8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 1/45

 

Management,

,

Confidential / © Siemens AG 2010. All rights reserved

Page 2: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 2/45

Siemens Water Technologies

,

Our Vision:We take care of the world's water.

 We enable our customers to improve the qualityand reduce the cost of their water and wastewater.

Our Values:We operate safely and in environmental compliance.

Page 2 Confidential / © Siemens AG 2010. All rights reserved

We take great care of our customers.We achieve profitable, market-leading growth.

We treat our employees and business partners with respect.Water Technologies

Page 3: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 3/45

Siemens is providing innovative solutions to some

TheChallenges

Availability: Water is scarce in most regions with

highest population growth Affordability: Reduce the cost for water and

wastewater treatment

Safety: Meet WHO standards and minimize water

for Water contaminations

Efficiency: Re-use water and improve energyefficiency of water treatment

Ongoing improvements of existing technologies(e.g., membranes, clarification)

Develo ment and commercialization of breakthrou h

The Answers technologies (electrochemical desalination, advancedbiological treatment, hollow fibres, trace contaminantremoval)

Combining multiple treatment technologies to address

Page 3 Confidential / © Siemens AG 2010. All rights reserved

 

Page 4: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 4/45

Our portfolio of products, systems and services

The Water Cycle The Water Offering

IndustrialMunicipal

    m    e    n     t    a     l

Siemens internationalsector approach:

Oil & Gas

Chem & Pharm

Food & Beverage

"Waterquality"

Highurit

TurnkeySolutions

EngineeredProducts & Systems

Turnkey EPC

   P

  u  r   i   t  y   t  r  e  a   t  m  e  n   t

     E    n    v     i    r    o Metals & Mining

Pulp & Paper

Semiconductors

Power

Systems

UF, MFMembranes Chemic.FeedEquipment

OdorContr.Vapour

UVOz. AnaerDigest. ClarificationMBR,Screens,Cannibal

E&ASyst.

Wastewatertreatment

Processwater forproductionprocess

Fresh watertreatmentPotable

Com o-

Products

Pumps MembraneElements

SpecialtyChemicals

Pipes & Valves Analytics &Instrument.

(by A&D)

Distill.

Stills

Automation,Drives&Switchgear

(by A&D + PTD)

for reuse

Waste treatment

Waste

nents

Page 4 Confidential / © Siemens AG 2010. All rights reserved

WT's white spots to befilled via M&A and / or R&D

Current WT portfolio

Page 5: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 5/45

Our broad range of technologies & services givescustomers choices, addresses every water treatment

Biological Treatment/ClarificationPurified Water

challenge

High Purity Water Services & Products

Chemical Feed & UV DisinfectionWater Services & Products

Aftermarket/Product

Page 5 Confidential / © Siemens AG 2010. All rights reserved

Page 6: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 6/45

as ewa er rea menTechnolo ies

Confidential / © Siemens AG 2010. All rights reserved

Page 7: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 7/45

Municipal Wastewater: The most comprehensive

Biological FiltrationSedimentationClarification

DisinfectionWaterPath

Clarification

Residuals Management

Instrumentation

Others

 

Solids Reduction DewateringPath Drying & Control

Page 7 Confidential / © Siemens AG 2010. All rights reserved

Page 8: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 8/45

Biological Unit Processes

Conventional Plu Flow Activated slud e Process

Completely Mixed Activated sludge ProcessExtended Aeration completely Mixed Activated sludge

ProcessTrickling Filter

Sequencing Batch Reactor

Rotating biological contactorUp flow anaerobic Sludge Blanket system

Oxidation ditch And others ……

Page 8 Confidential / © Siemens AG 2010. All rights reserved

Page 9: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 9/45

Siemens Flowsheet Solutions: for new plants and toupgrade existing ones

up to 50% less footprint, higher flow and less construction costsup to 80% biosolids residues reduction or convert to energy30-40% less energy

reuse quality of treated water,

odor control

Page 9 Confidential / © Siemens AG 2010. All rights reserved

Page 10: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 10/45

Modified Oxidation Ditch (MOD) with Aerated

Anoxic Technolo

Orbal ® Process

Multichannel oxidation ditch o erated in series 

VLR ® Process

Rectangular basins operated in series; like an oxidation ditch flipped on its side

VertiCel ® Process

VLR followed by Fine Bubble Aeration; optimize the Process Aeration Efficiency

Page 10 Confidential / © Siemens AG 2010. All rights reserved

Page 11: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 11/45

Orbal Process

Application: Biological Process

Headworks BiologicalClarification

FiltrationClarification

 

Up to 20% lower power usage (Aerated AnoxicProcess)

Enhanced nutrient removal capabilities

Modular – expandable

600+ units in operation

Page 11 Confidential / © Siemens AG 2010. All rights reserved

Page 12: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 12/45

 

Application: Biological ProcessHeadworks Biological

SecondaryClarification

FiltrationPrimary

Clarification

Value proposition

Reduced foot print (by 40 % compared with ditches)

Can retrofit existing rectangular aeration tanks

 – 

60+ units in operation

VLR is usually used for larger plants than Orbal

Some points that could lean the selection towards VLR:•VLR can go much deeper (25’ deep for Bangkok)•Each VLR tank has independent disc aerators•Disc aerators are small (20 hp or less)

 •Coarse bubble air has lots of flexibility•VLR tanks are deep – but inexpensive to build

Page 12 Confidential / © Siemens AG 2010. All rights reserved

VLR (Aerated Anoxic) Fine Bubble

Clarifier

Page 13: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 13/45

 ®  SecondarPrimar

The VertiCel System - biological reactors with stratified dissolved oxygen (DO).

1st reactor - SWT’s unique Vertical Loop Reactor (VLR ®  ).® 

ea wor s BiologicalClarification

Fil ra ionClarification

  - .SmartBNR ® Control System 

Measures DO and oxidation-reduction potential (ORP) throughout the System.

Controls oxygen delivery in response to DO and ORP.

Key Advantages 

Lowest possible energy costs.Aerated/Anoxic design increases oxygen transfer efficiency.Construction is economical.

Excellent nutrient removal capability.

The Smart BNR Control System monitors and manages.

n m zes aera on cos s un er vary ng o og ca oa s.Insures effluent requirements are consistently met.Switches to Storm flow mode when excessive flows occur.

Page 13 Confidential / © Siemens AG 2010. All rights reserved

 for the VertiCel System

JS1

Page 14: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 14/45

Slide 13

JS1 oo many words. This slide has less, but probably can be condensed further.John.Sheridan, 1/16/2008

Page 15: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 15/45

OMNIFLO ® 

SBR Started as a jet aeration/jet mixing company (June 81’)

Acquired by USFilter in January 96’, Vivendi in May 99’, and Siemens in July 04’

We have been designing and supplying SBR’s for over 25 yrs.

Over 600 SBR installations (70% Municipal, 30% Industrial)

Flow rates from as low as 2,000 GPD and up to 60 MGD

Dedicated and focused on the SBR process

Typical design based on no electro-mechanical equipment in the basin

Page 14 Confidential / © Siemens AG 2010. All rights reserved

Page 16: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 16/45

MBBR Process

Application: Biological Process

Headworks BiologicalSecondary

ClarificationFiltration

PrimaryClarification

a ue ropos t on

Easy upgrade of existing plants for capacity increase,nutrient removal

High rate - minimizes footprint for new plants. Bio Reactorropr e ary me a w g

surface area

Advantages

1. No sludge circulation2. Simple operation3. Suitable for high-load industrial applications4. Relativel low slud e ield 

5. Upstream stage: high rate6. Downstream stage: high quality7. DO related rate8. Can be applied for both BOD removal and

Clean Media Media with Biomass

Page 15 Confidential / © Siemens AG 2010. All rights reserved

r ca on

Page 17: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 17/45

MBR: Cutting-Edge Technology to Wastewater Treatment

Headworks BiologicalClarification

FiltrationClarification

ActivatedSludge Clarifier

Sand

Filter

Sludge

Conventional Treatment Process

Membranes

Sludge

SludgeHoldin

Page 16 Confidential / © Siemens AG 2010. All rights reservedIntegrated Membrane Bioreactor

Page 18: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 18/45

Proven MBR Developments: Continuous Improvement

Fiber DevelopmentInnovative Low OverallOptimized

+ + = 

20%Flux increase

• More durable

50%Power reduction

• No movin arts

30%Fluid exchange

increase

• Im roved fluid

• Stronger• Higher

permeability

 

• Random air pulse• Lower air demand• Higher scouring

efficiency

 

dynamics/design• Stable performance• No laterals for air• Ideas for Next Gen

Page 17 Confidential / © Siemens AG 2010. All rights reserved

ec no ogy

Page 19: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 19/45

Rectangular Sludge Collectors

Application: Clarification

Municipal

Headworks BiologicalSecondary

ClarificationFiltration

PrimaryClarification

Water treatment

Wastewater treatment

Value Proposition

e uce oo pr n . o a ea er

Three types of chain

Largest installed base

Page 18 Confidential / © Siemens AG 2010. All rights reserved

Page 20: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 20/45

High Performance Secondary Clarifiers

Application

Municipal wastewater treatment

Headworks BiologicalSecondary

ClarificationFiltration

PrimaryClarification

F & B, P & P, HPI

Value Proposition

40% of footprint reduction

etter qua ty e uent w t suct on ea er

TransFlo clarifiers for rectangular configuration

Page 19 Confidential / © Siemens AG 2010. All rights reserved

Page 21: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 21/45

Diffused Aeration – Dual Air

Application:Biological Process

Headworks BiologicalClarification

FiltrationClarification

Value proposition Less piping/lower installed cost

 ®  – efficiency

Page 20 Confidential / © Siemens AG 2010. All rights reserved

Page 22: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 22/45

SecondaryPrimary

Application

Aeration for biological treatment and SBR

ClarificationClarification

Value Proposition

No moving parts. No maintenance required

High oxygen transfer efficiency

Independent control of mixing and O2 transfer

Corrosion and abrasion resistant

Suitable to any basin geometry

Ideal for covered tanks

Lower installation cost

Page 21 Confidential / © Siemens AG 2010. All rights reserved

Page 23: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 23/45

Headworks BiologicalSecondary

FiltrationPrimary

Application

Biological Treatment

Nutrient Removal

Value Proposition:

 

Unattended operation

29 units in operation/sold

Standard

Page 22 Confidential / © Siemens AG 2010. All rights reserved

Page 24: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 24/45

 

 –  installations

Gas storage and recovery over the tank or on theground; 3 times the capacity of conventional steelfloating cover

Lower installed cost per m3 of gas storage

Greater operational flexibility

Variable operating pressure

True odor containment

Sludge storage flexibilityCost of Gas Storage

$50

$60

   )

Spiral Guided Gas

Holder

$10

$20

$30

$40

   C   o   s   t   (   $   /   c   u

 .   f   t .

Free Membrane Dystor

Page 23 Confidential / © Siemens AG 2010. All rights reserved

$0

20 30 40 50 60 70 80 90 100 110 120

Diameter (ft)

Page 25: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 25/45

SecondaryPrimary

Application: Biological Process

ClarificationClarification

 

Sludge reduction – up to 80 %Breakthrough technology

Selective introduction in internationalmarkets at this stageMUST HAVE: 

Activated sludge, suspended growth systems – no fixed film

Plants with loadings less than 25 to 30 lbs BOD / 1000 ft3

No water plant sludges discharged into sewer system

Non-aerobic zones at head of plant

Multiple aeration tanks in series with good aeration control

NICE TO HAVE: 

 

No primary clarifiers or anaerobic digestion

Influent flow 1 MGD to 20 MGD

MOST ECONOMICAL

Available tankage for Interchange Bioreactor

Page 24 Confidential / © Siemens AG 2010. All rights reserved

No phosphorus limits

High solids handling costs (energy, chemicals, hauling and disposal)

Solids handling upgrades - reduce size/number of units

Page 26: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 26/45

The Forty-X™ Disc FilterHeadworks

Biolo ical

Secondary

Filtration

Primary

Applications: Filtration

ar ca onar ca on

 

Reuse / Recycle

Industrial Reuse - Product Recovery

Retrofit of Conventional Filters

rave ng r ge; eep e s

Value Proposition

Pleated design with small foot print

(+40 % area than flat panel)

Page 25 Confidential / © Siemens AG 2010. All rights reserved

Page 27: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 27/45

All types of odor control systems under one very

Odour Control Technologies

c va e ar on

Range of Activated Carbons

Biolo ical Odour Control S stems

Bio-filters

Bio-trickling Filters

em ca our on ro ys ems

Multi-stage

Packed Towers

Page 26 Confidential / © Siemens AG 2010. All rights reserved

Page 28: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 28/45

IPS Composting System

 

in operation throughout Europe,New Zealand, Canada and the United States.

-

agitated bin composting

Project sizes range from

.

Page 27 Confidential / © Siemens AG 2010. All rights reserved

Page 29: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 29/45

“ ” 

Page 28 Confidential / © Siemens AG 2010. All rights reserved

Page 30: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 30/45

SLUDGE DEWATERING

-SIEMENS BELT PRESS

-SIEMENS CENTRIFUGE

-SIEMENS FILTER PRESS

-SIEMENS POLYMER DOSING SYSTEM

Page 29 Confidential / © Siemens AG 2010. All rights reserved

Page 31: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 31/45

Flowsheet Solution: Upgrade Solution to Minimize

,

Project Facts

Project: WWTP upgrade

Capacity: 8 MGD/30 MLD

Siemens Contract: USD $1M

Operative: 2005

Repeat USD $1M order in May 2009

Power reduction by + 50% (+$80K/yr)

Biosolids reduction by 40%

Siemens Value Provided

Effluent quality of <5ppm BOD, TSS, and TN

Utilized existingtankage

Vertical Loop Reactors

Siemens Solution

Page 30 Confidential / © Siemens AG 2010. All rights reserved

 Performance clarifiers

Cannibal SolidsReduction Process

Page 32: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 32/45

Upgrade to Minimize Waste, Energy and Improve

, ,

Expand from 32 to 64 MGD

Meet new discharge standards (NH3-N, TP)

Customer Perspective

• Installed new High Performance Clarifiers in the existingtanks and Verticel Aeration and Cannibal rocess.

Siemens Solution

m te space – max m ze use o ex st ngstructures

Lower operational costs: Energy, Sludge,Polymer

VertiCelVertiCelSystemSystem

HPHPClarifiersClarifiers

• Operative: 2006• 42% less power than conventional Fine Bubble Alternative.• Greater than 50% reduction in solids wasted from the

Project Facts/Results

Page 31 Confidential / © Siemens AG 2010. All rights reserved

.• $500,000 in annual savings

Page 33: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 33/45

Upgrade Solution to Minimize Waste, Energy and

,

Siemens Value Provided

HPHP

13055

Before After

Capacity:(in MiLD)

CannibalCannibalClarifiersClarifiers

75

152

Conventional SWT Solution

SludgeReductionfor 130 MLD:

(in Tons)

VertiCelVertiCelSystemSystem

2,441

3,510

InstalledPower:(in KW)

.

Project: Municipal WWTP with 50% textilecontribution

Capacity: 130 MLD Operative: July 2009

Project Facts

7 100

21,056AdditionalLand Require-

Conventional SWT Solution

~$0.7 M/yr savings

Page 32 Confidential / © Siemens AG 2010. All rights reserved

Conventional SWT Solution

ment:(in m2)

Page 34: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 34/45

Solution to Minimize Waste and Energy Usage:

,

New Casino required an easy to operate WWTP

Customer Perspective

No Biosolids hauled from the plant since start-up

Siemens Value Provided

Reduced Energy due to high power costs in CA

Sludge had to be hauled to Arizona

n ecem er

Significant Power savings of $44,000/year

equivalent to a 52% reduction Achieving effluent quality well below required

parameters

Siemens Solution

 

Cannibal Solids Reduction Process

Project: Wastewater treatment system

Project Facts

Page 33 Confidential / © Siemens AG 2010. All rights reserved

ustomer/ n user: orongo n an r e

Capacity: 0.75 MGD/ 3 MLD

Operative: December 2004

Page 35: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 35/45

SWT Solution to Minimize Waste & Reuse

,

Project: New WWTP

Capacity: 1.6 MGD/6 MLD

Operative: May 2009

Project Facts

Effluent < 5 BOD, 5 TSS and 0.2 NTU Turb

City revenue through industrial reuse

Siemens Value Provided

Sludge disposal savings of $174 K/yr

MBR integrated withCannibal Solids

Siemens Solution

Page 34 Confidential / © Siemens AG 2010. All rights reserved

e uc on rocess

Page 36: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 36/45

Solution to Achieve Stringent Discharge Effluent

,

Meet new discharge standards (Std 1 A)

Limited space – use existing structure

Customer Perspective

• Utilization of existing tanks, eliminating the needto add an new tanks

Siemens Value Provided

Lowest capital and operational costs

Plant to meet normal discharge standards while

retrofitting Confidence of an experienced process supplier

• Lowest capital cost alternative – (nearly 50 %savings)

Siemens Solution Project Facts

Siemens VertiCel system • Project: Upgrading 450 MLD WWTP to meet new Class 1

A discharge standards• Customer/End User: Tianjin Capital Environmental

Protection Co., Ltd.• Capacity: 24 MGD/90 MLD Verticel Pilot• O erative: Januar 2009

VertiCel SystemVertiCel System

Page 35 Confidential / © Siemens AG 2010. All rights reserved

 95 MGD/360 MLD upgrade

Page 37: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 37/45

SWT UPGRADE, SERVICE & PARTS to Extend Life and

• VertiCel solution.• Hi h Performance Clarifiers.

• Provided new Feedwel Baffle System, eliminatedinfluent short circuiting

Siemens Value Provided

• Ten clarifiers comprise 50% of surfacearea onl ca able of 35% of eak flows

Customer Perspective

• Forty-X filters.• Floating Surface Aerators for Aerobic Digestion.

• Odor Control system

• Improved sludge concentrations ( RAS 1000 to 2000mg/l higher than other units), reducing RAS,

increasing forward flow capacity• Specialized design kept upgrade costs to a minimum

 

Modeled flow patterns within the well

FEDWA bolted design allowed assembly without

Siemens Solution

• Project: Jones Island WWTP, Milwaukee, WI•

Project Facts

Page 36 Confidential / © Siemens AG 2010. All rights reserved

crane an ower cos  • Operative: 2007• Siemens Contract: USD $0.75M

Page 38: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 38/45

Singapore Sembcorp NEWater Project at

Largest Singapore NEWater project (Commissioned) Peak flow up to 316 ML/d UF filtrate

 + un s = mem ranes-

255360 m2 about 30 soccer fields of surface area for filtration

Page 37 Confidential / © Siemens AG 2010. All rights reserved

Page 39: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 39/45

 

SIEMENS offered the lowest Total Cost of Ownership 

Innovative solutions 

Substantial Energy Savings 

Local components were used where appropriate 

Alignment between local needs with regional priorities and within global 

framework / guidance of customer organization 

Long-term partnership 

Extended services to ensure continuous improvements 

Page 38 Confidential / © Siemens AG 2010. All rights reserved

Page 40: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 40/45

 

-Global WT R&D Center in Singapore

- Working on Technology Platform like

-  

- Electro Chemical Process 

-  

- Enhanced Oxidation 

-  

Page 39 Confidential / © Siemens AG 2010. All rights reserved

Page 41: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 41/45

Pilot Plants for Desalination

,

E-Desalination

eve op an emons ra e new esa na on ec no ogy ase on w < ,

kWh/m3 energy demand Develop new IX membranes and module types for cost competitive offering by 2012 Pilot operation of new desal process

Seawater Ultrafiltration

Page 40 Confidential / © Siemens AG 2010. All rights reserved

Evaluate and optimize the process or SWRO pretreatment Develop seawater compatible components. Low pressure membrane products for SWRO pretreatment in terms of performance, capital and operation costs, seawater

compatibility.

Page 42: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 42/45

 

Biotechnology “Green Technology” MBR Validation Plant

Demonstrate feasibility to retrofit large scaletreatment plants to approach virtually zeroenergy consumption, reduce CO2 footprint andreduce sludge generation

1000 m3/day MembraneBioReactor System at Changito develop and validate new innovative membraneproducts and process concepts under full-scaleconditions.

Page 41 Confidential / © Siemens AG 2010. All rights reserved

 sludge digestion; improved denitrification

50 m3/day demonstration as basis for futurecommercialization

 accommodate sales & marketing efforts in ASEAN.

Collaborative project with PUB. Operations begin inDecember, 2009

Page 43: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 43/45

Ideal PracticeCurrent Practice

 

End user / Consultant to go in for

Performance bidding with only inlet andoutlet parameters and area specified.

Prequalification in specific

technology and country asked for Tender comes out with specified

  o se ec etechnology based on life cycle costs – evaluation on Power, Chemical, foot print,

Sludge hauling etc.

ec no ogy men one y econsultant

We align with EPC and Bid

End user to call the bids for Civil and

Electro Mechanical separately

Technology supplier takes the processguarantee for the process unit.

 change

Alternatives are not alwaysaccepted.

Evaluation done on capital cost andO&M cost for one or two years.

EPCs left with minimal options towork out on technolo and alwa s

Page 42 Confidential / © Siemens AG 2010. All rights reserved

cost driven.

Page 44: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 44/45

 

Page 43 Confidential / © Siemens AG 2010. All rights reserved

Thank yo 

Page 45: WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

8/3/2019 WWMT-D2S3.1 Siemens Water Technologies by Sriram Kannan

http://slidepdf.com/reader/full/wwmt-d2s31-siemens-water-technologies-by-sriram-kannan 45/45

Questions - Discussion?

Page 44 Confidential / © Siemens AG 2010. All rights reserved