Page 1: WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

WWS

Report of the

World Wide Study

J. Brau

June 4, 2008

Dubna ILCSC Meeting

Page 2: WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

WWS Report, ILCSC, Dubna, 6/4/08 2 WW

S

Report of the World Wide Study

• LoI Team Workshops• Cooperation with CLIC efforts• ECFA08 Workshop next week• LCWS08 in Chicago - November• Reacting to Funding Crises in UK & US• P5 Report• Role of WWS in RD era

Page 3: WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

WWS Report, ILCSC, Dubna, 6/4/08 3 WW

S

14-16 January 2008

ILD Workshop

DESY, Zeuthen

Page 4: WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

WWS Report, ILCSC, Dubna, 6/4/08 4 WW

S

• Kickoff of merger LDC+GLD

120 participants

14-16 January 2008

ILD Workshop

DESY, Zeuthen

http://ilcagenda.linearcollider.org/conferenceDisplay.py?confId=2389

Page 5: WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

WWS Report, ILCSC, Dubna, 6/4/08 5 WW

S

• Successful advances in preparing for LoI and technical design effort

~ 65 participants

14-16 April 2008

SiD Workshop

RAL, Abingdon

Page 6: WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

WWS Report, ILCSC, Dubna, 6/4/08 6 WW

S

WWS and CLIC• Discussion on cooperation between ILC and

CLIC detector groups– February meeting at CERN– Participation and talk at SiD Workshop - April– Participation and talk at ECFA08 next week

• 3 LoI groups have chosen contacts to CLIC• WWS tools valuable to CLIC studies• CERN engineering to support LoIs• Studies on higher energy helpful to ILC

groups

Page 7: WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

WWS Report, ILCSC, Dubna, 6/4/08 7 WW

S

ECFA Workshop, Warsaw• > 170 registrants• Opening session includes

– Barry on “Path Forward” and “Critical Points of Contact Between GDE and P&D”

– Rolf on a “European Vision”– Sakue on the “New Organization”

• First meeting of IDAG– Plenary presentations by LoI groups– Closed discussions with each group

• Detector Performance– Including CLIC

• LHC-ILC Strategy to be discussed in plenary

Page 8: WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

WWS Report, ILCSC, Dubna, 6/4/08 8 WW

S

LCWS2008

• Conveners being nominated, to be recruited soon

Page 9: WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

WWS Report, ILCSC, Dubna, 6/4/08 9 WW

S

Funding Challenges in US and UK

• UK – recovery for detector effort more difficult than for

machine– go generic - connect to CLIC work

• US– Uncertainty in DOE/NSF response to P5

• HEPAP approved P5 recommendation of more funding for detector R&D• both DOE and NSF are considering the report

– Generic aspects of detector R&D important– Engineering support for LoIs currently restricted – LoI process requires strong lab (Fermilab/SLAC)

participation - uncertain, difficult in current climate

Page 10: WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

WWS Report, ILCSC, Dubna, 6/4/08 10 WW

S

P5 Report• The panel recommends for the near future a broad accelerator

and detector R&D program for lepton colliders that includes continued R&D on ILC at roughly the proposed FY2009 level in support of the international effort. This will ensure a significant role for the US even if the ILC is built overseas. The panel also recommends R&D for alternative accelerator technologies, to permit an informed choice when the lepton collider energy is established.

• The panel also recommends an R&D program for detector technologies to support a major US role in preparing for physics at a lepton collider.

Approved by HEPAP, May 29, 2008

Page 11: WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

WWS Report, ILCSC, Dubna, 6/4/08 11 WW

S

Role of WWS in RD Era

• Many WWS activities are being transferred to RD– eg. Roadmap planning, MDI studies, Detector R&D

coordination, etc.– WWS co-chairs are serving as initial RD regional

contacts

• WWS is the community (like user group)• WWS should

– Cooperate with RD– Organize workshops

• WWS is evolving into new role

Page 12: WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

WWS Report, ILCSC, Dubna, 6/4/08 12 WW

S

Conclusion

• LoI groups are hard at work developing integrated detector designs in support of the GDE machine design effort– Demonstrate realistic detector performance– Address machine detector interface issues

• Uncertainty regarding long term impact of funding cuts in UK and US