200 & 250 micron in the form of flat sheet of 6 to 9 metre width without having any joints as per IS: 2508-1984 120.00Kg.

25(a)Distance stone well dressed of required shape and size 60 cm x 23 cm x 7 cm with exposed faces chiesel dressed. 75.00Each

(b)Distance stone well dressed of required shape and size 60 cm x 23 cm x 7 cm with distance marked engraved and exposed faces well painted. 100.00Each

26Cost of Diesel39.88Lit

27Amonium nitrate30.00Kg

28Gelatin70.00Kg

29Fuse Coil5.00RM

30Ordinary detonator10.00Each

31Drill Rod 800 mm long3000Each

32Electric Detonator25.00Each

33Sealing Compound140Kg

34Air hose double braided110Mt

35Claw coupling45Each

36Hose clamps40Each

37Valve 3" dia350Each

38Suction pipe 3" dia230Mt

39Foot Valve 3"500Each

40GI pipe 3" dia400Mt.

41Extention Rod 1" hex 800 mm2700Each

42Extention Rod 1" hex 1600 mm5400Each

43Extention Rod 1" hex 2400 mm8100Each

44Extention Rod 1" hex 3200 mm13000Each

45Coupling sleeves1"1900Each

46Shank Rod2500Each

47Bit 48 mm dia4350Each

48Water Body1000Each

49Water body washer 20Each

50Lubricating oil 110lit

51Grinding wheel 1250Each

52Bit adopter1000Each

53Shank adopter1000Each

54T.C.T. Cross bit4350Each

55GI/MS pipe 65 mm dia150Mt