www.aoc.gov
Architect of the Capitol (AOC) Presentation to American Council of
Engineering Companies of Metropolitan Washington
February 16, 2012
10
www.aoc.gov
Authority for the AOC
• Permanent authority for maintenance and care of the U.S. Capitol given to the AOC by Congress on August 15, 1876
• Procurement authority is generally found in Titles 2 and 41 of the United States Code
11
www.aoc.gov
Competition Requirements
• Competition required for all procurements > $5,000
• General exceptions– Only one source available– Emergencies
www.aoc.gov11
12
www.aoc.gov
Advertising Requirements
• Requirements > $100,000 are advertised and posted on FedBizOpps (FBO)
• Search under “Agencies” for “Architect of the Capitol”
www.aoc.gov
13
www.aoc.gov
AOC and the Federal Acquisition Regulation (FAR)
• The FAR was developed for use by the Executive Branch
• AOC is not subject to the FAR, but generally aligns with the FAR
www.aoc.gov13
14
www.aoc.gov
Upcoming Major Projects
Dome Rehabilitation Phase II:• Complete restoration of the exterior and
interior of the cast iron shell • Replacement of essential systems • Restoration of the inner dome rotunda area• Solicitation anticipated in summer 2012
15
www.aoc.gov
Upcoming Major Projects
Refrigeration Plant Revitalization, Phases I and II:• Relocation of existing chillers• Installation of new chillers and cooling towers • Modification of chilled water and condenser water piping • Installation of associated pumps, controls and electrical
components • Solicitation anticipated in spring 2012
16
www.aoc.gov
Upcoming Major Projects
• Cannon Renewal– Replace infrastructure– Compliance with building codes and standards– Enhance effectiveness – Preserve historic character– Improve security– Meet sustainability goals
• CMa and CMc solicitations underway
17
www.aoc.gov
Cannon Building – Physical Features
• Completed in 1908
• 678,791 gross square feet (excluding garage)
• 490,300 occupiable square feet (excluding garage)
• 6 levels (including basement)
• 142 Member suites
• 4 Committee Hearing Rooms
• 316 underground parking spaces
• Monumental Rotunda has historically served as the main building entry and defining feature of the interior
18
www.aoc.gov
Cannon Potential Areas for Improvement
Replace Outdated Systems
• Provide energy efficient and code compliant building systems
• Improve size and accessibility of utility rooms
19
www.aoc.gov
Improve Energy Efficiency
• Upgrade exterior building envelope
• Replace building systems
Cannon Potential Areas for Improvement
20
www.aoc.gov
Address Life Safety
• Modernize systems• Fire alarm• Emergency communications • Sprinklers
• Improve Rotunda code compliance
• Address hazardous materials
Cannon Potential Areas for Improvement
21
www.aoc.gov
Improve Accessibility
• Address building access• Upgrade toilet rooms• Expand elevator platforms
• Provide hearing room access
Cannon Potential Areas for Improvement
22
www.aoc.gov
Enhance Member Suites
• Upgrade Multi-function center bay• Provide more efficient staff areas
Cannon Potential Areas for Improvement
23
www.aoc.gov
Improve Elevator Service • Car capacities/
configurations• Fifth Floor service• Single dedicated freight
car
Cannon Potential Areas for Improvement
24
www.aoc.gov
Cannon Potential Building System Upgrades
Upgrade Mechanical Systems• Upgrade utility rooms• Utilize center court distribution tunnel
26
www.aoc.gov
Upgrade Electrical Systems
• Establish dedicated closets on each wing and on each floor
• Upgrade switchgear, network transformers and network protectors
• Add emergency generators
• Provide central lighting controls
Cannon Potential Building System Upgrades
27
www.aoc.gov
Cannon Proposed Structural Systems Modifications
Address Structural Elements
• Add new elevator hoistways
• Provide new vertical shafts for utility distribution
• Raise fifth floor wall and roof structure
• Create basement utility rooms through removal of bearing walls
• Meet seismic requirements
28
www.aoc.gov
Cannon Exterior Preservation
Renew Exterior Envelope
• Reconstruct Independence Avenue
terrace wall
• Repair stone modillions
• Repair center courtyard façades
29
www.aoc.gov
Cannon Exterior Preservation
Renew Exterior Envelope
• Clean, repair and stabilize stone • Provide bird deterrence
30
www.aoc.gov
Cannon Exterior Preservation
Renew Exterior Envelope• Restore original windows and one
original door• Replace remainder of exterior
doors
Preserve Historic Landscape
• Retain specimen trees and planting around site