wtg oem’s role for foundation design optimisation · wtg 1 : without / wtg 2 with damper...

7
1 | WTG OEM’s role for Foundation Design Optimisation | 01 October 2019 | Classification: PUBLIC © 201[x] MHI Vestas Offshore Wind A/S KENJI SATO Head of LAC & Tower WTG OEM’s role for foundation design optimisation

Upload: others

Post on 25-Aug-2020

6 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: WTG OEM’s role for foundation design optimisation · WTG 1 : Without / WTG 2 With Damper Excitation test (Verify damper performance) Without PTD With PTD Enhanced Damping. ... MHI

1 | WTG OEM’s role for Foundation Design Optimisation | 01 October 2019 | Classification: PUBLIC

© 201[x] MHI Vestas Offshore Wind A/S

KENJI SATOHead of LAC & Tower

WTG OEM’s role for foundation design

optimisation

Page 2: WTG OEM’s role for foundation design optimisation · WTG 1 : Without / WTG 2 With Damper Excitation test (Verify damper performance) Without PTD With PTD Enhanced Damping. ... MHI

2 | WTG OEM’s role for Foundation Design Optimisation | 01 October 2019 | Classification: PUBLIC

© 201[x] MHI Vestas Offshore Wind A/S

Agenda ●Introduction

●Wind Turbine

●Integrated Load Assessment

●Summary

Page 3: WTG OEM’s role for foundation design optimisation · WTG 1 : Without / WTG 2 With Damper Excitation test (Verify damper performance) Without PTD With PTD Enhanced Damping. ... MHI

3 | WTG OEM’s role for Foundation Design Optimisation | 01 October 2019 | Classification: PUBLIC

© 201[x] MHI Vestas Offshore Wind A/S

IntroductionWTG OEM’s role For Foundation Design Optimisation

● For offshore wind farm design, support structure design

is site specific

● Design optimisation to achieve the most cost effective

site specific solution is complex and time consuming

● As for any structures, design is driven by the various load

contributions and, therefore, the focuses are:

• to reduce the loads on support structure

• to realise integrated load evaluation by utilising representative and efficient calculation method and process.

Page 4: WTG OEM’s role for foundation design optimisation · WTG 1 : Without / WTG 2 With Damper Excitation test (Verify damper performance) Without PTD With PTD Enhanced Damping. ... MHI

4 | WTG OEM’s role for Foundation Design Optimisation | 01 October 2019 | Classification: PUBLIC

© 201[x] MHI Vestas Offshore Wind A/S

Various foundation load reduction features are developed

for design optimisation.

● Passive Tower Damper (PTD)

● Active Side-Side Tower Damper (A-SSTD)

● Active Fore-Aft Tower Damper (A-FATD)

Wind TurbineWTG OEM’s role For Foundation Design Optimisation

Passive Tower Damper (PTD) Verification

WTG 1 : Without / WTG 2 With Damper Excitation test (Verify damper performance)

Without PTD

With PTD

Enhanced Damping

Page 5: WTG OEM’s role for foundation design optimisation · WTG 1 : Without / WTG 2 With Damper Excitation test (Verify damper performance) Without PTD With PTD Enhanced Damping. ... MHI

5 | WTG OEM’s role for Foundation Design Optimisation | 01 October 2019 | Classification: PUBLIC

© 201[x] MHI Vestas Offshore Wind A/S

Flexible interface to provide integrated optimisation

opportunities for foundation design.

● Foundation Modelling

● Tower variations

● Efficient load assessment method

● Documentation package to support foundation design

Integrated Load AssessmentWTG OEM’s role For Foundation Design Optimisation

Experiences with various foundation types

Monopile (Burbo Bank Extension) Gravity (Blyth)

Jacket (Aberdeen Bay) Floating (Wind Float 1)

Page 6: WTG OEM’s role for foundation design optimisation · WTG 1 : Without / WTG 2 With Damper Excitation test (Verify damper performance) Without PTD With PTD Enhanced Damping. ... MHI

6 | WTG OEM’s role for Foundation Design Optimisation | 01 October 2019 | Classification: PUBLIC

© 201[x] MHI Vestas Offshore Wind A/S

To support foundation design optimisation, MHI Vestas is committed

to;

● Develop various foundation load reduction features / damper

technologies (Passive tower damper, Active SSTD, Active FATD,

etc).

● Provide flexible interfaces in integrated load assessment

toward foundation designs.

● Develop new technologies to further support foundation design

optimisation (e.g. SMART Foundation Loads for V164)

SummaryWTG OEM’s role For Foundation Design Optimisation

Page 7: WTG OEM’s role for foundation design optimisation · WTG 1 : Without / WTG 2 With Damper Excitation test (Verify damper performance) Without PTD With PTD Enhanced Damping. ... MHI

7 | WTG OEM’s role for Foundation Design Optimisation | 01 October 2019 | Classification: PUBLIC

© 201[x] MHI Vestas Offshore Wind A/S

KENJI SATOHead of LAC & Tower

Let’s move the horizon.