wvdot gti section status update for districts. agenda introduction. introduction. status update....
TRANSCRIPT
WVDOT GTI WVDOT GTI SECTIONSECTION
Status Update for Districts
AGENDAAGENDA
Introduction.Introduction. Status Update.Status Update. How to Spatially Enable Database.How to Spatially Enable Database. Challenges.Challenges. Conclusion.Conclusion.
Phased ApproachPhased Approach
Phase One -Phase One - Research and PlanningResearch and Planning Phase Two - Phase Two - Build Geometric NetworkBuild Geometric Network Phase Three -Phase Three - Design and Build ServerDesign and Build Server Phase Four -Phase Four - Application DevelopmentApplication Development Phase Five -Phase Five - Application TestingApplication Testing Phase Six -Phase Six - Operation and Operation and
Maintenance Maintenance
Diagram OneDiagram One
Goals & ResponsibilitiesGoals & Responsibilities
GIS: GIS: Provide accurate base layers Provide accurate base layers to support WVDOT’s geospatial to support WVDOT’s geospatial needs. This will include the needs. This will include the following:following: RoadsRoads BridgesBridges IntersectionsIntersections AssetsAssets Critical InfrastructureCritical Infrastructure
Goals & ResponsibilitiesGoals & Responsibilities Mapping: Mapping: Will be taking GIS base layers to Will be taking GIS base layers to
create the following cartographic maps:create the following cartographic maps: Official State Highway MapOfficial State Highway Map State General Highway MapState General Highway Map State Functional Classification MapState Functional Classification Map State Highway Base MapState Highway Base Map State Outline MapState Outline Map District MapsDistrict Maps Regional Planning Councils MapsRegional Planning Councils Maps State Traffic Flow MapState Traffic Flow Map General Highway County Maps (55)General Highway County Maps (55) City Maps (187)City Maps (187) Urban Area Maps (26)Urban Area Maps (26) On-Demand Homeland Security MapsOn-Demand Homeland Security Maps
Goals & ResponsibilitiesGoals & Responsibilities
Straight Line Diagrams: Straight Line Diagrams: This program will This program will be electronic and will require less time to be electronic and will require less time to update.update.
Linear Referencing System: Linear Referencing System: This is the This is the procedures for determining and retaining a procedures for determining and retaining a record of specific points or segments along a record of specific points or segments along a highway. The system includes the location highway. The system includes the location reference methods together with the reference methods together with the procedures for storing, maintaining, and procedures for storing, maintaining, and retrieving location information about points retrieving location information about points and segments on the roads.and segments on the roads.
WVDOT GIS Status UpdateWVDOT GIS Status Update
Working to Complete the Location Working to Complete the Location Referencing Model. Referencing Model.
Completed Year One of GIS Training Completed Year One of GIS Training Program.Program.
Completed Website for GIS Section.Completed Website for GIS Section. Completed Fueling Location Book.Completed Fueling Location Book. Created Geo-spatial Data Policy.Created Geo-spatial Data Policy.
WVDOT GIS Status UpdateWVDOT GIS Status Update
December 2006December 20064155 Miles4155 Miles
10%
90%
Completed Roads
All Roads
27%
73% Completed Roads
All Roads
September 2007September 200713,509 Miles13,509 Miles
Cont: WVDOT GIS Status Cont: WVDOT GIS Status UpdateUpdate
Created Web-based ApplicationsCreated Web-based Applications STIPSTIP Proto-type Crash Analysis Proto-type Crash Analysis Port LocationsPort Locations
Other Information Systems evaluated and considered Other Information Systems evaluated and considered for GIS integration;for GIS integration;
Road Inventory Log (RIL)Road Inventory Log (RIL) Project Tracking System (PTS)Project Tracking System (PTS) Average Daily Traffic (ADT)Average Daily Traffic (ADT) Pavement ManagementPavement Management Document ManagementDocument Management Coal Resource Tracking Systems (CRTS)Coal Resource Tracking Systems (CRTS)
Cont: WVDOT GIS Status Cont: WVDOT GIS Status UpdateUpdate
GIS Maps Developed:GIS Maps Developed: Project Tracking SystemProject Tracking System Port LocationsPort Locations Fuel LocationsFuel Locations HPMS Sample LocationsHPMS Sample Locations Homeland SecurityHomeland Security
Cont: WVDOT GIS Status Cont: WVDOT GIS Status UpdateUpdate
Created Road Naming CommitteeCreated Road Naming Committee for standards on development of road for standards on development of road
naming and classification. naming and classification. Created a subcommittee to establish Created a subcommittee to establish
a plan for a relational database for a plan for a relational database for RIL.RIL. Consisting of database administrators Consisting of database administrators
and engineers to make and engineers to make recommendations for standards.recommendations for standards.
Thursday, January 18, 2007
WVDOT GIS LRS Model
LRS Components
Coordinate System
Crash
Mile PostLiteral
DescriptionAddress Range
Centerline Representation 1
Centerline Representation 2
PTS RIL ITS WVDOT Assets
The four options for spatially enabling
data for the WVDOT.
We are presently negotiating a
contract with RTI for this component.
The LRS Component is the base for
geospatially enabling and integrating data.
Centerline representation is the
road geometry.
Thursday, January 18, 2007
RIL Data Process
Physical Road Characteristic
Field Inventory Log (Paper)Planning and Research StaffConsultant Vans Commission Orders
Data Source for RIL
Manually enteredRoad Inventory Log
Straight Line Diagram
Mapping Alignment UpdatesCultural Feature Updates
CADD Mapping
Mainframe
VSAM File
Maps are then printed or
converted to PDF.
Straight Line Diagrams are still updated on paper.
The Mainframe application is outdated and inflexible. It cannot communicate with other systems easily, or store historical road data and will not meet the demands of modern spatial integration for Road Inventory.
Thursday, January 18, 2007
RIL Proposed Process Improvements
Physical Road Characteristic
Field Inventory Log (Paper)
Planning and Research Staff
Commission Orders
Data Source for RIL
Manually enteredRoad Inventory Log
Straight Line Diagram
Mapping Alignment UpdatesCultural Feature Updates
CADD Mapping
Mainframe
VSAM File
Maps are then printed or
converted to PDF.
Straight Line Diagrams are still updated on paper.
The new system will be a GIS based system to update, edit, share and manage the RIL information.
Legend
· Areas Identified for improvements
Establish Electronic field inventory Log
Integrate Document
Management and Road
Inventory Log.
This step will be unnecessary and will be changed into a Quality
Control Process
This step will be automated.
This step will be automated.
Change to SQL Server
New application will be spatially
enabled and user-friendly.
This step is no longer nessecary
Thursday, January 18, 2007
Proposed Field Inventory Log Process
Physical Road Characteristic
GPS enabled Field CrewCommission Orders Engineering DesignDOQQConsultant Van
Data Source for Alignment And Mileage
ESRIDigitization Alignment
Calibrate Mileage
Responsible for QA/QC of Fields and Data, Roadway Alignment, and Accurate LRS.
LRS Manager Geodatabase on SQL Server
Straight Line Diagram ViewerApplication
GIS Based Road Inventory Log Application
Spatially Enabled Project Tracking System
Thursday, January 18, 2007
Proposed Assets Log Process
Road Assets
GPS enabled District Crew
Consultant Vans
Data Source for Assets and Cultural Features
Intranet Based File Transfer Protocol to
Headquarters
Responsible for QA/QC of Fields and Data, Roadway Alignment, and Accurate LRS.
LRS Manager
Geodatabase on SQL Server
Straight Line Diagram ViewerApplication
GIS Based Road Inventory Log Application
Spatially Enabled Project Tracking System
Cultural Features
Temp Storage
User Needs AnalysisData RequirementsSystem Architecure DesignSystem Development· User Applications· Database Design· Data MigrationPrototype Functional
TestingInitial System DeploymentSystem Performance
TestingProduction Deployment
Friday, January 19, 2007
Data to be Collected for Guardrails
GuardrailColumn Name Datatype Comment
GUARDRAIL_ID NUMBER(6) Unique identifier of the guardrails
GUARDRAIL_TYPE VARCHAR2(10) Type of guardrail
DATE_INSTALLED DATE Date guardrail was installed
DATE_REPAIRED DATE Date guardrail was repaired
DATE_INSPECTED DATE Date of the most recent inspections
CONDITION VARCHAR2(10) Condition of the guardrail
DESCRIPTION VARCHAR2(10) General comments about this guardrail
COUNTY_CODE NUMBER(6) County Code
ROUTE_CLASS NUMBER(6) Highway system
ROUTE_ID VARCHAR2(10) Route ID
BEG_MILE NUMBER(6) The mile post at beginning of the guardrail
END_MILE NUMBER(6) The mile post at end of the guardrail
LATITUDE NUMBER(6) Coordinates
LONGITUDE NUMBER(6) Coordinates
CREATION_DATE DATE Date the record is created in Geodatebase
UPDATE_DATE DATE The date the latest changes made to the record
UPDATED_BY VARCHAR2(10) Person who made the latest change to the record
Draft database design demonstrating the minimum information that must be collected for guardrails as part of a GIS related data collection effort.
WVDOT GIS Logical WVDOT GIS Logical GroupingsGroupings
Reference LayerStreet Names
Address Ranges
Linear Referencing Routing/ITS
Assets Activities CrashMobil
Objects/ITS
Linear Referencing MethodsLinear Referencing Methods
Sign
Roughness
Pothole
Barrier /GuardrailAccident
Complaint
Traffic
Offset from asset
State - Route – Mile log
County-Route–Segment-Offset
Street Address
Street Intersection
Traffic Section
Machine Link to GPS
Sta
te L
ine
Cou
nty
Line
Survey Stationing
Station 2+34.5
Bridge
Interchange with rampsInterchange with rampsRamp Identification 4010640017
Route Identification 4010640000
Interchange with rampsInterchange with rampsRamp Identification with Direction 4010640017WB
Route Identification 4010640000WB
Interchange with rampsInterchange with rampsRamp Identification with Direction and Number 4010640017WB46
Ramp Identification with Direction and Number 4010640017WB45
SupplementaSupplemental Codel Code
00 Not ApplicableNot Applicable
11 AlternateAlternate
22 WyeWye
33 SpurSpur
44 NorthNorth
55 SouthSouth
66 EastEast
77 WestWest
88 businessbusiness
99 North Bound (Business)North Bound (Business)
1010 South Bound (Business)South Bound (Business)
1111 East Bound (Business)East Bound (Business)
1212 West Bound (Business)West Bound (Business)
1313 Truck RouteTruck Route
1414 BypassBypass
1515 LoopLoop
1616 TollToll
1717 RampRamp
1818 OtherOther
1919 City Streets Non-StateCity Streets Non-State
2020Roads Under Roads Under constructionconstruction
2121 FootbridgesFootbridges
2222 Historical BridgesHistorical Bridges
Supplemental CodeSupplemental Code
00 Not ApplicableNot Applicable
11 AlternateAlternate
22 WyeWye
33 SpurSpur
88 BusinessBusiness
1313 Truck RouteTruck Route
1414 BypassBypass
1515 LoopLoop
1616 TollToll
1717 RampRamp
1818 OtherOther
1919 City Streets Non-StateCity Streets Non-State
2020 Roads Under constructionRoads Under construction
2121 FootbridgesFootbridges
2222 Historical BridgesHistorical Bridges
DirectionDirection
00 Not ApplicableNot Applicable
NBNB North BoundNorth Bound
SBSB South BoundSouth Bound
EBEB East BoundEast Bound
WBWB West BoundWest Bound
ConclusionConclusion All roads owned by the WVDOT should have a All roads owned by the WVDOT should have a
unique ID, that all departments and sections unique ID, that all departments and sections should utilize. should utilize.
This unique ID should be a This unique ID should be a keykey added to each added to each database with the same formatting. database with the same formatting.
A relational database needs to be established for A relational database needs to be established for the Road Inventory Log.the Road Inventory Log.
Identify additional fields that need to added and Identify additional fields that need to added and collect on Road Inventory Log. collect on Road Inventory Log.
District offices need GIS personnel to start District offices need GIS personnel to start collecting asset inventory such as culvert, drains, collecting asset inventory such as culvert, drains, etc.etc.