wtp no. 2-contract 2-raw water transmission main us 19 crossing project bid tab
TRANSCRIPT
-
7/22/2019 WTP No. 2-Contract 2-Raw Water Transmission Main US 19 Crossing Project Bid Tab
1/2
BID
No. BID ITEMS UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT
1 Mobilization (3.5% Maximum) 1 LS 42,737.00$ 42,737.00$ 65,000.00$ 65,000.00$ 25,000.00$ 25,000$
2Maintenance of Traffic (1.5% Maximum)
1 LS19,500.00$ 19,500.00$ 26,000.00$ 26,000.00$ 10,000.00$ 10,000$
3
F&I 3 Communication Conduit HDPE DR11 Pipe by
Horizontal Directional Drill 1,150 LF 9.50$ 10,925.00$ 25.00$ 28,750.00$ 12.00$ 13,800$
4
F&I 6 Sanitary Sewer Force Main HDPE DR11 Pipe
by Horizontal Directional Drill 900 LF 23.90$ 21,510.00$ 40.00$ 36,000.00$ 32.00$ 28,800$
5
F&I 6 Backwash Water HDPE DR11 Pipe by
Horizontal Directional Drill 1,200 LF 23.90$ 28,680.00$ 40.00$ 48,000.00$ 30.00$ 36,000$
6
F&I 8 Raw Water HDPE DR9 Pipe by Horizontal
Directional Drill 420 LF 35.00$ 14,700.00$ 55.00$ 23,100.00$ 56.00$ 23,520$
7
F&I 8 Raw Water HDPE DR11 Pipe by Horizontal
Directional Drill 1,300 LF 32.60$ 42,380.00$ 55.00$ 71,500.00$ 54.00$ 70,200$
8
F&I 8 Potable Water HDPE DR11 Pipe by Horizontal
Directional Drill 300 LF 32.60$ 9,780.00$ 55.00$ 16,500.00$ 48.00$ 14,400$
9
F&I 8 Concentrate Water HDPE DR11 Pipe by
Horizontal Directional Drill 1,800 LF 32.60$ 58,680.00$ 55.00$ 99,000.00$ 43.00$ 77,400$
10
F&I 12 Raw Water HDPE DR11 Pipe by Horizontal
Directional Drill 1,250 LF 53.00$ 66,250.00$ 78.00$ 97,500.00$ 67.00$ 83,750$
11
Concentrate Water HDPE DR9 Pipe, 6 Backwash
Water HDPE DR9 Pipe and 3" Communication
Conduit HDPE DR9 Pipe 2,070 LF 245.00$ 507,150.00$ 300.00$ 621,000.00$ 74.50$ 154,215$
12
F&I 22" Horizontal Directional Drill with 8
Concentrate Water HDPE DR9 Pipe, 6 Backwash
Water HDPE DR9 Pipe and 3" Communication
Conduit HDPE DR9 Pipe 200 LF 7.00$ 1,400.00$ 35.00$ 7,000.00$ 7.50$ 1,500$
13
F&I 22" Horizontal Directional Drill with 8
Concentrate Water HDPE DR9 Pipe, 6 Backwash
Water HDPE DR9 Pipe and 3" Communication
Conduit HDPE DR9 Pipe 20 LF 31.00$ 620.00$ 65.00$ 1,300.00$ 53.00$ 1,060$
14 F&I 6 Backwash Water HDPE Pipe by Open Cut 130 LF 27.50$ 3,575.00$ 75.00$ 9,750.00$ 20.00$ 2,600$
15
F&I 6 Sanitary Sewer Force Main DI Pipe by Open
Cut 20 LF 123.00$ 2,460.00$ 300.00$ 6,000.00$ 148.00$ 2,960$
16 F&I 6 Backwash Water DI Pipe by Open Cut 110 LF 57.00$ 6,270.00$ 85.00$ 9,350.00$ 50.00$ 5,500$
17 F&I 8 Potable Water HDPE Pipe by Open Cut 15 LF 49.00$ 735.00$ 75.00$ 1,125.00$ 36.00$ 540$
18 F&I 8 Raw Water HDPE Pipe by Open Cut 170 LF 30.00$ 5,100.00$ 80.00$ 13,600.00$ 22.00$ 3,740$
19 F&I 8 Concentrate Water HDPE Pipe by Open Cut 120 LF 30.00$ 3,600.00$ 75.00$ 9,000.00$ 22.00$ 2,640$
20 F&I 8 Concentrate Water DI Pipe by Open Cut 150 LF 67.00$ 10,050.00$ 110.00$ 16,500.00$ 105.00$ 15,750$
21 F&I 12 Raw Water HDPE Pipe by Open Cut 20 LF 40.00$ 800.00$ 75.00$ 1,500.00$ 44.00$ 880$
22 F&I 12 Raw Water DI Pipe by Open Cut 50 LF 95.00$ 4,750.00$ 200.00$ 10,000.00$ 90.00$ 4,500$
23 F&I 6 Restrained Joints for HDPE Pipe 8 EA 552.00$ 4,416.00$ 225.00$ 1,800.00$ 105.00$ 840$
24 F&I 6 Restrained Joints for DI Pipe 34 EA 155.00$ 5,270.00$ 150.00$ 5,100.00$ 55.00$ 1,870$
25 F&I 8 Restrained Joints for HDPE Pipe 54 EA 578.00$ 31,212.00$ 225.00$ 12,150.00$ 133.00$ 7,182$
26 F&I 8 Restrained Joints for DI Pipe 20 EA 150.00$ 3,000.00$ 150.00$ 3,000.00$ 54.00$ 1,080$
27 F&I 12 Restrained Joints for HDPE Pipe 2 EA 996.00$ 1,992.00$ 325.00$ 650.00$ 203.00$ 406$
28 F&I 12 Restrained Joints for DI Pipe 6 EA 223.00$ 1,338.00$ 250.00$ 1,500.00$ 92.00$ 552$
29 F&I 16 Restrained Joints for DI Pipe 10 EA 840.00$ 8,400.00$ 650.00$ 6,500.00$ 512.00$ 5,120$
30 F&I Compact DI Fittings 2,500 LB 5.30$ 13,250.00$ 12.50$ 31,250.00$ 8.20$ 20,500$
31 F&I 6 Resilient Wedge Gate Valve & Valve Box 5 EA 1,110.00$ 5,550.00$ 1,600.00$ 8,000.00$ 963.00$ 4,815$
32 F&I 8 Resilient Wedge Gate Valve & Valve Box 9 EA 1,408.00$ 12,672.00$ 2,000.00$ 18,000.00$ 1,283.00$ 11,547$
33 F&I 12 Resilient Wedge Gate Valve & Valve Box 2 EA 2,418.00$ 4,836.00$ 3,200.00$ 6,400.00$ 2,138.00$ 4,276$
34
F&I 17" x 30" Pull Boxes for Communication
Conduits 10 EA 2,200.00$ 22,000.00$ 4,000.00$ 40,000.00$ 980.00$ 9,800$
WTP #2 - CONTRACT 2: RAW WATER TRANSMISSION MAIN US19 CROSSING PROJECT - 10-0039-UT-(B)
THURSDAY, FEBRUARY 28, 2013 AWARD - THURSDAY, MARCH 21, 2012
WESTRA CONSTRUCTION YOUNGS COMMUNICATIOHARRIS-MCBURNEY
-
7/22/2019 WTP No. 2-Contract 2-Raw Water Transmission Main US 19 Crossing Project Bid Tab
2/2
BID
No. BID ITEMS UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT
WTP #2 - CONTRACT 2: RAW WATER TRANSMISSION MAIN US19 CROSSING PROJECT - 10-0039-UT-(B)
THURSDAY, FEBRUARY 28, 2013 AWARD - THURSDAY, MARCH 21, 2012
WESTRA CONSTRUCTION YOUNGS COMMUNICATIOHARRIS-MCBURNEY
34A
F&I 30" X 48" Pull Boxes for Communication
Conduits 2 EA 3,597.00$ 7,194.00$ 5,000.00$ 10,000.00$ 2,004.00$ 4,008$
35 F&I Combination Air Valve - Type I 7 EA 2,893.00$ 20,251.00$ 5,500.00$ 38,500.00$ 2,536.00$ 17,752$
36 F&I Combination Air Valve - Type II 5 EA 2,765.00$ 13,825.00$ 5,000.00$ 25,000.00$ 2,405.00$ 12,025$
37 F&I Combination Air Valve - Type III 5 EA 2,360.00$ 11,800.00$ 4,000.00$ 20,000.00$ 1,887.00$ 9,435$
38 F&I Combination Air Valve - Type IV 1 EA 5,471.00$ 5,471.00$ 7,500.00$ 7,500.00$ 4,662.00$ 4,662$
39 F&I Combination Air Valve - Type V 1 EA 9,753.00$ 9,753.00$ 11,000.00$ 11,000.00$ 9,500.00$ 9,500$
40 Root Pruning 1,000 LF 7.00$ 7,000.00$ 3.50$ 3,500.00$ 3.00$ 3,000$
41 Tree Barricades 1 LS 13,800.00$ 13,800.00$ 7,000.00$ 7,000.00$ 1,025.00$ 1,025$
42 Remove Trees 7 EA 700.00$ 4,900.00$ 1,800.00$ 12,600.00$ 448.00$ 3,136$
43
Disconnect Existing 8" WM from Existing 16" WM at
North Side of S.R. 60 (Sheet C02) 1 LS 1,948.00$ 1,948.00$ 6,000.00$ 6,000.00$ 500.00$ 500$
44
Tapping of Existing 8" WM with 8"x8" Tapping
Sleeve and Valve at North Side of S.R. 60 (Sheet C02) 1 0 4,978.00$ 4,978.00$ 8,500.00$ 8,500.00$ 4,125.00$ 4,125$
45
Reconnections to Existing 16" RWM and Existing 16"
WM North of Well #53 (Sheet C02) 1 LS 18,400.00$ 18,400.00$ 50,000.00$ 50,000.00$ 31,138.00$ 31,138$
46
Brackish RWM to Proposed 8" Fresh RWM (Sheet
C04) 1 LS 5,484.00$ 5,484.00$ 12,000.00$ 12,000.00$ 5,300.00$ 5,300$
47
Video Inspect6ion, Pigging, Flushing, Hydrostatic
Testing and Disinfec tion of Existing 16-inch Piping 3000 LF 9.40$ 28,200.00$ 25.00$ 75,000.00$ 10.50$ 31,500$
48
Sod Restoration as Directed by the Owner or the
Owner's Authorized Project Representative 500 SY 4.60$ 2,300.00$ 3.00$ 1,500.00$ 4.54$ 2,270$
49
Concrete Driveway Restoration as Directed by the
Owner or the Owner's Authorized Project
Representative 200 SY 43.00$ 8,600.00$ 50.00$ 10,000.00$ 42.32$ 8,464$
50
Concrete Sidewalk Restoration as Directed by the
Owner or the Owner's Authorized Project
Representative 200 SY 40.00$ 8,000.00$ 48.00$ 9,600.00$ 42.32$ 8,464$
51
Concrete Curb Restoration as Directed by the Owner
or the Owner's Authorized Project Representative 200 LF 25.00$ 5,000.00$ 25 5,000.00$ 26.50$ 5,300$
52
Underdrain Restoration as Directed by the Owner or
the Owner's Authorized Project Representative 200 LF 18.00$ 3,600.00$ 22 4,400.00$ 16.50$ 3,300$
53
Asphalt Paving Restoration as Directed by the Owner
or the Owner's Authorized Project Representative 500 SY 30.00$ 15,000.00$ 32 16,000.00$ 22.00$ 11,000$
54
Unsuitable Material Excavation Below Grade as
Directed by the Owner or the Owner's Authorized
Project Representative 500 CY 5.00$ 2,500.00$ 11.00$ 5,500.00$ 12.00$ 6,000$
55
Select Backfill Below Grade as Directed by the Owner
or the Owner's Authorized Project Representative 500 CY 15.00$ 7,500.00$ 18.00$ 9,000.00$ 25.00$ 12,500$
56
Asphalt Overlay as Directed by the Owner or the
Owner's Authorized Project Representative 500 SY 40.00$ 20,000.00$ 35.00$ 17,500.00$ 17.00$ 8,500$
1,201,092.00$ 1,716,925.00$ 849,647$
57 Owners 10% Contingency 1 LS 120,109.20$ 171,692.50$ 84,964$
1,321,201.20$ 1,888,617.50$ 934,611$
Subtotal Construction Costs (Bid Items Nos. 1 - 56)
Bidders Grand Total (Bid Items Nos. 1 - 57)