![Page 1: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/1.jpg)
www.businessengine.com
CPM -200: Principles of Schedule CPM -200: Principles of Schedule ManagementManagement
IPM 2002 Fall ConferenceIPM 2002 Fall Conference
PMI-College of Performance Management – Professional Education ProgramPMI-College of Performance Management – Professional Education Program
Lesson F: Enterprise Wide SchedulingLesson F: Enterprise Wide Scheduling
Previously Presented ByPreviously Presented By
John BronnJohn [email protected]
(970) 390-3693(970) 390-3693
![Page 2: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/2.jpg)
© 2001 Business Engine Software Corp. All Rights Reserved.
Enterprise Wide Enterprise Wide Scheduling & Scheduling &
Resource Planning Resource Planning --
Strategies for Strategies for SuccessSuccess
Enterprise Wide Enterprise Wide Scheduling & Scheduling &
Resource Planning Resource Planning --
Strategies for Strategies for SuccessSuccess
John W. Bronn
![Page 3: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/3.jpg)
www.businessengine.com
Strategies for Success
• Enterprise Wide Scheduling
• Enterprise Wide Resource Planning
• Tools for Better Decisions
• Strategies for Success
![Page 4: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/4.jpg)
www.businessengine.com
Enterprise Wide Scheduling
• The application of a single, consistent methodology for planning and managing the time dimension of all of the projects within the enterprise.
• The methodology should avoid cross-project conflicts by considering all of the plans.
![Page 5: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/5.jpg)
www.businessengine.com
Single, Consistent Methodology
• Business Rules
• Cross-Project Visibility
• Framework for Benchmarking
![Page 6: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/6.jpg)
www.businessengine.com
• Avoid Confusing the Performing Organizations
• Give Appropriate Weight to Projects
• i.e. Schedule Reserve Policies
Business Rules
![Page 7: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/7.jpg)
www.businessengine.com
Save it for the End
Reserve
Schedule Reserve
![Page 8: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/8.jpg)
www.businessengine.com
Use it at the Start
Reserve
Schedule Reserve
![Page 9: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/9.jpg)
www.businessengine.com
Protect the Risk
-erveRes-
Schedule Reserve
![Page 10: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/10.jpg)
www.businessengine.com
• A Consistent Policy
• Allows Projects to Compete Equally for Resources
• Bonus - Guides Project Managers to Best Practices
Schedule Reserve
![Page 11: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/11.jpg)
www.businessengine.com
Cross-Project Visibility
• Common Milestone / Status Display
• Benchmarking
![Page 12: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/12.jpg)
www.businessengine.com
ABCD
All Projects
Cross-Project Visibility
Project D
Project C
Project B
Project A
![Page 13: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/13.jpg)
www.businessengine.com
Benchmarking
• Process Comparison
• Cycle Time Analysis
• Historical Data Base Development
![Page 14: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/14.jpg)
www.businessengine.com
Enterprise Wide Resource Planning
• The use of tools and methods to plan and manage application of resources to projects across an entire enterprise
• Strategic• resource availability • longer term enterprise wide needs
• Day-to-day Tactical • key resources to priority projects
![Page 15: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/15.jpg)
www.businessengine.com
Applying Resources to Projects
• Viewing Needs Across Projects
• Comparing Needs & Availability
• Key Resources to Key Projects
![Page 16: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/16.jpg)
www.businessengine.com
All Projects Supply & DemandProject D
Availability & Need
Project C
Project B
Project A
![Page 17: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/17.jpg)
www.businessengine.com
Key Resources to Key Projects
Project A
Project B
Project C
Project D
![Page 18: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/18.jpg)
www.businessengine.com
Enterprise WideAvailability vs.
Need
Tools For Better Decisions
ProjectSchedule Planning
Project Resource Planning
PortfolioAnalysis
Key Resources To
Key Projects
![Page 19: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/19.jpg)
www.businessengine.com
All Projects Supply & DemandProject D
Enterprise Wide Availability & Need
Project C
Project B
Project A
![Page 20: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/20.jpg)
www.businessengine.com
Enterprise Wide Availability
Enterprise Availability
Roles & Skills Skill Attributes Inventory Timephased Availability HR Interface
![Page 21: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/21.jpg)
www.businessengine.com
All Projects DemandProject D
Enterprise Wide Need
Project C
Project B
Project A
• Process Templates• Product Structures• Historical Databases• Top Down Planning
![Page 22: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/22.jpg)
www.businessengine.com
• The Enterprise Process
• Task Framework
• Duration Baseline
• Critical Resource Baseline
The Process Template
![Page 23: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/23.jpg)
www.businessengine.com
The Process Template
A2 N
1M
2
K4
L4 3
D4
C2
B3
E3
F2
G3
H2
I4
P4
Q2
R2
S5
A 2 N 1M 2
K 4 L 4 O 3
DC 2B 3
E 3
Process Template
F 2 G 3 H 2 I 4
Subsystem Template
![Page 24: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/24.jpg)
www.businessengine.com
• Consistent Processes
• Identification of Risks
• Framework for Process Improvement
• Simplifies the Planning Process
The Process Template
![Page 25: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/25.jpg)
www.businessengine.com
Standard Product Structure
• Supports the Template Concept
• Forms the Heart of the Work Breakdown Structure
• Provides a Basis for a Historical Database
![Page 26: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/26.jpg)
www.businessengine.com
History Database
• Collect & Characterize
– Resources / Costs
– Durations
• Value Reduced by Rapid Technological Change
– Still Very Worthwhile
![Page 27: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/27.jpg)
www.businessengine.com
Requirements
Summary Plan
Summary Resource Plan
Top Down Planning
![Page 28: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/28.jpg)
www.businessengine.com
Enterprise WideAvailability vs.
Need
Tools For Better Decisions
ProjectSchedule Planning
Project Resource Planning
PortfolioAnalysis
• Project Prioritization• Phase / Gate Controls
![Page 29: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/29.jpg)
www.businessengine.com
Potential Projects Selected
Projects
Ordered Projects
3 2 1
Project Prioritization
![Page 30: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/30.jpg)
www.businessengine.com
Phase Gate Phase Gate
Strategic Decision Making
- At Every Control Gate
Phase / Gate Controls
Phase Gate
![Page 31: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/31.jpg)
www.businessengine.com
• Business Viability
• Technical Feasibility
• Relative Importance
• Resource Availability
Portfolio Criteria
![Page 32: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/32.jpg)
www.businessengine.com
Enterprise WideAvailability vs.
Need
Tools For Better Decisions
ProjectSchedule Planning
Project Resource Planning
PortfolioAnalysis
Key Resources To
Key Projects
![Page 33: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/33.jpg)
www.businessengine.com
Key Resource Isolation
• The “Full Scale Map” Syndrome• What’s Key?
– Mission Critical• People• Facilities, Equipment etc.
– Long Lead Time
• Skill Inventory Tools Can Help
![Page 34: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/34.jpg)
www.businessengine.com
Implementation Strategies for Success
• Bottoms Up - Detailed Project Data
• Top Down - Overview Data Only
• Hybrid - Mixed Data
![Page 35: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/35.jpg)
www.businessengine.com
Bottoms Up Implementation
Enterprise Wide Demand
Project A Project B Project C
![Page 36: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/36.jpg)
www.businessengine.com
Bottoms Up Implementation
• Implies Accurate Data
• Requires Full & Consistent Implementation
• Hard to Realize
![Page 37: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/37.jpg)
www.businessengine.com
Top Down Implementation
Enterprise Wide Demand
Top Down Project Planning
![Page 38: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/38.jpg)
www.businessengine.com
Top Down Implementation
• Rapid Implementation
• Relies on Accuracy of Templates & Historical Data
• Easier to Implement, Less Reliable
• Doesn’t Incorporate Detailed Plans, even where they exist
![Page 39: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/39.jpg)
www.businessengine.com
Hybrid Implementation
Enterprise Wide Demand
Project A Project C
Top Down Project Planning
![Page 40: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/40.jpg)
www.businessengine.com
Hybrid Implementation
• Allows a Quick Start
• Best of Both Worlds
• Takes Advantage of Increased Maturity - as it Happens
![Page 41: Www.businessengine.com CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education](https://reader036.vdocuments.net/reader036/viewer/2022062314/56649db05503460f94a9eb7e/html5/thumbnails/41.jpg)
© 2001 Business Engine Software Corp. All Rights Reserved.
Enterprise Wide Solutions
CAN Make a Difference !
Thanks for Your Time
John W. Bronn