wrd dsr 11
DESCRIPTION
wrdTRANSCRIPT
CONTENTS
ChapterParticularsPage
GENERAL NOTE1
BASIC RATES
ILABOUR RATES2
IISUPPLY OF MATERIAL5
IIICARRIAGE OF MATERIAL19
IVHIRE CHARGES OF PLANTS AND MACHINERIES30
MAIN WORKS
VEARTHWORK IN EXCAVATION/EMBANKMENT AND PROTECTION WORK33
VIMORTAR72
VIICONCRETE AND CANAL LINING79
VIIIMASONRY102
IXPLASTERING AND POINTING125
XCENTERING, SHUTTERING AND RCC141
XIFOUNDATION AND SURFACE TREATMENT144
DATA SHEET
1Hire charges of Truck1200.00Per shift of 8 hours
2Cost of Diesel39.88Per litre
3Wages
Mate145.00P day
Beldar135.00P day
Stone Braker Grade I155.00P day
Stone Braker Grade II145.00P day
Excavators135P day
Chawalia175.00P day
Stone dresser Grade I275.00P day
Stone dresser Grade II250.00P day
Mistri205.00P day
Driller/Grout pump driver145.00P day
Helper145.00P day
Fitter205.00P day
Blaster205.00P day
Mason Grade I250.00P day
Mason Grade II205.00P day
Royalties
Aggregate, stone0.00P. Cum
Earth0.00P. Cum
Material
Amonium nitrate30.00Kg
Gelatin70.00Kg
Fuse Coil5.00RM
Ordinary detonator10.00Each
Drill Rod 800 mm long3000.00Each
Electric Detonator25.00Each
Sealing Compound140.00Kg
Air hose double braided110.00Mt
Claw coupling45.00Each
Hose clamps40.00Each
Valve350.00Each
Suction pipe 3" dia230.00Mt
Foot Valve 3"500.00Each
GI pipe 3" dia400.00Mt.
Extention Rod 1" hex 800 mm2700.00Each
Extention Rod 1" hex 1600 mm5400.00Each
Extention Rod 1" hex 2400 mm8100.00Each
Extention Rod 1" hex 3200 mm13000.00Each
Coupling sleeves1"1900.00Each
Shank Rod2500.00Each
Bit 48 mm dia4350.00Each
Water Body1000.00Each
Water body washer 20.00Each
Lubricating oil 110.00lit
Grinding wheel 1250.00Each
Bit adopter1000.00Each
Shank adopter1000.00Each
T.C.T. Cross bit4350.00Each
GI/MS pipe 65 mm dia150.00Mt
Grout pump including water hose, air hose, fittings, repairs etc.300.00Each
Cost of Crusher broken Graded Aggregate
Upto 150 mm437.50P. Cum
Upto 80 mm488.50P. Cum458.665
Upto 40 mm528.00P. Cum
Upto 20 mm535.00P. Cum
Cost of Natural Graded Aggregate
Upto 150 mm435P. Cum
Upto 80 mm459P. Cum
Upto 40 mm487P. Cum
Upto 20 mm530.6P. Cum
GENERAL NOTES
1Notes have been given before each chapter wherever necessary, which must be read thoroughly before using the B.S.R. for incorporating appropriate provisions and specifications in estimates and tender documents.
2Rates are for complete finished items and inclusive of all ancillary works necessary for the completion of work covered under respective item as per standard specification unless otherwise specified in the description of the item.
3Rates of all items provided in this BSR are inclusive of all taxes, overheads and contractor's profit and labour welfare, camping, medical and sanitation facilities to labour, tools and plants etc., required to complete the work as per standard specifications.
4In case of disputes if any, regarding interpretation of the description of items in this Schedule of Rates, the decision of the Chief Engineer, Water Resources Rajasthan, Jaipur shall be final and binding.
5OPC/PPC (Fly ash based ) Cement of grade 43N/m2 shall be used unless otherwise specified.
CHAPTER-I
LABOUR RATES
1The labour rates are inclusive of all allowances including weekly holidays and no extra element will be admissible on this account.
2The rates of skilled and unskilled labours are inclusive of necessary tools, which are normally carried by them according to the trade practice.
3The rates do not include contractor's profit unless otherwise specified.
4The rate provided in item No. 13 may also be permissible for water arrangement from tube well/open well through electric / diesel operated pump sets. If water supply arrangements is not required for 8 hours a day than proportionate rate shall be permitted.
5Labour rates shall be governed by minimum wages act in force.
6These rates are for analysis and estimation purpose only.
S. No.ItemUnitRate
(in `)
UNSKILLED
1(a)Beldar/Women Cooli / Chowkidar /Water man / Earth- dresserPer Day135
(b)White washer/store or laboratory attendant/floor polisherPer Day145
(c)Dak Runner with his own cyclePer Day155
(d)Sweeper part time
i)For 2 hours45
ii)For 1/2 day (Four hours)80
iii)Per Day155
SEMI SKILLED
2MatePer Day145
3Helper for Carpenter /Black smith / Mechanic/Electrician / Plumber / Steel fabricator /Fitter / Driller / Truck / Tractor /Compressor/ Jack Hammer /DumperPer Day145
4(a)Security Guard with licensed gun owned by himPer Day205
(b)Security Guard without gun Per Day190
5Munshi/Survey Amin/ Density Observer/ Record Keeper/Time Keeper/ Gate Keeper/ Core Observer/ Laboratory Assistant / Gauge Reader / Telephone Assistant
(a)Grade I (Secondary Pass)Per Day205
(b)Grade IIPer Day155
6Cook cum Chowkidar Per Day155
7Stone breaker (unsing Ghan) / Turriya
(a)Grade I Per Day155
(b)Grade IIPer Day145
8ChawaliaPer Day175
9Gharat with Gharat man and bullock/buffaloPer Day300
10Billock/Camel/Buffalo pair with bullock man and plough para / cart/ drum if required Per Day350
11Rahat/Charas with bollock /Camel/Buffalo pair and driver including cost of water and lifting device etc. complete Per Day350
124-wheel hand "thela" with hammalPer Day205
13(a)Donkey man with six donkey and carrier bags.Per Day445
(b)Add/Subtract for each donkey Per Day50
14Operator for Jack Hammer/ Vibrator/ Pneumatic Tamper or pavement Breaker/shot-crete placerPer Day155
SKILLED
15Gardener
(a)Grade IPer Day155
(b)Grade IIPer Day145
16(a)Driver for pumps/Concrete MixersPer Day145
(b)Driver for Compressor/Generators Per Day155
(c)Heavy vehicle driver for Trucks/Dumpers/Tractors/ Stone crusher etc. (License holder) Per Day205
17Boat man/Blaster (with license)Per Day205
18Welder/Fitter/Line-man/Turner/Wireman/DrillerPer Day205102.5
19Stone Dresser/cutter (Silawat)
(a)Grade IPer Day275
(b)Grade IIPer Day250
20Mason/ Painter/ Carpenter/ Electrician /Black smith / plumber
(a)Grade IPer Day250
(b)Grade IIPer Day205
21Survey Mistry / earthwork Mistry / Work Mistry (Experienced/Trained) Patwari (Trained) / Tracer (I.T.I.) / Wireless Operator (Trained) / Receptionist Per Day205
22(a)Typist having knowledge of typing in computerPer Day205
(b)Computer Operator having knowledge of M.S. Office/Excel/Power point
(i)with own computer Per Day255
(ii)without computerPer Day205
23Light vehicle driver for Jeep/Car/Station wagon etc. (License holder) (Grade I)Per Day205
24Driver with life jackets and all accessories for working under water. Duty hours at sitePer Hour250
25Driver for Heavy Machine like chain type Dozers/Shovels, etc. (License Holder) Boring/Wagonet machine operator Per Day325
26Work Agents/Surveyors/Supervisors
(a)Possessing Civil Engineering Degree or equivalent. Per Day460
(b)Possessing Civil Engineering DiplomaPer Day400
CHAPTER - II
SUPPLY OF MATERIALS
NOTES:
1These rates are at work site inclusive of all leads and also inclusive of all taxes, levies, turn over tax, service tax, income tax, sales tax, octroi, panchayat tax, contractor's profit & royalty etc.
2The rates are also inclusive of making proper approaches to quarry, removal of over-burden and other essential operations required at quarry site, including opening of quarry.
3Measurments shall be made on the basis of stacks and effective height for payment purpose will be as prescribed below. No separate payment shall be made made for laying of stacks.
4Effective height of stacks for various materials shall be as under:
iStone,boulders,brick bats,morrum,sand,surkhi,flyash etc. 85 % of Av. Ht.
iiUn-slacked lime, aggregates etc. 90% of Av. Ht.
5These rates are for analysis and estimation purpose only.
S. No.ItemBasic rate in `Rate in `Unit
LabourMaterialTotal
1(i)Crusher broken stone aggregate of various sizes in accordance with IS:383 1970 for concrete work for dams, canals, and other important structures, well graded with size of aggregate.
(a)150 to 80 mm size310.00Cum
(b)80 to 40 mm size430.00Cum
(c)40 to 20 mm size530.00Cum
(d)20 to 10 mm size550.00Cum
(e)10 to 4.75 mm size500.00Cum
(ii)Hand broken stone aggregate of various sizes in accordance with IS:383 1970 for concrete work for dams, canals, and other important structures, well graded with size of aggregate.
(a)150 to 80 mm size
0.75 Beldars for collection and breaking @ 135.00101.25
T&P & labour welfare @ 3% on101.253.0375
Sundries 1% on 101.251.0125
Contractor's profit @ 10% on 101.2510.13
Average lead for transportation of material from quarry to work site 5 km184.00184.00
Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on299.4312.16
114.41197.17
Say114.00197.00311.00Cum
(b)80 to 40 mm ( Hand broken)
i1.5 Beldars for collection and breaking @135.00202.50
iiT&P & labour welfare @ 3% on202.506.08
iiiSundries 1% on 202.502.025
vContractor's profit @10% on 202.5020.25
viAverage lead for transportation of material from quarry to work site 5 km184.00184.00
viiIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 414.8516.84
228.83202.87
Say229.00203.00432.00Cum
(c)40 to 20 mm ( Hand broken)
i2 Beldars for collection and breaking @ 135.00270.00
iiT&P & labour welfare @ 3% on270.008.10
iiiSundries 1% on 270.002.7
vContractor's profit @10% on 270.0027.00
viAverage lead for transportation of material from quarry to work site 5 km184.00184.00
viiIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 491.8019.97
305.10206.67
Say305.00207.00512.00Cum
(d)20 to 12.5 mm ( Hand broken)
i3.0 Beldars for collection and breaking @ 135.00405.00
iiT&P & labour welfare @ 3% on 405.0012.15
iiiSundries 1% on 405.004.05
vContractor's profit @10% on405.0040.50
viAverage lead for transportation of material from quarry to work site 5 km184.00184.00
viiIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on645.7026.22
457.65214.27
Say458.00214.00672.00Cum
2Stones for Random Rubble masonry work at least 90% stones weighing not less than 37.50 Kg. and no dimension less than 23 cm for massive work
(a)Drilling and blasting charges
LabourMaterial
Drilling charges 2/3 of Item No. Chapter V1.3050.900.8733.93
Blasting charges 2/3 of Item No. Chapter V1.7168.111.1445.41
2.0179.34
(b)Labour charges for mucking sorting and stacking for 10 cum
2 Stone breakers @ 155.00310.00
3 Excavators @ 135.00405.00
4 Chawalias @ 175.00700.00
2 Carriers @ 135.00270.00
1 Beldar for sorting small stone and spalls & their disposal @ 135.00135.00
2 Beldars for stacking @ 135.00270.00
SayRs.2090.00
or P.Cum209.00
(c)Other charges
i Removal of over burden, approaches & mines Cost etc. L.S.35.00
iiT&P Labour welfare @ 3% on 209.006.27
iiiSundries 1% on 209.002.09
ivContractor's profit @ 10% on 209.0020.9
Average lead for transportation of material from quarry to work site 5 km184.00184.00
viIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on538.6121.87
238.18322.30560.48
Say 238.00322.00560.00Cum
3Stones for Random Rubble masonry, at least 75% stones not less than 15 cm in size in any direction and weighing not less than 23 kg.
(a)Labour charges
i 1 No. stone breaker @ 155.00155
ii3/8 No. Beldar for collection and stacking @ 135.0050.63
iiiRemoval of over burden at quarry L.S.3.302.20
ivDrilling and blasting charges 15 % of item (a+b) of chapter no V3.01119.010.4517.85
209.3820.05
b)Miscellaneous charges.
i Removal of over burden, approaches & mines Cost etc. L.S.35.00
ii T&P Labour welfare @ 3% on 209.386.28
iiiSundries 1% on 209.382.09
ivContractor's profit @ 10% on 209.3820.94
vAverage lead for transportation of material from quarry to work site 5 km184.00184.00
viIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on442.7417.98
236.60259.12495.72
Say 237.00259.00496.00Cum
4C.R. Masonry stone for face work of massive structures duly hammer dressed on all beds and sides, the beds joints & faces shall be chisel dressed for at least 8 cm back from face and at least 4 cm from sides height not less than 25 cm and weighing not less then 50 kg., 50% stones to have depth more than 45 cm & tail area not less than half the face area.
(a)Rate as per item No. 2 II above 238.00322.00
Add extra for wastage due to selecting suitable size stones 25% on 238.00322.0059.580.5
Sub toatl 'a'297.50402.50
(b)Add extra for
1.5 stone dressers for dressing of stones @ 275.00412.50
Chawalieas for rehandling of stones @ 175.0087.50
1 Beldar for sorting and disposal of wastage @ 135117.50
1/5 Mistry @ 205.0041.00
Sub toatl 'b'658.500.00
Other charges.
i T&P Labour welfare @ 3% on 658.5019.76
iiSundries 1% on 658.506.59
iiiContractor's profit @ 10% on 658.5065.85
ivIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on750.6930.48
Sub toatl ' c '85.6137.06
Total of (a+b+c)1041.61439.561481.17
Say 1042.00440.001482.00Cum
5(a)C.R. Masonry stone for face work of general structures duly hammer dressed not less than 20 cm in any direction and at least 50% stones to be more than 23 cm in depth.
(a)Rate as per item No. 3 II above 237.00259.00
Add extra for wastage due to selecting suitable size stones 25% on 237.00259.0059.2564.75
Sub toatl 'a'296.25323.75
(b)Add extra for
1.0 stone dressers for dressing of stones @ 275.00275.00
Chawalieas for rehandling of stones @ 175.0087.50
1 Beldar for sorting and disposal of wastage @ 135.00135.00
1/5 Mistry @ 205.0041.00
Sub toatl 'b'538.500.00
Other charges.
i T&P Labour welfare @ 3% on 538.5016.16
iiSundries 1% on 538.505.39
iiiContractor's profit @ 10% on 538.5053.85
ivIncome tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 613.8924.92
Sub toatl ' c '70.0130.31
Total of (a+b+c)904.76354.061258.81
Say905.00354.001259.00Cum
(b)C.R. stones headers, hammer dressed finished size not less than 20 cm x 20 cm and depth not less than 30 cm
Rate as per item No. 5 (a) above905.00354.00
Add 10% extra for headers 90.5035.40
995.50389.40
Say 996.00389.001385.00Cum
6Stones for soling , boulder for rock toe, toe drain , rock fill etc. not less than 15 cm in any direction.
iLabour charges.`
1 Stone breaker @ 155.00155.00
iiOther charges.
T&P Labour welfare @ 3% on 155.004.65
Sundries 1% on 155.001.55
Contractor's profit @ 10% on 155.0015.50
Average lead for transportation of material from quarry to work site 5 km184.00184.00
Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 360.7014.64
175.15200.19
Say 175.00200.00375.00Cum
7(a)Quarry spalls properly screened and graded but not more than 10 cm and not less than 10 mm in size,
(i)Labour charges
Beldar for collection of 1.00 cum quarry spall @13567.5
(ii)Other charges
T&P Labour welfare @ 3% on 67.502.03
Sundries 1% on 67.500.68
Contractor's profit @ 10% on 67.506.75
Average lead for transportation of material from quarry to work site 5 km184.00184.00
Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 260.9510.59
76.275195.27
Say 76.00195.00271.00Cum
bQuarry rubish not more than 10 cm in size.184.00Cum
8(a)Pitching stones atleast 75% stones to be more than 40 kg, in weight and 23 cm x 25 cm x 30 cm in size
Rate as per item No. 8(b)213.00202.00
Add 25 % extra for bigger size stones 53.2550.5
266.25252.50
Say 266.00253.00519.00Cum
(b)Pitching stones atleast 75% stones to be more than 25 kg , in weight and 20 cm x 20 cm x 23 cm in size.
i Labour charges
1 stone breaker @ 155.00155.00
Beldar for 1 cum @135.0033.75
188.75
iiOther charges
T&P Labour welfare @ 3% on 188.755.66
Sundries 1% on 188.751.89
Contractor's profit @ 10% on 188.7518.88
Average lead for transportation of material from quarry to work site 5 km184.00184.00
Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on Rs.399.1816.21
213.29202.09
Say 213.00202.00415.00Cum
(c )Stones for Rip Rap at least one side not less than 23 cm in size.
iLabour charges.`
1 Stone breaker @ 155.00155.00
iiOther charges.
T&P Labour welfare @ 3% on 155.004.65
Sundries 1% on 155.001.55
Contractor's profit @ 10% on 155.0015.50
Average lead for transportation of material from quarry to work site 5 km184.00184.00
Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on360.7014.64
175.15200.19
Say 175.00200.00375.00Cum
9Cement (in bags) 50 Kg in weight. As per IS 1489 and IS 8112 as per requirment (excluding cost of bags)200.00Bag
10Un Slaked Lime.(Sojat or equivalent)5250.00Cum
11Surkhi pulverized as per IS specification i.e., passing through IS Sieve No. 9630.00Cum
12Sand (Un-screened)
i Labour charges
1/8 beldar for clearance of overburden such as silt, mucking boulders, and debries etc. for I cum @135.0016.88
2/5 Beldar will excavate one cum of unscreened sand @135.0054.00
70.88
iiOther charges
Cost of sand at quarry50.00
T&P Labour welfare @ 3% on 70.882.13
Sundries 1% on 120.881.21
Contractor's profit @ 10% on 70.887.09
Average lead for transportation of material from quarry to work site 15 km @ 251.00251.00
Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on382.3015.52
80.09317.73
Say 80.00318.00398.00Cum
13Sand screened and free from organic and deleterious material.
aLabour charges
As per item no 12 above80.00318.00
Wastage 15% on 318.0047.70
Add extra labour charges for screening sand 2/5 beldar @ 135.0054.00
bOther charges
T&P Labour welfare @ 3% on 54.001.62
Sundries 1% on 54.000.54
Contractor's profit @ 10% on 54.005.40
Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on109.264.44
141.02370.68
Say 141.00371.00512.00Cum
Bikaner Bajri having F.M. from 2.2 to 3.2 as per IS specifications. not required in Udaipur ZoneCum
Tibba sand F.M. not less than 0.75not required in Udaipur ZoneCum
14Natural Aggregate
(a)150 to 80 mm size
For 1 Cum
1.0 Beldar required for excavation, sorting, collection, screening and stacking @ 135.00135.00
T&P Labour welfare @ 3% on 135.004.05
Sundries 1% on 135.001.35
Contractor's profit @ 10% on 135.0013.50
Average lead for transportation of material from quarry to work site 5 km184.00184.00
Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 337.9013.72
152.55199.07
Say 153.00199.00352.00Cum
(b)80 to 40 mm size
For 1 Cum
1.33 Beldar required for excavation, sorting, collection, screening and stacking @ 135.00179.55
T&P Labour welfare @ 3% on 179.555.39
Sundries 1% on 179.551.80
Contractor's profit @ 10% on 179.5517.96
Average lead for transportation of material from quarry to work site 5 km184.00184.00
Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on388.6915.78
202.89201.58
Say 203.00202.00405.00Cum
(c)40 to 20 mm size
For 1 Cum
1.66 Beldar required for excavation, sorting, collection, screening and stacking @ 135.00224.10
T&P Labour welfare @ 3% on 224.106.72
Sundries 1% on 224.102.24
Contractor's profit @ 10% on 224.1022.41
Average lead for transportation of material from quarry to work site 5 km184.00184.00
Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on439.4717.84
253.23204.08
Say 253.00204.00457.00Cum
(d)20 to 10 mm size
For 1 Cum
2.17 Beldar required for excavation, sorting, collection, screening and stacking @ 135.00283.50
T&P Labour welfare @ 3% on 283.508.51
Sundries 1% on 283.502.84
Contractor's profit @ 10% on 283.5028.35
Average lead for transportation of material from quarry to work site 5 km184.00184.00
Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on 507.1920.59
320.36207.43
Say 320.00207.00527.00Cum
(e)10 to 4.75 mm size
For 1 Cum
2.17 Beldar required for excavation, sorting, collection, screening and stacking @ 135.00292.95
T&P Labour welfare @ 3% on 292.958.79
Sundries 1% on 292.952.93
Contractor's profit @ 10% on 292.9529.30
Average lead for transportation of material from quarry to work site 5 km184.00184.00
Income tax 2.06% + Sale tax 1.5%+Royalti 0.50% I.e= 4.06 % on517.9621.03
331.03207.96
Say 331.00208.00539.00Cum
15Morrum or Murda
As per chapter V item 1 c47.00
Average lead for transportation of material from quarry to work site 1/2 km40.0040.00
87.0087.00Cum
16Mild steel
(a)Mild steel and medium tensile steel bars as per IS : 432-198235.00Kg.
(b)HYSD steel bars as per IS 1786-198539.00Kg.
(c)Structural steel 40.00Kg.
17Supply of bricks as per IS : 1077-1992
(a)Well burnt clay bricks ( size 230x110x70 mm) class designation 100 as per specification32001000 Nos.
(b)Well burnt clay bricks ( size 230x110x70 mm) class designation 75 as per specification28001000 Nos.
(c)Comman burnt clay bricks ( size 230x110x70 mm) class designation 50 as per specification24001000 Nos.
(d)Brick bats275Cum
(e)Supply of pucca clay tiles (size 30 x 15 x 5 cm) class designation 105 as per IS:3367-199335801000 Nos.
18Hydraulically compressed P.C.C. tiles 40 mm thick (50 mm compressed to 40 mm) in cement, sand, aggregate upto 10 mm (well graded crusher broken) as per specifications conforming to ISI 10646-1991 with concrete of M15 grade.
(a)300 x 300 mm size13.00Each
(b)150 x 300 mm size8.00Each
19Stone patties edges hammer dressed
(a)Length up to 1.50 m and thickness 50 mm and above270.00Sqm
(b)Length up to 1.50 m to 2.50 m and thickness 70 mm and above300.00Sqm
(c)Length up to 2.50 m to 4 m and thickness 80 mm and above430.00Sqm
20Cut stone sills, slab, or lintels one face plain and edge hammer dressed.
(a)100 to 125 mm thick 365.00Sqm
(b)126 to 150 mm thick 380.00Sqm
(c)151 to 200 mm thick 400.00Sqm
21Fly ash confirming to IS 3812-1981( in bags) 20 Kg in weight25.00Per bag
22Chemical for curing as per ASTM36.00Per Lit
23Empty bag of 50 kg capacity in good condition
a.Jute12.00Each
b.Plastic / Polythene 3.00Each
24ISI marked low Density Poly Ethylene (LDPE) film black, High Impact resistant, Heavy duty Grade 030 in thickness of 125, 200 & 250 micron in the form of flat sheet of 6 to 9 metre width without having any joints as per IS: 2508-1984 120.00Kg.
25(a)Distance stone well dressed of required shape and size 60 cm x 23 cm x 7 cm with exposed faces chiesel dressed. 75.00Each
(b)Distance stone well dressed of required shape and size 60 cm x 23 cm x 7 cm with distance marked engraved and exposed faces well painted. 100.00Each
26Cost of Diesel39.88Lit
27Amonium nitrate30.00Kg
28Gelatin70.00Kg
29Fuse Coil5.00RM
30Ordinary detonator10.00Each
31Drill Rod 800 mm long3000Each
32Electric Detonator25.00Each
33Sealing Compound140Kg
34Air hose double braided110Mt
35Claw coupling45Each
36Hose clamps40Each
37Valve 3" dia350Each
38Suction pipe 3" dia230Mt
39Foot Valve 3"500Each
40GI pipe 3" dia400Mt.
41Extention Rod 1" hex 800 mm2700Each
42Extention Rod 1" hex 1600 mm5400Each
43Extention Rod 1" hex 2400 mm8100Each
44Extention Rod 1" hex 3200 mm13000Each
45Coupling sleeves1"1900Each
46Shank Rod2500Each
47Bit 48 mm dia4350Each
48Water Body1000Each
49Water body washer 20Each
50Lubricating oil 110lit
51Grinding wheel 1250Each
52Bit adopter1000Each
53Shank adopter1000Each
54T.C.T. Cross bit4350Each
55GI/MS pipe 65 mm dia150Mt