Page 1: WV Water & Sewer Project (2010)

WEST VIRGINIA ASSOCIATION OF

GEOSPATIAL PROFESSIONALS

UPDATE ON WEST VIRGINIA COMPREHENSIVE

PLANNING STUDY

Dan Ferrell, Thrasher Engineering, Inc.

Page 2: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

Background

Mission of Project

Overview of Project

Data Collection Task Review

GIS Task Overview

Page 3: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

West Virginia Infrastructure and Jobs Development Council (IJDC) ◦ Created by the West Virginia Legislature in 1994 ◦ Clearing house for State and Federal Funds for

water and wastewater projects ◦ Established a revolving loan fund ◦ Authorized to issue revenue bonds ◦ The Legislation requires an update every 3 years

West Virginia Water Development Authority (WDA) ◦ Provides loan processing and administration to

West Virginia’s water and wastewater projects

Page 4: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

WDA/IJDC – Hired Camp, Dresser, & McKee, Inc. (CDM) and Thrasher Engineering, Inc. (TEI) to develop comprehensive plan

CDM – Lead organization to develop plan

TEI – Assigned to collect data

Page 5: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

MISSION

Develop technology tools to help identify,

prioritize, manage, track and accelerate

water, wastewater, and storm water projects in

a cost-effective and efficient manner

throughout West Virginia.

Page 6: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

PROJECT OVERVIEW

Enhance the funding process for public utility

projects

◦ More projects to construction quicker

Develop financial tools to assist in effective

utilization of funds for utility projects

Collect information and mapping for utilities in

West Virginia

◦ Create a Geographic Information System (GIS) to

assist in identifying areas in the state which are

served, unserved, or underserved

Page 7: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

DATA COLLECTION

Over 600 water, sewer, and storm sewer

regulated utilities

Developed a process to collect data and

mapping

Two Primary Sources

◦ Retrieved electronic data from online sources

and State Agencies

◦ Contacted utilities to collect data and mapping

for systems

Page 8: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

DATA COLLECTION CONTINUED

Mapping provided in different forms

◦ GIS

◦ Record Drawings

◦ Highlighted on USGS Quad or County Highway

Map

◦ Drawn on a napkin

Page 9: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

DATA COLLECTION CONTINUED

Mapping collection items consisted of:

◦ Served Area

◦ Service Area

◦ Office Location

◦ Treatment Plant Location

◦ Master Meter Locations

Mapping was loaded to GIS

Completed maps were sent to utility operators

for review

Page 10: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

Page 11: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

Page 12: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

DATA COLLECTION CONTINUED

95% of al utilities with over 500 customers have

been collected and mapped.

◦ Quality Control Maps have been sent to utilities.

Most utilities with less than 500 customers have

been collected and mapped.

◦ Quality Control Maps have been sent to utilities.

Still Chasing Stragglers

Page 13: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

DATA COLLECTION CONTINUED

Issues

Utilities not supplying information

Variable mapping accuracy

Inability to contact smaller utilities

Page 14: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

DATA COLLECTION CONTINUED

What Remains

Collect remaining utility mapping

Collect Service Areas (Jurisdictional

Boundaries)

Quality Control Mapping

Page 15: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

GIS TASK OVERVIEW

Data will be assembled and implemented in a central GIS data environment

A series of WebGIS applications will be developed to support data access

Sustainable policies and procedures will be developed

Manage physical location of data

Camp, Dresser McKee will provide support throughout duration of this project

Page 16: WV Water & Sewer Project (2010)

West Virginia Comprehensive Planning Study Dan Ferrell, Thrasher Engineering, Inc.

QUESTIONS?