WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION 30/08/2013 development & environment consultants Beveridge Williams

Upload: lucius

Post on 25-Feb-2016

34 views

Category:

Documents


1 download

DESCRIPTION

WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION. 30/08/2013. Beverid ge Williams. development & environment consultants. Parcels A & B are freehold Parcel C - Wurundjeri Way Road & Reserve Parcel D owned by Public Transport Development Authority - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST

BRIDGE DECLARATION30/08/2013

development & environment consultantsBeveridge Williams

Page 2: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

THE SITE

development & environment consultants

• Parcels A & B are freehold

• Parcel C - Wurundjeri Way Road & Reserve

• Parcel D owned by Public

Transport Development Authority

• Parcel E - Collins Street Bridge

Page 3: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

“BUNJIL” THE EAGLE

development & environment consultants

• Feature of Wurundjeri Way since 2002

• Sculpture is 25m high & weighs

approx. 20 tonnes.

• Sits on a concrete base thought to weigh 90 tonnes.

• Designed by artist Bruce Armstrong

• Movement of the Eagle will require

agreement and consent between:- The Wurundjeri Council- Melbourne City Council- Vic Roads- Places Victoria- Bruce Armstrong

Page 4: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

THE PROPOSED DEVELOPMENT BY LEND LEASE

development & environment consultants

• Lend lease has won the tender to develop the entire site

• The proposed development will include 100,000m² of office space

• 600 Apartments in 7 towers

• Construction of a public plaza

• Approximate construction cost of 1.5 billion dollars

• I’m not allowed to show you any impressive plans

• Approval for the development will be by the Minister for Planning , The Hon. Mr Matthew Guy………… not Melbourne City Council

Page 5: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

KEY STAKEHOLDERS AND INTERESTED PARTIES

development & environment consultants

PLACES VICTORIA- Land Owner- Developer

PUBLIC TRANSPORT VIC- Land Owner

MELBOURNE CITY COUNCIL- Referral Authority

- Professional advice

BEVERIDGE WILLIAMS- Surveying Services (Road Closure)

- Professional Advice for Places Victoria

MADIGAN SURVEYING- Surveying Services (Subdivision)

- Professional Advice for Lend Lease

LEND LEASE- Developer

- Key financier

VIC ROADS- Land Owner

- Professional Advice

Page 6: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

LOT IN AIRSPACE

development & environment consultants

• Lot has been designed as a series of sloping and tilting planes

• Lot design maximises the amount of developable land in airspace

• The lot in airspace must not breach the 5.9m minimum clearance to the constructed road

Page 7: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

LOT IN AIRSPACE(CONTINUED)

development & environment consultants

Page 8: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

NOT SO TYPICAL CROSS-SECTIONS

development & environment consultants

• Multiple Sections required to clarify lower limits of the lot

• Reduced levels computed to accord with intersection of the relevant section with the outer edge of each tilted plane

Page 9: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

NOT SO TYPICAL CROSS-SECTIONS(CONTINUED)

development & environment consultants

• The creation of the lot was designed and computed by Madigan

Surveying and verified by Beveridge Williams

Page 10: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

CREATION OF FREEHOLD TITLE TO BE INSERTED INTO MADIGANS STAGED SUBDIVSION

development & environment consultants

• Discontinuance of Wurundjeri Way will take place under Section 12 of the

Road Management Act 2004 by notice in the Government Gazette

• Some confusion on who the land vests in after its discontinuance- Crown has absolute property in Land over which there is an Arterial Road or Freeway (Schedule 5 (1a) RMA 2004)

YET………

Page 11: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

development & environment consultants

- If VicRoads has discontinued the use of a road or part of a road, it may in accordance with this clause sell the land on which the road or part of the road was located (Schedule 5 (15)(1) RMA 2004)

• Legal Advice has been sought and the Victorian Government Solicitor has advised: - VicRoads can transfer land to a third party purchaser or - Include this land within a Plan of Subdivision under Section 35 of the Subdivision Act 1988

Page 12: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

FUTURE WORKS – CONSTRUCTION PHASE

development & environment consultants

• Bridge deck will be constructed to sit within the airspace lot (1.5 billion dollar development will lie on top of the bridge deck)

• Columns and Pile Caps will have to be sunk and constructed into Wurundjeri Way to support the bridge deck:

- Who is going to be responsible for them? - Are titles for the supports required?

• Possible solutions included:

- Leave the columns under the control of VicRoads - Create a Section 173 agreement that covers maintenance - Create (In conjunction with the O.S.G.) C.A.’s for the area covered by the deck and

columns.

Page 13: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

FUTURE WORKS – CONSTRUCTION PHASE(CONTINUED)

development & environment consultants

• The agreed solution:

- The columns and pile caps within the road will be located and discontinued

- The titles will be inserted into the Madigans Staged Subdivision and become Common Property along with the deck that they support.

- Owners Corporation will be responsible for maintenance of structure within Common Property

- Owners Corporation must be fully funded, have the appropriate rules, regulations, insurance and procedures from its inception

Page 14: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

COLLINS STREET BRIDGE DECLARATION

development & environment consultants

• Collins Street Bridge has been accepted by the public and is on Melbourne City Councils public register of roads

• The bridge was incorrectly declared as Docklands Hwy (Wurundjeri Way) in 2000

Page 15: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

COLLINS STREET BRIDGE DECLARATION(CONTINUED)

development & environment consultants

• Declaration Survey of Collins Street Bridge Required:- Thorough search of Land Status- As-constructed survey of the bridge deck and piers- Search of historical design drawings for the bridge

Page 16: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

COLLINS STREET BRIDGE DECLARATION(CONTINUED)

development & environment consultants

• A best fit of our as-constructed survey with the design drawings for the bridge revealed that one of the pile caps encroached into Wurundjeri Way

• This is of particular importance as:

- We do not want to discontinue any part of the Collins Street bridge structure

- We do not want to sink columns (required for Lend Lease Development) into pile caps

Page 17: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

development & environment consultants

• Varying Depth and Height Limitations for Collins Street Bridge Declaration

Page 18: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

SIMILAR PROJECT…… DIFFERENT PROCESS

development & environment consultants

• Jolimont Railyards- This project has been in the pipeline for years - Construction of a deck over the Railyards opens up Federation Square to the Yarra

Page 19: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

THANKYOU

development & environment consultants

Page 20: WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

QUESTIONS?

development & environment consultants